MUDAJAYA CORPORATION BERHAD OSH TASK RISK ASSESSMENT Doc No. Ref Code / Rev Department 10 Damansara Height Personnel participated & consulted: Assessors name Prepared by: Reviewed by: Area Name Designation 1) Name: Name: Name: Activity Preliminaries Works - Site Clearing 2) Signature: Signature: Signature: 3) Date: Date: Date: dentification Risk Assessment Control No. Sub-Activity Hazards Consequences F L S C, PC, NC 1 R/W C 1 2 4 Y 8 I C 1 3 4 Y 12 II Exposure to noise C 1 2 2 N 4 I C 1 2 2 N 4 I Mosquito/ insect bites C 2 2 2 N 8 I Inhalation of dust C 1 3 2 N 6 I C 1 2 2 N 4 I C 1 2 4 Y 8 I Heat stress Fatigue/ skin rash C 3 2 2 N 12 II C 1 2 2 N 4 I Exposed to UV & IR ray C 1 2 2 N 4 I Skin burn C 1 2 1 N 2 I Condition of assessment Applicable OSH Leg/Reg/COP (in addition to OSHA Sec 15, FM(SHW) reg) Existing Control Measures (ECM) Legal Compliance Significa nt Hazard? (Y/N) Risk Rating Risk Categ. Determination of control 1. Elimination of hazards 2. Substitution 3. Engineering 4. Administrative 5. Personal Protective Eq Excavation Of Earth - (Excavator, Back Hoe and Dump Truck) Struck /crushed by machine/Collision Body injuries / fatality OSHA Act Sec 15. FM (BOWEC)(Safety) Enggineering & Admin. Control - Safety awareness -Barrier, Traffic Control, Training, Briefing & Monitoring 1. All workers must be in work. 2. All wor commencement and weekly t hazards. Barricade to Excavate Are 4. Appoint Potential contact with underground power line Body injuries / fatality OSHA Act Sec 15. FM (BOWEC) (Electrical Hazard) Reg 16. 1986 Electricity Supply Act 1990 Electricity Reg. and rules 1994 Enggineering, Admin. Control & PPE - Safety awareness -Isolation, Briefing, Monitoring and appropriate PPE work. 2. Al P.P.E To provide competent supe activity full time. 4. To organi every time want to start 5. To Chronic hearing problem OSHA Act Sec 15 FM (Noise Exposure) Reg. 1989. Admin. Control & PPE - Safety awareness -Ear plug/muff & initial noise monitoring 1. All workers must be in work. 2. Al P.P.E To provide competent supe activity full time. 4. To organi every time want to start Inhalation of heavy smoke / exhaust fume Chronic health problem OSHA Sec 15, FM (BOWEC) Reg 11 & 14. 1986 Enggineering & Admin. Control - Safety awareness -Face mask, Servicing, Toolbox Talk, Monitoring 1. All workers must used 2. Un-goo to be check and repair as 3. Toolbox Tal Dengue/ skin rash/dermatitis 1. OSHA Act Sect 15, 2. FMA Sect. 22. 3. Prevention And Control Of Infectious Diseases Act and Regulation Elimination- Pest control 1. Appoint pest control t as shown in Prevention An Diseases Act and Regulati Irritation of respiratory tract OSHA Sec 15, FM (Mineral Dust) Reg. 1989 Engineering, admin control & PPE - Water sprinkling/Browser, Dust mask and training 1. Provide water sprinkle dust. 2. supply fa involved Slippery & poor access/egress Slip, trip & fall - body injuries OSHA Sec 15, FM (SHW) & (BOWEC) Engineering, Admin Control - Provided proper access/egress, training/information Operation in unsafe mode Body injuries / fatality OSHA Sec 15 & 24 Admin. Control - Safe work practice 1. Stop work. 2.Terminate if necessary OSHA Sec 15 & 24, FMA Sect. 23 Engineering, admin control & PPE - Shelter, Briefing & Protective clothing 1. Provive Shelter for wo direct sun. 2. Brief wo water. 3. Advise workers to use hot weather. Exposure to welding fume Irritation of respiratory tract OSHA Sec 15 & 24, FM (BOWEC)(Safety) Reg 14. Admin control & PPE Training, Briefing & Face mask permanent eye damage OSHA Sec 15, FMA Sec 11 & (BOWEC) Reg 15 Admin control & PPE Training, Briefing & Face Shield Exposure to welding spark OSHA Sec 15, FMA Sec 11 & (BOWEC) Reg 15 Admin control & PPE Training, Briefing, Protective clothing, hand glove & face shield

Upload: harry-hasbullah

Post on 25-Nov-2014

545 views

Category:

Documents


60 download

TRANSCRIPT

MUDAJAYA CORPORATION BERHAD OSH TASK RISK ASSESSMENTDoc No.

Ref Code / Rev

Department 10 Damansara Height Personnel participated & consulted: Assessors name Prepared by: Reviewed by: Approved by:

Area Name Designation 1) Name: Name: Name:Activity

Preliminaries Works - Site Clearing2) Signature: Signature: Signature:

3) Date: Date: Date:Hazard Identification Risk Assessment Control

No. Sub-Activity Hazards Consequences F L S

C, PC, NC

1 R/W

Body injuries / fatality C 1 2 4 Y 8 I

Body injuries / fatality C 1 3 4 Y 12 II

Exposure to noise C 1 2 2 N 4 I

Chronic health problem C 1 2 2 N 4 I

Mosquito/ insect bites C 2 2 2 N 8 I

Inhalation of dust C 1 3 2 N 6 I

C 1 2 2 N 4 I

Operation in unsafe mode Body injuries / fatality OSHA Sec 15 & 24 C 1 2 4 Y 8 I

Heat stress Fatigue/ skin rash C 3 2 2 N 12 II

2 NR/W

Exposure to welding fume C 1 2 2 N 4 I

Exposed to UV & IR ray permanent eye damage C 1 2 2 N 4 I

Exposure to welding spark Skin burn C 1 2 1 N 2 I

Condition of assessment

Applicable OSH Leg/Reg/COP (in addition to OSHA Sec 15,

FM(SHW) reg)

Existing Control Measures (ECM)

Legal Compliance Significant

Hazard?(Y/N)

Risk Rating

Risk Categ.

Determination of control hierarchy:1. Elimination of hazards2. Substitution3. Engineering4. Administrative5. Personal Protective Equipment (PPE)

Excavation Of Earth - (Excavator, Back Hoe and

Dump Truck)

Struck /crushed by machine/Collision

OSHA Act Sec 15. FM (BOWEC)(Safety)

Enggineering & Admin. Control - Safety awareness

-Barrier, Traffic Control, Training, Briefing &

Monitoring

1. All workers must be inducted before commencing of work. 2. All workers must be briefing before commencement and weekly toolbox talks to explain the hazards. 3. Provide Barricade to Excavate Area. 4. Appoint a Traffic Controller.

Potential contact with underground power line

OSHA Act Sec 15. FM (BOWEC) (Electrical Hazard) Reg 16. 1986 Electricity Supply Act 1990 Electricity Reg. and

rules 1994

Enggineering, Admin. Control & PPE - Safety awareness -

Isolation, Briefing, Monitoring and appropriate PPE

1. All workers must be inducted before commencing work. 2. All workers must use proper P.P.E 3. To provide competent super visor to supervise the activity full time. 4. To organize Tool Box talk/meeting every time want to start work. 5. To provide ‘Clearance Marking’ as per TNB requirement.

Chronic hearing problem

OSHA Act Sec 15 FM (Noise Exposure)

Reg. 1989.

Admin. Control & PPE - Safety awareness -Ear plug/muff &

initial noise monitoring

1. All workers must be inducted before commencing work. 2. All workers must use proper P.P.E 3. To provide competent super visor to supervise the activity full time. 4. To organize Tool Box talk/meeting every time want to start work.

Inhalation of heavy smoke / exhaust fume

OSHA Sec 15, FM (BOWEC) Reg 11 & 14. 1986

Enggineering & Admin. Control - Safety awareness

-Face mask, Servicing, Toolbox Talk,

Monitoring

1. All workers must used proper PPE at work site. 2. Un-good condition of machinery need to be check and repair as posible. 3. Toolbox Talk before start work.

Dengue/ skin rash/dermatitis

1. OSHA Act Sect 15, 2. FMA Sect. 22. 3. Prevention And Control Of Infectious Diseases Act and

Regulation

Elimination- Pest control

1. Appoint pest control to clear all insect/ mosquito as shown in Prevention And Control Of Infectious Diseases Act and Regulation

Irritation of respiratory tract

OSHA Sec 15, FM (Mineral Dust) Reg. 1989

Engineering, admin control & PPE - Water

sprinkling/Browser, Dust mask and training

1. Provide water sprinkler/ browser to prevent flying dust. 2. supply face mask to worker which involved

Slippery & poor access/egress

Slip, trip & fall - body injuries

OSHA Sec 15, FM (SHW) & (BOWEC)

Engineering, Admin Control - Provided proper

access/egress, training/information

Admin. Control - Safe work practice

1. Stop work. 2.Terminate if necessary

OSHA Sec 15 & 24, FMA Sect. 23

Engineering, admin control & PPE - Shelter,

Briefing & Protective clothing

1. Provive Shelter for workers cooling body from direct sun. 2. Brief workers to drink a lot of plain water. 3. Advise workers to use a appropriate cloth due to hot weather.

Installation of Hoarding - (Welding Set, Power Tool/Drill)

Irritation of respiratory tract

OSHA Sec 15 & 24, FM (BOWEC)(Safety)

Reg 14.

Admin control & PPE Training, Briefing &

Face mask

OSHA Sec 15, FMA Sec 11 &

(BOWEC) Reg 15

Admin control & PPE Training, Briefing &

Face Shield

OSHA Sec 15, FMA Sec 11 &

(BOWEC) Reg 15

Admin control & PPE Training, Briefing, Protective clothing, hand glove &

face shield

Hazard Identification Risk Assessment Control

No. Sub-Activity Hazards Consequences F L S

C, PC, NC

Condition of assessment

Applicable OSH Leg/Reg/COP (in addition to OSHA Sec 15,

FM(SHW) reg)

Existing Control Measures (ECM)

Legal Compliance Significant

Hazard?(Y/N)

Risk Rating

Risk Categ.

Determination of control hierarchy:1. Elimination of hazards2. Substitution3. Engineering4. Administrative5. Personal Protective Equipment (PPE)

2 NR/W

Electrocution Fatality /body injuries C 1 3 4 Y 12 II

Exposure to sharp object Hand Injuries C 1 3 2 N 6 I

Flying of particles Eye or body injuries C 1 2 2 N 4 I

Heat stress Fatigue C 2 3 2 N 12 II

Mosquito/ insect bites C 1 2 3 Y 6 I

3 NR/W

Body injuries / fatality C 1 2 4 Y 8 I

Mosquito/ insect bites C 1 2 3 Y 6 I

C 1 3 2 N 6 I

Body injuries / fatality C 1 3 4 Y 12 II

Fall into excavated trench Body injuries C 1 3 2 N 6 I

Inhalation of dust C 1 3 2 N 6 I

Electrocution Fatality /body injuries C 1 2 4 Y 8 I

Heat stress Fatigue C 1 2 1 N 2 I

Installation of Hoarding - (Welding Set, Power Tool/Drill)

OSHA Sec 15, FM (BOWEC)(SAFETY)

Reg. 16

Admin control & PPE Training, Briefing, Protective

clothing & hand glove.

1. Only the competent permitted to carrying out work. 2. PPE equipment that suitable to be used while working. 3. Supervise and provide briefing before start work. 4. Obtain Working Permit from MCB. 5. All workers must be inducted before commencing of work. 6. All workers must be briefing before start work.

OSHA Sec 15, FMA Sec. 24

Engineering, admin control & PPE - Guarded,

briefing and Protective clothing

1. All moving part of the machine must be fully guarded. 2. All workers must be inducted before commencing of work. 3. All workers must be briefing before start work. 4. Proper PPE must be worn while working. 5. Provide training to workers which involved.

OSHA Sec 15, FMA Sec. 24

Admin control & PPE Training, Briefing, Protective

clothing & hand glove.

OSHA Sec 15 & 24, FMA Sect. 23

Engineering, admin control & PPE - Shelter,

Briefing & Protective clothing

1. Provive Shelter for workers cooling body from direct sun. 2. Brief workers to drink a lot of plain water. 3. Advise workers to use a appropriate cloth due to hot weather.

Dengue/ skin rash/dermatitis

1. OSHA Act Sect 15, 2. FMA Sect. 22. 3. Prevention And Control

Of Infectious Diseases Act and Regulation

Elimination- Pest control

1. Appoint pest control to clear all insect/ mosquito as shown in Prevention And Control Of Infectious Diseases Act and Regulation

Silt Trap/Wash Trough - (Excavator, Back Hoe, Welding Set, Cutting

Machine/grinder)

Struck /crushed by machine/Collision

OSHA Act Sec 15. FM (BOWEC)(Safety)

Enggineering & Admin. Control - Safety awareness

-Barrier, Traffic Control, Training, Briefing &

Monitoring

1. All workers must be inducted before commencing of work. 2. All workers must be briefing before commencement and weekly toolbox talks to explain the hazards. 3. Provide Barricade to Excavate Area. 4. Appoint a Traffic Controller.

Dengue/ skin rash/dermatitis

1. OSHA Act Sect 15, 2. FMA Sect. 22. 3.

Prevention And Control Of Infectious Diseases Act and

Regulation

Elimination- Pest control

1. Appoint pest control to clear all insect/ mosquito as shown in Prevention And Control Of Infectious Diseases Act and Regulation

Inhalation of dust/Concrette Dust

Irritation of respiratory tract

OSHA Sec 15, FM (Mineral Dust) Reg. 1989

Engineering, admin control & PPE - Water

sprinkling/Browser, Dust mask and training

1. Provide water sprinkler/ browser to prevent flying dust. 2. supply face mask to worker which involved

Potential contact with underground power line

OSHA Act Sec 15. FM (BOWEC) (Electrical Hazard) Reg 16. 1986 Electricity Supply Act 1990 Electricity Reg. and

rules 1994

Enggineering, Admin. Control & PPE - Safety awareness -

Isolation, Briefing, Monitoring and appropriate PPE

1. All workers must be inducted before commencing work. 2. All workers must use proper P.P.E 3. To provide competent super visor to supervise the activity full time. 4. To organize Tool Box talk/meeting every time want to start work. 5. To provide ‘Clearance Marking’ as per TNB requirement. 6. Permit To Work.

OSHASec 15, FMA (BOWEC)

Engineering,Admin control- Guardrail/Barrier, monitoring

Irritation of respiratory tract

OSHA Sec 15, FM (Mineral Dust) Reg. 1989

Engineering, admin control & PPE - Water

sprinkling/Browser, Dust mask and training

1. Provide water sprinkler/ browser to prevent flying dust. 2. supply face mask to worker which involved

OSHA Sec 15, FM (BOWEC)(SAFETY)

Reg. 16

Admin control & PPE Training, Briefing, Protective

clothing & hand glove.

1. Only the competent permitted to carrying out work. 2. PPE equipment that suitable to be used while working. 3. Supervise and provide briefing before start work. 4. Obtain Working Permit from MCB. 5. All workers must be inducted before commencing of work. 6. All workers must be briefing before start work.

OSHA Sec 15 & 24, FMA Sect. 23

Engineering, admin control & PPE - Shelter,

Briefing & Protective clothing

Hazard Identification Risk Assessment Control

No. Sub-Activity Hazards Consequences F L S

C, PC, NC

Condition of assessment

Applicable OSH Leg/Reg/COP (in addition to OSHA Sec 15,

FM(SHW) reg)

Existing Control Measures (ECM)

Legal Compliance Significant

Hazard?(Y/N)

Risk Rating

Risk Categ.

Determination of control hierarchy:1. Elimination of hazards2. Substitution3. Engineering4. Administrative5. Personal Protective Equipment (PPE)

4 R/W

Body injuries / fatality C 1 3 4 Y 12 II

Body injuries / fatality C 1 3 4 Y 12 II

Chronic health problem C 1 3 2 N 6 I

Manual handling C 1 2 2 N 4 I

Exposure to welding fume C 1 3 2 N 6 I

Operation in unsafe mode Body injuries / fatality OSHA Sec 15 & 24 C 1 2 4 Y 8 I

Heat stress Fatigue/ skin rash C 2 3 2 N 12 II

Confined Space C 1 3 4 Y 12 II

Fall into excavated trench Body injuries C 1 3 2 N 6 I

Body injuries / fatality C 1 3 4 Y 12 II

Exposed to UV & IR ray Permanent eye damage C 1 3 2 N 6 I

Exposure to welding spark Skin burn C 1 3 2 N 6 I

Stream Diversion - (Excavator, Back Hoe, Welding Set & Cutting

Machine)

Struck /crushed by machine/Collision

OSHA Act Sec 15. FM (BOWEC)(Safety)

Enggineering & Admin. Control - Safety awareness

-Barrier, Traffic Control, Training, Briefing &

Monitoring

1. All workers must be inducted before commencing of work. 2. All workers must be briefing before commencement and weekly toolbox talks to explain the hazards. 3. Provide Barricade to Excavate Area. 4. Appoint a Traffic Controller.

Potential contact with underground power line

OSHA Act Sec 15. FM (BOWEC) (Electrical Hazard) Reg 16. 1986 Electricity Supply Act 1990 Electricity Reg. and

rules 1994

Enggineering, Admin. Control & PPE - Safety awareness -

Isolation, Briefing, Monitoring and appropriate PPE

1. All workers must be inducted before commencing work. 2. All workers must use proper P.P.E 3. To provide competent super visor to supervise the activity full time. 4. To organize Tool Box talk/meeting every time want to start work. 5. To provide ‘Clearance Marking’ as per TNB requirement. 6. Permit To Work.

Inhalation of heavy smoke / exhaust fume

OSHA Sec 15, FM (BOWEC) Reg 11 & 14. 1986

Enggineering & Admin. Control - Safety awareness

-Face mask, Servicing, Toolbox Talk,

Monitoring

1. All workers must used proper PPE at work site. 2. Un-good condition of machinery need to be check and repair as posible. 3. Toolbox Talk before start work.

