Aspley Guise Parish Council Proposed Budget and Precept Request 2017/18 For Consideration at the January 2017 Parish Council Meeting 1 of 13 1. Highlights Budget expenditure to be increased by 2% Highways Works reserve to be increased to £15,000 Streetlight Replacement reserve to be increased to £10,000 Planning Advice reserve of £2,500 to be created General reserves to be reduced by £11,879 to £20,803 Proposed precept for a Council Tax Band D property of £45.55 per year 2. Introduction The attached detailed budget for the Council’s expenditure has been prepared for the financial year 2017/18 and represents an increase of 2% compared to the forecast out turn for 2016/17. It is further proposed that the council’s specific reserves for Highways Works and Streetlight Replacements are increased to £15,000 and £10,000 respectively and that an additional specific reserve of £2,500 for the cost of Planning Advice be created. The increased specific reserves will be partially funded by a reduction in the council’s general reserves to £20,803 equivalent to six months normal expenditure which is generally the minimum considered appropriate and is in line with the policy set a few years ago to reduce the general reserves from 12 months to 6 months worth of routine expenditure. The net effect of the above will require a precept for 2017/18 of £45.55 an increase of £7.20 per year or 18.8% for a property in Council Tax Band D. The proposed precept for all of the Council tax bands is shown in the chart in Section 4 below. Assuming all other similar sized councils (with between 800 and 1,250 dwellings) increase their precept by 2% Aspley Guise would still have the 5 th lowest precept, rising from 3 rd lowest this year – see Attachment IV. A summary of the budget expenditure compared to the current year forecast out turn and the reserve movements is shown in Attachment I. 3. Process for Setting the Budget and Precept The Parish Council is following its established procedures for setting the budget and precept which are set out in the Council’s Financial Regulations which are available on the Council’s website. We have received a number of representations from residents in recent weeks suggesting that the Council hold a village-wide consultation on the level of precept and the uses to which it is put included in the budget for next year.

Upload: others

Post on 03-Feb-2021

6 views

Category:

Documents


0 download

TRANSCRIPT

  • AspleyGuiseParishCouncilProposedBudgetandPreceptRequest2017/18

    ForConsiderationattheJanuary2017ParishCouncilMeeting

    1of13

    1. Highlights

    • Budgetexpendituretobeincreasedby2%• HighwaysWorksreservetobeincreasedto£15,000• StreetlightReplacementreservetobeincreasedto£10,000• PlanningAdvicereserveof£2,500tobecreated• Generalreservestobereducedby£11,879to£20,803• ProposedpreceptforaCouncilTaxBandDpropertyof£45.55peryear

    2. IntroductionTheattacheddetailedbudgetfortheCouncil’sexpenditurehasbeenpreparedforthefinancialyear2017/18andrepresentsanincreaseof2%comparedtotheforecastoutturnfor2016/17.Itisfurtherproposedthatthecouncil’sspecificreservesforHighwaysWorksandStreetlightReplacementsareincreasedto£15,000and£10,000respectivelyandthatanadditionalspecificreserveof£2,500forthecostofPlanningAdvicebecreated.Theincreasedspecificreserveswillbepartiallyfundedbyareductioninthecouncil’sgeneralreservesto£20,803equivalenttosixmonthsnormalexpenditurewhichisgenerallytheminimumconsideredappropriateandisinlinewiththepolicysetafewyearsagotoreducethegeneralreservesfrom12monthsto6monthsworthofroutineexpenditure.Theneteffectoftheabovewillrequireapreceptfor2017/18of£45.55anincreaseof£7.20peryearor18.8%forapropertyinCouncilTaxBandD.TheproposedpreceptforalloftheCounciltaxbandsisshowninthechartinSection4below.Assumingallothersimilarsizedcouncils(withbetween800and1,250dwellings)increasetheirpreceptby2%AspleyGuisewouldstillhavethe5thlowestprecept,risingfrom3rdlowestthisyear–seeAttachmentIV.AsummaryofthebudgetexpenditurecomparedtothecurrentyearforecastoutturnandthereservemovementsisshowninAttachmentI.3. ProcessforSettingtheBudgetandPreceptTheParishCouncilisfollowingitsestablishedproceduresforsettingthebudgetandpreceptwhicharesetoutintheCouncil’sFinancialRegulationswhichareavailableontheCouncil’swebsite.WehavereceivedanumberofrepresentationsfromresidentsinrecentweekssuggestingthattheCouncilholdavillage-wideconsultationonthelevelofpreceptandtheusestowhichitisputincludedinthebudgetfornextyear.

