Production Leveling & Balancing

Introduction

to

Slide No.Property of ACT ( ACMA Centre for Technology ) 2009 1

Production leveling and

Balancing

Production Leveling & Balancing

Old situation

Improved

Advanced

• Less stocks

• Single Piece

Flow

• Zero Defects

• No Waiting

Slide No.Property of ACT ( ACMA Centre for Technology ) 2009 2

Old situation

• Large

stocks

• Defects

• Waiting

NO FLOW

• Less stocks

• Less Defects

• Less Waiting

INTERRUPTED

FLOW

Smooth and

Sequenced

FLOW

Production Leveling & Balancing

What is Production Leveling

& Balancing ?

Slide No.Property of ACT ( ACMA Centre for Technology ) 2009 3

& Balancing ?

Production Leveling & Balancing

Production leveling and balancing is to

produce any type of product at an even pace

which matches customer demand.

What is Production Leveling & Balancing ?

Slide No.Property of ACT ( ACMA Centre for Technology ) 2009 4

which matches customer demand.

This is also called Spread-over production

Or

HEIJUNKA

Production Leveling & Balancing

20 Days per month with 8 hours working per day

Example

ProductMonthly

productionDaily production

TAKT TIME

( Min )

A 4800 240 2

B 2400 120 4

Slide No.Property of ACT ( ACMA Centre for Technology ) 2009 5

B 2400 120 4

C 1200 60 8

TOTAL 8400 420 1.1

This shows different TAKT time for different products

Production Leveling & Balancing

Example

ProductMonthly

productionDaily production

TAKT TIME

( Min )

A 4800 240 2

B 2400 120 4

C 1200 60 8

TOTAL 8400 420 1.1

Slide No.Property of ACT ( ACMA Centre for Technology ) 2009 6

In case of LOT ( Batch ) Production

In case of Leveled production ( TAKT TIME =1.1 Min )

A A A A A A A A B B B B C C

A A B A A B C B A A C B A A

Production Leveling & Balancing

Example

In case of Leveled production ( TAKT TIME =1.1 Min )

A A B A A B C B A A C B A A

Slide No.Property of ACT ( ACMA Centre for Technology ) 2009 7

But , when customer

demand fluctuates

( Not Even ) ?

Production Leveling & Balancing

When customer demand fluctuates

( Not Even ) ?

Slide No.Property of ACT ( ACMA Centre for Technology ) 2009 8

Customer

Demand

Dam ( Breakwater )

Product Stock

Ripples

( Spread-over production )

Big waves are

smoothened

by DAM

Production Leveling & Balancing

Leveled Production and Balancing

Rewards of leveled production are

great , but smooth implementation is

Slide No.Property of ACT ( ACMA Centre for Technology ) 2009 9

great , but smooth implementation is

difficult , requires constant attention

and fine-tunning .

Production Leveling & Balancing

Leveled Production and Balancing

Leveled production makes the total production

system as efficient and as flexible as possible

with no waste of time and Money , without

overburdening the employees .

Slide No.Property of ACT ( ACMA Centre for Technology ) 2009 10

It also balances production among all processes ,

making it possible to produce the exact volume

and types of products that can be sold Just-IN –

Time.

Production Leveling & Balancing

Production Leveling and Balancing

3 operating principles :

1. Pull System

2. Continuous flow processing

Slide No.Property of ACT ( ACMA Centre for Technology ) 2009 11

2. Continuous flow processing

3.Self stopping equipments when defect

occurs

Production Leveling & Balancing

3 operating principles :

1. Pull System

2. Continuous flow processing

Production Leveling and Balancing

Slide No.Property of ACT ( ACMA Centre for Technology ) 2009 12

2. Continuous flow processing

3.Self stopping equipments when defect

occurs

Production Leveling & Balancing

3 operating principles

1. Pull System

What is Pull System ?

We should make and supply products when next

Slide No.Property of ACT ( ACMA Centre for Technology ) 2009 13

We should make and supply products when next

process demands .