Sprains, strains & backache

OSHA Act 15, FMA Sec. 12

Admin. Control - safe lifting procedure

Irritation of respiratory tract

OSHA Sec 15 & 24, FM (BOWEC)(Safety)

Reg 14.

Admin control & PPE Training, Briefing &

Face mask

Admin. Control - Safe work practice

1. Stop work. 2.Terminate if necessary

OSHA Sec 15 & 24, FMA Sect. 23

Engineering, admin control & PPE - Shelter,

Briefing & Protective clothing

1. Provive Shelter for workers cooling body from direct sun. 2. Brief workers to drink a lot of plain water. 3. Advise workers to use a appropriate cloth due to hot weather.

Harzadous Atmosphere OSHA Sect 15. ICOP 2010

(Industrial Code Of Practice)

Engineering, admin control & PPE - Guidelines in Industrial Code Of Practice

2010 (ICOP)

Detail Requirement: 1. Permit System. 2. Permit to Work. 3. Isolation Requirement. 4.Requirement to Ensure Safety of Atmosphere. 5. Entry Into Hazardous Atmosphere. 6. Rescue and Emergency Services. 7.Health Requirements of Person Working in Confined Space. 8. Training. 9. Additional Precautions During Occupancy of Confined Space. 10. Record Keeping.

OSHA Sec 15, FMA (BOWEC)

Engineering,Admin control- Guardrail/Barrier, monitoring

Soil collapse into trench/Cave in

OSHA Act 15, FM (BOWEC)

Reg 116,117 & 118

Engineering control- Shoring/ safe work practice,

Supervising

1. Permit To Work Required before excavation. 2. Supervise at all potential area in full time. 3. Briefing/Toolbox Talk before start work. 4. Training.

OSHA Sec 15, FMA Sec 11 &

(BOWEC) Reg 15

Admin control & PPE Training, Briefing &

Face Shield

OSHA Sec 15, FMA Sec 11 &

(BOWEC) Reg 15

Admin control & PPE Training, Briefing, Protective clothing, hand glove &

face shield

Hazard Identification Risk Assessment Control

No. Sub-Activity Hazards Consequences F L S

C, PC, NC

Condition of assessment

Applicable OSH Leg/Reg/COP (in addition to OSHA Sec 15,

FM(SHW) reg)

Existing Control Measures (ECM)

Legal Compliance Significant

Hazard?(Y/N)

Risk Rating

Risk Categ.

Determination of control hierarchy:1. Elimination of hazards2. Substitution3. Engineering4. Administrative5. Personal Protective Equipment (PPE)

4 R/W

Electrocution Fatality /body injuries C 1 3 4 Y 12 II

5 R/W

Body injuries / fatality C 1 2 4 Y 8 I

Body injuries / fatality C 1 3 4 Y 12 II

Exposure to noise C 1 2 2 N 4 I

Chronic health problem C 1 3 2 N 6 I

C 1 3 2 N 6 I

Operation in unsafe mode Body injuries / fatality OSHA Sec 15 & 24 C 1 2 4 Y 8 I

Heat stress Fatigue/ skin rash C 2 3 2 N 12 II

C 1 2 2 N 4 I

6 R/W

Exposed to UV & IR ray permanent eye damage C 1 2 2 N 4 I

Exposure to welding spark Skin burn C 1 3 2 N 6 I

Electrocution Fatality /body injuries C 1 3 4 Y 12 II

Stream Diversion - (Excavator, Back Hoe, Welding Set & Cutting

Machine)

OSHA Sec 15, FM (BOWEC)(SAFETY)

Reg. 16

Admin control & PPE Training, Briefing, Protective

clothing & hand glove.

1. Permit to Work Required for Hot Job. 2. Monitoring and analyze the potential of hazard. 3. Briefing/Toolbox Talk before start work. 4. Competent/Training.

Earth Work - (Excavator, Back Hoe, Back Pusher, Roller Compactor, Dump Truck)

Struck /crushed by machine/Collision

OSHA Act Sec 15. FM (BOWEC)(Safety)

Enggineering & Admin. Control - Safety awareness

-Barrier, Traffic Control, Training, Briefing &

Monitoring

1. All workers must be inducted before commencing of work. 2. All workers must be briefing before commencement and weekly toolbox talks to explain the hazards. 3. Provide Barricade to Excavate Area. 4. Appoint a Traffic Controller.

Potential contact with underground power line

OSHA Act Sec 15. FM (BOWEC) (Electrical Hazard) Reg 16. 1986 Electricity Supply Act 1990 Electricity Reg. and

rules 1994

Enggineering, Admin. Control & PPE - Safety awareness -

Isolation, Briefing, Monitoring and appropriate PPE

1. All workers must be inducted before commencing work. 2. All workers must use proper P.P.E 3. To provide competent super visor to supervise the activity full time. 4. To organize Tool Box talk/meeting every time want to start work. 5. To provide ‘Clearance Marking’ as per TNB requirement. 6. Permit To Work.

Chronic hearing problem

OSHA Act Sec 15 FM (Noise Exposure)

Reg. 1989.

Admin. Control & PPE - Safety awareness -Ear plug/muff &

initial noise monitoring

1. All workers must be inducted before commencing work. 2. All workers must use proper P.P.E 3. To provide competent super visor to supervise the activity full time. 4. To organize Tool Box talk/meeting every time want to start work.

Inhalation of heavy smoke / exhaust fume

OSHA Sec 15, FM (BOWEC) Reg 11 & 14. 1986

Enggineering & Admin. Control - Safety awareness

-Face mask, Servicing, Toolbox Talk,

Monitoring

1. All workers must used proper PPE at work site. 2. Un-good condition of machinery need to be check and repair as posible. 3. Toolbox Talk before start work.

Inhalation of dust/Concrette Dust

Irritation of respiratory tract

OSHA Sec 15, FM (Mineral Dust) Reg. 1989

Engineering, admin control & PPE - Water

sprinkling/Browser, Dust mask and training

1. Provide water sprinkler/ browser to prevent flying dust. 2. supply face mask to worker which involved

Admin. Control - Safe work practice

1. Stop work. 2.Terminate if necessary

OSHA Sec 15 & 24, FMA Sect. 23

Engineering, admin control & PPE - Shelter,

Briefing & Protective clothing

1. Provive Shelter for workers cooling body from direct sun. 2. Brief workers to drink a lot of plain water. 3. Advise workers to use a appropriate cloth due to hot weather.

Slippery & poor access/egress

Slip, trip & fall - body injuries

OSHA Sec 15 & 24 FMA (BOWEC)

Engineering, Admin Control - Provided proper

access/egress, training/information

Box Culvert and Sump - (Excavator/Back Hoe, Mobile Crane, Hacker, Oxy-Cutting,

Cutting Machine/Grinder)

OSHA Sec 15, FMA Sec 11 &

(BOWEC) Reg 15

Admin control & PPE Training, Briefing &

Face Shield

OSHA Sec 15, FMA Sec 11 &

(BOWEC) Reg 15

Admin control & PPE Training, Briefing, Protective clothing, hand glove &

face shield

OSHA Sec 15, FM (BOWEC)(SAFETY)

Reg. 16

Admin control & PPE Training, Briefing, Protective

clothing & hand glove.

1. Permit to Work Required for Hot Job. 2. Monitoring and analyze the potential of hazard. 3. Briefing/Toolbox Talk before start work. 4. Kompetent/Training.

Hazard Identification Risk Assessment Control

No. Sub-Activity Hazards Consequences F L S

C, PC, NC

Condition of assessment

Applicable OSH Leg/Reg/COP (in addition to OSHA Sec 15,

FM(SHW) reg)

Existing Control Measures (ECM)

Legal Compliance Significant

Hazard?(Y/N)

Risk Rating

Risk Categ.

Determination of control hierarchy:1. Elimination of hazards2. Substitution3. Engineering4. Administrative5. Personal Protective Equipment (PPE)

6 R/W

Exposure to welding fume C 1 3 2 N 6 I

Confined Space C 1 3 4 Y 12 II

Skin burn C 2 3 2 N 12 II

Fatality /body injuries C 2 1 4 Y 8 I

C 1 3 1 N 3 I

Flying of particles Eye or body injuries C 1 3 2 N 6 I

Body vibration Body injuries C 1 2 2 N 4 I

Body strain C 1 3 2 N 6 I

Exposure to noise C 1 3 3 Y 9 I

Hand-arm vibration Carpal tunnel syndrome C 1 2 2 N 4 I

Exposure to sharp object Hand Injuries C 1 3 2 N 6 I

Falling of materials Fatality /body injuries C 1 3 4 Y 12 II

Box Culvert and Sump - (Excavator/Back Hoe, Mobile Crane, Hacker, Oxy-Cutting,

Cutting Machine/Grinder)

Irritation of respiratory tract

OSHA Sec 15 & 24, FM (BOWEC)(Safety)

Reg 14.

Admin control & PPE Training, Briefing &

Face mask

Harzadous AtmosphereOSHA Sect 15.

ICOP 2010 (Industrial Code Of Practice)

Engineering, admin control & PPE - Guidelines in Industrial Code Of Practice

2010 (ICOP)

Detail Requirement: 1. Permit System. 2. Permit to Work. 3. Isolation Requirement. 4.Requirement to Ensure Safety of Atmosphere. 5. Entry Into Hazardous Atmosphere. 6. Rescue and Emergency Services. 7.Health Requirements of Person Working in Confined Space. 8. Training. 9. Additional Precautions During Occupancy of Confined Space. 10. Record Keeping.

Minor fire accident/ Contact with Hot Part

OSHA Sec 15 & 24 FMA (BOWEC)

Admin Control & PPE - Briefing,Protective clothing,

hand glove & face shield

1. Permit To Work Required for Hot Job. 2. Flashback Arrestor is compulsory. 3. Briefing/Toolbox Talk before start work. 4. Competent/Training.

Leakage of oxy-acetylene hose- fire or explosion

OSHA Sec 15 & 24 FMA (BOWEC)

Engineering & Admin. Control - Flash Back

Arrestor, Training, Briefing & Hot work permit

1. Permit Ro Work Required for Hot Job. 2. Flashback Arrestor is compulsory. 3. Briefing/Toolbox Talk before start work. 4. Competent/Training.

Inhalation of dust/Concrette Dust

Irritation of respiratory tract

OSHA Sec 15, FM (Mineral Dust) Reg. 1989

Engineering, admin control & PPE - Water

sprinkling/Browser, Dust mask and training

1. Provide water sprinkler/ browser to prevent flying dust. 2. supply face mask to worker which involved

OSHA Sec 15, FMA Sec. 24

Admin control & PPE Training, Briefing, Protective

clothing & hand glove.

OSHA Sec 15 FMA (BOWEC)

Admin. Control - Training, Briefing, Job

Rotation & Safe work practice

Ergonomic- awkward position & repetitive motion

Info from: DOSH,Niosh, CROSH, CCOHS, Miosh & etc

Admin. Control - Training, Briefing, Job

Rotation & Safe work practice

Chronic hearing problem

OSHA Act Sec 15 FM (Noise Exposure)

Reg. 1989.

Admin. Control & PPE - Safety awareness -Ear plug/muff &

initial noise monitoring

1. All workers must be inducted before commencing work. 2. All workers must use proper P.P.E 3. To provide competent super visor to supervise the activity full time. 4. To organize Tool Box talk/meeting every time want to start work.

OSHA Sec 15 FMA (BOWEC)

Admin. Control - Training, Briefing, Job

Rotation & Safe work practice

OSHA Sec 15, FMA Sec. 24

Engineering, admin control & PPE - Guarded,

briefing and Protective clothing

1. All moving part of the machine must be fully guarded. 2. All workers must be inducted before commencing of work. 3. All workers must be briefing before start work. 4. Proper PPE must be worn while working. 5. Provide training to workers which involved.

OSHA Sec 15 & 24 FMA (BOWEC)

Admin control & PPE Training, Briefing, Signalman, Safe Work Practice & Safety

Helmet

1. All workers must be inducted before commencing of work. 2. All workers must be briefing before commencement and weekly toolbox talks to explain the hazards. 3. Provide Barricade to Excavate Area. 4. Appoint a signalman with a good communication to operator.

Hazard Identification Risk Assessment Control

No. Sub-Activity Hazards Consequences F L S

C, PC, NC

Condition of assessment

Applicable OSH Leg/Reg/COP (in addition to OSHA Sec 15,

FM(SHW) reg)

Existing Control Measures (ECM)

Legal Compliance Significant

Hazard?(Y/N)

Risk Rating

Risk Categ.

Determination of control hierarchy:1. Elimination of hazards2. Substitution3. Engineering4. Administrative5. Personal Protective Equipment (PPE)

6 R/W

Toppling of crane Fatality /body injuries C 1 2 4 Y 8 I

C 1 3 2 N 6 I

Operation of Power Tools C 1 2 3 Y 6 I

Heat stress Fatigue/ skin rash C 1 3 1 N 3 I

Body injuries / fatality C 1 3 4 Y 12 II

Flying of particles Eye or body injuries C 1 3 2 N 6 I

C 1 2 2 N 4 I

Skin burn C 1 3 3 Y 9 I

Exposure to sharp object Hand Injuries C 1 3 2 N 6 I

7 R/W

Falling of material Body injuries C 1 2 4 Y 8 I

Toppling of crane Body injuries / fatality C 1 3 4 Y 12 II

Operation in unsafe mode Body injuries / fatality OSHA Sec 15 & 24 C 1 2 4 Y 8 I

Box Culvert and Sump - (Excavator/Back Hoe, Mobile Crane, Hacker, Oxy-Cutting,

Cutting Machine/Grinder)

OSHA Sec 15 FMA (BOWEC)

Admin. Control - Safe working load/procedure

1. All workers must be inducted before commencing of work. 2. All workers must be briefing before commencement and weekly toolbox talks to explain the hazards. 3. Competent/license operator only can operate machine 4. Appoint a signalman with a good communication to operator. 5. Supervise by the experience person.

Slippery & poor access/egress

Slip, trip & fall - body injuries

OSHA Sec 15 & 24 FMA (BOWEC)

Engineering, Admin Control - Provided proper

access/egress, training/information

Hand injuries/Body Injury

OSHA Sec 15, FM (BOWEC)

Engin. & Admin control - Mechanical guard, Safe Work

Practice training & Briefing

1. All workers must be inducted before commencing of work. 2. All workers must be briefing before commencement and weekly toolbox talks to explain the hazards. 3. Training workers only can operate machine. 4. Supervise by the experience person.

OSHA Sec 15 & 24, FMA Sect. 23

Engineering, admin control & PPE - Shelter,

Briefing & Protective clothing

Soil collapse into trench/Cave in

OSHA Act 15, FM (BOWEC)

Reg 116,117 & 118

Engineering control- Shoring/ safe work practice,

Supervising

1. Permit To Work Required before excavation. 2. Supervise at all potential area in full time. 3. Briefing/Toolbox Talk before start work. 4. Training.

OSHA Sec 15, FMA Sec. 24

Admin control & PPE Training, Briefing, Protective

clothing & hand glove.

Inhalation of dust/Concrette Dust

Irritation of respiratory tract

OSHA Sec 15, FM (Mineral Dust) Reg. 1989

Engineering, admin control & PPE - Water

sprinkling/Browser, Dust mask and training

Minor fire accident/ Contact with Hot Part

OSHA Sec 15 & 24 FMA (BOWEC)

Admin Control & PPE - Briefing,Protective clothing,

hand glove & face shield

1. Permit To Work Required before excavation. 2. Supervise at all potential area in full time. 3. Briefing/Toolbox Talk before start work. 4. Training.

OSHA Sec 15, FMA Sec. 24

Engineering, admin control & PPE - Guarded,

briefing and Protective clothing

1. All moving part of the machine must be fully guarded. 2. All workers must be inducted before commencing of work. 3. All workers must be briefing before start work. 4. Proper PPE must be worn while working. 5. Provide training to workers which involved.

Piling Works - (Jack-In Machine, Mobile Crane,

Welding Set, Generator, Drop Hammer)

OSHA Sec 15 & 24 FMA (BOWEC)

Admin control & PPE Training, Briefing, Signalman, Safe Work Practice & Safety

Helmet

1. All workers must be inducted before commencing of work. 2. All workers must be briefing before commencement and weekly toolbox talks to explain the hazards. 3. Provide Barricade to Excavate Area. 4. Appoint a signalman with a good communication to license machine operator.

OSHA Sec 15 FMA (BOWEC)

Admin. Control - Safe working load/procedure

1. All workers must be inducted before commencing of work. 2. All workers must be briefing before commencement and weekly toolbox talks to explain the hazards. 3. Competent/license operator only can operate machine 4. Appoint a signalman with a good communication to operator. 5. Supervise by the experience person.

Admin. Control - Safe work practice

1. Stop work. 2.Terminate if necessary

Hazard Identification Risk Assessment Control

No. Sub-Activity Hazards Consequences F L S

C, PC, NC

Condition of assessment

Applicable OSH Leg/Reg/COP (in addition to OSHA Sec 15,

FM(SHW) reg)

Existing Control Measures (ECM)

Legal Compliance Significant

Hazard?(Y/N)

Risk Rating

Risk Categ.

Determination of control hierarchy:1. Elimination of hazards2. Substitution3. Engineering4. Administrative5. Personal Protective Equipment (PPE)

7 R/W

Exposure to noise C 1 3 2 N 6 I

Electrocution Fatality /body injuries C 1 3 4 Y 12 II

Heat stress Fatigue/ skin rash C 2 3 1 N 6 I

8 NR/W

Heat stress Fatigue/ skin rash C 1 3 1 N 3 I

Body injuries / fatality C 1 2 4 Y 8 I

Piling Works - (Jack-In Machine, Mobile Crane,

Welding Set, Generator, Drop Hammer)

Chronic hearing problem

OSHA Act Sec 15 FM (Noise Exposure)

Reg. 1989.

Admin. Control & PPE - Safety awareness -Ear plug/muff &

initial noise monitoring

1. All workers must be inducted before commencing work. 2. All workers must use proper P.P.E 3. To provide competent super visor to supervise the activity full time. 4. To organize Tool Box talk/meeting every time want to start work.

OSHA Sec 15, FM (BOWEC)(SAFETY)

Reg. 16

Admin control & PPE Training, Briefing, Protective

clothing & hand glove.

