Solaria Energía y Medio Ambiente
Fact and fiction in the Spanish PV Market
19 February 2009
Pedro Echeguren. Director. Head of IRTel.: +34 91 5644272 [email protected]
Growth in the Spanish Solar MarketCapturing the Potential for Growth in Spain Supportive Regulatory Environment
Regulation RD 661/2007 (Approved 25 May 2007)PV Installed Capacity (MW)
Fixed amount to be applied to capacity installed up to 29 September 2008; growth rate indexed to CPI minus 0.25% until Dec-2012 and CPI minus 0.50% thereafter:
g ( pp y )
First 25 years After 25 years
3,800
1,938
814
750
1000
2,973
Up to 100 kW
100 kW – 10 MW
10 MW 50 MW
First 25 years
44.04 c€
41.75 c€
22 98 c€
After 25 years
35.23 c€
33.40 c€
18 38 c€
1 3 7 11 22 46144
692
0
250
500
750
2000 2001 2002 2003 2004 2005 2006 2007 2007 2007 2007
100
20072008
Attractive Radiation Conditions Regulation RD 1578/2008 (Approved 26 Sep 2008)
10 MW – 50 MW 22.98 c€ 18.38 c€Source CNE for Spain, EPIA for other countries Germany
JapanUS
Spain2000 2001 2002 2003 2004 2005 2006 2007 2007 2007 2007
Italy20072008
Spain = 1,586 kWh/m2
Applicable to licences applied after 29 September 2008. Market size: 500 MW in 2009 and 2010, 460 MW in 2011Tariffs indexed to CPI minus 0.25%, valid for 25 years
25 years
Solar Radiation
Germany = 1,014 kWh/m2
Europe= 1,197 kWh/m2
Rooftop installations <20 kW
Rooftop installations 20 kW - 2 MW
Ground based (Maximum size 10 MW)
34.00 c€
32.00 c€
32.00 c€S E C i i Ph t lt i G hi l I f ti S t PVGIS htt // j / i /
Regulation passed in September 2008 provides a supportive 3-year framework3
Source European Commission Photovoltaic Geographical Information System PVGIS http://re.jrc.ec.europa.eu/pvgis/
Fact and Fiction in the Spanish Solar MarketPV Installed Capacity in Spain (MW)
4500 Dec-08
3500
4000
D 07
Dec 082973 MW4195 MW
Market size per year2007: 547 MW2008: 2 281 MW
2500
3000Dec-07692 MW569 MW
2008: 2,281 MW (or 3,503 MW under the statistical calculation)
1500
2000 Dec-06145 MW
2009: 500 MW2010: 500 MW2011: 460 MW
500
1000(unless current scheme is superseded by the expected 2010-2020 renewables
Source: www cne es (Spanish Energy Commission)
02007 2008
Actual CNE data CNE’s Statistical calculation
plan)
Regulation passed in September 2008 modulates growth4
Source: www.cne.es (Spanish Energy Commission)
Fact and Fiction in the Spanish Solar Market
SOLAR PV per region MW YOY
Growth in installed capacity: 2008
GaliciaAsturias 0 MW
Cantabria 1 MW
Basque 16 MW
CASTILLE MANCHA 791 386%Andalusia 357 391%Castille León 354 309%Extremadura 344 476%Murcia 280 306%
Castille Leon354 MW
7 MWRioja 74 MW
Navarra 156 MW
Aragon110 MW
Catalonia158 MWFuenmayor
Murcia 280 306%Valencia 215 177%Catalonia 158 312%Navarra 156 159%Aragón 110 1213%RIOJA 74 818%
110 MW
Madrid 23 MW
Canary Is. 48 110%Regions <10 MW 85 231%
Total Spain 2,973 329%
CASTILLE MANCHA791 MW
Puertollano
Extremadura344 MW
Valencia215 MW
Balearic Is. 36 MWInstalled Production
Almadén
Andalusia357 MW
Murcia280 MW
Solaria’s factories: Puertollano, Fuenmayor and Almadén
GW TWhHydro 17 21Nuclear 8 59Coal 11 50Fuel & Gas 8 11
Canary Is. 48 MW
Ceuta & Melilla 0 MW
TOTAL SOLAR 2,973 MW
CCGT 22 96Wind 15 29Solar 3 2Other 6 37Exports ‐7
