14 - production leveling & balancing rev 1 --advance cluster
DESCRIPTION
14 - Production Leveling & Balancing Rev 1 --Advance ClusterTRANSCRIPT
Production Leveling & Balancing
Introduction
to
Slide No.Property of ACT ( ACMA Centre for Technology ) 2009 1
Production leveling and
Balancing
Production Leveling & Balancing
Old situation
Improved
Advanced
• Less stocks
• Single Piece
Flow
• Zero Defects
• No Waiting
Slide No.Property of ACT ( ACMA Centre for Technology ) 2009 2
Old situation
• Large
stocks
• Defects
• Waiting
NO FLOW
• Less stocks
• Less Defects
• Less Waiting
INTERRUPTED
FLOW
Smooth and
Sequenced
FLOW
Production Leveling & Balancing
What is Production Leveling
& Balancing ?
Slide No.Property of ACT ( ACMA Centre for Technology ) 2009 3
& Balancing ?
Production Leveling & Balancing
Production leveling and balancing is to
produce any type of product at an even pace
which matches customer demand.
What is Production Leveling & Balancing ?
Slide No.Property of ACT ( ACMA Centre for Technology ) 2009 4
which matches customer demand.
This is also called Spread-over production
Or
HEIJUNKA
Production Leveling & Balancing
20 Days per month with 8 hours working per day
Example
ProductMonthly
productionDaily production
TAKT TIME
( Min )
A 4800 240 2
B 2400 120 4
Slide No.Property of ACT ( ACMA Centre for Technology ) 2009 5
B 2400 120 4
C 1200 60 8
TOTAL 8400 420 1.1
This shows different TAKT time for different products
Production Leveling & Balancing
Example
ProductMonthly
productionDaily production
TAKT TIME
( Min )
A 4800 240 2
B 2400 120 4
C 1200 60 8
TOTAL 8400 420 1.1
Slide No.Property of ACT ( ACMA Centre for Technology ) 2009 6
In case of LOT ( Batch ) Production
In case of Leveled production ( TAKT TIME =1.1 Min )
A A A A A A A A B B B B C C
A A B A A B C B A A C B A A
Production Leveling & Balancing
Example
In case of Leveled production ( TAKT TIME =1.1 Min )
A A B A A B C B A A C B A A
Slide No.Property of ACT ( ACMA Centre for Technology ) 2009 7
But , when customer
demand fluctuates
( Not Even ) ?
Production Leveling & Balancing
When customer demand fluctuates
( Not Even ) ?
Slide No.Property of ACT ( ACMA Centre for Technology ) 2009 8
Customer
Demand
Dam ( Breakwater )
Product Stock
Ripples
( Spread-over production )
Big waves are
smoothened
by DAM
Production Leveling & Balancing
Leveled Production and Balancing
Rewards of leveled production are
great , but smooth implementation is
Slide No.Property of ACT ( ACMA Centre for Technology ) 2009 9
great , but smooth implementation is
difficult , requires constant attention
and fine-tunning .
Production Leveling & Balancing
Leveled Production and Balancing
Leveled production makes the total production
system as efficient and as flexible as possible
with no waste of time and Money , without
overburdening the employees .
Slide No.Property of ACT ( ACMA Centre for Technology ) 2009 10
It also balances production among all processes ,
making it possible to produce the exact volume
and types of products that can be sold Just-IN –
Time.
Production Leveling & Balancing
Production Leveling and Balancing
3 operating principles :
1. Pull System
2. Continuous flow processing
Slide No.Property of ACT ( ACMA Centre for Technology ) 2009 11
2. Continuous flow processing
3.Self stopping equipments when defect
occurs
Production Leveling & Balancing
3 operating principles :
1. Pull System
2. Continuous flow processing
Production Leveling and Balancing
Slide No.Property of ACT ( ACMA Centre for Technology ) 2009 12
2. Continuous flow processing
3.Self stopping equipments when defect
occurs
Production Leveling & Balancing
3 operating principles
1. Pull System
What is Pull System ?