1. Permit Ro Work Required for Hot Job. 2. Monitoring and analyze the potential of hazard. 3. Briefing/Toolbox Talk before start work. 4. Kompetent/Training.

OSHA Sec 15 & 24, FMA Sect. 23

Engineering, admin control & PPE - Shelter,

Briefing & Protective clothing

Load Test - (Mobile Crane, Jack-In Machine)

OSHA Sec 15 & 24, FMA Sect. 23

Engineering, admin control & PPE - Shelter,

Briefing & Protective clothing

Struck /crushed by machine/Collision

OSHA Act Sec 15. FM (BOWEC)(Safety)

Enggineering & Admin. Control - Safety awareness

-Barrier, Traffic Control, Training, Briefing &

Monitoring

1. All workers must be inducted before commencing of work. 2. All workers must be briefing before commencement and weekly toolbox talks to explain the hazards. 3. Provide Barricade to Excavate Area. 4. Appoint a Traffic Controller.

MUDAJAYA CORPORATION BERHAD OSH TASK RISK ASSESSMENTDoc No.

Ref Code / Rev

Department 10 Damansara Height Personnel participated & consulted: Assessors name Prepared by: Reviewed by: Approved by:

Area Name Designation 1) Name: Name: Name:Activity Building Works 2) Signature: Signature: Signature:

3) Date: Date: Date:Hazard Identification Risk Assessment Control

No. Sub-Activity Hazards Consequences F L S

C, PC, NC

1 Scaffolding NR/W

Collapse of Structure Body injuries / fatality C 1 3 4 Y 12 II

Falling from Height Body injuries / fatality C 1 3 4 Y 12 II

Fatality /body injuries C 1 3 4 Y 12 II

C 1 2 3 Y 6 I

Lightning Body injuries / fatality C 1 2 4 Y 8 I

Electrocution Fatality /body injuries C 1 2 4 Y 8 I

Wind/Rain C 1 3 4 Y 12 II

Heat Stress Fatigue C 4 2 1 N 8 I

2 Working Platform NR/W

Collapse Body injuries / fatality C 1 3 4 Y 12 II

Falling from Height Body injuries / fatality C 1 3 4 Y 12 II

Condition of assessment

Applicable OSH Leg/Reg/COP (in addition to OSHA Sec 15,

FM(SHW) reg)

Existing Control Measures (ECM)

Legal Compliance Significant

Hazard?(Y/N)

Risk Rating

Risk Categ.

Determination of control hierarchy:1. Elimination of hazards2. Substitution3. Engineering4. Administrative5. Personal Protective Equipment (PPE)

OSHA Sec 15. FM (BOWEC) (Scaffold)

Part 10 Reg 72-98

Enggin. & Admin. Control - Safety awareness, Competent, PE Design,

Training, Briefing & Monitoring

1. Erected by competent/training person only. 2. PE Design required for any scaffold erected more than 15 meters. 3. Inspection and supervising of competent person every time before its to be used. 4. Record keeping. 5. Ensure the material is in good condition/serviceable

Osha Sec. 15 & 24 FM (SHW) Reg 12, 32 & (Scaffold)

Pt 10 Reg 72-98

Engin. & Admin Control - Walking Platform, Safety Harness /belt, Training &

Briefing

1. Erected by competent/training person only. 2. Safety Harness/belt, lifelines & necessary precaution. 3. Briefing/toolbox talk before commencing work. 4. Supervise by competent person. 5. Safe Work Practice.

Falling of construction material from height

OSHA Sec 15 & 24 FMA (BOWEC)

Admin control & PPE Training, Briefing, Signalman, Safe Work Practice & Safety

Helmet

1. All workers must be inducted before commencing of work. 2. All workers must be briefing before commencement and weekly toolbox talks to explain the hazards. 3. Provide Toe Board to Open Edge. 4. Barrier working area to prevent any invasion. 5. Monitoring of work and working area.

Slippery & poor access/egress

Slip, trip & fall - body injuries

OSHA Sec 15 & 24 FMA (BOWEC)

Engineering, Admin Control - Provided proper

access/egress, training/information

1. Ensure all workers aware about a safe work practice & procedure. 2. Briefing before start work. 3. immediately replace unserviceable or damage equipment. 4. safety belt or lifelines required for working at height

OSHA Act Sec 15. FMA Sec 23

Admin Control - Safe work practice & Briefing.

1. All workers must be inducted before commencing of work. 2. All workers must be briefing before commencement and weekly toolbox talks to explain the hazards. 3. Stop work immediatly.

OSHA Sec 15, FM (BOWEC) Reg. 16

Admin control & PPE Training, Briefing, Protective

clothing & hand glove.

1. Electrical Hand Tool must be in good condition. 2. Monitoring and analyze the potential of hazard. 3. Briefing/Toolbox Talk before start work. 4. Competent/Training.

Structure Collapse/ disturbed/budge

OSHA Sec 15. FM (BOWEC) (Scaffold)

Part 10 Reg 72-98

Admin. Control - Safe work practice

1. Scaffold must be check and assessed every week and after heavy rain or wind, (Refer Checklist) 2. Record keeping. 3. Immediate action fo any consequences to the structure or scaffold condition. 4. PE Design Required for scaffold erected 15 meter and above

OSHA Sec 15 & 24, FMA Sect. 23

Engineering, admin control & PPE - Shelter, Briefing &

Protective clothing

OSHA Sec 15. FM (BOWEC) (Scaffold)

Part 10 Reg 72-98

Enggin. & Admin. Control - Safety awareness, Competent, PE Design,

Training, Briefing & Monitoring

1. Erected by competent/training person only. 2. PE Design required for any scaffold erected more than 15 meters. 3. Inspection and supervising of competent person every time before its to be used. 4. Record keeping. 5. Ensure the material is in good condition/serviceable

Osha Sec. 15 & 24 FM (SHW) Reg 12, 32 & (Scaffold)

Pt 10 Reg 72-98

Engin. & Admin Control - Walking Platform, Safety Harness /belt, Training &

Briefing

1. Erected by competent/training person only. 2. Safety Harness/belt, lifelines & necessary precaution. 3. Briefing/toolbox talk before commencing work. 4. Supervise by competent person. 5. Safe Work Practice.

Hazard Identification Risk Assessment Control

No. Sub-Activity Hazards Consequences F L S

C, PC, NC

Condition of assessment

Applicable OSH Leg/Reg/COP (in addition to OSHA Sec 15,

FM(SHW) reg)

Existing Control Measures (ECM)

Legal Compliance Significant

Hazard?(Y/N)

Risk Rating

Risk Categ.

Determination of control hierarchy:1. Elimination of hazards2. Substitution3. Engineering4. Administrative5. Personal Protective Equipment (PPE)

2 Working Platform NR/W

Fatality /body injuries C 1 3 4 Y 12 II

C 1 2 3 Y 6 I

Lightning Body injuries / fatality C 1 2 4 Y 8 I

Electrocution Fatality /body injuries C 1 2 4 Y 8 I

Wind/Rain C 1 3 4 Y 12 II

Heat Stress Fatigue C 4 2 1 N 8 I

3 Ladder NR/W

Collapse of Structure Body injuries / fatality C 1 2 4 Y 8 I

Falling from Height Body injuries / fatality C 1 3 4 Y 12 II

C 1 3 2 N 6 I

4 Concrette Mixer R/W

Body injuries C 1 3 3 Y 9 I

Body strain C 1 3 2 N 6 I

Chronic health problem C 1 3 2 N 6 I

Falling of construction material from height

OSHA Sec 15 & 24 FMA (BOWEC)

Admin control & PPE Training, Briefing, Signalman, Safe Work Practice & Safety

Helmet

1. All workers must be inducted before commencing of work. 2. All workers must be briefing before commencement and weekly toolbox talks to explain the hazards. 3. Provide Toe Board to Open Edge. 4. Barrier working area to prevent any invasion. 5. Monitoring of work and working area.

Slippery & poor access/egress

Slip, trip & fall - body injuries

OSHA Sec 15 & 24 FMA (BOWEC)

Engineering, Admin Control - Provided proper

access/egress, training/information

1. Ensure all workers aware about a safe work practice & procedure. 2. Briefing before start work. 3. immediately replace unserviceable or damage equipment. 4. safety belt or lifelines required for working at height

OSHA Sec 15. FMA Sec 23

Admin Control - Safe work practice & Briefing.

1. All workers must be inducted before commencing of work. 2. All workers must be briefing before commencement and weekly toolbox talks to explain the hazards. 3. Stop work immediatly.

OSHA Sec 15, FM (BOWEC) Reg. 16

Admin control & PPE Training, Briefing, Protective

clothing & hand glove.

1. Electrical Hand Tool must be in good condition. 2. Monitoring and analyze the potential of hazard. 3. Briefing/Toolbox Talk before start work. 4. Competent/Training.

Structure Collapse/ disturbed/budge

OSHA Sec 15. FM (BOWEC) (Scaffold)

Part 10 Reg 72-98

Admin. Control - Safe work practice

1. Scaffold must be check and assessed condition every week and after heavy rain or wind, (Refer Checklist) 2. Record keeping. 3. Immediate action for any consequences to the structure or scaffold condition.

OSHA Sec 15 & 24, FMA Sect. 23

Engineering, admin control & PPE - Shelter, Briefing &

Protective clothing

OSHA Sec 15. FM (BOWEC) (Scaffold)

Part 10 Reg 72-98

Enggin. & Admin. Control - Safety awareness, Competent, PE Design,

Training, Briefing & Monitoring

1. Only a good condition of ladder allowed to be used. 2. Mantain of good keeping of ladder condition. 3. Immediate change any damages with serviceable one. 4. Ensure the material is in good condition/serviceable

Osha Sec. 15 & 24 FM (SHW) Reg 12, 32 & (Scaffold)

Pt 10 Reg 72-98

Engin. & Admin Control - Walking Platform, Safety Harness /belt, Training &

Briefing

1. Erected by competent/training person only. 2. Hard Barrier/Guard rail. 3. Briefing/toolbox talk before commencing work. 4. Supervise by competent person. 5. Safe Work Practice. 6. Ensure the material is in good condition/serviceable

Slippery & poor access/egress

Slip, trip & fall - body injuries

OSHA Sec 15 & 24 FMA (BOWEC)

Engineering, Admin Control - Provided proper

access/egress, training/information

Caught in moving parts of machines

OSHA Sec 15 & 24 FMA sec 15,20

Engin, Admin Control & PPE - Guard rail, Safe work

practice, Training & Briefing.

1. All workers must be inducted before commencing of work. 2. All workers must be briefing before commencement and weekly toolbox talks to explain the hazards. 3. Guarding machine/moving part.

Ergonomic- awkward position & repetitive motion

Info from: DOSH,Niosh, CROSH, CCOHS, Miosh & etc

Admin. Control - Training, Briefing, Job Rotation

& Safe work practice

Inhalation of heavy smoke / exhaust fume

OSHA Sec 15, FM (BOWEC) Reg 11 & 14. 1986

Enggineering & Admin. Control - Safety awareness

-Face mask, Servicing, Toolbox Talk,

Monitoring

1. All workers must used proper PPE at work site. 2. Un-good condition of machinery need to be check and repair as posible. 3. Briefing before start work.

Hazard Identification Risk Assessment Control

No. Sub-Activity Hazards Consequences F L S

C, PC, NC

Condition of assessment

Applicable OSH Leg/Reg/COP (in addition to OSHA Sec 15,

FM(SHW) reg)

Existing Control Measures (ECM)

Legal Compliance Significant

Hazard?(Y/N)

Risk Rating

Risk Categ.

Determination of control hierarchy:1. Elimination of hazards2. Substitution3. Engineering4. Administrative5. Personal Protective Equipment (PPE)

4 Concrette Mixer R/W

Exposure to noise Chronic hearing problem C 1 3 2 N 6 I

5 Air Compressor NR/W

Electrocution Fatality /body injuries C 1 2 4 Y 8 I

Chronic health problem C 1 3 2 N 6 I

Struck by pressure hoses Body injuries C 1 2 3 Y 6 I

Unfit/ unsafe machine Body injuries / fatality C 1 3 4 Y 12 II

Exposure to noise Chronic hearing problem C 1 3 3 Y 9 I

6 Generator NR/W

Electrocution Fatality /body injuries C 1 3 4 Y 12 II

Exposed hot surface Skin burn C 1 3 2 N 6 I

Chronic health problem C 1 3 2 N 6 I

Exposure to noise Chronic hearing problem C 1 1 2 N 2 I

7 Bending Machine R/W

Body injuries / fatality C 1 3 4 Y 12 II

OSHA Act Sec 15 FM (Noise Exposure)

Reg. 1989.

Admin. Control & PPE - Safety awareness

-Ear plug/muff & initial noise monitoring

1. All workers must be inducted before commencing work. 2. All workers must use proper P.P.E 3. To provide competent super visor to supervise the activity full time. 4. Briefing before start work.

OSHA Sec 15, FM (BOWEC) Reg. 16

Admin control & PPE Training, Briefing, Protective

clothing & hand glove.

1. Electrical Hand Tool must be in good condition. 2. Monitoring and analyze the potential of hazard. 3. Briefing/Toolbox Talk before start work. 4. Competent/Training.

Inhalation of heavy smoke / exhaust fume

OSHA Sec 15, FM (BOWEC) Reg 11 & 14. 1986

Enggineering & Admin. Control - Safety awareness

-Face mask, Servicing, Toolbox Talk,

Monitoring

1. All workers must used proper PPE at work site. 2. Un-good condition of machinery need to be check and repair as posible. 3. Briefing before start work.

OSHA Sec 15. FMA Reg 4 & 118

Enggineering & Admin. Control - Safety awareness

-Barrier, Traffic Control, Training, Briefing &

Monitoring

1. All workers must be inducted before commencing of work. 2. All workers must be briefing before commencement and weekly toolbox talks to explain the hazards.

FM - Rules (Boiler and Compressor) 1970 & FMA

(Notification,Cert of Fitness & Insp.) Reg.1970

Admin Control - Only machine with fitness certified must be

used.

1. All Air compressor must have c ertificate of fitness from DOSH and display at the compressor. 2. Maintenance and servicing as schedule. 3. Record Keeping.

OSHA Act Sec 15 FM (Noise Exposure)

Reg. 1989.

Admin. Control & PPE - Safety awareness

-Ear plug/muff & initial noise monitoring

1. All workers must be inducted before commencing work. 2. All workers must use proper P.P.E 3. To provide competent super visor to supervise the activity. 4. Briefing before start work.

OSHA Sec 15, FM (BOWEC) Reg. 16

Admin control & PPE Training, Briefing, Protective

clothing & hand glove.

1. General check before used and the machine must be in good condition. 2. Monitoring and analyze the potential of hazard. 3. Monthly check/maintenance must in schedule. 4. Record Keeping.

OSHA Sec 15 & 24 FMA (BOWEC)

Admin Control & PPE - Briefing,Protective clothing,

hand glove & face shield

Inhalation of heavy smoke / exhaust fume

OSHA Sec 15, FM (BOWEC) Reg 11 & 14. 1986

Enggineering & Admin. Control - Safety awareness

-Face mask, Servicing, Toolbox Talk,

Monitoring

1. Placement generator in open area and suitable. 2. Un-good condition of machinery need to be check and repair as posible. 3. Maintenance must be done as schedule. 4. Record Keeping.

OSHA Act Sec 15 FM (Noise Exposure)

Reg. 1989.

Admin. Control & PPE - Safety awareness

-Ear plug/muff & initial noise monitoring

Caught in moving parts of machines

OSHA Sec 15 & 24 FMA sec 15,20

Engin, Admin Control & PPE - Guard rail, Safe work

practice, Training & Briefing.

1. All workers must be inducted before commencing of work. 2. All workers must be briefing before commencement and weekly toolbox talks to explain the hazards. 3. Guarding machine/moving part.

Hazard Identification Risk Assessment Control

No. Sub-Activity Hazards Consequences F L S

C, PC, NC

Condition of assessment

Applicable OSH Leg/Reg/COP (in addition to OSHA Sec 15,

FM(SHW) reg)

Existing Control Measures (ECM)

Legal Compliance Significant

Hazard?(Y/N)

Risk Rating

Risk Categ.

Determination of control hierarchy:1. Elimination of hazards2. Substitution3. Engineering4. Administrative5. Personal Protective Equipment (PPE)

7 Bending Machine R/W

Operation of Power Tools Hand injuries/Body Injury C 1 2 3 Y 6 I

Chronic health problem C 1 3 2 N 6 I

Body strain C 1 2 2 N 4 I

Exposure to noise Chronic hearing problem C 1 2 2 N 4 I

8 Cutting Machine R/W

Operation of Power Tools Hand injuries/Body Injury C 1 2 3 Y 6 I

Chronic health problem C 1 3 2 N 6 I

Eye or body injuries C 1 2 2 N 4 I

Inhalation of dust C 1 3 2 N 6 I

Body strain C 1 2 2 N 4 I

Exposure to noise Chronic hearing problem C 1 3 3 Y 9 I

9 Mobile Crane R/W

Toppling Fatality /body injuries C 1 3 4 Y 12 II

OSHA Sec 15, FM (BOWEC)

Engin. & Admin control - Mechanical guard, Safe Work

Practice training & Briefing

1. All workers must be inducted before commencing of work. 2. All workers must be briefing before commencement and weekly toolbox talks to explain the hazards. 3. Guarding machine/moving part.

Inhalation of heavy smoke / exhaust fume

OSHA Sec 15, FM (BOWEC) Reg 11 & 14. 1986

Enggineering & Admin. Control - Safety awareness

-Face mask, Servicing, Toolbox Talk,

Monitoring

1. Placement machine in open area and suitable. 2. Un-good condition of machinery need to be check and repair as posible. 3. Maintenance must be done as schedule.

Ergonomic- awkward position & repetitive motion

Info from: DOSH,Niosh, CROSH, CCOHS, Miosh & etc

Admin. Control - Training, Briefing, Job Rotation

& Safe work practice

OSHA Act Sec 15 FM (Noise Exposure)

Reg. 1989.

Admin. Control & PPE - Safety awareness

-Ear plug/muff & initial noise monitoring

OSHA Sec 15, FM (BOWEC)

Engin. & Admin control - Mechanical guard, Safe Work

Practice training & Briefing

1. All workers must be inducted before commencing of work. 2. All workers must be briefing before commencement and weekly toolbox talks to explain the hazards. 3. Guarding machine/moving part.