Sounds easy but how to Implement ?

Production Leveling & Balancing

3 operating principles

1. Pull System

Let us understand by Flow of Instruction

Material Flow

Slide No.Property of ACT ( ACMA Centre for Technology ) 2009 14

Press Welding line

Instruction Flow

Instruction Flow can be achieved by KANBAN

Production Leveling & Balancing

3 operating principles

1. Pull System

PICK UP by the following process

Preceding process Following process

Slide No.Property of ACT ( ACMA Centre for Technology ) 2009 15

Press Welding line

Preceding process

KANBAN means signboard used for delivery instructions to preceding

processes

Following process

Flow direction

Production Leveling & Balancing

3 operating principles

1. Pull System

With KANBAN…….

- Excess inventory is eliminated

Slide No.Property of ACT ( ACMA Centre for Technology ) 2009 16

- Production is tied to processes closest to the Consumer

- Production is synchronized

- Communication becomes frequent therefore teamwork is fostered

- Good quality becomes a MUST

Production Leveling & Balancing

3 operating principles

1. Pull System

Supermarket

KANBAN was conceived by taking a hint from American

Slide No.Property of ACT ( ACMA Centre for Technology ) 2009 17

KANBAN was conceived by taking a hint from American

Supermarket .

At supermarket …..

………. Only those stocks are replenished which are sold

IF TEN are sold ………… TEN are replenished

IF ONE is sold …………… ONE is replenished

Production Leveling & Balancing

3 operating principles :

1. Pull System

Production Leveling and Balancing

Slide No.Property of ACT ( ACMA Centre for Technology ) 2009 18

2. Continuous flow processing

3.Self stopping equipments when defect

occurs

Production Leveling & Balancing

3 operating principles :

1. Pull System

Production Leveling and Balancing

Slide No.Property of ACT ( ACMA Centre for Technology ) 2009 19

2. Continuous flow processing

3.Self stopping equipments when defect

occurs

Production Leveling & Balancing

3 operating principles

2. Continuous flow processing

What is Continuous flow processing ?

Continuous flow processing attempts to eliminate

Slide No.Property of ACT ( ACMA Centre for Technology ) 2009 20

Continuous flow processing attempts to eliminate

the stops in production …..

…………… Shortening production lead time by

reducing non-processing time

Production Leveling & Balancing

3 operating principles

2. Continuous flow processing

To achieve continuous processing, it is

necessary to produce

- AN ITEM

Slide No.Property of ACT ( ACMA Centre for Technology ) 2009 21

- AN ITEM

- ONLY ONE ITEM and

- Immediately pass it to next production

process

NO Production of Batches is allowed

Production Leveling & Balancing

3 operating principles

2. Continuous flow processing

Batch process catches defects too late

Slide No.Property of ACT ( ACMA Centre for Technology ) 2009 22

In-process stocks… NOT OK

In-process

stockIn-process

stock

Production Leveling & Balancing

3 operating principles

2. Continuous flow processing

Single piece process catches defects easily

Slide No.Property of ACT ( ACMA Centre for Technology ) 2009 23

NO In-process stock

Production Leveling & Balancing

3 operating principles

2. Continuous flow processing

Batch Vs Single Piece Flow

Production Method

Parameter Batch Single Piece Flow

Quality StatusRisk of heavy

DamageNo or Negligible damage

Slide No.Property of ACT ( ACMA Centre for Technology ) 2009 24

Damage

FIFO Not Possible 100 % possible

Inventories HIGH NIL

Production lead

timeMore Less

Changeover Time PreferredNot preferred unless you

bring it < 1 TAKT

Production Leveling & Balancing

3 operating principles

2. Continuous flow processing

Push Vs Pull System

Production Method

Parameter Push Pull

Quality StatusDefects passed to

next process

Can be caught at the

generation point

Slide No.Property of ACT ( ACMA Centre for Technology ) 2009 25

next process generation point

Work system Based on Planning As per demand of

Downstream Process

Mix production Difficult Easy

Response to

Customer Late Quick

Stock taking Laborious Easy

Production Leveling & Balancing

3 operating principles

2. Continuous flow processing

What to do when Changeover time is

HIGH ?