We should make and supply products when next
Slide No.Property of ACT ( ACMA Centre for Technology ) 2009 13
We should make and supply products when next
process demands .
Sounds easy but how to Implement ?
Production Leveling & Balancing
3 operating principles
1. Pull System
Let us understand by Flow of Instruction
Material Flow
Slide No.Property of ACT ( ACMA Centre for Technology ) 2009 14
Press Welding line
Instruction Flow
Instruction Flow can be achieved by KANBAN
Production Leveling & Balancing
3 operating principles
1. Pull System
PICK UP by the following process
Preceding process Following process
Slide No.Property of ACT ( ACMA Centre for Technology ) 2009 15
Press Welding line
Preceding process
KANBAN means signboard used for delivery instructions to preceding
processes
Following process
Flow direction
Production Leveling & Balancing
3 operating principles
1. Pull System
With KANBAN…….
- Excess inventory is eliminated
Slide No.Property of ACT ( ACMA Centre for Technology ) 2009 16
- Production is tied to processes closest to the Consumer
- Production is synchronized
- Communication becomes frequent therefore teamwork is fostered
- Good quality becomes a MUST
Production Leveling & Balancing
3 operating principles
1. Pull System
Supermarket
KANBAN was conceived by taking a hint from American
Slide No.Property of ACT ( ACMA Centre for Technology ) 2009 17
KANBAN was conceived by taking a hint from American
Supermarket .
At supermarket …..
………. Only those stocks are replenished which are sold
IF TEN are sold ………… TEN are replenished
IF ONE is sold …………… ONE is replenished
Production Leveling & Balancing
3 operating principles :
1. Pull System
Production Leveling and Balancing
Slide No.Property of ACT ( ACMA Centre for Technology ) 2009 18
2. Continuous flow processing
3.Self stopping equipments when defect
occurs
Production Leveling & Balancing
3 operating principles :
1. Pull System
Production Leveling and Balancing
Slide No.Property of ACT ( ACMA Centre for Technology ) 2009 19
2. Continuous flow processing
3.Self stopping equipments when defect
occurs
Production Leveling & Balancing
3 operating principles
2. Continuous flow processing
What is Continuous flow processing ?
Continuous flow processing attempts to eliminate
Slide No.Property of ACT ( ACMA Centre for Technology ) 2009 20
Continuous flow processing attempts to eliminate
the stops in production …..
…………… Shortening production lead time by
reducing non-processing time
Production Leveling & Balancing
3 operating principles
2. Continuous flow processing
To achieve continuous processing, it is
necessary to produce
- AN ITEM
Slide No.Property of ACT ( ACMA Centre for Technology ) 2009 21
- AN ITEM
- ONLY ONE ITEM and
- Immediately pass it to next production
process
NO Production of Batches is allowed
Production Leveling & Balancing
3 operating principles
2. Continuous flow processing
Batch process catches defects too late
Slide No.Property of ACT ( ACMA Centre for Technology ) 2009 22
In-process stocks… NOT OK
In-process
stockIn-process
stock
Production Leveling & Balancing
3 operating principles
2. Continuous flow processing
Single piece process catches defects easily
Slide No.Property of ACT ( ACMA Centre for Technology ) 2009 23
NO In-process stock
Production Leveling & Balancing
3 operating principles
2. Continuous flow processing
Batch Vs Single Piece Flow
Production Method
Parameter Batch Single Piece Flow
Quality StatusRisk of heavy
DamageNo or Negligible damage
Slide No.Property of ACT ( ACMA Centre for Technology ) 2009 24
Damage
FIFO Not Possible 100 % possible
Inventories HIGH NIL
Production lead
timeMore Less
Changeover Time PreferredNot preferred unless you
bring it < 1 TAKT
Production Leveling & Balancing
3 operating principles
2. Continuous flow processing
Push Vs Pull System
Production Method
Parameter Push Pull
Quality StatusDefects passed to
next process
Can be caught at the
generation point
Slide No.Property of ACT ( ACMA Centre for Technology ) 2009 25
next process generation point
Work system Based on Planning As per demand of
Downstream Process
Mix production Difficult Easy
Response to
Customer Late Quick
Stock taking Laborious Easy
Production Leveling & Balancing
3 operating principles
2. Continuous flow processing
What to do when Changeover time is
HIGH ?
