    Sl.

    No:Drawing No. RPCL/Steag Comments BHEL Reply

    1 35210078623-Sht 02Correct the CT Neutral formation in the GRP

    differential relay connections.

    Noted & incorporated.

    2 35210078623-Sht 03Correct the CT Neutral formation in the GRP

    REF relay connections.

    Noted & incorporated.

    3 35210078623-Sht 04Clarify the P1 philosophy P1 is always on the breaker side irrespective of power flow

    direction.

    4 35210078623-Sht 04Output contacts does not match with the

    typical functions in relay catalogue.

    Noted & incorporated.

    5 35210078623-Sht 07Interlocks to other panels to be taken care of

    in respective drawings.

    Noted & incorporated.

    6 35210078623-Sht 08Breaker in test,service,local,remote to ddcmis Noted & incorporated.

    7 35210078623-Sht 14Correct the I/O list in all schemes to be revised. Noted & incorporated.

    8 35210078624-Sht 08 86X contactor in incomer & Tie Feeder Noted & incorporated.

    9 35210078624A-Sht 01

    10 35210078625-Sht 01Wherever MCBs are given to be replaced with

    fuse.

    Noted & incorporated.

    11 35210078626-Sht 01

    12 35210078627-Sht 01

    13 35210078628-Sht 01

    14 35210078629-Sht 01

    15 35210078630-Sht 01

    16 35210078631-Sht 01

    17 35210078632-Sht 01

    18 35210078633-Sht 01

    19 35210078634-Sht 01

    20 35210078635-Sht 09

    21 35210078636-Sht 09

    22 35210078637-Sht 09

    23 35210078637A-Sht 09

    24 35210078638-Sht 10 Rename 27/27N/2M as 27/27N/2

    BHEL REPLY DATED 25/04/2013 RPCL/STEAG COMMENTS ON 11kV SCHMATIC DRAWING REV 02

  • 7/27/2019 11kv Schemes 24th-25th April 2013

    2/14

    reply to be given for output contact rating

  • 7/27/2019 11kv Schemes 24th-25th April 2013

    3/14

    Sl. No: Drawing No. RPCL/Steag Comments BHEL Reply

    1 35210078623-Sht 01

    Schematic drawing shall be confirmed to logic

    diagram of 11Kv switchgear & shall bementioned in the drawing

    Drawing revised in line with revised 11kv

    Logic diagram. Reference drawing no. of SLD& Logic shall be incorporated in revised/as

    manufactured drawings

    2 35210078623-Sht 01Furnish legend details Legend of devices submitted.

    3 35210078623-Sht 01

    Furnish BOM As per MOM Dtd 16-17th Nov'2012 pt 13

    BOM shall be furnishede 3 weeks before

    inspection.

    4 35210078623-Sht 01Panel number mentioned here is not matched

    with SLD

    Drawing revised to incorporate the comment.

    5 35210078623-Sht 01

    The closing & tripping logic shall be hardwiredcontrol from ECP & DDCMIS seperately.

    Remote closing /tripping shall be wired as

    agreed in MOM dtd 4-6th june 2012.

    Drawing revised to incorporate the comment.

    6 35210078623-Sht 01Furnish CT & PT details in this drawing also for

    easy reference.

    Drawing revised to incorporate the comment.

    7 35210078623-Sht 01

    Furnish Numerical Relay connection diagram

    for SEL 751A & 2505 indicating P.S , I/O Ports ,

    CT/PT connections & communication ports.

    Relay catalogue soft copy shall be sent by

    15.02.2013.

    8 35210078623-Sht 01

    Furnish VCB breaker contact development

    diagram indicating 94, 52a/b,33SC contact

    configuration.

    Shall be incorporated in revised/as

    manufactured drawings.

    9 35210078623-Sht 01Furnish OGA of VCB & details of FEB & BEB OGA of VCB & FEB/BEB Scheme submitted.

    BHEL REPLY TO RPCL/STEAG COMMENTS ON 11kV SCHMATIC DRAWING Rev 00

  • 7/27/2019 11kv Schemes 24th-25th April 2013

    4/14

    10 35210078623-Sht 01

    Indicate reference drawings Shall be incorporated in revised drawings.

    11 35210078623-Sht 02

    Since the relay manufacturer is not indicated in

    the keydiagram, calculations for the burden &

    knee point voltage shall be provided.

    Shall be furnished as agreed.

    12 35210078623-Sht 02Note: Shorting links are to be removed when

    CTs are connected in GRP circuit.

    Drawing revised to incorporate the comment.

    13 35210078623-Sht 04

    R ,Y B Phase shall be shown It may please be noted that Bus PT voltage is

    not required in IF scheme, as it requires only

    line voltage, which is provided by Line PT

    signals as shown in the scheme.Earlier it was

    shown inadvertently & hence it has been

    removed.