5Source: Red Eléctrica de España (www.ree.es) and CNE (www.cne.es) Jan. 2009, Statistics on sales of renewable energies
Pumping ‐11Total Spain 90 279
Turn-key leadership in SpainLA RIOJA 11 MWFuenmayor (Logroño)Completed: Sept. 2008LEON 1 MW
Vill ñá (L ó )Villamañán (León)Completed: Sept. 2008 MIGUELTURRA 1.3 MW
Miguelturra (Ciudad Real)Completed: March 2008
EXTREMADURA I 11 MWVill d l S (B d j )
POZUELO 1 MWPozuelo de Calatrava (Ciudad Real)Completed: March 2008
PUERTOLLANO 1 MWPuertollano (Ciudad Real)
Villanueva de la Serena (Badajoz)Completed: Sept. 2008
Completed: March 2008
MURCIA 7 MWAlhama de Murcia (Murcia)
Completed: June 2008EXTREMADURA II 11 MWMagacela (Badajoz)Completed: Sept. 2008
T k j t M k t l d i S i ith 44 MW f T k j t l t d
Alhama de Murcia (Murcia)Completed: Sept. 2008
Turnkey projects: Market leader in Spain with over 44 MW of Turn-key projects completed
6
Export activities
Solaria expects 1/3 of 2009 revenues to be generated from export activities (Modules andSolaria expects 1/3 of 2009 revenues to be generated from export activities (Modules and Turnkey). The remaining 2/3 (domestic business) to be split 60% Modules / 40% Turnkey.
Italy: Exports of PV Modules started in Q4 2007. Local office is well
France: Local office to be started in H2‐2009. Outlook for Module and
Italy: Exports of PV Modules started in Q4 2007. Local office is welladvanced in the application process for obtaining Turnkey licenses
Turnkey demand could exceed market expectations for the Italian market
Morocco: Bids presented in Q1‐2009 for 4 x 40 MW off‐grid projects. Biddi ti i l d ll iti d l l tBidding consortium includes well‐positioned local partners
Chile and Brazil: Non‐grid Turnkey applications are being negotiated with local b O t it t d l ti i S i h ki t i
Expansion into new markets is to reduce dependance on the Spanishmarket and export a succesful business model
buyers. Opportunity to deploy expertise in Spanish‐speaking countries
7
market and export a succesful business model
Sector Value ChainRaw Silicon Silicon Blocks Silicon Wafers Solar Cells Solar Modules Distribution/
Installations
REC GroupMEMC
Turnkey Development
HemlockWacker
SolarWorld AG
E S l
MEMC
Schott Solar
SharpEvergreen Solar
ErSolQ-Cells
SOLARIA NOW
IsofotonSunpower
SOLARIA IN H1-2008
BP Solar
SunwaysMitsubishi Electric
Solon
Conergy
Solar-FabrikAleo Solar
Phönix Sonnenstrom
ATERSASiliken
SAG SolarstromAccionaGamesa
8
Capacity and Production Targets
2008 201120072006 2009
15025
2008
250
2011
650
20072006
Capacity (Year end, MW)PV Modules
2009
350150
40
n/m
25
6
n/m
250
--- ---
80%
y ( )
Production (MW)
Utilization Rate (%)
Cells
---
25
0
-
-
25
---
650
---
Capacity (Year end, MW)
Production (MW)
Cells
100
---
-- 80%Utilization Rate (%)
Factory sites in 2011
PV Modules: Three factories: Puertollano 250 MW + La Rioja 300 MW + Almaden 100 MW
Cells: Two factories: Puertollano 400 MW + La Rioja 250 MW
9
Solaria Tomorrow
Solaria is to maintain the leadership in installing Turnkey projects in SpainSolaria is to maintain the leadership in installing Turnkey projects in Spainand be one of the worldwide leaders in manufacturing PV modules
PV factory in Puertollano reached planned capacity of 250 MW in Q1 2008. Cell