Slide No.Property of ACT ( ACMA Centre for Technology ) 2009 26
- Need to reduce large lot sizes for such
operations to approach ONE Piece Flow
- Need to use multi-purpose equipment
- Need to improve conveyance
Production Leveling & Balancing
3 operating principles :
1. Pull System
Production Leveling and Balancing
Slide No.Property of ACT ( ACMA Centre for Technology ) 2009 27
2. Continuous flow processing
3.Self stopping equipments when defect
occurs
Production Leveling & Balancing
3 operating principles :
1. Pull System
2. Continuous flow processing
Production Leveling and Balancing
Slide No.Property of ACT ( ACMA Centre for Technology ) 2009 28
2. Continuous flow processing
3.Self stopping equipments when defect
occurs
Production Leveling & Balancing
3 operating principles
3. Self Stopping Equipments when defects occur
What is Self Stopping Equipments ?
Ability of production lines to stop automatically in
Slide No.Property of ACT ( ACMA Centre for Technology ) 2009 29
Ability of production lines to stop automatically in
case of problems
This is called JIDOKA
Production Leveling & Balancing
3 operating principles
3. Self Stopping Equipments when defects occur
Line stops automatically helps in…
Equipment breakdown is prevented
• The “ passing on” of defects is prevented ,
Slide No.Property of ACT ( ACMA Centre for Technology ) 2009 30
Equipment breakdown is prevented
• Management of production is simplified
( Full time inspectors become unnecessary )
• Problems are clearly identifiable so that
Improvements ( Kaizen ) can be accomplished
Production Leveling & Balancing
3 operating principles
3. Self Stopping Equipments when defects occur
Basic attitude is required for understanding
NEXT Process is THE
Slide No.Property of ACT ( ACMA Centre for Technology ) 2009 31
NEXT Process is THE
CUSTOMER
So next process owner should be satisfied as
much as customer who actually buys the product .
Production Leveling & Balancing
3 operating principles
3. Self Stopping Equipments when defects occur
� Every operator is an Inspector..Should be trained to stop the line for getting Help
Andon
Slide No.Property of ACT ( ACMA Centre for Technology ) 2009 32
Andon
STAGE
1 2 3
Line Running OK
Production Leveling & Balancing
3 operating principles
3. Self Stopping Equipments when defects occur
Andon
DEFECT at
STAGE 2
Slide No.Property of ACT ( ACMA Centre for Technology ) 2009 33
Andon
STAGE
1 2 3
Production Leveling & Balancing
3 operating principles
3. Self Stopping Equipments when defects occur
Operator Pulls ANDON
chord
Slide No.Property of ACT ( ACMA Centre for Technology ) 2009 34
Andon
STAGE
1 2 3
Help should be
provided
like an EMERGENCY
Production Leveling & Balancing
3 operating principles
3. Self Stopping Equipments when defects occur
Andon
DEFECT at STAGE 2…………
HELP IS Provided and problem is solved
Slide No.Property of ACT ( ACMA Centre for Technology ) 2009 35
Andon
STAGE
1 2 3
Line Running OK
Production Leveling & Balancing
3 operating principles
3. Self Stopping Equipments when defects occur
� Each stage should have in-built
POKA-YOKE
Slide No.Property of ACT ( ACMA Centre for Technology ) 2009 36
Poka- yoke help employees to prevent themselves from
making mistakes
Production Leveling & Balancing
3 operating principles
3. Self Stopping Equipments when defects occur
� Workplace should be visual
-ANDON Light should be visible
Slide No.Property of ACT ( ACMA Centre for Technology ) 2009 37
-ANDON Light should be visible
- Defect notification devices should be
visible and should be heard easily
Production Leveling & Balancing