    14 35210078623-Sht 042-50 LBB function shall be indicated Drawing revised to incorporate the comment.

    15 35210078623-Sht 05

    Indicate what are the parameters shown at

    MFTD output.Furnish details of MFTD.

    MFTD is Multifunction Transducer which

    provides analog signals which can measure

    active, reactive power & energy at ECP.

    16 35210078623-Sht 05Digital multi function meter Drawing revised to incorporate the comment.

    17 35210078623-Sht 05

    Watt transducer indicated in SLD to be shown Multifunction transducer provided instead of

    watt transducer which provides watt output

    alongwith other analog signals.

    18 35210078623-Sht 05 Current y phase shall be indicated. To be indicated in revised drawings.

    19 35210078623-Sht 06

    DC supply supervision 80D aux Contactor used for DC supply

    supervision.Description will be indicated in

    revised drawings.

  • 7/27/2019 11kv Schemes 24th-25th April 2013

    5/14

    20 35210078623-Sht 06

    240VAC shall be derived from 415/240 VAC

    aux. transformer of adequate rating so as to

    have fault isolation on sec side.

    It may be noted that the 415V AC supply is

    being fed from AC distribution SWBD. In case

    of any short circuit, fuses at the AC

    distribution SWBD shall be blown protecting

    the bus.Also as the supply is taken from 1

    phase & neutral alternately it will prevent theunbalance of current in a single phase.

    21 35210078623-Sht 07

    What is future interlock for FEB & BEB This future interlock is provided for any

    interlock to be used in future at later stage.

    22 35210078623-Sht 07Furnish FEB/BEB Scheme Scheme submitted

    23 35210078623-Sht 07 Furnish the logic for this where it is derived Drawing revised to incorporate the comment.

    24 35210078623-Sht 0786 not operated shall be taken for test closing

    circuit

    Drawing revised to incorporate the comment.

    25 35210078623-Sht 08Furnish the details of planned logic where it is

    derived

    Planned Logic is derived in numerical relay &

    the same has been furnished.

    26 35210078623-Sht 0950LBB function of relay shall be indiacted. Drawing revised to incorporate the comment.

    27 35210078623-Sht 09

    LBB aux relay shall be provided for contact

    multiplication & use.

    LBB function is part of the numerical relay as

    mentioned in SLD. If required numerical relay

    contacts can be programmed.

    28 35210078623-Sht 11Breaker in Service indication shall be Amber Drawing revised to incorporate the comment.

    29 35210078623-Sht 11Provide indicating lamp for closing circuit

    healthy indication

    Drawing revised to incorporate the comment.

    30 35210078623-Sht 1252a/b contacts not shown in sheet 07. Shall be incorporated in revised/as

    manufactured drawings.

  • 7/27/2019 11kv Schemes 24th-25th April 2013

    6/14

    31 35210078623-Sht 12Indicate service description of all the contacts

    shown

    Drawing revised to incorporate the comment.

    32 35210078623-Sht 12Closing circuit unhealthy to DDCMIS Drawing will be revised to incorporate the

    comment.

    33 35210078623-Sht 12Breaker spring charged to DDCMIS Drawing revised to incorporate the comment.

    34 35210078623-Sht 12

    Feeder/ Bus earthed contacts to DDCMIS. 75FET contacts are given to upstream breaker

    circuit for tripping the upstream breaker

    during Feeder earthing. However, it is not

    possible to provide feeder/Bus earthed

    contacts to DDCMIS as no electrical interlocks

    can be provided for the same.

    35 35210078623-Sht 13

    LBB opearted contacts for alarm/ DCS & spare ,

    to wire to Bus under voltage master trip relay

    & for tie breaker Trip

    Drawing will be revised to incorporate the

    comment.

    36 35210078623-Sht 14Indicate what are the indications provided on

    relay front

    Shall be incorporated in revised drawings.

    37 35210078626-Sht 03

    As per SLD time delayed no voltage protection

    shall be provided.

    Time delayed no voltage protection feature is

    present in the numerical relay provided.

    38 35210078626-Sht 05Indicate the parameters displayed in MFM Drawing revised to incorporate the comment.

    39 35210078626-Sht 05

    Ammeter & watt meter transducer shall be

    provided to monitor the parameters at ECP

    No meters on ECP.Ammeter & Multifunction

    transducer provided

    40 35210078627-Sht 01Panel number mentioned here is not matched

    with SLD

    Drawing revised to incorporate the comment.

    41 35210078627-Sht 01Also refer comments marked in IF type 1 from

    unit incomer

    Drawing revised to incorporate the comment.

