Page 1: 130340109028_Wanakbori Visit Report

7/25/2019 130340109028_Wanakbori Visit Report

http://slidepdf.com/reader/full/130340109028wanakbori-visit-report 1/11

 

PROJECT REPORT

ON

“INDUSTRIAL VISIT AT WANAKBORI (T.P.S)” 

Submitted in accordance with the INDUSTRIAL VISIT requirements for

4thsemester of the BE course in the branch of

ELECTRICAL ENGINEERING

Of

GUJARAT TECHNOLOGICAL UNIVERSITY

YEAR 2015

Submitted By:-Mihir Patel

(130340109028)

Page 2: 130340109028_Wanakbori Visit Report

7/25/2019 130340109028_Wanakbori Visit Report

http://slidepdf.com/reader/full/130340109028wanakbori-visit-report 2/11

 

INDEX

1 Introduction

2 Purpose of Visit

3 Block diagram of power plant

4 Working Power Plant Models

5 Future

6 Equipment Details

7 Switch Yard

8 Other Details

9 Control Room

10 Conclusion 

Page 3: 130340109028_Wanakbori Visit Report

7/25/2019 130340109028_Wanakbori Visit Report

http://slidepdf.com/reader/full/130340109028wanakbori-visit-report 3/11

 

 

INTRODUCTION:-

 

 

W.T.P.S is the biggest power plant in GUJARAT.

  Wanakbori Thermal Power Station is a coal-f ired power station in Gujarat,

India. It is located on the bank of  Mahi river in Kheda district.

  There are 7 Turbo Generator sets each of 210MW out of which first 3

units are equipped with Russian Turbines and other 4 Units are equipped

with German Turbines. Unit no 7 is entirely computerized and well advanced.All the above units are of BHEL make.

Page 4: 130340109028_Wanakbori Visit Report

7/25/2019 130340109028_Wanakbori Visit Report

http://slidepdf.com/reader/full/130340109028wanakbori-visit-report 4/11

  Purpose of Visit:-

  Electrical Engineering Dept. of Narnarayan Shastri Institute of Technology

decided to arrange one day industrial visit for 4th Electrical Engineering students to

improve practical knowledge and get benefited their theoretical knowledge

  In W.T.P.S, Students will get benefit regarding their theoretical

subject of conventional power engineering, Electrical Power and

Electrical & Electronic Measurement.

 

Block Diagram of Power Plant:-

  Coal to Electricity

Page 5: 130340109028_Wanakbori Visit Report

7/25/2019 130340109028_Wanakbori Visit Report

http://slidepdf.com/reader/full/130340109028wanakbori-visit-report 5/11

 Energy Balance

Page 6: 130340109028_Wanakbori Visit Report

7/25/2019 130340109028_Wanakbori Visit Report

http://slidepdf.com/reader/full/130340109028wanakbori-visit-report 6/11

  Feed water and Steam Flow Diagram

Page 7: 130340109028_Wanakbori Visit Report

7/25/2019 130340109028_Wanakbori Visit Report

http://slidepdf.com/reader/full/130340109028wanakbori-visit-report 7/11

  WORKING POWER PLANT MODELS:-

 

Generator, Generator Transformer Turbine

 Boiler,

 Boiler Drum

 Boiler Burners,

 Dampers arrangement

 Boiler Feed Pump

 Air Pre-heater

 ID Fan,

 

FD Fan,

 PA Fan

 Coal Mill

 FW Pump

  FEATURES:-

 

Installed Capacity: 7× 210 = 1470 MW Total Area of Project: 1571 Acres

 PLF %: Between 84.64 to 91.24%

 Plant Area: 626.2 ha

 Ash Dump Area: 215.7 ha

 

Cooling Water Quantity Required: From Canal of Mahi River Reservoir 60 to 70

Cusecs / month

 Cooling Tower Heights: Stage I & II - 112 Mtrs,

Stage III - 118 Mtrs.