Basic Leveling is the core of all Resource Planning
Production Leveling & Balancing
Basic Leveling
TAKT
Slide No.Property of ACT ( ACMA Centre for Technology ) 2009 38
Standardized Work
Production Leveling & Balancing
1. Initial Stability of Quantity
Prerequisites of Production Leveling & Balancing
Prerequisites :
Slide No.Property of ACT ( ACMA Centre for Technology ) 2009 39
Before After
Production Leveling & Balancing
2. Initial Stability of Quality
Prerequisites of Production Leveling & Balancing
Prerequisites :
Slide No.Property of ACT ( ACMA Centre for Technology ) 2009 40
Before After
Production Leveling & Balancing
3. Balance the Lines for TAKT Time
Prerequisites of Production Leveling & Balancing
Prerequisites :
Slide No.Property of ACT ( ACMA Centre for Technology ) 2009 41
Before After
Production Leveling & Balancing
4. Containerization
Prerequisites of Production Leveling & Balancing
Prerequisites :
Should have 3 C Containers
Slide No.Property of ACT ( ACMA Centre for Technology ) 2009 42
Clean , Clear and Count Free
Production Leveling & Balancing
5. Buffer stock
Prerequisites of Production Leveling & Balancing
Prerequisites :
Should have buffer stock at those places where
processing time is large .
Slide No.Property of ACT ( ACMA Centre for Technology ) 2009 43
processing time is large .
Should aim to achieve processing time equal to
one TAKT
Production Leveling & Balancing
Production Leveling & Balancing
We should consider following :
�Product Volume
� Product Mix
� Product Sequence
Slide No.Property of ACT ( ACMA Centre for Technology ) 2009 44
� Product Sequence
Legends : ED = Every Day , AD = Alternate day
E2D= Every 2 Days or E3D= Every 3 Days
Production Leveling & Balancing
We should plan effectively to optimize use all resources
Production Leveling & Balancing
1 2 3 4 5 6 Total PlanTotal Customer
RequirementExcess / Less
1 A 200 200 200 200 200 200 1200 1000 200
2 B 50 0 50 0 50 0 150 100 50
Date Demand Vs ActualS.N. Product
Slide No.Property of ACT ( ACMA Centre for Technology ) 2009 45
3 C 0 0 1000 0 0 0 1000 500 500
4 D 20 20 20 20 20 20 120 120 0
5 E 0 0 0 0 0 1000 1000 2000 -1000
6 F 2800 0 0 0 0 0 2800 3000 -200
3070 220 1270 220 270 1220 6270 6720 -450
90 10 50 30 30 40Week's
Plan
Customer
Requirement
Delivery
Failure
Day's Total
Line Capacity
Utilization %
Production Leveling & Balancing
We should believe in Technology , People and Processes
Production Leveling & Balancing
Technology should ….
Contribute to the value adding process
Reduce waste
Slide No.Property of ACT ( ACMA Centre for Technology ) 2009 46
Reduce waste
Contribute to a flexible system that can economically
adjust to ups and downs in Demand
Support to ease work of people
MAKE TECHNOLOGY FIT IN OUR WORKING
Production Leveling & Balancing
Production Leadership structure
Production Leveling & Balancing
Develop leaders who live your
Slide No.Property of ACT ( ACMA Centre for Technology ) 2009 47
Develop leaders who live your
system
Production Leveling & Balancing
Develop Thorough understanding
Production Leveling & Balancing
Importance…how important is the problem in the overall context of
Customer satisfaction
Slide No.Property of ACT ( ACMA Centre for Technology ) 2009 48
Urgency… what deadlines are dependent on the resolution of the
problem
Tendency.. Is the problem getting worse or staying the same
Production Leveling & Balancing
is not possible UNLESS ……
Production Leveling & Balancing
Slide No.Property of ACT ( ACMA Centre for Technology ) 2009 49
We have a culture that STOPS to Fix
problems