Inhalation of heavy smoke / exhaust fume

OSHA Sec 15, FM (BOWEC) Reg 11 & 14. 1986

Enggineering & Admin. Control - Safety awareness

-Face mask, Servicing, Toolbox Talk,

Monitoring

1. All workers must used proper PPE at work site. 2. Un-good condition of machinery need to be check and repair as posible. 3. Toolbox Talk before start work. 4. Place the machine in a good ventilation area.

Flying of particles and cutting disc

OSHA Sec 15, FMA Sec. 24

Admin control & PPE Training, Briefing, Protective

clothing & hand glove.

Irritation of respiratory tract

OSHA Sec 15, FM (Mineral Dust) Reg. 1989

Engineering, admin control & PPE - Water

sprinkling/Browser, Dust mask and training

1. Provide water sprinkler/ browser to prevent flying dust. 2. supply face mask to worker which involved

Ergonomic- awkward position & repetitive motion

Info from: DOSH,Niosh, CROSH, CCOHS, Miosh & etc

Admin. Control - Training, Briefing, Job Rotation

& Safe work practice

OSHA Act Sec 15 FM (Noise Exposure)

Reg. 1989.

Admin. Control & PPE - Safety awareness

-Ear plug/muff & initial noise monitoring

1. All workers must used proper PPE at work site. 2. Un-good condition of machinery need to be check and repair as posible. 3. Toolbox Talk before start work. 4. stationed machine in open area to prevent sound wave that repeat

OSHA Sec 15 FM (BOWEC) Reg 6, 58, 118

Admin. Control - Safe working load/procedure

1. Operator must be inducted before commencing of work. 2. Competent/license operator only can operate machine 3. Appoint a signalman with a good communication to operator. 4. Supervise by the experience person.

Hazard Identification Risk Assessment Control

No. Sub-Activity Hazards Consequences F L S

C, PC, NC

Condition of assessment

Applicable OSH Leg/Reg/COP (in addition to OSHA Sec 15,

FM(SHW) reg)

Existing Control Measures (ECM)

Legal Compliance Significant

Hazard?(Y/N)

Risk Rating

Risk Categ.

Determination of control hierarchy:1. Elimination of hazards2. Substitution3. Engineering4. Administrative5. Personal Protective Equipment (PPE)

9 Mobile Crane R/W

Falling of materials Fatality /body injuries C 1 3 4 Y 12 II

Body injuries / fatality C 1 2 4 Y 8 I

Fatality /body injuries C 1 3 4 Y 12 II

Lightning Body injuries / fatality C 1 1 4 Y 4 I

10 Excavator / Back Hoe R/W

Body injuries / fatality C 1 3 4 Y 12 II

Falling of materials Fatality /body injuries C 1 3 2 N 6 I

Operation in unsafe mode Body injuries / fatality OSHA Sec 15 & 24 C 1 2 4 Y 8 I

Fall into excavated trench Body injuries C 1 3 2 N 6 I

Body injuries / fatality C 1 3 4 Y 12 II

Fatality /body injuries C 1 3 4 Y 12 II

Lightning Body injuries / fatality C 1 2 4 Y 8 I

11 Lorry / Dump Truck NR/W

Body injuries / fatality C 1 2 4 Y 8 I

OSHA Sec 15 & 24 FMA (BOWEC)

Admin control & PPE Training, Briefing, Signalman, Safe Work Practice & Safety

Helmet

1. All workers must be inducted before commencing of work. 2. All workers must be briefing before commencement and weekly toolbox talks to explain the hazards. 3. Avoid to be under loading material. 4. Appoint a signalman with a good communication to operator.

Struck /crushed by machine/Collision

OSHA Act Sec 15. FM (BOWEC)(Safety)

Enggineering & Admin. Control - Safety awareness

-Barrier, Traffic Control, Training, Briefing &

Monitoring

1. Operator must be inducted before commencing of work. 2. Competent/license operator only can operate machine 3. Appoint a signalman with a good communication to operator. 4. Supervise by the experience person.

Electrocution (Working near power sources)

OSHA Sec 15, FMA (BOWEC)

Admin Control & PPE -Briefing, monitoring, Safe Work Practice, hand glove & Safety

Boot

1. Safe work practice/procedure must be follow 2. Monitoring and analyze the potential of hazard. 3. Briefing/Toolbox Talk before start work.

OSHA Sec 15. FMA Sec 23

Admin Control - Safe work practice & Briefing.

1. All workers must be inducted before commencing of work. 2. All workers must be briefing before commencement and weekly toolbox talks to explain the hazards. 3. Stop work immediatly.

Struck /crushed by machine/Collision

OSHA Act Sec 15. FM (BOWEC)(Safety)

Enggineering & Admin. Control - Safety awareness

-Barrier, Traffic Control, Training, Briefing &

Monitoring

1. All workers must be inducted before commencing of work. 2. All workers must be briefing before commencement and weekly toolbox talks to explain the hazards. 3. Provide Barricade to Excavate Area. 4. Appoint a Traffic Controller.

OSHA Sec 15 & 24 FMA (BOWEC)

Admin control & PPE Training, Briefing, Signalman, Safe Work Practice & Safety

Helmet

1. All workers must be inducted before commencing of work. 2. All workers must be briefing before commencement and weekly toolbox talks to explain the hazards. 3. Provide Barricade to Excavate Area. 4. Appoint a signalman with a good communication to operator.

Admin. Control - Safe work practice

1. Stop work. 2.Terminate if necessary

OSHA Sec 15, FMA (BOWEC)

Engineering,Admin control- Guardrail/Barrier, monitoring

Potential contact with underground power line

OSHA Act Sec 15. FM (BOWEC) (Electrical Hazard) Reg 16. 1986 Electricity Supply Act 1990 Electricity Reg. and

rules 1994

Enggineering, Admin. Control & PPE - Safety awareness -

Isolation, Briefing, Monitoring and appropriate PPE

1. All workers must be inducted before commencing work. 2. All workers must use proper P.P.E 3. To provide competent super visor to supervise the activity full time. 4. To organize Tool Box talk/meeting every time want to start work. 5. To provide ‘Clearance Marking’ as per TNB requirement. 6. Permit To Work.

Electrocution (Working near power sources)

OSHA Sec 15, FMA (BOWEC)

Admin Control & PPE -Briefing, monitoring, Safe Work Practice, hand glove & Safety

Boot

1. Safe work practice/procedure must be follow 2. Monitoring and analyze the potential of hazard. 3. Briefing/Toolbox Talk before start work.

OSHA Sec 15. FMA Sec 23

Admin Control - Safe work practice & Briefing.

1. All workers must be inducted before commencing of work. 2. All workers must be briefing before commencement and weekly toolbox talks to explain the hazards. 3. Stop work immediatly.

Struck /crushed by machine/Collision

OSHA Act Sec 15. FM (BOWEC)(Safety)

Enggineering & Admin. Control - Safety awareness

-Barrier, Traffic Control, Training, Briefing &

Monitoring

1. All workers must be inducted before commencing of work. 2. All workers must be briefing before commencement and weekly toolbox talks to explain the hazards. 3. Arrange flow of traffic 4. Appoint a Traffic Controller.

Hazard Identification Risk Assessment Control

No. Sub-Activity Hazards Consequences F L S

C, PC, NC

Condition of assessment

Applicable OSH Leg/Reg/COP (in addition to OSHA Sec 15,

FM(SHW) reg)

Existing Control Measures (ECM)

Legal Compliance Significant

Hazard?(Y/N)

Risk Rating

Risk Categ.

Determination of control hierarchy:1. Elimination of hazards2. Substitution3. Engineering4. Administrative5. Personal Protective Equipment (PPE)

11 Lorry / Dump Truck NR/W

Fall into excavated trench Body injuries C 1 3 2 N 6 I

Body injuries / fatality C 1 3 4 Y 12 II

Chronic health problem C 1 3 2 N 6 I

Falling of materials Body injuries C 1 2 2 N 4 I

12 Roller / Roller Compactor NR/W

Body injuries / fatality C 1 3 4 Y 12 II

Exposure to noise Chronic hearing problem C 1 3 2 N 6 I

Body Vibration C 1 3 2 N 6 I

13 Power Tool NR/W

Exposure to noise Chronic hearing problem C 1 2 2 N 4 I

Body injuries / fatality C 1 2 4 Y 8 I

Body Vibration C 1 2 2 N 4 I

Hand-arm vibration Carpal tunnel syndrome C 1 3 2 N 6 I

OSHA Sec 15, FMA (BOWEC)

Engineering,Admin control- Guardrail/Barrier, monitoring

Struck /crushed by machine/Collision

OSHA Act Sec 15. FM (BOWEC)(Safety)

Enggineering & Admin. Control - Safety awareness

-Barrier, Traffic Control, Training, Briefing &

Monitoring

1. All workers must be inducted before commencing of work. 2. All workers must be briefing before commencement and weekly toolbox talks to explain the hazards. 3. Provide Barricade to Excavate Area. 4. Appoint a Traffic Controller.

Inhalation of heavy smoke / exhaust fume

OSHA Sec 15, FM (BOWEC) Reg 11 & 14. 1986

Enggineering & Admin. Control - Safety awareness

-Face mask, Servicing, Toolbox Talk,

Monitoring

1. All workers must used proper PPE at work site. 2. Un-good condition of machinery need to be check and repair as posible. 3. Toolbox Talk before start work. 4. Place the machine in a good ventilation area.

OSHA Sec 15 & 24 FMA (BOWEC)

Admin control & PPE Training, Briefing, Signalman, Safe Work Practice & Safety

Helmet

1. All workers must be inducted before commencing of work. 2. All workers must be briefing before commencement and weekly toolbox talks to explain the hazards. 3. Appoint a Traffic Controller.

Struck /crushed by machine/Collision

OSHA Act Sec 15. FM (BOWEC)(Safety)

Enggineering & Admin. Control - Safety awareness

-Barrier, Traffic Control, Training, Briefing &

Monitoring

1. All workers must be inducted before commencing of work. 2. All workers must be briefing before commencement and weekly toolbox talks to explain the hazards. 3. Provide Barricade to working Area. 4. Appoint a Traffic Controller.

OSHA Act Sec 15 FM (Noise Exposure)

Reg. 1989.

Admin. Control & PPE - Safety awareness

-Ear plug/muff & initial noise monitoring

1. All workers must be inducted before commencing work. 2. All workers must use proper P.P.E 3. Noise monitoring 4. Briefing before start work.

Body Injuries/ Health Impact

OSHA Sec 15 FMA (BOWEC)

Admin. Control - Training, Briefing, Job Rotation

& Safe work practice

1. Operator must be inducted before start work. 2. Work monitoring in a potential area.

OSHA Act Sec 15 FM (Noise Exposure)

Reg. 1989.

Admin. Control & PPE - Safety awareness

-Ear plug/muff & initial noise monitoring

1. All workers must be inducted before commencing work. 2. All workers must use proper P.P.E 3. To provide competent super visor to supervise the activity full time. 4. To organize Tool Box talk/meeting every time want to start work.

Caught in moving parts of machines

OSHA Sec 15 & 24 FMA sec 15,20

Engin, Admin Control & PPE - Guard rail, Safe work

practice, Training & Briefing.

1. All workers must be inducted before commencing of work. 2. All workers must be briefing before commencement and weekly toolbox talks to explain the hazards. 3. Provide guard to moving part if necessary. 4. Supervise the work

Body Injuries/ Health Impact

OSHA Sec 15 FMA (BOWEC)

Admin. Control - Training, Briefing, Job Rotation

& Safe work practice

1. Workers must be inducted before start work. 2. Work monitoring and supervising. 3. Workers must have a good health and fit to work.

OSHA Sec 15 FMA (BOWEC)

Admin. Control - Training, Briefing, Job Rotation

& Safe work practice

Hazard Identification Risk Assessment Control

No. Sub-Activity Hazards Consequences F L S

C, PC, NC

Condition of assessment

Applicable OSH Leg/Reg/COP (in addition to OSHA Sec 15,

FM(SHW) reg)

Existing Control Measures (ECM)

Legal Compliance Significant

Hazard?(Y/N)

Risk Rating

Risk Categ.

Determination of control hierarchy:1. Elimination of hazards2. Substitution3. Engineering4. Administrative5. Personal Protective Equipment (PPE)

13 Power Tool NR/W

Electrocution Fatality /body injuries C 1 3 4 Y 12 II

14 Drill / Grinder NR/W

Exposure to noise Chronic hearing problem C 1 2 2 N 4 I

Flying of particles Eye or body injuries C 1 3 2 N 6 I

Exposure to sharp object Hand Injuries C 1 3 2 N 6 I

Operation in unsafe mode Body injuries / fatality OSHA Sec 15 & 24 C 1 2 4 Y 8 I

Body injuries C 1 2 3 Y 6 I

Electrocution Fatality /body injuries C 1 3 4 Y 12 II

15 Jack Hammer / Hacker NR/W

Exposure to noise Chronic hearing problem C 1 2 2 N 4 I

Body injuries C 1 2 2 N 4 I

Electrocution Fatality /body injuries C 1 2 4 Y 8 I

Body vibration Body injuries C 1 3 2 N 6 I

OSHA Sec 15, FM (BOWEC) Reg. 16

Admin control & PPE Training, Briefing, Protective

clothing & hand glove.

1. Electrical Hand Tool must be in good condition. 2. Monitoring and analyze the potential of hazard. 3. Briefing/Toolbox Talk before start work. 4. Competent/Training.

OSHA Sec 15 FM (Noise Exposure)

Reg. 1989.

Admin. Control & PPE - Safety awareness

-Ear plug/muff & initial noise monitoring

1. All workers must be inducted before commencing work. 2. All workers must use proper P.P.E 3. To provide competent super visor to supervise the activity. 4. Briefing before start work.

OSHA Sec 15, FMA Sec. 24

Admin control & PPE Training, Briefing, Protective

clothing & hand glove.

OSHA Sec 15, FMA Sec. 24

Engineering, admin control & PPE - Guarded, briefing

and Protective clothing

1. All moving part of the machine must be fully guarded. 2. All workers must be inducted before commencing of work. 3. All workers must be briefing before start work. 4. Proper PPE must be worn while working. 5. Provide training to workers which involved.

Admin. Control - Safe work practice

1. Stop work. 2.Terminate if necessary

Caught in moving parts of machines

OSHA Sec 15 & 24 FMA sec 15,20

Engin, Admin Control & PPE - Machine Guard, Safe work practice, Training & Briefing.

1. All workers must be inducted before commencing of work. 2. All workers must be briefing before commencement and weekly toolbox talks to explain the hazards. 3. Provide guard to moving part if necessary. 4. Supervise the work

OSHA Sec 15, FM (BOWEC) Reg. 16

Admin control & PPE Training, Briefing, Protective

clothing & hand glove.

1. Electrical Hand Tool must be in good condition. 2. Monitoring and analyze the potential of hazard. 3. Briefing/Toolbox Talk before start work. 4. Competent/Training.

OSHA Sec 15 FM (Noise Exposure)

Reg. 1989.

Admin. Control & PPE - Safety awareness

-Ear plug/muff & initial noise monitoring

1. All workers must be inducted before commencing work. 2. All workers must use proper P.P.E 3. To provide competent super visor to supervise the activity. 4. Briefing before start work.

Caught in moving parts of machines

OSHA Sec 15 & 24 FMA sec 15,20

Engin, Admin Control & PPE - Machine Guard, Safe work practice, Training & Briefing.

1. All workers must be inducted before commencing of work. 2. All workers must be briefing before commencement and weekly toolbox talks to explain the hazards. 3. Provide guard to moving part if necessary. 4. Supervise the work

OSHA Sec 15 & 24 FMA (BOWEC)

Admin control & PPE Training, Briefing, Protective

clothing & hand glove.

1. Electrical Hand Tool must be in good condition. 2. Monitoring and analyze the potential of hazard. 3. Briefing/Toolbox Talk before start work. 4. Competent/Training.

OSHA Sec 15 FMA (BOWEC)

Admin. Control - Training, Briefing, Job Rotation

& Safe work practice

1. Electrical Hand Tool must be in good condition. 2. Workers must be inducted before start work. 3. Work monitoring and supervising. 4. Workers must have a good health and fit to work. 5. Competent/Training.

Hazard Identification Risk Assessment Control

No. Sub-Activity Hazards Consequences F L S

C, PC, NC

Condition of assessment

Applicable OSH Leg/Reg/COP (in addition to OSHA Sec 15,

FM(SHW) reg)

Existing Control Measures (ECM)

Legal Compliance Significant

Hazard?(Y/N)

Risk Rating

Risk Categ.

Determination of control hierarchy:1. Elimination of hazards2. Substitution3. Engineering4. Administrative5. Personal Protective Equipment (PPE)

16

R/W

Fatality /body injuries C 1 3 4 Y 12 II

Electrocution Fatality /body injuries C 1 3 4 Y 12 II

Exposed to UV & IR ray permanent eye damage C 1 2 2 N 4 I

Heat Stress Fatigue/ skin rash C 1 2 2 N 4 I

Exposure to welding fume C 1 2 2 N 4 I

Exposure to welding spark Skin burn C 1 3 2 N 6 I

17 Construction of Main Drains

R/W

Falling of materials Fatality /body injuries C 1 3 4 Y 12 II

Body injuries / fatality C 1 3 4 Y 12 II

C 1 3 1 N 3 I

C 1 2 2 N 4 I

Body strain C 1 2 2 N 4 I

NR/W Lightning Body injuries / fatality C 1 2 4 Y 8 I

Welding - (Electric/Gases)

Leakage of oxy-acetylene hose- fire or explosion

OSHA Sec 15 & 24 FMA (BOWEC)

Engineering & Admin. Control - Flash Back Arrestor, Training, Briefing & Hot work

permit

1. Cartridge must be stored in proper place and secure. 2. The cartridge must have a bucket c/w standby fire extinguisher. 3. Only the hose with flash back arreator allowed to be used. 4. Only the competent workers can operate the welding. 5. Working permit needed before start work. 6. Safety briefing and workplace monitoring by supervisor in charge

OSHA Sec 15, FM (BOWEC) Reg. 16

Admin control & PPE Training, Briefing, Protective

clothing & hand glove.