First phase of investment in new PV Module factory (Fuenmayor)
PV factory in Puertollano reached planned capacity of 250 MW in Q1 2008. Cellmanufacturing started in September 2008, now adding new capacity
p y ( y )completed in September 2008, recently comissioned 100 MW capacity
Client profile evolves from spot to contract, thus becoming more stable and longt i t d Fi i i h i li ti li t filterm‐oriented. Financing issues have implications on client profiles
We expect more competition in our sector and are leveraging our leadership, i t t fi i l t th d f h fl t b ld l d
Entry into new markets is to reduce dependance on the Spanish marketand export a succesful business model
investments, financial strength and free cash‐flow to become a world leader
10
and export a succesful business model
Solaria Energía y Medio AmbienteSolaria Energía y Medio AmbienteBack up slides
11
Solaria Today
Solaria manufactures PV modules, Thermal pannels and develops Turnkey installations
Solaria’s factories are located in Puertollano and in Fuenmayordevelops Turnkey installations
•• La Nava II (La Nava II (PuertollanoPuertollano) 51,300 ) 51,300 sq.msq.m sitesite: : Solar Solar cellcell and PV module and PV module factoriesfactories
•• La Nava III (La Nava III (PuertollanoPuertollano: 63,700 : 63,700 sq.msq.msitesite:: UnderUnder developmentdevelopment
and in Fuenmayor
PV M d l Th l lT k i t ll ti
sitesite: : UnderUnder developmentdevelopment•• SecundarySecundary productionproduction centers and centers and
warehouseswarehouses in in PuertollanoPuertollano•• FuenmayorFuenmayor (La Rioja) 307,000 (La Rioja) 307,000 sq.msq.m sitesite: :
PV module PV module factoryfactory•• Almadén:Almadén: FeasibilityFeasibility studiesstudies forfor futurefuturePV Modules Thermal pannelsTurnkey installations
Solaria began trading in the Spanish Stock M k t 19 J 2007
Key figures (€ 000s)
•• Almadén: Almadén: FeasibilityFeasibility studiesstudies forfor futurefuturePV module PV module factoryfactory
221,265SALES
2006
19,147
Market on 19 June 2007
•• FirstFirst and and onlyonly Solar PV Solar PV companycompany listedlisted onon thetheSpanishSpanish stockstock MarketMarket
y g ( )
9m 2008
186,209
2007
20,750NET PROFIT 5,642
SpanishSpanish stock stock MarketMarket•• OnlyOnly tradedtraded companycompany fromfrom Castilla La ManchaCastilla La Mancha•• MarketMarket capcap: : €€ 250 250 millmill•• Free Free floatfloat: 38.5% of shares (61.5% : 38.5% of shares (61.5% ownedowned byby
thethe company’scompany’s foundersfounders))
53,257EBITDA 8,940
30,110EBIT 8,706
48,400
71,695
71,078
33,919
52,087
0, 50NET PROFIT , p yp y ))
12
559AVG WORKFORCE 48
48,400
324
,
590
Solaria Today
9-mth 2008 Sales BreakdownDesign, manufacture and sale of PV modules to
PV Modules29%
Turnkey71%
Modulethird parties. Production capacity 250 MW / YearValue Added ServicesTechnical assistance and post sales service
Thermal
End-to-end development of solar PV power plants including engineering servicesValue Added Services
Total Sales = €221 MM
Thermal 0%
Deep knowledge of local marketExtensive project management know-how and experienceGrid Connection Point Manager status
Turnkey 2007 Sales Breakdown
Turnkey
Thermal0%Grid Connection Point Manager status