Slide No.Property of ACT ( ACMA Centre for Technology ) 2009 26

- Need to reduce large lot sizes for such

operations to approach ONE Piece Flow

- Need to use multi-purpose equipment

- Need to improve conveyance

Production Leveling & Balancing

3 operating principles :

1. Pull System

Production Leveling and Balancing

Slide No.Property of ACT ( ACMA Centre for Technology ) 2009 27

2. Continuous flow processing

3.Self stopping equipments when defect

occurs

Production Leveling & Balancing

3 operating principles :

1. Pull System

2. Continuous flow processing

Production Leveling and Balancing

Slide No.Property of ACT ( ACMA Centre for Technology ) 2009 28

2. Continuous flow processing

3.Self stopping equipments when defect

occurs

Production Leveling & Balancing

3 operating principles

3. Self Stopping Equipments when defects occur

What is Self Stopping Equipments ?

Ability of production lines to stop automatically in

Slide No.Property of ACT ( ACMA Centre for Technology ) 2009 29

Ability of production lines to stop automatically in

case of problems

This is called JIDOKA

Production Leveling & Balancing

3 operating principles

3. Self Stopping Equipments when defects occur

Line stops automatically helps in…

Equipment breakdown is prevented

• The “ passing on” of defects is prevented ,

Slide No.Property of ACT ( ACMA Centre for Technology ) 2009 30

Equipment breakdown is prevented

• Management of production is simplified

( Full time inspectors become unnecessary )

• Problems are clearly identifiable so that

Improvements ( Kaizen ) can be accomplished

Production Leveling & Balancing

3 operating principles

3. Self Stopping Equipments when defects occur

Basic attitude is required for understanding

NEXT Process is THE

Slide No.Property of ACT ( ACMA Centre for Technology ) 2009 31

NEXT Process is THE

CUSTOMER

So next process owner should be satisfied as

much as customer who actually buys the product .

Production Leveling & Balancing

3 operating principles

3. Self Stopping Equipments when defects occur

� Every operator is an Inspector..Should be trained to stop the line for getting Help

Andon

Slide No.Property of ACT ( ACMA Centre for Technology ) 2009 32

Andon

STAGE

1 2 3

Line Running OK

Production Leveling & Balancing

3 operating principles

3. Self Stopping Equipments when defects occur

Andon

DEFECT at

STAGE 2

Slide No.Property of ACT ( ACMA Centre for Technology ) 2009 33

Andon

STAGE

1 2 3

Production Leveling & Balancing

3 operating principles

3. Self Stopping Equipments when defects occur

Operator Pulls ANDON

chord

Slide No.Property of ACT ( ACMA Centre for Technology ) 2009 34

Andon

STAGE

1 2 3

Help should be

provided

like an EMERGENCY

Production Leveling & Balancing

3 operating principles

3. Self Stopping Equipments when defects occur

Andon

DEFECT at STAGE 2…………

HELP IS Provided and problem is solved

Slide No.Property of ACT ( ACMA Centre for Technology ) 2009 35

Andon

STAGE

1 2 3

Line Running OK

Production Leveling & Balancing

3 operating principles

3. Self Stopping Equipments when defects occur

� Each stage should have in-built

POKA-YOKE

Slide No.Property of ACT ( ACMA Centre for Technology ) 2009 36

Poka- yoke help employees to prevent themselves from

making mistakes

Production Leveling & Balancing

3 operating principles

3. Self Stopping Equipments when defects occur

� Workplace should be visual

-ANDON Light should be visible

Slide No.Property of ACT ( ACMA Centre for Technology ) 2009 37

-ANDON Light should be visible

- Defect notification devices should be

visible and should be heard easily

Production Leveling & Balancing

Basic Leveling is the core of all Resource Planning

Production Leveling & Balancing

Basic Leveling

TAKT

Slide No.Property of ACT ( ACMA Centre for Technology ) 2009 38

Standardized Work

Production Leveling & Balancing

1. Initial Stability of Quantity

Prerequisites of Production Leveling & Balancing

Prerequisites :