1. Electrical Hand Tool must be in good condition. 2. Monitoring and analyze the potential of hazard. 3. Briefing/Toolbox Talk before start work. 4. Competent/Training.

OSHA Sec 15, FMA Sec 11 &

(BOWEC) Reg 15

Admin control & PPE Training, Briefing & Face

Shield

OSHA Sec 15 & 24, FMA Sect. 23

Engineering, admin control & PPE - Shelter, Briefing &

Protective clothing

Irritation of respiratory tract

OSHA Sec 15 & 24, FM (BOWEC)(Safety)

Reg 14.

Admin control & PPE Training, Briefing & Face

mask

1. All workers must used proper PPE at work site. 2. Un-good condition of equipment need to be check and repair as posible. 3. Toolbox Talk before start work.

OSHA Sec 15, FMA Sec 11 &

(BOWEC) Reg 15

Admin control & PPE Training, Briefing, Protective

clothing, hand glove & face shield

OSHA Sec 15 & 24 FMA (BOWEC)

Admin control & PPE Training, Briefing, Signalman, Safe Work Practice & Safety

Helmet

1. All workers must be inducted before commencing of work. 2. All workers must be briefing before commencement and weekly toolbox talks to explain the hazards. 3. Provide Barricade to Excavate Area. 4. Appoint a signalman with a good communication to operator.

Soil collapse into trench/Cave in

OSHA Act 15, FM (BOWEC)

Reg 116,117 & 118

Engineering control- Shoring/ safe work practice, Supervising

1. Permit To Work Required before excavation. 2. Supervise at all potential area in full time. 3. Briefing/Toolbox Talk before start work. 4. Trenching system required. 5. Training.

Inhalation of dust/Concrette Dust

Irritation of respiratory tract

OSHA Sec 15 & 24 FM (Mineral Dust) Reg. 1989

Engineering, admin control & PPE - Water

sprinkling/Browser, Dust mask and training

1. Provide water sprinkler/ browser to prevent flying dust. 2. supply face mask to worker which involved

Slippery & poor access/egress

Slip, trip & fall - body injuries

OSHA Sec 15, FMA 1967

Engineering, Admin Control - Provided proper

access/egress, training/information

Ergonomic- awkward position & repetitive motion

Info from: DOSH,Niosh, CROSH, CCOHS, Miosh & etc

Admin. Control - Training, Briefing, Job Rotation

& Safe work practice

OSHA Sec 15. FMA Sec 23

Admin Control - Safe work practice & Briefing.

1. All workers must be inducted before commencing of work. 2. All workers must be briefing before commencement and weekly toolbox talks to explain the hazards. 3. Stop work immediatly.

Hazard Identification Risk Assessment Control

No. Sub-Activity Hazards Consequences F L S

C, PC, NC

Condition of assessment

Applicable OSH Leg/Reg/COP (in addition to OSHA Sec 15,

FM(SHW) reg)

Existing Control Measures (ECM)

Legal Compliance Significant

Hazard?(Y/N)

Risk Rating

Risk Categ.

Determination of control hierarchy:1. Elimination of hazards2. Substitution3. Engineering4. Administrative5. Personal Protective Equipment (PPE)

17 Construction of Main Drains

R/W Heat Stress Fatigue/ skin rash C 1 2 1 N 2 I

18 Wall R/W

Falling from Height Body injuries / fatality C 1 3 4 Y 12 II

Fatality /body injuries C 1 2 4 Y 8 I

Wall Collapse Body injuries / fatality C 1 2 3 Y 6 I

Body strain C 1 2 2 N 4 I

19 Formwork R/W

Falling from Height Body injuries / fatality C 1 3 4 Y 12 II

Entanglement by rotating saw Body injuries / fatality C 1 3 4 Y 12 II

Inhalation of wood dust C 1 3 2 N 6 I

Flying of nails/ objects Eye or body injuries C 1 2 2 N 4 I

Body injuries / fatality C 1 3 4 Y 12 II

Body injuries C 1 2 2 N 4 I

Struck or pinch by hammer Hand Injuries C 1 3 2 N 6 I

OSHA Sec 15 & 24, FMA Sect. 23

Engineering, admin control & PPE - Shelter, Briefing &

Protective clothing

Osha Sec. 15 & 24 FMA (BOWEC)

Engin. & Admin Control - Walking Platform, Safety Harness /belt, Training &

Briefing

1. All workers must be inducted before commencing of work. 2. All workers must be briefing before commencement and weekly toolbox talks to explain the hazards. 3. Provide training & safe work practice. 4. Monitoring and supervise the works..

Falling of construction material from height

OSHA Sec 15 & 24 FMA (BOWEC)

Admin control & PPE Training, Briefing, Signalman, Safe Work Practice & Safety

Helmet

1. All workers must be inducted before commencing of work. 2. All workers must be briefing before commencement and weekly toolbox talks to explain the hazards. 3. Provide training & safe work practice. 4. Monitoring and supervise the works..

OSHA Sec 15 & 24 FMA (BOWEC)

Admin control & PPE Training, Briefing,safe Work

Practice & Safety Helmet

1. Supervise & monitoring at all potential area. 2. Briefing/Toolbox Talk before start work. 3. Training & Safe work Practice. 4. Analyze works expose to hazards.

Ergonomic- awkward position & repetitive motion

Info from: DOSH,Niosh, CROSH, CCOHS, Miosh & etc

Admin. Control - Training, Briefing, Job Rotation

& Safe work practice

OSHA Sec 15 & 24 FMA (BOWEC)

Engin. & Admin Control - Walking Platform, Safety Harness /belt, Training &

Briefing

1. All workers must be inducted before commencing of work. 2. All workers must be briefing before commencement and weekly toolbox talks to explain the hazards. 3. Provide training & safe work practice. 4. Monitoring and supervise the works..

OSHA Sec 15 & 24 FMA sec 15,20

Engin, Admin Control & PPE - Safe guard, Safe work

practice, Training & Briefing.

1. All workers must be inducted before commencing of work. 2. All workers must be briefing before commencement and weekly toolbox talks to explain the hazards. 3. Guarding machine/moving part.

Irritation of respiratory tract

OSHA Sec 15, FM (Mineral Dust) Reg. 1989

Admin Control & PPE - Dust mask and training

OSHA Sec 15, FMA Sec. 24

Admin control & PPE Training, Briefing, Protective

clothing

Failure of formwork/ temporary platform

OSHA Sec 15. FM (BOWEC) (Scaffold)

Part 10 Reg 72-98

Enggin. & Admin. Control - Safety awareness, Competent, PE Design,

Training, Briefing & Monitoring

1. Erected by competent/training person only. 2. PE Design required for any scaffold erected more than 15 meters. 3. Inspection and supervising of competent person every time before its to be used. 4. Record keeping. 5. Ensure the material is in good condition/serviceable

Protruding nails, starter bar & sharp objects

OSHA Sec 15 & 24 FMA 1967

Engineering control -house keeping

OSHA Sec 15, FMA Sec. 24

Admin control & PPE - Briefing, Hand Glove and

Protective clothing

Hazard Identification Risk Assessment Control

No. Sub-Activity Hazards Consequences F L S

C, PC, NC

Condition of assessment

Applicable OSH Leg/Reg/COP (in addition to OSHA Sec 15,

FM(SHW) reg)

Existing Control Measures (ECM)

Legal Compliance Significant

Hazard?(Y/N)

Risk Rating

Risk Categ.

Determination of control hierarchy:1. Elimination of hazards2. Substitution3. Engineering4. Administrative5. Personal Protective Equipment (PPE)

19 Formwork R/W

Fatality /body injuries C 1 3 4 Y 12 II

Body injuries / fatality C 1 3 4 Y 12 II

20

R/W

Falling from Height Body injuries / fatality C 1 3 4 Y 12 II

Fatality /body injuries C 1 3 4 Y 12 II

Body injuries / fatality C 1 3 4 Y 12 II

Body injuries / fatality C 1 2 4 Y 8 I

Eye or body injuries C 1 2 2 N 4 I

Fatality /body injuries C 1 3 4 Y 12 II

Body/Hand-arm vibration Body injuries C 1 3 3 Y 9 I

NR/W Lightning Body injuries / fatality C 1 2 4 Y 8 I

Falling of construction material from height

OSHA Sec 15 & 24 FMA (BOWEC)

Admin control & PPE Training, Briefing, Signalman, Safe Work Practice & Safety

Helmet

1. All workers must be inducted before commencing of work. 2. All workers must be briefing before commencement and weekly toolbox talks to explain the hazards. 3. Provide training & safe work practice. 4. Monitoring and supervise the works..

Collapse/Failure of formwork/ temporary platform

OSHA Sec 15 & 24 FMA (BOWEC)

Admin control & PPE Training, Briefing, Signalman, Safe Work Practice & Safety

Helmet

1. All formwork support such as scaffold must be check frequently to avoid any miss use or damage by the competent/train person. 2. All workers must be briefing before commencement and weekly toolbox talks to explain the hazards. 3. Provide training & safe work practice. 4. Monitoring and supervise the works..

Concretting (Vibrator machine, mortar

pump & etc)

OSHA Sec 15 & 24 FMA (BOWEC)

Engin. & Admin Control - Walking Platform, Safety Harness /belt, Training &

Briefing

1. All workers must be inducted before commencing of work. 2. All workers must be briefing before commencement and weekly toolbox talks to explain the hazards. 3. Provide training & safe work practice. 4. Monitoring and supervise the works..

Falling of construction material from height

OSHA Sec 15 & 24 FMA (BOWEC)

Admin control & PPE Training, Briefing, Signalman, Safe Work Practice & Safety

Helmet

1. All workers must be inducted before commencing of work. 2. All workers must be briefing before commencement and weekly toolbox talks to explain the hazards. 3. Provide training & safe work practice. 4. Monitoring and supervise the works..

Failure of formwork/ temporary platform

OSHA Sec 15. FM (BOWEC) (Scaffold)

Part 10 Reg 72-98

Enggin. & Admin. Control - Safety awareness, Competent, PE Design,

Training, Briefing & Monitoring

1. Erected by competent/training person only. 2. PE Design required for any scaffold erected more than 15 meters. 3. Inspection and supervising of competent person every time before its to be used. 4. Record keeping. 5. Ensure the material is in good condition/serviceable

Struck or hit by concrete bucket/ mixer

OSHA Sec 15. FMA (BOWEC)

Admin. Control - Safety awareness

Signalman, Training, Briefing & Monitoring

1. All workers must be inducted before commencing of work. 2. All workers must be briefing before commencement and weekly toolbox talks to explain the hazards. 3. Appoint a Signalman.

Splashes of conrete in eyes and contact with skin

OSHA Sec 15, FMA Sec. 24

Admin control & PPE Training, Briefing, Protective

clothing & hand glove.

Falling of concrete bucket from height

OSHA Sec 15 & 24 FMA (BOWEC)

Admin control & PPE Training, Briefing, Signalman, Safe Work Practice & Safety

Helmet

1. All workers must be inducted before commencing of work. 2. All workers must be briefing before commencement and weekly toolbox talks to explain the hazards. 3. Provide training & safe work practice. 4. Monitoring and supervise the works..

OSHA Sec 15 FMA (BOWEC)

Admin. Control - Training, Briefing, Job Rotation

& Safe work practice

1. Electrical Hand Tool must be in good condition. 2. Workers must be inducted before start work. 3. Work monitoring and supervising. 4. Workers must have a good health and fit to work. 5. Competent/Training.

OSHA Sec 15. FMA Sec 23

Admin Control - Safe work practice & Briefing.

1. All workers must be inducted before commencing of work. 2. All workers must be briefing before commencement and weekly toolbox talks to explain the hazards. 3. Stop work immediatly.

Hazard Identification Risk Assessment Control

No. Sub-Activity Hazards Consequences F L S

C, PC, NC

Condition of assessment

Applicable OSH Leg/Reg/COP (in addition to OSHA Sec 15,

FM(SHW) reg)

Existing Control Measures (ECM)

Legal Compliance Significant

Hazard?(Y/N)

Risk Rating

Risk Categ.

Determination of control hierarchy:1. Elimination of hazards2. Substitution3. Engineering4. Administrative5. Personal Protective Equipment (PPE)

20

R/W Body strain C 1 2 2 N 4 I

21 Installation of Roof R/W

Falling from Height Body injuries / fatality C 1 3 4 Y 12 II

Fatality /body injuries C 1 2 4 Y 8 I

Lightning Body injuries / fatality C 1 3 4 Y 12 II

Electrocution Fatality /body injuries C 1 3 4 Y 12 II

Heat Stress Fatigue/ skin rash C 2 3 2 N 12 II

Wind/Rain C 1 3 4 Y 12 II

C 1 3 2 N 6 I

22

Brick Laying R/W

Falling from Height Body injuries / fatality C 1 3 4 Y 12 II

C 1 3 1 N 3 I

C 1 3 1 N 3 I

Concretting (Vibrator machine, mortar

pump & etc)

Ergonomic- awkward position & repetitive motion

Info from: DOSH,Niosh, CROSH, CCOHS, Miosh & etc

Admin. Control - Training, Briefing, Job Rotation

& Safe work practice

OSHA Sec 15 & 24 FMA (BOWEC)

Engin. & Admin Control - Walking Platform, Safety

Harness /belt, lifelines, Training & Briefing

1. All workers must be inducted before commencing of work. 2. All workers must be briefing before commencement and weekly toolbox talks to explain the hazards. 3. Provide training & safe work practice. 4. Monitoring and supervise the works. 5. Follow working at height procedure. 6. Training workers.

Falling of construction material from height

OSHA Sec 15 & 24 FMA (BOWEC)

Admin control & PPE Training, Briefing, Signalman, Safe Work Practice & Safety

Helmet

1. All workers must be inducted before commencing of work. 2. All workers must be briefing before commencement and weekly toolbox talks to explain the hazards. 3. practically to provide Catch Platform or catch netting at a potential area. 4. Appoint a signalman with a good communication to operator. 5. Safe work practice.

OSHA Sec 15. FMA Sec 23

Admin Control - Safe work practice & Briefing.

1. All workers must be inducted before commencing of work. 2. All workers must be briefing before commencement and weekly toolbox talks to explain the hazards. 3. Stop work immediatly.

OSHA Sec 15, FM (BOWEC) Reg. 16

Admin control & PPE Training, Briefing, Protective clothing & hand

glove.

1. Electrical Hand Tool must be in good condition. 2. Monitoring and analyze the potential of hazard. 3. Briefing/Toolbox Talk before start work. 4. Competent/Training. 5. Proper PPE must be worn.

OSHA Sec 15 & 24, FMA Sect. 23

Engineering, admin control & PPE - Shelter, Briefing &

Protective clothing

1. Proper PPE must be worn. 2. Briefing before start work. 3. Supervise and monitoring potential impact to workers. 4. Provide shelter/cool place for rest if necessary. 5. Wear a appropriate clothing.

Structure Collapse/ disturbed/budge

OSHA Sec 15. FMA (BOWEC)

Admin. Control - Safe work practice

1. All equipment must be place correctly and check daily to prevent from any falling material when raining or heavy wind occurs. 2. Immediate action must be taken when comes the unwanted condition that may prevent damage/injury to property or people. 4. Safe work practice and prosedure working at height must be follow.

Slippery & poor access/egress

Slip, trip & fall - body injuries

OSHA Sec 15 & 24 FMA (BOWEC)

Engineering, Admin Control - Provided proper

access/egress, training/information

1. Proper PPE must be worn. 2. Briefing before start work. 3. Supervise and monitoring potential impact to workers. 4. Issued an appropriate grip shoe. 5. Wear a appropriate clothing.

OSHA Sec 15 & 24 FMA (BOWEC)

Engin. & Admin Control - Walking Platform, Safety Harness /belt, Training &

Briefing

1. All workers must be inducted before commencing of work. 2. All workers must be briefing before commencement and weekly toolbox talks to explain the hazards. 3. Provide training & safe work practice. 4. Monitoring and supervise the works. 5. Follow working at height procedure. 6. Training workers.

Inhalation of dust/Concrette Dust

Irritation of respiratory tract

OSHA Sec 15, FM (Mineral Dust) Reg. 1989

Engineering, admin control & PPE - Water

sprinkling/Browser, Dust mask and training

1. Provide water sprinkler/ browser to prevent flying dust. 2. supply face mask to worker which involved

Spillage into eyes and contact with skin

Eye injuries, Skin irritation/dermatitis

OSHA Sec 15 OSH (USECHH) Reg. 2000

Admin Control & PPE hand glove, protective clothing &

safety glass

Hazard Identification Risk Assessment Control

No. Sub-Activity Hazards Consequences F L S

C, PC, NC

Condition of assessment

Applicable OSH Leg/Reg/COP (in addition to OSHA Sec 15,

FM(SHW) reg)

Existing Control Measures (ECM)

Legal Compliance Significant

Hazard?(Y/N)

Risk Rating

Risk Categ.

Determination of control hierarchy:1. Elimination of hazards2. Substitution3. Engineering4. Administrative5. Personal Protective Equipment (PPE)

Brick Laying R/W

Skin irritation/dermatitis C 1 3 1 N 3 I

Fatality /body injuries C 1 3 4 Y 12 II

Body strain C 1 3 2 N 6 I

Body injuries / fatality C 1 2 4 Y 8 I

23

Plastering R/W

Falling from Height Body injuries / fatality C 1 3 4 Y 12 II

Heat Stress Fatigue/ skin rash C 1 3 2 N 6 I

C 1 3 2 N 6 I

Fatality /body injuries C 1 2 4 Y 8 I

24 Tiling, Marble and Parquet R/W

Trip, Slip and Fall Body injuries C 1 3 2 N 6 I

C 1 3 1 N 3 I

Skin contact with cement mortar

OSHA Sec 15 OSH (USECHH) Reg. 2000

PPE- hand glove & protective clothing

Falling of construction material from height

OSHA Sec 15 & 24 FMA (BOWEC)

Admin control & PPE Training, Briefing, Signalman, Safe Work Practice & Safety

Helmet

1. All workers must be inducted before commencing of work. 2. All workers must be briefing before commencement and weekly toolbox talks to explain the hazards. 3. practically to provide Catch Platform or catch netting at a potential area. 4. Appoint a signalman with a good communication to operator. 5. Safe work practice.