    42 35210078628-Sht 01Also refer comments marked in IF type 1 from

    unit incomer

    Drawing revised to incorporate the comment.

    43 35210078629-Sht 01Also refer comments marked in IF type 1 from

    unit incomer

    Drawing revised to incorporate the comment.

  • 7/27/2019 11kv Schemes 24th-25th April 2013

    7/14

    44 35210078629-Sht 01Panel number mentioned here is not matched

    with SLD

    Drawing revised to incorporate the comment.

    45 35210078629-Sht 01Indicate services of OG Feeder Drawing revised to incorporate the comment.

    46 35210078630-Sht 01Comments same as on 629 Drawing revised to incorporate the comment.

    47 35210078630-Sht 02

    Relay should be communicated to DDCMIS All numerical relays will be connected through

    RS 485 port to the DDCMIS.Drawing will be

    revised to incorporate the comment.

    48 35210078630-Sht 03Relay should cover sensitive earth fault

    protection by using CBCT as input

    Function 50G will be shown in drawing

    49 35210078630-Sht 04 Ammeter & transducer to be provided Already shown in drawing as TDI.

    50 Indicate services Shall be incorporated in revised drawings.

    51 Indicate logic diagram reference Shall be incorporated in revised drawings.

    52Panel number mentioned here is not matched

    with SLD

    Drawing revised to incorporate the comment.

    53Also refer comments marked in IF type 1 from

    unit incomer

    Drawing revised to incorporate the comment.

    54 35210078632,33-Sht 02Relay should have sensitive earth fault

    protection

    Function 50G will be shown in drawing

    55 35210078633-Sht 03Current to be displayed at ECP, necessary

    transducer to be provided.

    Ammeter transducer already provided in Y

    phase.

    56 35210078634-Sht 02Provide technical manual Technical manual to be sent by 15th feb 2013.

    57 35210078634-Sht 03Ammeter transducer to be provided Ammeter transducer already provided in Y

    phase.

    58Panel number mentioned here is not matched

    with SLD

    Drawing revised to incorporate the comment.

    59Also refer comments marked in IF type 1 from

    unit incomer

    Drawing revised to incorporate the comment.

    35210078631,32,33,34-

    Sht 01

    35210078635,36,37,38-

  • 7/27/2019 11kv Schemes 24th-25th April 2013

    8/14

    60

    As per SLD time delayed no voltage protection

    shall be provided.

    Time delayed no voltage protection feature is

    present in the numerical relay provided.

    RPCL STEAG BHEL

  • 7/27/2019 11kv Schemes 24th-25th April 2013

    9/14

    RPCL/Steag Comments

    Noted

    RPCL/Steag will review & furnish

    comments, if any.

    Noted

    Noted

    Discussed on Rev 01 drawings.

    Noted

    BHEL to include the numerical

    relay diagram in the respective

    schemes indicating all itscontacts & ports. BHEL agreed to

    incorporate the same.

    Same shall be indicated in the

    revised drawings.BHEL agreed.

    RPCL/Steag will review & furnish

    comments/approval.

  • 7/27/2019 11kv Schemes 24th-25th April 2013

    10/14

    Same shall be indicated in the

    revised drawings.BHEL agreed.

    Not yet furnished.BHEL to furnish

    the same.

    Noted

    Noted

    Noted

    Noted

    Noted

    Noted

    Noted

    Noted

  • 7/27/2019 11kv Schemes 24th-25th April 2013

    11/14

    Noted

    RPCL/Steag requested BHEL to

    furnish the write up on interlock

    & functioning of FEB & BEB.

    BHEL has agreed to furnish the

    same.

    RPCL/Steag will review & furnish

    comments/approval.

    RPCL/Steag will review & furnishcomments, if any.

    Noted

    RPCL/Steag will review & furnish

    comments, if any.

    Noted.

    Noted.

    Noted.

    Noted.

    Noted.

  • 7/27/2019 11kv Schemes 24th-25th April 2013

    12/14

    Noted.

    Noted.

    Noted.

    Noted

    Noted

    Same to be indicated in the

    drawing

    Noted

    Noted

    Noted

    Same as in Drg No: 35210078623

    Same as in Drg No: 35210078623

    Same as in Drg No: 35210078623

  • 7/27/2019 11kv Schemes 24th-25th April 2013

    13/14

    Noted

    Noted

    Noted

    Noted

    Noted

    Noted

    Noted

    Noted

    Noted

    Noted

    Noted

    Noted

    Not recieved. BHEL furnished

    soft copy.

    Noted

    RPCL/Steag will review & furnish

    comments/approval.

    RPCL/Steag will review & furnish

    comments/approval.

  • 7/27/2019 11kv Schemes 24th-25th April 2013

    14/14

    RPCL/Steag will review & furnish

    comments/approval.