MSRATF Update to TSS(Modeling SPS and RAS Ad Hoc Task Force)

May 15, 2013

Joe Seabrook

Puget Sound Energy

Page 2: 1 MSRATF Update to TSS (Modeling SPS and RAS Ad Hoc Task Force) May 15, 2013 Joe Seabrook Puget Sound Energy

2

Background

In May of 2012, FERC and NERC issued a joint report on the September 8, 2011 Southwest Blackout Event calling for improved planning.

It recommended that entities throughout WECC identify and plan for external contingencies that could impact their systems and internal contingencies that could impact their neighbors’ systems, and expand entities’ external visibility in their models through, for example, more complete data sharing.

Page 3: 1 MSRATF Update to TSS (Modeling SPS and RAS Ad Hoc Task Force) May 15, 2013 Joe Seabrook Puget Sound Energy

3

Purpose

To achieve WECC wide visibility of contingencies in planning and operating.

– Facilitate developing and/or implementing models for RAS, relays and contingency definitions

– In WECC base cases, in BCCS, and in cases that are consistent with the WSM

– Throughout program platforms used by planners in WECC

This task force will also coordinate with the RAS and Protective Systems Modeling Oversight Task Force (RPSOTF).

Page 4: 1 MSRATF Update to TSS (Modeling SPS and RAS Ad Hoc Task Force) May 15, 2013 Joe Seabrook Puget Sound Energy

4

Purpose - Discussion

• September 8, 2011 outage report:– Contingencies are not shared between utilities– Relay models / data are not shared between

utilities– RAS models are not shared between utilities

• Past methods for sharing are peer to peer– Must know what to ask, who to ask, provider

have time, interest and approval, and to then do this with each case. Has not worked well

Page 5: 1 MSRATF Update to TSS (Modeling SPS and RAS Ad Hoc Task Force) May 15, 2013 Joe Seabrook Puget Sound Energy

5

Ultimate Goal Statement

To simulate faults in power flow and transient stability by specifying the fault location and fault type on facilities like buses or branches.

– Includes TPL standard faults; balanced and unbalanced, normally cleared, stuck breaker, double circuit, adjacent, extreme, and reclosing

– RAS and Relays models would trip appropriate breakers at appropriate times

– Data would be provided in cases for both near and long term planning and operating

– Fault descriptions are resident in (or with) WECC posted cases

– Available on programs used by planners in WECC

Page 6: 1 MSRATF Update to TSS (Modeling SPS and RAS Ad Hoc Task Force) May 15, 2013 Joe Seabrook Puget Sound Energy

6

Steps to Get There – 3 Phases

• Ph 1 – Existing and New Models for – RAS, – Relays, and – Contingency Definitions

• Ph 2 – Base Case Coordination System– Includes fault sequence data

• Ph 3 – Breaker-Node Topology– Build into BCCS– Compare with WSM

Page 7: 1 MSRATF Update to TSS (Modeling SPS and RAS Ad Hoc Task Force) May 15, 2013 Joe Seabrook Puget Sound Energy

7

RAS

• Writing RAS Specification– Event Driven & Condition Based– Power Flow then Transient Stability

• Had presentations by 3 vendors on current capabilities and future vision

• Will engage specific response by vendors at next meeting

Page 8: 1 MSRATF Update to TSS (Modeling SPS and RAS Ad Hoc Task Force) May 15, 2013 Joe Seabrook Puget Sound Energy

8

Relays – Inverse Time Over Current• Seeking approval of existing 3-phase relays

– Existing for two vendors are curve based– Existing for third vendor is both curve and equation

based

• Preparing generic specification for 3-phase– Is both curve and equation based– Send to MVWG 2 weeks before their meeting

• Data from relays is generally equation based– Equation based faster & fewer errors than curve

Page 9: 1 MSRATF Update to TSS (Modeling SPS and RAS Ad Hoc Task Force) May 15, 2013 Joe Seabrook Puget Sound Energy

9

Relays – Distance / Impedance• Will seek approval of existing 3-phase

relays later in summer– Existing for two vendors are different but

similar

• Will write specification for generic relay with features still needed

Page 10: 1 MSRATF Update to TSS (Modeling SPS and RAS Ad Hoc Task Force) May 15, 2013 Joe Seabrook Puget Sound Energy

10

Contingency Definitions

• Writing specification for criteria and extreme faults (to cover faults required by standards)

• Could be used to develop (1) A common format, or (2) BCCS contingencies data base

• Exploring the BCCS data base option– Contingencies managed in BCCS– Written by a contractor– Could be used in the long term– Program vendors provide round trip conversion to the

contingency processor of their choice

Page 11: 1 MSRATF Update to TSS (Modeling SPS and RAS Ad Hoc Task Force) May 15, 2013 Joe Seabrook Puget Sound Energy

11

Fault – Sequence Data (MOD B)

• Network Sequence Data in CAPE, Aspen, planning programs(negative sequence for branches, transformer tertiary

and connections, line mutual coupling– Update bus numbers, device IDs– Export to planning program– Create equivalents at boundaries as needed– Automate changes in protection program for future

updates

(Demonstrated at MSRATF meeting)

Page 12: 1 MSRATF Update to TSS (Modeling SPS and RAS Ad Hoc Task Force) May 15, 2013 Joe Seabrook Puget Sound Energy

12

Breaker Node

• Continental interest to move planning models from Bus/Branch to Breaker Node

• NERC paper “Proposal for Development and Use of a Single Node-Breaker Topology Representation for Off-line and Real-time Study Models”