Page 8: 130340109028_Wanakbori Visit Report

7/25/2019 130340109028_Wanakbori Visit Report

http://slidepdf.com/reader/full/130340109028wanakbori-visit-report 8/11

 

EQUIPMENT DETAILS:-

 Fuel: Bituminous Coal

 Linked Coal Mines: Coal India From Bihar, Orissa, M.P., West Bengal, Andhra

Pradesh Generally 400 Wagons received per day

 Record of Unloading Wagons : 650 Wagons / Day

 Gross Calorific Value of Coal : 4400 Kcal/Kg

 

 No’s of Wagon Tip plers: 05 NOS.

 Coal Quantity Required :

 With Design Coal : 16000 MT / Day

 

With Actual Coal: 18000 MT / Day

 

Stock Yard: Storage Capacity:02 Lacks MT

 Area : 48000 m2

 Oil : LSHS / LDO

  Boiler Details:-

 

Stage I & II: Tangentially Fired, Balance Draft, Natural Circulation, Radiant RehType

 Stage III : Vertically Suspended Water Tubes, Radiant Reheat Cycle, Natural

Circulation

 Capacity : 700 Tones / hr. / unit

 Feed Water Temp. : 241 C

 Steam Pressures at Boiler Outlets: [1] SH: 137 Kg / Cm2 

[2] RH: 25.8 Kg / Cm2

Page 9: 130340109028_Wanakbori Visit Report

7/25/2019 130340109028_Wanakbori Visit Report

http://slidepdf.com/reader/full/130340109028wanakbori-visit-report 9/11

 

Turbine Details:-

 Type: Three Cylinders Condensing Tandem, Compound Horizontal Reheat Type.

  Nos. of Stages: Stage I: HP - 12,

IP -11,

LP - Double Flow each having 4 stages.

Stage II: HP - 25,

IP - Double Flow each having 20 stages,

LP - Double Flow each having 4 stages

  Generator Details:-

 Type: THW - 210 - 2B (Water & Hydrogen Cooled Turbo Generator)

 Rated Capacity: 210 MW, 247 MVA

 Power Factor: 0.85 Lag

 Stator: 15.75 Volts, 9050 A

 Rotor: 310 V DC, 2600 A

 Excitation System: Static

 

Type of Cooling: Water, Hydrogen

 Hydrogen Pressure: 3.5 Kg / Cm2 

Page 10: 130340109028_Wanakbori Visit Report

7/25/2019 130340109028_Wanakbori Visit Report

http://slidepdf.com/reader/full/130340109028wanakbori-visit-report 10/11

 

TRANSFORMER :-

Generator Transformer:

 Stage I: 250 MVA, 15.75 / 220KV

 Stage II: 250 MVA, 15.75/400KV

 Interconnection Transformer: 500 MVA (167 x 4, 3+1 St by), 220 / 400 KV

 Station Transformers: 25 MVA, 220 / 07 KV

 

Unit Auxiliary Transformers: 15 MVA, 15.75 / 07 KV 

Unit Service Transformers: 07 KV / 433 Volts

 Station Service Transformers: 02 MVA, 07 KV / 433 Volts

  SWITCH YARD:-

The switchyard houses transformers, circuit breaker sand switches

for connecting and disconnecting the transformers and circuit breakers. Italso has lightning arrestors for the protection of the power station against

lighting strokes.

  CONTROL ROOM:-  Types of Control Panel

 Fuel Gas Panel

 

Combustion Air Panel Primary Air & Coal Panel

 

Steam Panel (Boiler)

 Feed Water panel

 Condensate & Cooling Water Panel

 Turbovisory Panel

Page 11: 130340109028_Wanakbori Visit Report

7/25/2019 130340109028_Wanakbori Visit Report

http://slidepdf.com/reader/full/130340109028wanakbori-visit-report 11/11

 

CONCLUSION:-

After visit at the Wanakbori Thermal Power Station I can say

that one can visualize the complex study of power generation using coalas a fuel, which will help me a lot in future in many field & I can

understand the function of each component in thermal power station, their

importance, their arrangement & precautions that to be used for the safety

in the plant.

At last I will only say that I really enjoyed my visit over hereand I again want to thank all my faculties, staff of Wanakbori Thermal

Power Station to give me this great pleasure of the training.