Ergonomic- awkward position & repetitive motion

Info from: DOSH,Niosh, CROSH, CCOHS, Miosh & etc

Admin. Control - Training, Briefing, Job Rotation

& Safe work practice

Collapse of construction material

OSHA Sec 15 & 24 FMA (BOWEC)

Engineering control- Safe work practice, Supervising

1. All workers must be inducted before commencing of work. 2. All workers must be briefing before commencement and weekly toolbox talks to explain the hazards. 3. Supervise workers due to the potential area. 4. Used proper working platform. 5. Safe work practice.

OSHA Sec 15 & 24 FMA (BOWEC)

Engin. & Admin Control - Walking Platform, Safety Harness /belt, Training &

Briefing

1. All workers must be inducted before commencing of work. 2. All workers must be briefing before commencement and weekly toolbox talks to explain the hazards. 3. Provide training & safe work practice. 4. Monitoring and supervise the works. 5. Follow working at height procedure. 6. Training workers.

OSHA Sec 15 & 24, FMA Sect. 23

Engineering, admin control & PPE - Shelter, Briefing &

Protective clothing

1. Proper PPE must be worn. 2. Briefing before start work. 3. Supervise and monitoring potential impact to workers. 4. Provide shelter/cool place for rest if necessary. 5. Wear a appropriate clothing.

Splashes of conrete in eyes and contact with skin

Eye injuries & skin irritation, dermatitis

OSHA Sec 15 & 24 FMA (SHW) & Sec 23

PPE- Protective clothing, safety glass & glove

1. Proper PPE must be worn. 2. Briefing before start work. 3. Supervise and monitoring potential impact to workers. 4. Wear an appropriate clothing.

Falling of construction material from height

OSHA Sec 15 & 24 FMA (BOWEC)

Admin control & PPE Training, Briefing, Safe Work

Practice & Safety Helmet

1. All workers must be inducted before commencing of work. 2. All workers must be briefing before commencement and weekly toolbox talks to explain the hazards. 3. To provide working platform. 5. Safe work practice.

OSHA Sec 15 & 24 FMA (BOWEC)

Engineering, Admin Control - Provided proper

access/egress, training/information

1. Proper PPE must be worn. 2. Briefing before start work. 3. Supervise and monitoring potential impact to workers. 4. Issued an appropriate grip shoe. 5. Wear a appropriate clothing.

Inhalation of dust/Concrette Dust

Irritation of respiratory tract

OSHA Sec 15, FM (Mineral Dust) Reg. 1989

Admin control & PPE - Dust mask and training

Hazard Identification Risk Assessment Control

No. Sub-Activity Hazards Consequences F L S

C, PC, NC

Condition of assessment

Applicable OSH Leg/Reg/COP (in addition to OSHA Sec 15,

FM(SHW) reg)

Existing Control Measures (ECM)

Legal Compliance Significant

Hazard?(Y/N)

Risk Rating

Risk Categ.

Determination of control hierarchy:1. Elimination of hazards2. Substitution3. Engineering4. Administrative5. Personal Protective Equipment (PPE)

24 Tiling, Marble and Parquet R/W

Exposure to sharp object Hand Injuries C 1 3 2 N 6 I

25 Ceiling R/W

Falling from Height Body injuries / fatality C 1 3 4 Y 12 II

Fatality /body injuries C 1 2 4 Y 8 I

C 1 2 3 Y 6 I

Body strain C 1 2 2 N 4 I

26 Painting R/W

Falling from Height Body injuries / fatality C 1 3 4 Y 12 II

Fatality /body injuries C 1 2 4 Y 8 I

C 1 2 3 Y 6 I

C 1 3 2 N 6 I

OSHA Sec 15, FMA Sec. 24

Admin control & PPE - Briefing, Hand Glove and

Protective clothing

Osha Sec. 15 & 24 FMA (SHW)(BOWEC)

Engin. & Admin Control - Working Platform, Safety Harness /belt, Training &

Briefing

1. All workers must be inducted before commencing of work. 2. All workers must be briefing before commencement and weekly toolbox talks to explain the hazards. 3. To provide working platform. 4. Safe work practice.

Falling of construction material from height

OSHA Sec 15 & 24 FMA (BOWEC)

Admin control & PPE Training, Briefing, Safe Work

Practice & Safety Helmet

1. All workers must be inducted before commencing of work. 2. All workers must be briefing before commencement and weekly toolbox talks to explain the hazards. 3. To provide working platform. 4. Safe work practice.

Slippery & poor access/egress

Slip, trip & fall - body injuries

OSHA Sec 15 & 24 FMA (BOWEC)

Engineering, Admin Control - Provided proper

access/egress, training/information

1. All workers must be inducted before commencing of work. 2. All workers must be briefing before commencement and weekly toolbox talks to explain the hazards. 3. To provide proper access/egress. 4. Safe work practice.

Ergonomic- awkward position & repetitive motion

Info from: DOSH,Niosh, CROSH, CCOHS, Miosh & etc

Admin. Control - Training, Briefing, Job Rotation

& Safe work practice

Osha Sec. 15 & 24 FMA (SHW)(BOWEC)

Engin. & Admin Control - Working Platform, Safety Harness /belt, Training &

Briefing

1. All workers must be inducted before commencing of work. 2. All workers must be briefing before commencement and weekly toolbox talks to explain the hazards. 3. To provide working platform. 4. Safe work practice.

Falling of construction material from height

OSHA Sec 15 & 24 FMA (BOWEC)

Admin control & PPE Training, Briefing, Safe Work

Practice & Safety Helmet

1. All workers must be inducted before commencing of work. 2. All workers must be briefing before commencement and weekly toolbox talks to explain the hazards. 3. To provide working platform. 4. Safe work practice.

Slippery & poor access/egress

Slip, trip & fall - body injuries

OSHA Sec 15 & 24 FMA (BOWEC)

Engineering, Admin Control - Provided proper

access/egress, training/information

1. All workers must be inducted before commencing of work. 2. All workers must be briefing before commencement and weekly toolbox talks to explain the hazards. 3. To provide proper access/egress. 4. Safe work practice.

Inhalation of dust/Painting fume

Irritation of respiratory tract

OSHA Sec 15, FM (Mineral Dust) Reg. 1989

Admin control & PPE - Face mask and training

MUDAJAYA CORPORATION BERHAD OSH TASK RISK ASSESSMENTDoc No.

Ref Code / Rev

Department KLIA - Spurline Project Personnel participated & consulted: Assessors name Prepared by: Reviewed by: Approved by:

Area Name Designation 1) Name: Name: Name:Activity External Works 2) Signature: Signature: Signature:

3) Date: Date: Date:Hazard Identification Risk Assessment Control

No. Sub-Activity Hazards Consequences F L S

C, PC, NC

1 Retaining Wall R/W

Falling of Person Body injuries / fatality C 1 3 4 Y 12 II

Falling Objects Fatality /body injuries C 1 3 4 Y 12 II

Collapse Fatality /body injuries C 1 2 4 Y 8 I

Lightning Body injuries / fatality C 1 2 4 Y 8 I

Heavy Wind / Rain C 1 2 4 Y 8 I

Heat Stress Fatigue C 1 2 2 N 4 I

Ergonomics C 1 2 2 N 4 I

2 R/W

Body injuries C 1 3 2 N 6 I

Struck by Machineries Fatality /body injuries C 1 3 4 Y 12 II

Body injuries / fatality C 1 3 4 Y 12 II

Condition of assessment

Applicable OSH Leg/Reg/COP (in addition to OSHA Sec 15,

FM(SHW) reg)

Existing Control Measures (ECM)

Legal Compliance Significant

Hazard?(Y/N)

Risk Rating

Risk Categ.

Determination of control hierarchy:1. Elimination of hazards2. Substitution3. Engineering4. Administrative5. Personal Protective Equipment (PPE)

Osha Sec. 15 & 24 FMA 1967

Engin. & Admin Control - Working Platform, Safety Harness /belt, Training &

Briefing

1. All workers must be inducted before commencing of work. 2. All workers must be briefing before commencement and weekly toolbox talks to explain the hazards. 3. Provide training & safe work practice. 4. Monitoring and supervise the works..

Osha Sec. 15 & 24 FMA 1967

Admin control & PPE Training, Briefing, Signalman, Safe Work Practice & Safety

Helmet

1. All workers must be inducted before commencing of work. 2. All workers must be briefing before commencement and weekly toolbox talks to explain the hazards. 3. Provide training & safe work practice. 4. Monitoring and supervise the works..

OSHA Act Sec 15 FMA (BOWEC)

Admin. Control - Safe working load/procedure

1. All workers must be inducted before commencing of work. 2. All workers must be briefing before commencement and weekly toolbox talks to explain the hazards. 3. Provide training & safe work practice. 4. Monitoring and supervise the works..

OSHA Act Sec 15. FMA Act139 Sec 23

Admin Control - Safe work practice & Briefing.

1. All workers must be inducted before commencing of work. 2. All workers must be briefing before commencement and weekly toolbox talks to explain the hazards. 3. Stop work immediatly.

Structure Collapse/ disturbed/budge

OSHA Act Sec 15 FMA (BOWEC)

Admin Control - Safe work practice & Briefing.

1. All workers must be brief before commencing of work. 2. Stop work immediatly.

OSHA Act 15, FM (SHW) Sect. 23 & 28

Engineering, admin control & PPE - Shelter,

Briefing & Protective clothing

Sprains, strains & backache

OSHA Act 15, FMA 1967

Admin. Control - Safe work practice

External Road - (Pneumatic Machine, Compactor Roller,

Back Pusher, Back Hoe, Cutting Road Machine, Lorry)

Falling of Person from a moving machine

Osha Sec. 15 & 24 FMA 1967

Admin Control - Safe work practice, Training & Briefing

Osha Sec. 15 & 24 FMA 1967

PPE & Admin Control - Signage, Safety Vest,

Training & Briefing

1. Briefing before start work. 2. Plan and schedule work programme. 3. Place traffic controller to monitor and control .

Potential contact with underground power line

OSHA Act Sec 15. FM (BOWEC) (Electrical Hazard) Reg 16. 1986 Electricity Supply Act 1990 Electricity Reg. and

rules 1994

Enggineering, Admin. Control & PPE - Safety awareness -

Isolation, Briefing, Monitoring and appropriate PPE

1. All workers must be inducted before commencing work. 2. All workers must use proper P.P.E 3. To provide competent super visor to supervise the activity full time. 4. To organize Tool Box talk/meeting every time want to start work. 5. To provide ‘Clearance Marking’ as per TNB requirement. 6. Permit To Work. (Liase with TNB)

Hazard Identification Risk Assessment Control

No. Sub-Activity Hazards Consequences F L S

C, PC, NC

Condition of assessment

Applicable OSH Leg/Reg/COP (in addition to OSHA Sec 15,

FM(SHW) reg)

Existing Control Measures (ECM)

Legal Compliance Significant

Hazard?(Y/N)

Risk Rating

Risk Categ.

Determination of control hierarchy:1. Elimination of hazards2. Substitution3. Engineering4. Administrative5. Personal Protective Equipment (PPE)

2 R/W

Exposure to noise C 1 3 2 N 6 I

Chronic health problem C 1 3 2 N 6 I

Inhalation of dust C 1 3 2 N 6 I

Eye or body injuries C 1 2 2 N 4 I

Caught into rotating parts Body injuries / fatality C 1 3 4 Y 12 II

Body vibration syndrome Body injuries C 1 2 2 N 4 I

Operation in unsafe mode Body injuries / fatality OSHA Sec 15 & 24 C 1 2 4 Y 8 I

C 1 3 2 N 6 I

Manual handling Body strain C 1 2 2 N 4 I

Exposed hot surface Skin burn C 1 3 2 N 6 I

C 1 3 2 N 6 I

Heat Stress Fatigue C 1 2 2 N 4 I

Body injuries / fatality C 1 2 4 Y 8 I

External Road - (Pneumatic Machine, Compactor Roller,

Back Pusher, Back Hoe, Cutting Road Machine, Lorry)

Chronic hearing problem

OSHA Act Sec 15 FM (Noise Exposure)

Reg. 1989.

Admin. Control & PPE - Safety awareness -Ear plug/muff &

initial noise monitoring

1. All workers must be inducted before commencing work. 2. All workers must use proper P.P.E 3. To provide competent super visor to supervise the activity full time. 4. To organize Tool Box talk/meeting every time want to start work.

Inhalation of heavy smoke / exhaust fume

OSHA Sec 15, FM (BOWEC) Reg 11 & 14. 1986

Enggineering & Admin. Control - Safety awareness

-Face mask, Servicing, Toolbox Talk,

Monitoring

1. All workers must used proper PPE at work site. 2. Un-good condition of machinery need to be check and repair as posible. 3. Toolbox Talk before start work.

Irritation of respiratory tract

OSHA Sec 15, FM (Mineral Dust) Reg. 1989

Engineering, admin control & PPE - Water

sprinkling/Browser, Dust mask and training

1. Provide water sprinkler/ browser to prevent flying dust. 2. supply face mask to worker which involved

Flying of particles and cutting disc

OSHA Sec 15, FMA Sec. 24

Admin control & PPE Training, Briefing, Protective

clothing & hand glove.

OSHA Sec 15 & 24 FMA sec 15,20

Engin, Admin Control & PPE - Safe guard, Safe work practice, Training & Briefing.

1. All workers must be inducted before commencing of work. 2. All workers must be briefing before commencement and weekly toolbox talks to explain the hazards. 3. Guarding machine/moving part.

OSHA Sec 15 FMA (BOWEC)

Admin. Control - Training, Briefing, Job

Rotation & Safe work practice

Admin. Control - Safe work practice

1. Stop work. 2.Terminate if necessary

Splashes of hot bitumen in eyes and contact with skin

Eye injuries & skin irritation, dermatitis

OSHA Sec 15 & 24 FMA (SHW) & Sec 23

PPE- Protective clothing, safety glass & glove

1. Proper PPE must be worn. 2. Briefing before start work. 3. Supervise and monitoring potential impact to workers. 4. Wear an appropriate clothing.

Info from: DOSH,Niosh, CROSH, CCOHS, Miosh & etc

Admin. Control - Training, Briefing, Job

Rotation & Safe work practice

OSHA Sec 15 & 24 FMA (BOWEC)

Admin Control & PPE - Briefing,Protective clothing,

hand glove & face shield

Inhalation of bitumen vapor/ mist

Irritation of respiratory tract / chronic health problem in long term

OSHA Sec 15 OSH (USECHH)

Reg. 2000

Admin control & PPE Dust mask and training

1. Briefing before start work. 2. supply face mask to worker which involved

OSHA Act 15, FM (SHW) Sect. 23 & 28

Engineering, admin control & PPE - Shelter,

Briefing & Protective clothing

Struck /crushed by machine/Collision

OSHA Sec 15. FMA (BOWEC)

Enggineering & Admin. Control - Safety awareness

-Barrier, Traffic Control, Training, Briefing &

Monitoring

1. All workers must be inducted before commencing of work. 2. All workers must be briefing before commencement and weekly toolbox talks to explain the hazards. 3. Provide Barricade to Excavate Area. 4. Appoint a Traffic Controller.

Hazard Identification Risk Assessment Control

No. Sub-Activity Hazards Consequences F L S

C, PC, NC

Condition of assessment

Applicable OSH Leg/Reg/COP (in addition to OSHA Sec 15,

FM(SHW) reg)

Existing Control Measures (ECM)

Legal Compliance Significant

Hazard?(Y/N)

Risk Rating

Risk Categ.

Determination of control hierarchy:1. Elimination of hazards2. Substitution3. Engineering4. Administrative5. Personal Protective Equipment (PPE)

3 Drainage / Sewerage R/W

Body injuries / fatality C 1 3 4 Y 12 II

Fall into excavated trench Body injuries C 1 3 2 N 6 I

Toxic Gas (Confined Space) C 1 3 4 Y 12 II

Mosquito/ insect bites C 1 2 3 Y 6 I

Drowning Fatality C 1 2 4 Y 8 I

Lightning Body injuries / fatality C 1 1 4 Y 4 I

4 External Water Reticulation R/W

Body injuries / fatality C 1 2 4 Y 8 I

Body injuries C 1 2 2 N 4 I

Electrocution Fatality /body injuries C 1 2 4 Y 8 I

Lightning Body injuries / fatality C 1 1 4 Y 4 I

R/W

Electrocution Fatality /body injuries C 1 2 4 Y 8 I

Manual handling Body strain C 1 2 2 N 4 I

Soil collapse into trench/Cave in

OSHA Sec 15, FMA (BOWEC)

Engineering control- Shoring/ safe work practice,

Supervising

1. Permit To Work Required before excavation. 2. Supervise at all potential area in full time. 3. Briefing/Toolbox Talk before start work. 4. Training.

OSHASec 15, FMA (BOWEC)

Engineering,Admin control- Guardrail/Barrier, monitoring

Harzadous Atmosphere OSHA Sect 15. ICOP 2010 (Industrial Code Of Practice)

Engineering, admin control & PPE - Guidelines in Industrial Code Of Practice

2010 (ICOP)

Detail Requirement: 1. Permit System. 2. Permit to Work. 3. Isolation Requirement. 4.Requirement to Ensure Safety of Atmosphere. 5. Entry Into Hazardous Atmosphere. 6. Rescue and Emergency Services. 7.Health Requirements of Person Working in Confined Space. 8. Training. 9. Additional Precautions During Occupancy of Confined Space. 10. Record Keeping.

Dengue/ skin rash/dermatitis

1. OSHA Act Sect 15, 2. FMA Sect. 22. 3.

Prevention And Control Of Infectious Diseases Act and

Regulation

Elimination- Pest control

1. Appoint pest control to clear all insect/ mosquito as shown in Prevention And Control Of Infectious Diseases Act and Regulation

OSHA Sec 15 & 24 FMA 1967

Engineering, admin control & PPE - Safe Work

Practice

1. Provide a safe access/egress. 2. Hand rail and walking platform. 3. A proper PPE such as safety harness and lifelines. 4. Briefing before start work. 5. Supervise and monitoring. 6. Analyze potential hazard may harm workers. Safe work procedure.

OSHA Act Sec 15. FMA Act139 Sec 23

Admin Control - Safe work practice & Briefing.