Design, manufacture, sale and installation of thermal panels and engineering process
PV Modules58%
Turnkey42%
Potential linked to construction sectorValue Added ServicesTechnology adapted to Spanish climateNO LONGER A CORE ACTIVITY
Thermal58%
Total Sales = €186 MMNO LONGER A CORE ACTIVITY
Source Solaria IFRS Financial Statements
13
Regulatory Framework
Positives:
f ff f
Licences will total 500 MW in 2009, 500 MW in 2010 and 460 MW in 2011
Flexible feed‐in tariff depending on growth rate of new installations
Supportive 3‐yr framework until 2010‐2020 renewables plan is announced
Negatives:
Licences to be awarded quarterly Q1 and Q2 auctions give priority to late
Licences to be awarded quarterly. Q1 and Q2 auctions give priority to late runners and are unlikely to generate new demand for PV modules
Licences to be awarded quarterly. Q1 and Q2 auctions give priority to late runners and are unlikely to generate new demand for PV modules
Other considerations affecting demand outlook are the financing
14
restrictions from banks and markets
Cell supplies contracted for 2008
Supply of cells is below the amounts contractedSupply of cells is below the amounts contracted
Supplier Status Q1 Q2 Q3 Q4 Total
Gintech Contact signed 9.5 12.0 15.0 13.5 50.0E Ton Contact signed 4.9 7.3 12.3 15.5 40.0Neo Solar Power Contact signed 1.5 3.0 4.5 6.0 15.0Neo Solar Power Contact signed 1.5 3.0 4.5 6.0 15.0JA Solar Contact signed 6.0 9.0 15.0 15.0 45.0Supplier 1 Spot supply 2.5 2.5 5.0Supplier 2 Spot supply 2.5 2.5 5.0Supplier 3 Spot supply 2.5 2.5 5.0Supplier 4 Spot supply 1.0 3.0 4.0Internal production Production starts Sept‐08 3.0 8.0 11.0
Cell supply contracted (MW) 21.9 31.3 58.3 68.5 180.0
Cell supply received (MW) 19.5 11.5 20.8
DelaysDelays in in cellcell suppliessupplies havehave preventedprevented reachingreaching productionproduction targetstargets15
January – September 2008 results
Sales +127% in 9m2008 vs 9m2007
9m 2008 vs9‐mth 2008 (*) 9‐mth 2007 (*) FY‐07
9m 2008 vs9m 2007
Sales. PV Modules € 000s 172,783 80,009 132,385 116%
Sales Turnkey € 000s 157 817 22 092 77 562 614%Sales. Turnkey € 000s 157,817 22,092 77,562 614%
Sales. Thermal pannels € 000s 42 140 142 n/a
sq.m. 247 712 722
Adjustments € 000s ‐109,377 ‐4,679 ‐23,880 n/a
Total sales € 000s 221,265 97,561 186,209 127%
MW 51.8 21.7 38.3 139%
Sales Sales mixmix shows shows substantialsubstantial growthgrowth in in TurnkeyTurnkey reflectingreflecting thethe drive drive toto complete complete projectsprojects beforebefore endend of of SeptemberSeptember 20082008
(*) Unaudited figures. 9-mth 2008 consolidated data is fully comprable with parent company figures due to negligible impact of WOS“Solar Cell” division has been integrated in “PV Modules” division 16
January – September 2008 results
EBITDA+58% in 9m2008 vs 9m2007EBITDA+58% in 9m2008 vs 9m2007
9 th 2008 (*) 9 th 2007 (*) FY 079m 2008 vs
9‐mth 2008 (*) 9‐mth 2007 (*) FY‐079m 2007
PV Modules EBITDA € 000s 29,168 18,198 26,976 60%
% sales 16.9% 22.7% 20.4%
Turnkey EBITDA € 000s 24,403 15,314 44,820 59%
% sales 15.5% 69.3% 57.8%
Thermal pannels EBITDA € 000s ‐315 129 ‐100 n/a
% sales n/r 92.1% n/r
Total EBITDA EBITDA € 000s 53,257 33,641 71,696 58%
% sales 24% 34% 39%
