1 overview cqc asphalt specifications. payment based on contractor’s quality control tests. fdot...
TRANSCRIPT
In a Nutshell….
Payment based on Contractor’s Quality Control tests.
FDOT runs verification tests at a lesser frequency.
Payment is based on roadway density, air voids, asphalt content and gradation. Uses Percent Within Limits (PWL) statistical specs. Separate Master Production Range to catch
outliers. Began with July 2002 workbook.
2
Basics
Standard Lot size: 4,000 tons for dense mix or 2000 tons for
OGFC. Four sublots per Lot. Plant Lot & Roadway Lot same. Engineer establishes sampling points.
Random basis. Use Excel spreadsheet. Directs Contractor when to sample.
Contractor does all the sampling.
3
Basics
QC = Quality Control = Contractor VT = Verification Test = FDOT Project
personnel (typically a consultant) IV = Independent Verification = FDOT
District Materials personnel RT = Resolution Testing = FDOT District
Materials personnel
4
1- 1
387- 1- 1- 2
37
2310
64
85
3836
Offset (ft)
101081311
6
11
3423
1
3649
2553275428763022
- 31
1
- 3- 4- 5
3347
2332
- 3
11711368- 2
- 1- 1
473
2051
973714
- 1- 1
- 2- 2- 2
1
1
- 3
- 4- 4
11
1
11
- 3
- 3
1
1
- 2- 2
142116781881 2
- 493
1 - 4
- 2
- 2
- 3
- 3
111
- 3
- 5
Density Cores
- 5- 1
11
- 4- 4
- 4
- 4
- 5- 1
1
CORE ID# (tons)
107
3Verification Sublot
Plant
1000
Sublot
1
2
3
1133
2696
37284
QC Samples
(tons)
Tons/sublot:
487
Lot 1, sublot 1
50 trucks, 20 tons each = 1,000 ton sublot
Random Sample Numbers by Sublot
6
Sublot 1 Sublot 2 Sublot 3 Sublot 4
LOT = 4,000 Tons
QC randomly tests one per sublot.
VT randomly tests one split per Lot.
RT splits held until Lot is verified.
QC Testing at Plant
487 26961133 3728Tons
7
Master Production Range for Quality Control
10
Table 334-5 Master Production RangeCharacteristic Tolerance (1)
Asphalt Binder Content (%) Target ± 0.55
Passing No. 200 Sieve (%) Target ± 1.50
Air Voids (%) Coarse Graded 2.00 – 6.00
Air Voids (%) Fine Graded 2.30 – 6.00
Density, %Gmm (2)
Coarse Graded (minimum) 93.00
Fine Graded (minimum) 90.00(1) Tolerances for sample size of n = 1 from the verified mix design(2) Based on an average of 5 randomly located cores
If Quality Control Test Does Not Meet Tolerances: 334-5.4.4 (for MPR)
Terminate Lot if: One sublot failure for Air Voids. One sublot density failure. Two consecutive sublot density failures for
fine mix. Two consecutive sublot failures for
gradation. Two consecutive sublot failures for asphalt
content. 2 individual core densities for coarse mix
less than 91.00% Gmm.
11
Verification Testing334-5.5
At completion of each Lot Test VT sample for randomly selected
sublot Split from QC sample
Use test method precision for comparison Excel spreadsheet
If everything compares favorably… Calculate pay based on QC results
If not….go to Resolution testing District Materials Office
12
Sublot 1 Sublot 2 Sublot 3 Sublot 4
LOT = 4,000 Tons
QC tests one per sublot.
VT randomly tests one split per Lot.
VT Testing
13
Between-Laboratory Precision ValuesTable 334-6
14
Table 334-6Between-Laboratory Precision Values
Property Maximum DifferenceGmm 0.016
Gmb (gyratory compacted samples)
0.022
Gmb (roadway cores – fine graded mixture) 0.015
Gmb (roadway cores – coarse graded mixture) 0.018
Pb 0.44 percentP-200 FM 1-T 030 (Figure 2)P-8 FM 1-T 030 (Figure 2)
Resolution Testing334-5.6
If the verification testing does not compare on a pay property
Resolution samples tested by third party lab for the property in question All sublots are tested
Use test method precision for comparison to QC Excel spreadsheet
If everything compares favorably… Calculate pay based on QC results
If the sample does not compare Resolution results are used to calculate pay for that
property 15
Sublot 1 Sublot 2 Sublot 3 Sublot 4
LOT = 4,000 Tons
QC randomly tests one per sublot.
VT randomly tests one split per Lot.
RT tests non-comparison property for each sublot.
RT Testing
487 26961133 3728Tons
16
Roadway Acceptance334-5.4.3
Roadway and Plant Lot the same.
6-inch diameter cores . Five cores per sublot.
Randomly located (stratified manner).
Use spreadsheet. Minimum of 3 cores/sublot.
Retain QC cores for VT & RT.
17
Density Testing Exceptions334-5.1.2
Density testing not required for: Total quantity of hot mix < 2,000 tons. Widening or shoulders with a width of 5 ft or less. FC-5 Misc. Asphalt , Variable thickness or overbuild
layers . Leveling, Bridge Decks, Approach slabs. First lift of asphalt placed on subgrade. Bike/shared use paths. Crossovers or intersections. Any course thickness < 1 inch or specified spread
rate converts to < 1 inch. 18
Density Testing Exceptions (continued)334-5.1.2
Testing not required for the following areas when they are less than 1,000 feet long: Turning lanes Acceleration lanes Deceleration lanes Shoulders Parallel parking lanes Ramps
Use rolling procedure (equipment and pattern) as approved by the Engineer.
Density testing required everywhere else. 19
Calculate Payment334-8
If two or less sublots: Use Small Quantity Pay Table based on average
deviations from target. If three or more sublots:
Use Percent Within Limits (PWL) for the Lot. Calculate Pay Factor for:
Density, Air Voids, AC Content, P-200, P-8
20
Payment….334-8
Pay factor for each characteristic is determined.
Composite Pay factor is based on: 35% Density 25% Air Voids 25% AC Content 10% P-200 5% P-8
Calculations done by spreadsheet. 21
Minimum Acceptable Quality Levels 334-5.9
Individual Pay Factors Below 0.90 First time correct, 2 consecutive – cease.
Composite Pay Factor 0.80 to 0.89 Cease until problem is resolved.
Composite Pay Factor 0.75 to 0.79 Handle per 334-5.9.5 (EAR).
Composite Pay Factor Less than 0.75 Remove and Replace.
22
Defective Material 334-5.9.5
Contractor must remove & replace…OR Engineering Analysis Report…
If approved by Engineer / Paid by contractor. Independent Lab approved by Engineer. Remain in place at composite pay factor, or as
determined by Engineer. Can be waived by Engineer.
Delineation testing by Contractor Only for asphalt content, density, and
gradation.
23
Independent Verification Testing334-5.7
Handled by the District Materials Office. One sample per 4,000 tons. Sampled by Contractor with FDOT
supervision. Compare IV results with QC (test precision). Use Master Production Range Table 334-5.
IF IV fails MPR, cease production until problem resolved and then evaluate in-place material.
24
Friction Course 337
FC 9.5 and FC 12.5 Handled in same manner as 334 HMA.
FC 5 (OGFC) Same concepts but different material properties:▪ Asphalt content, Gradation (P-3/8, P-4, P-200)
25