1. All workers must be inducted before commencing of work. 2. All workers must be briefing before commencement and weekly toolbox talks to explain the hazards. 3. Stop work immediatly.

Struck /crushed by machine/Collision

OSHA Act Sec 15 & 24 FMA 1967

Admin. Control - Safety awareness, Briefing and

Traffic Control

1. All workers must be inducted before commencing of work. 2. All workers must be briefing before commencement and weekly toolbox talks to explain the hazards. 3. Provide Barricade to Excavate Area. 4. Appoint a Traffic Controller.

Slippery & poor access/egress

OSHA Act Sec 15 & 24 FMA 1967

Engin, Admin Control & PPE - Guard rail, Safe work practice, Training & Briefing.

OSHA Act 15, FM (BOWEC)(SAFETY) Reg. 16.

1986

Admin Control & PPE -Briefing,Protective clothing, hand glove & Safety Boot

1. Electrical Hand Tool must be in good condition. 2. Monitoring and analyze the potential of hazard. 3. Briefing/Toolbox Talk before start work. 4. Competent/Training.

OSHA Sec 15. FMA Sec 23

Admin Control - Safe work practice & Briefing.

1. All workers must be inducted before commencing of work. 2. All workers must be briefing before commencement and weekly toolbox talks to explain the hazards. 3. Stop work immediatly.

External M & E - (Electrical & TNB Sub-Station)

OSHA Act 15, FM (BOWEC)(SAFETY) Reg. 16.

1986

Admin Control & PPE -Briefing,Protective clothing, hand glove & Safety Boot

1. Electrical Hand Tool must be in good condition. 2. Monitoring and analyze the potential of hazard. 3. Briefing/Toolbox Talk before start work. 4. Competent/Training.

Info from: DOSH,Niosh, CROSH, CCOHS, Miosh & etc

Admin. Control - Training, Briefing, Job

Rotation & Safe work practice

Hazard Identification Risk Assessment Control

No. Sub-Activity Hazards Consequences F L S

C, PC, NC

Condition of assessment

Applicable OSH Leg/Reg/COP (in addition to OSHA Sec 15,

FM(SHW) reg)

Existing Control Measures (ECM)

Legal Compliance Significant

Hazard?(Y/N)

Risk Rating

Risk Categ.

Determination of control hierarchy:1. Elimination of hazards2. Substitution3. Engineering4. Administrative5. Personal Protective Equipment (PPE)

R/W

Body strain C 1 2 2 N 4 I

Body injuries C 1 2 2 N 4 I

Heat Stress Fatigue C 1 2 2 N 4 I

Fatality /body injuries C 1 3 4 Y 12 II

Minor fire accident Skin burn C 2 2 2 N 8 I

Exposure to sharp object Hand Injuries C 1 3 2 N 6 I

Skin burn C 1 3 3 Y 9 I

Confined Space C 1 3 4 Y 12 II

Body injuries / fatality C 1 3 4 Y 12 II

Body injuries / fatality C 1 3 4 Y 12 II

Skin burn C 2 3 2 N 12 II

External M & E - (Electrical & TNB Sub-Station)

Ergonomic- awkward position & repetitive motion

Info from: DOSH,Niosh, CROSH, CCOHS, Miosh & etc

Admin. Control - Training, Briefing, Job

Rotation & Safe work practice

Slippery & poor access/egress

OSHA Act Sec 15 & 24 FMA 1967

Engin, Admin Control & PPE - Guard rail, Safe work practice, Training & Briefing.

OSHA Act 15, FM (SHW) Sect. 23 & 28

Engineering, admin control & PPE - Shelter,

Briefing & Protective clothing

Falling of construction material from height

OSHA Sec 15 & 24 FMA (BOWEC)

Admin control & PPE Training, Briefing, Signalman, Safe Work Practice & Safety

Helmet

1. All workers must be inducted before commencing of work. 2. All workers must be briefing before commencement and weekly toolbox talks to explain the hazards. 3. practically to provide Catch Platform or catch netting at a potential area. 4. Appoint a signalman with a good communication to operator. 5. Safe work practice.

OSHA Act Sec 15 & 24 FMA 1967

Admin Control & PPE - Briefing,Protective clothing,

hand glove & face shield

OSHA Sec 15, FMA Sec. 24

Engineering, admin control & PPE - Guarded,

briefing and Protective clothing

1. All moving part of the machine must be fully guarded. 2. All workers must be inducted before commencing of work. 3. All workers must be briefing before start work. 4. Proper PPE must be worn while working. 5. Provide training to workers which involved.

Minor fire accident/ Contact with Hot Part

OSHA Sec 15 & 24 FMA (BOWEC)

Admin Control & PPE - Briefing,Protective clothing,

hand glove & face shield

1. Permit To Work Required before excavation. 2. Supervise at all potential area in full time. 3. Briefing/Toolbox Talk before start work. 4. Training.

Harzadous AtmosphereOSHA Sect 15.

ICOP 2010 (Industrial Code Of Practice)

Engineering, admin control & PPE - Guidelines in Industrial Code Of Practice

2010 (ICOP)

Detail Requirement: 1. Permit System. 2. Permit to Work. 3. Isolation Requirement. 4.Requirement to Ensure Safety of Atmosphere. 5. Entry Into Hazardous Atmosphere. 6. Rescue and Emergency Services. 7.Health Requirements of Person Working in Confined Space. 8. Training. 9. Additional Precautions During Occupancy of Confined Space. 10. Record Keeping.

Potential contact with underground power line

OSHA Act Sec 15. FM (BOWEC) (Electrical Hazard) Reg 16. 1986 Electricity Supply Act 1990 Electricity Reg. and

rules 1994

Enggineering, Admin. Control & PPE - Safety awareness -

Isolation, Briefing, Monitoring and appropriate PPE

1. All workers must be inducted before commencing work. 2. All workers must use proper P.P.E 3. To provide competent super visor to supervise the activity full time. 4. To organize Tool Box talk/meeting every time want to start work. 5. To provide ‘Clearance Marking’ as per TNB requirement. 6. Permit To Work.

Soil collapse into trench/Cave in

OSHA Act 15, FM (BOWEC)

Reg 116,117 & 118

Engineering control- Shoring/ safe work practice,

Supervising

1. Permit To Work Required before excavation. 2. Supervise at all potential area in full time. 3. Briefing/Toolbox Talk before start work. 4. Training.

Minor fire accident/ Contact with Hot Part

OSHA Sec 15 & 24 FMA (BOWEC)

Admin Control & PPE - Briefing,Protective clothing,

hand glove & face shield

1. Permit To Work Required for Hot Job. 2. Flashback Arrestor is compulsory. 3. Briefing/Toolbox Talk before start work. 4. Competent/Training.

Hazard Identification Risk Assessment Control

No. Sub-Activity Hazards Consequences F L S

C, PC, NC

Condition of assessment

Applicable OSH Leg/Reg/COP (in addition to OSHA Sec 15,

FM(SHW) reg)

Existing Control Measures (ECM)

Legal Compliance Significant

Hazard?(Y/N)

Risk Rating

Risk Categ.

Determination of control hierarchy:1. Elimination of hazards2. Substitution3. Engineering4. Administrative5. Personal Protective Equipment (PPE)

R/W

Exposure to sharp object Hand Injuries C 1 2 2 N 4 I

External M & E - (Electrical & TNB Sub-Station)

OSHA Act Sec 15 & 24 FM (BOWEC) (Safety) Reg 148

FM (BOWEC) (SHW) Reg 32

Engineering, admin control & PPE - Guarded,

briefing and Protective clothing

1. All moving part of the machine must be fully guarded. 2. All workers must be inducted before commencing of work. 3. All workers must be briefing before start work. 4. Proper PPE must be worn while working. 5. Provide training to workers which involved.

MUDAJAYA CORPORATION BERHAD OSH TASK RISK ASSESSMENTDoc No.

Ref Code / Rev

Department KLIA - Spurline Project Personnel participated & consulted: Assessors name Prepared by: Reviewed by: Approved by:

Area Name Designation 1) Name: Name: Name:Activity General Activities 2) Signature: Signature: Signature:

3) Date: Date: Date:Hazard Identification Risk Assessment Control

No. Sub-Activity Hazards Consequences F L S

C, PC, NC

1

R/W C 1 2 2 N 4 I

R/W Fatality /body injuries C 1 2 4 Y 8 I

R/W Manual handling Sprains, strains C 1 3 2 N 6 I

R/W Snapping of lifting gear Fatality /Body injuries C 1 3 3 Y 9 I

R/W Body strain C 1 3 2 N 6 I

R/W Struck by material Body injuries C 1 2 2 N 4 I

2

R/W Falling from height Body injuries / fatality C 1 3 4 Y 12 II

R/W Manual handling C 1 3 2 N 6 I

R/W Fatality /body injuries C 1 2 4 Y 8 I

3 Application of painting

R/W C 1 3 2 N 6 I

R/W C 1 3 2 N 6 I

Condition of assessment

Applicable OSH Leg/Reg/COP (in addition to OSHA Sec 15,

FM(SHW) reg)

Existing Control Measures (ECM)

Legal Compliance Significant

Hazard?(Y/N)

Risk Rating

Risk Categ.

Determination of control hierarchy:1. Elimination of hazards2. Substitution3. Engineering4. Administrative5. Personal Protective Equipment (PPE)

Loading and unloading of construction materials

Slippery & poor access/egress

Slip, trip & fall - body injuries

OSHA Sec 15, FM (SHW) & (BOWEC)

Engineering, Admin Control - Provided proper

access/egress, training/information

Falling of construction material from height

OSHA Sec 15 & 24 FMA (BOWEC)

Admin control & PPE Training, Briefing, Safe Work Practice &

Safety Helmet

1. All workers must be inducted before commencing of work. 2. All workers must be briefing before commencement and weekly toolbox talks to explain the hazards. 3. Provide training & safe work practice. 4. Monitoring and supervise the works..

Info from: DOSH,Niosh, CROSH, CCOHS, Miosh & etc

Admin. Control - Training, Briefing, Job

Rotation & Safe work practice

OSHA Sec 15, FMA 1967

Comply SWL and inspection of machineries & lifting gears.

1. Only Machiineries with the fit certificate (PMA) can be used at site work. 2. Daily checklist for machineries to be fill up before start work. 3. SWL must be follow and monitoring by supervisor. 4. Change any damages item immediately. (Stop work if necessary/change other machine)

Ergonomic- awkward position & repetitive motion

Info from: DOSH,Niosh, CROSH, CCOHS, Miosh & etc

Admin. Control - Training, Briefing, Job

Rotation & Safe work practice

OSHA Sec 15 & 24 FMA (BOWEC)

Admin. Control - Safety awareness

Installation of temporary access / working platform

OSHA Sec 15 & 24 FMA (BOWEC)

Engin. & Admin Control - Walking Platform, Safety Harness /belt, lifelines,

Training & Briefing

1. All workers must be inducted before commencing of work. 2. All workers must be briefing before commencement and weekly toolbox talks to explain the hazards. 3. Provide training & safe work practice. 4. Monitoring and supervise the works..

Sprains, strains & backache

Info from: DOSH,Niosh, CROSH, CCOHS, Miosh & etc

Admin. Control - Training, Briefing, Job

Rotation & Safe work practice

Falling of construction material from height

OSHA Sec 15 & 24 FMA (BOWEC)

Admin control & PPE Training, Briefing, Safe Work Practice &

Safety Helmet

1. All workers must be inducted before commencing of work. 2. All workers must be briefing before commencement and weekly toolbox talks to explain the hazards. 3. Provide training & safe work practice. 4. Monitoring and supervise the works..

Inhalation of thinner/paint vapor/ mist

Irritation of respiratory tract / chronic health problem in long term

OSHA Sec 15 & 24 OSH (USECHH)

Reg. 2000

Admin control & PPE Dust mask and training

Splashes of hinner/paint in eyes and contact with skin

Eye injuries & skin irritation, dermatitis

OSHA Sec 15 & 24 FMA (SHW) & Sec 23

OSH (USECHH) Reg. 2000

PPE- Protective clothing, safety glass & glove

Hazard Identification Risk Assessment Control

No. Sub-Activity Hazards Consequences F L S

C, PC, NC

Condition of assessment

Applicable OSH Leg/Reg/COP (in addition to OSHA Sec 15,

FM(SHW) reg)

Existing Control Measures (ECM)

Legal Compliance Significant

Hazard?(Y/N)

Risk Rating

Risk Categ.

Determination of control hierarchy:1. Elimination of hazards2. Substitution3. Engineering4. Administrative5. Personal Protective Equipment (PPE)

3 Application of painting R/W Body strain C 1 2 2 N 4 I

R/W Skin burnt C 1 2 2 N 4 I

R/W Falling from height Body injuries / fatality C 1 3 4 Y 12 II

4

R/W C 1 3 2 N 6 I

R/W C 1 2 2 N 4 I

R/W Manual handling C 1 2 2 N 4 I

R/W Inhalation of vapor/ fume C 1 3 2 N 6 I

R/W Fire & explosion Body injuries / fatality C 1 3 4 Y 12 II

5

R/W Manual handling C 1 2 2 N 4 I

R/W Exposure to noise C 1 3 2 N 6 I

R/W Flying of concrete particles Eye / body injuries C 1 3 2 N 6 I

R/W Exposure to concrete dust C 1 3 2 N 6 I

Ergonomic- awkward position & repetitive motion

Info from: DOSH,Niosh, CROSH, CCOHS, Miosh & etc

Admin. Control - Training, Briefing, Job Rotation & safe lifting

procedure

Fire hazard - Smoking while painting

OSHA Sec 15 & 24 FMA (BOWEC)

Elimination & Admin Control - No spark source

OSHA Sec 15 & 24 FMA (BOWEC)

Engin. & Admin Control - Walking Platform, Safety Harness /belt, lifelines,

Training & Briefing

1. All workers must be inducted before commencing of work. 2. All workers must be briefing before commencement and weekly toolbox talks to explain the hazards. 3. Provide training & safe work practice. 4. Monitoring and supervise the works..

Refilling of fuel, hydraulic & application of lubricant

Splashes in eyes and contact with skin

Eye injuries & skin irritation, dermatitis

OSHA Sec 15 & 24 FMA (SHW) & Sec 23

OSH (USECHH) Reg. 2000

PPE- Protective clothing, safety glass & glove

Slippery & poor access/egress

Slip, trip & fall - body injuries

OSHA Sec 15, FM (SHW) & (BOWEC)

Engineering, Admin Control - Provided proper

access/egress, training/information

Sprains, strains & backache

Info from: DOSH,Niosh, CROSH, CCOHS, Miosh & etc

Admin. Control - Training, Briefing, Job Rotation & safe lifting

procedure

Irritation of respiratory tract / chronic health problem in long term

OSHA Sec 15 & 24 OSH (USECHH)

Reg. 2000

Admin control & PPE Dust mask and training

OSHA Sec 15 & 24 FMA (BOWEC)

Admin. Control Training, Briefing & Safety

Awareness

1. All workers must be inducted before commencing of work. 2. No s,okimg or naked fire below 30 meters from the potential area. 3. Provide training & safe work practice. 4. Monitoring and supervise the works..

Hacking & drilling of concrete structure

Sprains, strains & backache

Info from: DOSH,Niosh, CROSH, CCOHS, Miosh & etc

Admin. Control - Training, Briefing, Job Rotation & safe lifting

procedure

Chronic hearing problem

OSHA Act Sec 15 FM (Noise Exposure)

Reg. 1989.

Admin. Control & PPE - Safety awareness -Ear plug/muff &

initial noise monitoring

OSHA Sec 15 & 24 FMA (BOWEC)

PPE- Protective clothing, safety glass & glove

Irritation of respiratory tract

OSHA Sec 15, FM (Mineral Dust) Reg. 1989

Admin control & PPE Safety Awareness

Dust mask and training

Hazard Identification Risk Assessment Control

No. Sub-Activity Hazards Consequences F L S

C, PC, NC

Condition of assessment

Applicable OSH Leg/Reg/COP (in addition to OSHA Sec 15,

FM(SHW) reg)

Existing Control Measures (ECM)

Legal Compliance Significant

Hazard?(Y/N)

Risk Rating

Risk Categ.

Determination of control hierarchy:1. Elimination of hazards2. Substitution3. Engineering4. Administrative5. Personal Protective Equipment (PPE)

5

R/W C 1 2 2 N 4 I

R/W Falling from height Body injuries / fatality C 1 3 4 Y 12 II

6 Application of pesticide

NR/V Inhalation of vapor /mist Chronic health problem C 1 3 2 N 6 I

NR/V C 1 3 2 N 6 I

NR/V Manual handling C 1 2 2 N 4 I

NR/V C 1 2 2 N 4 I

NR/V Body strain C 1 2 2 N 4 I

7

R/W Insufficient lighting

R/W C 1 2 2 N 4 I

R/W

R/W Mosquito/ insect bites C 1 2 3 Y 6 I

R/W Fatality /body injuries C 1 3 4 Y 12 II

R/W Body injuries

R/W Heat stress Fatigue/ skin rash C 1 2 1 N 2 I

Hacking & drilling of concrete structure

Slippery & poor access/egress

Slip, trip & fall - body injuries

OSHA Sec 15, FM (SHW) & (BOWEC)

Engineering, Admin Control - Provided proper

access/egress, training/information

OSHA Sec 15 & 24 FMA (BOWEC)

Engin. & Admin Control - Walking Platform, Safety Harness /belt, lifelines,

Training & Briefing

1. All workers must be inducted before commencing of work. 2. All workers must be briefing before commencement and weekly toolbox talks to explain the hazards. 3. Provide training & safe work practice. 4. Monitoring and supervise the works..