EBITDA EBITDA marginmargin in PV Modules in PV Modules divisiondivision stabilisedstabilised aroundaround 20% in 20% in spitespite of of raterate of of utilisationutilisation belowbelow targets. targets. LowerLower EBITDA EBITDA marginsmargins in in TurnkeyTurnkey isis cyclicalcyclical and and isis toto improveimprove in in thethe final final phasephase of of constructionconstruction (Q4 2008)(Q4 2008)
(*) Unaudited figures. 9-mth 2008 consolidated data is fully comprable with parent company figures due to negligible impact of WOS“Solar Cell” division has been integrated in “PV Modules” division 17
January – September 2008 results
Net profit: +48% 9m2008 vs 9m2007
9m 2008 vs9‐mth 2008 (*) 9‐mth 2007 (*) FY‐2007
9m 2008 vs9m 2007
€ 000s PV Th T/Key Adjust Total PV Th T/Key Adjust Total PV Th T/Key Adjust Total Total
Net sales 172,783 42 157,817 ‐109,377 221,265 80,009 140 22,092 ‐4,679 97,561 132,385 142 77,562 ‐23,880 186,209 127%Other income 84 0 0 84 48 10 0 58 200 19 0 219 45%COGS 143 699 357 24 036 168 092 61 859 21 2 099 63 979 105 609 261 8 862 114 732 163%COGS ‐143,699 ‐357 ‐24,036 ‐168,092 ‐61,859 ‐21 ‐2,099 ‐63,979 ‐105,609 ‐261 ‐8,862 ‐114,732 163%Adjustments ‐109,377 ‐4,679 ‐23,880EBITDA 29,168 ‐315 24,403 53,257 18,198 129 15,314 33,641 26,976 ‐100 44,820 71,695 58%
Depreciation ‐1,064 ‐5 ‐100 ‐1,169 ‐305 ‐42 ‐12 ‐359 ‐563 ‐54 0 ‐617 226%EBIT 28,104 ‐320 24,303 52,087 17,893 87 15,302 33,282 26,413 ‐154 44,820 71,078 57%
FINANCIAL RESULT ‐3,678 752 474 ‐589%ORDINARY PROFIT 48,410 34,034 71,552 42%Non‐recurrent items 0 0 0Pre‐tax profit 48,410 34,034 71,552 42%Taxes ‐14,491 ‐11,062 ‐23,151 31%NET PROFIT 33,919 22,972 48,400 48%
FinancialFinancial datadata underunder IRFSIRFS
, , ,
PV: Photovoltaic Modules. Th: Thermal pannels. T/Key: Turnkey projects. Adjust: Internal sales between divisions
(*) Unaudited figures. 9-mth 2008 consolidated data is fully comprable with parent company figures due to negligible impact of WOS“Solar Cell” division has been integrated in “PV Modules” division
FinancialFinancial data data underunder IRFSIRFS
18
January – September 2008 results€ 000s Sep 08 (*) Jun 08 (*) Mar 08 (*) Dec 07 Sep 07 (*) Jun 07 (*)
Fixed assets:‐ Net tangible fixed assets 66,925 64,971 55,972 32,743 22,311 16,559‐ Intangibles 260 246 21 17 18 19‐ Financial investments 94 34 34 34 33 24Deferred expenses 3,854 7,869 7,201 5,689 3,264 35Current assets:‐ Stocks 50 320 21 512 16 750 34 786 27 667 23 974 Stocks 50,320 21,512 16,750 34,786 27,667 23,974‐ Debtors 247,986 174,248 139,976 178,002 88,238 36,013‐ Other 1,813 957 1,224 550 165 320‐ Cash 71,710 179,108 201,554 153,163 179,250 218,803
TOTAL ASSETS 442 962 448 945 422 732 404 984 320 946 295 747TOTAL ASSETS 442,962 448,945 422,732 404,984 320,946 295,747
Shareholder's funds 290,350 275,090 265,669 261,196 240,818 223,877Deferred income 4,852 4,866 5,158 4,870 5,530 4,928Deferred taxes 1,679 1,187 1,093 1,171 87 240Long term debt 30,409 30,765 31,051 14,581 15,181 15,173Current liabilities:‐ Short term debt 59,389 61,117 46,701 43,916 17,942 21,811‐ Creditors 44,414 37,670 33,589 55,895 30,188 22,725‐ Other 11,868 38,250 39,471 23,355 11,200 6,993
FinancialFinancial data data underunder IRFSIRFS(*) Unaudited figures.