Slide No.Property of ACT ( ACMA Centre for Technology ) 2009 39

Before After

Production Leveling & Balancing

2. Initial Stability of Quality

Prerequisites of Production Leveling & Balancing

Prerequisites :

Slide No.Property of ACT ( ACMA Centre for Technology ) 2009 40

Before After

Production Leveling & Balancing

3. Balance the Lines for TAKT Time

Prerequisites of Production Leveling & Balancing

Prerequisites :

Slide No.Property of ACT ( ACMA Centre for Technology ) 2009 41

Before After

Production Leveling & Balancing

4. Containerization

Prerequisites of Production Leveling & Balancing

Prerequisites :

Should have 3 C Containers

Slide No.Property of ACT ( ACMA Centre for Technology ) 2009 42

Clean , Clear and Count Free

Production Leveling & Balancing

5. Buffer stock

Prerequisites of Production Leveling & Balancing

Prerequisites :

Should have buffer stock at those places where

processing time is large .

Slide No.Property of ACT ( ACMA Centre for Technology ) 2009 43

processing time is large .

Should aim to achieve processing time equal to

one TAKT

Production Leveling & Balancing

Production Leveling & Balancing

We should consider following :

�Product Volume

� Product Mix

� Product Sequence

Slide No.Property of ACT ( ACMA Centre for Technology ) 2009 44

� Product Sequence

Legends : ED = Every Day , AD = Alternate day

E2D= Every 2 Days or E3D= Every 3 Days

Production Leveling & Balancing

We should plan effectively to optimize use all resources

Production Leveling & Balancing

1 2 3 4 5 6 Total PlanTotal Customer

RequirementExcess / Less

1 A 200 200 200 200 200 200 1200 1000 200

2 B 50 0 50 0 50 0 150 100 50

Date Demand Vs ActualS.N. Product

Slide No.Property of ACT ( ACMA Centre for Technology ) 2009 45

3 C 0 0 1000 0 0 0 1000 500 500

4 D 20 20 20 20 20 20 120 120 0

5 E 0 0 0 0 0 1000 1000 2000 -1000

6 F 2800 0 0 0 0 0 2800 3000 -200

3070 220 1270 220 270 1220 6270 6720 -450

90 10 50 30 30 40Week's

Plan

Customer

Requirement

Delivery

Failure

Day's Total

Line Capacity

Utilization %

Production Leveling & Balancing

We should believe in Technology , People and Processes

Production Leveling & Balancing

Technology should ….

Contribute to the value adding process

Reduce waste

Slide No.Property of ACT ( ACMA Centre for Technology ) 2009 46

Reduce waste

Contribute to a flexible system that can economically

adjust to ups and downs in Demand

Support to ease work of people

MAKE TECHNOLOGY FIT IN OUR WORKING

Production Leveling & Balancing

Production Leadership structure

Production Leveling & Balancing

Develop leaders who live your

Slide No.Property of ACT ( ACMA Centre for Technology ) 2009 47

Develop leaders who live your

system

Production Leveling & Balancing

Develop Thorough understanding

Production Leveling & Balancing

Importance…how important is the problem in the overall context of

Customer satisfaction

Slide No.Property of ACT ( ACMA Centre for Technology ) 2009 48

Urgency… what deadlines are dependent on the resolution of the

problem

Tendency.. Is the problem getting worse or staying the same

Production Leveling & Balancing

is not possible UNLESS ……

Production Leveling & Balancing

Slide No.Property of ACT ( ACMA Centre for Technology ) 2009 49

We have a culture that STOPS to Fix

problems

Production Leveling & Balancing

End of training

Slide No.Property of ACT ( ACMA Centre for Technology ) 2009 50

End of training