OSHA Sec 15 & 24 OSH (USECHH)

Reg. 2000

Admin control & PPE Safety Awareness

Dust mask and training

Splashes in eyes and contact with skin

Eye injuries, Skin irritation/dermatitis

OSHA Sec 15 & 24 FMA (SHW) & Sec 23

OSH (USECHH) Reg. 2000

PPE- Protective clothing, safety glass & glove

Sprains, strains & backache

Info from: DOSH,Niosh, CROSH, CCOHS, Miosh & etc

Admin. Control - Training, Briefing, Job Rotation & safe lifting

procedure

Slippery & poor access/egress

Slip, trip & fall - body injuries

OSHA Sec 15, FM (SHW) & (BOWEC)

Engineering, Admin Control - Provided proper

access/egress, training/information

Ergonomic- awkward position & repetitive motion

Info from: DOSH,Niosh, CROSH, CCOHS, Miosh & etc

Admin. Control - Training, Briefing, Job

Rotation & Safe work practice

Workplace Inspection & site visit

Slip, trip & fall- body injuries

Elimination- Provide sufficient lighting

Slippery & poor access/egress

Slip, trip & fall - body injuries

OSHA Sec 15, FM (SHW) & (BOWEC)

Engineering, Admin Control - Provided proper

access/egress, training/information

Unprotected floor opening/ edge

Slip, trip & fall- body injuries / fatality

Elimination- Provide edge protection

Dengue/ skin rash/dermatitis

1. OSHA Act Sect 15, 2. FMA Sect. 22. 3.

Prevention And Control Of Infectious Diseases Act and

Regulation

Elimination- Pest control

1. Appoint pest control to clear all insect/ mosquito as shown in Prevention And Control Of Infectious Diseases Act and Regulation. 2. Proper Housekeeping and safe environment.

Falling of construction material from height

OSHA Sec 15 & 24 FMA (BOWEC)

Admin control & PPE Training, Briefing, Signalman, Safe Work Practice & Safety

Helmet

1. Provide safe & secure walk way. (Barrier & Signages) 2. Briefing about safety matters and site condition before entring workplace. 3. Avoid to be under loading material. 4. Monitoring activities near the visiting people. 5. Stop work at a risky area if necessary.

Protruding nails, starter bar & sharp objects

Engineering control -house keeping

OSHA Sec 15 & 24, FMA Sect. 23

Engineering, admin control & PPE - Shelter,

Briefing & Protective clothing

Hazard Identification Risk Assessment Control

No. Sub-Activity Hazards Consequences F L S

C, PC, NC

Condition of assessment

Applicable OSH Leg/Reg/COP (in addition to OSHA Sec 15,

FM(SHW) reg)

Existing Control Measures (ECM)

Legal Compliance Significant

Hazard?(Y/N)

Risk Rating

Risk Categ.

Determination of control hierarchy:1. Elimination of hazards2. Substitution3. Engineering4. Administrative5. Personal Protective Equipment (PPE)

7

R/W Body injuries C 1 2 4 Y 8 I

R/W Thunder and lightning. Body injuries/ fatality C 1 2 4 Y 8 I

R/W C 1 2 2 N 4 I

8

R/W Struck against object Body injuries C 1 2 4 Y 8 I

R/W C 1 3 2 N 6 I

R/W Contact with hot parts Skin burnt C 2 3 2 N 12 II

R/W Exposure to noise C 1 3 2 N 6 I

R/W Fire & explosion Body injuries / fatality C 1 3 4 Y 12 II

R/W Electric shock/ electrocution Body injuries / fatality C 1 2 4 Y 8 I

R/W Struck by pressure hoses Body injuries C 1 2 3 Y 6 I

R/W Unfit/ unsafe machine Body injuries / fatality

Workplace Inspection & site visit

Struck against object/ structure

OSHA Act Sec 15. FM (BOWEC)(Safety)

Enggineering & Admin. Control - Safety awareness

-Barrier, Traffic Control, Training, Briefing &

Monitoring

1. Provide safe & secure walk way. 2. Briefing about safety matters and site condition before entring workplace. 3. Avoid to be under loading material. 4. Monitoring activities near the visiting people. 5. Stop work at a risky area if necessary.

OSHA Sec 15. FMA Sec 23

Admin Control - Safe work practice & Briefing.

1. Provide safe & secure walk way. 2. Briefing about safety matters and site condition before entring workplace. 3. Stop activities immediattely when storm/thunder seen.

Slippery & poor access/egress

Slip, trip & fall - body injuries

OSHA Sec 15, FM (SHW) & (BOWEC)

Engineering, Admin Control - Provided proper

access/egress, training/information

Operation of genset & air compressor

OSHA Act Sec 15. FM (BOWEC)(Safety)

Enggineering & Admin. Control - Safety awareness -Barricade, Traffic Control, Training, Briefing &

Monitoring

1. All workers must be inducted before commencing of work. 2. All workers must be briefing before commencement and weekly toolbox talks to explain the hazards. 3.Monitoring the activities. 4. Barricade at te potential area and place signages.

Inhalation of heavy smoke / exhaust fume

Irritation of respiratory tract

OSHA Sec 15, FM (BOWEC) Reg 11 & 14. 1986

Enggineering & Admin. Control - Safety awareness

-Face mask, Servicing, Toolbox Talk,

Monitoring

1. All workers must used proper PPE at work site. 2. Un-good condition of machinery need to be check and repair as posible. 3. Toolbox Talk before start work.

OSHA Sec 15 & 24 FMA (BOWEC)

Admin Control & PPE - Briefing,Protective clothing,

hand glove & face shield

Chronic hearing problem

OSHA Act Sec 15 FM (Noise Exposure)

Reg. 1989.

Admin. Control & PPE - Safety awareness -Ear plug/muff &

initial noise monitoring

OSHA Sec 15 & 24 FMA (BOWEC)

Admin. Control Training, Briefing & Safety

Awareness

1. All workers must be inducted before commencing of work. 2. No smokimg or naked fire below 30 meters from the potential area. (Briefing & signages) 3. Provide training & safe work practice. 4. Monitoring and supervise the works..

OSHA Act 15, FM (BOWEC)(SAFETY) Reg. 16.

1986

Admin Control & PPE -Briefing,Protective clothing, hand glove & Safety Boot

1. Analyze any potential of hazards. 2. Daily checklist need to be updated and display by the supervisor and any hazards must immediattely take necessary action. 3. Safe work practice and display signage. 4. only trained person can operate the machine. 5. Work monitoring and supervising

OSHA Sec 15. FMA Reg 4 & 118

Enggineering & Admin. Control - Safety awareness

-Barrier, Traffic Control, Training, Briefing &

Monitoring

1. Analyze any potential of hazards. 2. Daily checklist need to be updated and display by the supervisor and any hazards must immediattely take necessary action. 3. Safe work practice and display signage. 4. only trained person can operate the machine. 5. Work monitoring and supervising

FM (Notification,Cert of Fitness & Insp.) Reg.1970

Admin Control - Safety awareness

Hazard Identification Risk Assessment Control

No. Sub-Activity Hazards Consequences F L S

C, PC, NC

Condition of assessment

Applicable OSH Leg/Reg/COP (in addition to OSHA Sec 15,

FM(SHW) reg)

Existing Control Measures (ECM)

Legal Compliance Significant

Hazard?(Y/N)

Risk Rating

Risk Categ.

Determination of control hierarchy:1. Elimination of hazards2. Substitution3. Engineering4. Administrative5. Personal Protective Equipment (PPE)

9 House Keeping

R/W Falling from height Fatality /Body injuries C 1 3 4 Y 12 II

R/W C 1 2 2 N 4 I

R/W Manual handling Sprains, strains C 1 2 2 N 4 I

R/W Inhalation of dust Irritate respiratory tract C 1 3 1 N 3 I

10

R/W Exposed to UV & IR ray permanent eye damage C 1 2 2 N 4 I

R/W Exposure to welding spark Skin burnt C 1 3 2 N 6 I

R/W Electrocution Fatality /body injuries C 1 3 4 Y 12 II

R/W Exposure to welding fume C 1 2 2 N 4 I

R/W Minor fire accident Skin burnt C 2 2 2 N 8 I

R/W Fatality /body injuries C 1 3 4 Y 12 II

R/W Inhalation of dust C 1 3 1 N 3 I

R/W Flying of particles Eye or body injuries C 1 3 2 N 6 I

Osha Sec. 15 & 24 FM (SHW) Reg 12, 32 & (Scaffold)

Pt 10 Reg 72-98

Engin. & Admin Control - Walking Platform, Safety Harness /belt, Training &

Briefing

1. All workers must be inducted before commencing of work. 2. All workers must be briefing before commencement and weekly toolbox talks to explain the hazards. 3.Monitoring the activities. 4. Barricade at te potential area and place signages.

Slippery & poor access/egress

Slip, trip & fall - body injuries

OSHA Sec 15, FM (SHW) & (BOWEC)

Engineering, Admin Control - Provided proper

access/egress, training/information

Info from: DOSH,Niosh, CROSH, CCOHS, Miosh & etc

Admin. Control - Training, Briefing, Job

Rotation & Safe work practice

OSHA Sec 15, FM (Mineral Dust) Reg. 1989

Engineering, admin control & PPE - Water

sprinkling/Browser, Dust mask and training

Welding, grinding & oxy-cutting

OSHA Sec 15, FMA Sec 11 &

(BOWEC) Reg 15

Admin control & PPE Training, Briefing &

Face Shield

OSHA Sec 15, FMA Sec 11 &

(BOWEC) Reg 15

Admin control & PPE Training, Briefing, Protective clothing, hand glove &

face shield

OSHA Sec 15, FM (BOWEC) Reg. 16

Admin control & PPE Training, Briefing, Protective

clothing & hand glove.

1. Electrical Hand Tool must be in good condition. 2. Monitoring and analyze the potential of hazard. 3. Briefing/Toolbox Talk before start work. 4. Competent/Training. 5. Proper PPE must be provided. 6. Random check before start work.

Irritation of respiratory tract

OSHA Sec 15 & 24, FM (BOWEC)(Safety)

Reg 14.

Admin control & PPE Training, Briefing &

Face mask

OSHA Act Sec 15 & 24 FMA 1967

Admin Control & PPE - Briefing,Protective clothing,

hand glove & face shield

Leakage of oxy-acetylene hose- fire or explosion

OSHA Sec 15 & 24 FMA (BOWEC)

Engineering & Admin. Control - Flash Back

Arrestor, Training, Briefing & Hot work permit

1. Cartridge must be stored in proper place and secure. 2. The cartridge must have a bucket c/w standby fire extinguisher. 3. Only the hose with flash back arrestor allowed to be used. 4. Only the competent/train workers can operate the welding equipment. 5. Working permit needed before start hot work. 6. Safety briefing and workplace monitoring by supervisor in charge

Irritation of respiratory tract

OSHA Sec 15, FM (Mineral Dust) Reg. 1989

Engineering, admin control & PPE - Welding Sheild,

Face mask and training

OSHA Sec 15, FMA Sec. 24

Admin control & PPE Training, Briefing, Welding sheild, Protective clothing &

hand glove.

Hazard Identification Risk Assessment Control

No. Sub-Activity Hazards Consequences F L S

C, PC, NC

Condition of assessment

Applicable OSH Leg/Reg/COP (in addition to OSHA Sec 15,

FM(SHW) reg)

Existing Control Measures (ECM)

Legal Compliance Significant

Hazard?(Y/N)

Risk Rating

Risk Categ.

Determination of control hierarchy:1. Elimination of hazards2. Substitution3. Engineering4. Administrative5. Personal Protective Equipment (PPE)

11

R/W Body vibration Body injuries C 1 3 2 N 6 I

R/W Body strain C 1 2 2 N 4 I

R/W C 1 2 2 N 4 I

R/W Flying of sharp object Eye or body injuries C 1 3 2 N 6 I

R/W Exposure to rotating parts Hand injuries C 1 2 3 Y 6 I

R/W Electrocution Fatality /body injuries C 1 3 4 Y 12 II

Operation of pneumatic/electrical powered hand tools.

OSHA Sec 15 FMA (BOWEC)

Admin. Control - Training, Briefing, Job

Rotation & Safe work practice

1. Electrical Hand Tool must be in good condition. 2. Workers must be inducted before start work. 3. Work monitoring and supervising. 4. Workers must have a good health and fit to work. 5. Competent/Training.

Ergonomic- awkward position & repetitive motion

Info from: DOSH,Niosh, CROSH, CCOHS, Miosh & etc

Admin. Control - Training, Briefing, Job

Rotation & Safe work practice

Exposure to noise in long term

Chronic hearing problem

OSHA Sec 15 FM (Noise Exposure)

Reg. 1989.

Admin. Control & PPE - Safety awareness -Ear plug/muff &

initial noise monitoring

1. All workers must be inducted before commencing work. 2. All workers must use proper P.P.E 3. To provide supervisor to monitoring the activity. 4. Briefing before start work.

OSHA Sec 15, FMA Sec. 24

Admin control & PPE Training, Briefing, Protective

clothing & hand glove.

OSHA Sec 15 & 24 FMA sec 15,20

Engin, Admin Control & PPE - Machine Guard, Safe

work practice, Training & Briefing.

1. All workers must be inducted before commencing of work. 2. All workers must be briefing before commencement and weekly toolbox talks to explain the hazards. 3. Provide guard to moving part if necessary. 4. Supervise the work

OSHA Sec 15, FM (BOWEC) Reg. 16

Admin control & PPE Training, Briefing, Protective

clothing & hand glove.

1. Electrical Hand Tool must be in good condition. 2. Monitoring and analyze the potential of hazard. 3. Briefing/Toolbox Talk before start work. 4. Competent/Training. 5. Proper PPE must be provided. 6. Random check before start work.

Type Hazard description Consequences

Biological exposed to pathogen - bacteria, fungi, virus, toxic plant, leechexposed to allergen

Chemical

chemical splash onto skin, eye skin or eye iritationchemical (high concentration) splash onto skin, eye skin burntchemical (high concentration) splash eye blindnessexplosion Fatality

inhalation of toxic substance refer to CSDSswallow (ingestion) of chemical refer to CSDSfire Fatalityexposed to carcinogens - e.g. benzene leukaemia - cancer of blood-forming tissuesinhalation of smoke

Physical

exposed to X-rayexposed to excessive noiseexposed to high/low temperaturesubjected to vibration impactexposed to laserexposed to microwave frequencyexposed to low freqeuncyexposed to infraredexposed to ultra violet

Ergonomic

repetitive motionawkward posturewrong sitting posturephysical stressvibration impactcomputer screen radiationforceful hand exertion

Psychosocialsexual harrasmentwork harrassmentmental stress

Others

exposed to conductive materialexposed to high static voltageexposed to high voltagehit/poked by object/masscut/poked by sharp object/edgesunguarded machinedraw in …caught in between …Snake bitelack of oxygen

fall from heightfall on same levelhit by falling objecthit by vehiclestab/puncture by flying objectstab/puncture by moving parts of machinerysheared between two machinessheared between a machinery part and workpieceDrawn in between counter-rotating partsCaught in between rotating and fixed-partscaught in between materials in motioncontact against hot surfacecontact against abrasive materialcrushed by moving partscrushed by stamping machine

acute inhalation of vapor (short period of exposure to high concentration of chemical vapour) - e.g. n-hexane

narcosis (unconsciousness), due to a repressive effect on the central nervous system.

chronic inhalation of vapor (repeated or prolonged exposure to relatively low concentration of chemical vapour) - e.g. n-hexane

Chronic effect - e.g. cause peripheral neuropathy (disease of the peripheral nerves), an irreversible effect

chronic inhalation of fume (repeated or prolonged exposure to relatively low levels of substance) - e.g. lead

anaemia, a reduced ability of the blood to distribute oxygen throughout the body

asphyxiation (acute lack of oxygen that can cause death)

Factories and Machinery Act (FMA) 1967No. Reg/Order1 Electric Passenger & Goods Lift Regulations 19702 Fencing of Machinery & Safety Regulations 19703 Notification, Certificate of Fitness and Inspection Regulation 19704 Persons-In-Charge Regulations 19705 Safety, Health & Welfare Regulations 19706 Steam Boiler and Unfired Pressure Vessel Regulations 19707 Lead Regulations 19848 Asbestos Process Regulations 19869 Building Operations & Works of Engineering Construction (Safety) Regulations 1986

10 Noise Exposure Regulations 198911 Mineral Dust Regulations 1989

Occupationa Safety & Health Act (OSHA) 1994No. Reg/Order1 Control of Industrial Major Accident Hazards (CIMAH) Regulations 19962 Safety and Health Committee (SHC) Regulations 19963 Classification, Packaging & Labelling of Hazardous Chemical (CPL) Regulations 1997 .4 Safety and Health Officer (SHO) Regulations 19975 Safety and Health Officer (SHO) Order 19976 Prohibition of Use of Substance Order 19997 Use and Standards of Exposure of Chemicals Hazardous to Health (USECHH) Regulations 2000 .8 Notification of Accident, Dangerous Occurrence, Occupational Poisoning & Occupational Diseases (NADOOPOD) Regulations 2004

OthersNo. Act/Reg./Order1 Fire Services Act 1988

1.1 Fire Certificate Regulations 20012 Poisons Act 1952

2.1 Poisons Regulations 19522.2 Sodium Arsenite Regulations 19492.3 Sodium Hydroxide Regulations 19622.4 Psychotropc Substance Regulations 19893 Electricity Supply Act 1990

3.1 Electricity Regulation 19944 Atomic Energy Licensing Act 1984

4.1 Licensing Regulations 4.2 Basic Safety Standards Regulations4.3 Transport Regulations

Code of Practices (COP)No. COP1 COP of Food Hygiene 19802 ICOP for Safe Working in a Confined Space 20103 COP on Prevention and Management of HIV/AIDS at the Workplace 20014 COP on Indoor Air Quality 2005

Engineering control Administrative control

Planned machinery maintenance Safety helmet

Water spray Medical surveillance Safety shoesDetection system Emergency preparedness and response plan Wire harnessEnclosure/closed system Audiometric test Protective clothingMachine guarding Lock-out Tag-out (LOTO) system GogglesInterlock system Permit to work system Face shield General ventilation Workplace inspection Dust maskIsolation Signages Vapor maskLocal exhaust ventilation Safe work instruction availability Fume maskProcess control Scheduled breaks Half-faced respiratorSafety switch Job rotation Full-faced respiratorSafety valve Human factors: Ear plug

Ear muff

Awareness program Cotton gloveTraining on PPE usage Nitril (chemical) gloveTraining on safe handlingOn-the-Job Training (OJT)Work matches workers physical capabilitiesMedical checkup prior to work allocation (e.g. fitness check)Behavior: Workersa. following safe work practices / procedures (SWP)b. wearing PPE (e.g. ear plug, chemical glove, vapor mask)c. highligting on safety issues when observed

PPE control(Provision, control and

maintenance)

Adapt work to individual studies prior to work start and applied