Ot e ,868 38, 50 39, 3,355 , 00 6,993
TOTAL LIABILITIES & NET WORTH 442,962 448,945 422,732 404,984 320,946 295,747
( ) g9-mth 2008 consolidated data is fully comprable with parent company figures due to negligible impact of WOS“Solar Cell” division has been integrated in “PV Modules” division
19
January – September 2008 results€ 000s 6‐mth to Jun 08 (*) 12‐mth to Dec 07 6‐mth to Jun 07 (*)
Cash generated from operations 36,989 ‐67,257 ‐5,053Interest paid ‐6,510 ‐2,905 ‐571Income tax paid ‐4 233 ‐9 800 ‐55Income tax paid ‐4,233 ‐9,800 ‐55NET CASH FROM OPERATIONS 26,246 ‐79,962 ‐5,679
Acquisition fixed assets ‐32,806 ‐26,060 ‐9,543Disposal fixed assets 0 77 186Acquisition intangibles ‐276 ‐12 0Deposits constituted ‐19 ‐522 ‐109Deposits liquidated 508 600 600Repayments on loans 0 591 0Interest received 3,474 4,378 89NET CASH FROM INVESTMENT ACTIVITIES ‐29,119 ‐20,947 ‐8,777
Income shares issued 0 210,240 211,410Dividends paid 0 ‐2,410 ‐2,410Own stock held ‐8,366 0 0Proceeds banking debt 33,657 34,292 20,066Repayments banking debt 315 739 35Repayments banking debt ‐315 ‐739 ‐35Net income from current accounts 0 8,500 0Subsidies received 3,864 0 0Financial leases repaid ‐22 ‐38 0NET CASH FROM FINANCING ACTIVITIES 28,818 249,845 229,031
FinancialFinancial datadata underunder IRFSIRFS
Net increase in cash 25,945 148,935 214,575Cash at BOP 153,163 4,228 4,228Cash at EOP 179,108 153,163 218,803
FinancialFinancial data data underunder IRFSIRFS(*) Unaudited figures.
H1 2008 consolidated data is fully comprable with parent company figures due to negligible impact of WOS20
Puertollano factoryL N III
Office block Solar cell factory
La Nava III Greenfield
Solaria
Puertollano
Turnkey plant (1 MW) Warehouse
PuertollanoPV Module factories
21
Solaria is located in La Nava II Industrial site, 2 Km from Puertollano
Fuenmayor factoryFactory site
SolariaFuenmayor
Solaria
Fuenmayor
22
Solaria is located in the outskirts of Fuenmayor, 12 Km from Logroño
Disclaimer
This presentation does not constitute or form part of any offer for sale or solicitation of any offer to by any securities nor shall it or any part of itform the basis or be relied on in connection with any contract or commitment to purchase shares.
The information contained in this document has been provided by Solaria Energía y Medio Ambiente, S.A.
Thi t ti i l d f d l ki t t t All t t t th th t t t f hi t i l f t i l d d i thi t tiThis presentation includes forward-looking statements. All statements other than statements of historical facts included in this presentation,including, without limitation, those regarding our financial position, business strategy, management plans and objectives for future operations areforward-looking statements. These forward-looking statements involve known and unknown risks, uncertainties and other factors, which maycause our actual results, performance or achievements, or industry results, to be materially different from those expressed or implied by theseforward-looking statements. These forward-looking statements are based on numerous assumptions regarding our present and future business
fstrategies and the environment in which we expect to operate in the future.
Forward-looking statements speak only as of the date of this presentation and we expressly disclaim any obligation or undertaking to release anyupdate of or revisions to any forward-looking statements in this presentation, for any change in our expectations, or any change in events,conditions or circumstances on which these forward-looking statements are based or otherwise.co d t o s o c cu sta ces o c t ese o a d oo g state e ts a e based o ot e se
2323