  • AspleyGuiseParishCouncilProposedBudgetandPreceptRequest2017/18

    ForConsiderationattheJanuary2017ParishCouncilMeeting

    2of13

    AstheprocesshastobeconcludedattheCouncil’smeetingscheduledfor9thJanuaryintimetomeetCentralBedsCouncil’sdeadlineon20thJanuaryforsubmissionofthelevelorprecepttobesetfor2017/18therehasbeeninsufficienttimetocarryoutthesortofconsultationsuggestedthisyear.WewillconsiderthissuggestionwhenconductingtheannualreviewoftheFinancialRegulationsinthespring.WehavealsoreceivedanumberofrepresentationssuggestingthattheParishCouncilshoulddomoretobringthegeneralupkeepofthevillagebackuptotheprevioushighstandardandgenerallyimprovevillagelife.Whileprimaryresponsibilityformuchofthisworklieseitherwithresidents,forexamplebycuttingbackhedgesencroachingonfootpaths,orwithCentralBedsCouncil,whoareresponsibleforallhighwaysissues,thereisundoubtedlymorethattheParishCouncilcoulddoifithadthenecessaryfunding.Examplesofsuggestionsforadditionalexpenditurethatwehavereceivedwhicharenotprovidedforinnextyear’sbudgetinclude:

    • ReprintingtheAspleyGuisevillagewalksleaflet• ProvisionofaDefibrillator• CompletingthefencingatrearoftheWestHillplayarea• OtherHighwaysSchemesegazebracrossingonAspleyHill• AcontributiontowardsthecostofanewCricketPavilionwithsegregatedchanging

    facilities• AfurthercontributiontorefurbishingtheVillageHall• SupplementingserviceswhicharetheresponsibilityofCBC–egstreetsweeping

    4. ProposedPreceptbyCouncilTaxBand

    £0£20£40£60£80

    £100

    BandA BandB BandC BandD BandE BandF BandG BandH

    £30.37 £35.43£40.49 £45.55

    £55.67£65.79

    £75.92£91.10

  • AspleyGuiseParishCouncilProposedBudgetandPreceptRequest2017/18

    ForConsiderationattheJanuary2017ParishCouncilMeeting

    3of13

    5. ProposedIncreaseinPreceptbyCouncilTaxBand

    6. BudgetedExpenditurefor2017/18AdetailedbudgetissetoutinAttachmentIIandissummarisedinthetablebelow.

    Abreakdownoftheexpenditureisshowngraphicallyinthepiechartsbelow.

    £0

    £5

    £10

    £15

    £20

    BandA BandB BandC BandD BandE BandF BandG BandH

    £4.80 £5.60 £6.40£7.20 £8.80

    £10.40 £12.00£14.40

    Budget YTD 4thQTR 9+3Fcast Budget Change %2016/17 2017/18

    CurrentExpenditureGrants 10,631 5,534 6,138 11,671 13,687 2,016 17%AdministrativeCostsinclVAT 16,003 9,562 6,527 16,089 12,278 (3,811) -24%Streetlights 5,814 4,577 2,145 6,721 8,725 2,004 30%OpenandPlayAreas 8,192 4,912 1,243 6,155 6,761 606 10%

    40,640 24,584 16,052 40,636 41,451 815 2.0%

    2017/182016/17

  • AspleyGuiseParishCouncilProposedBudgetandPreceptRequest2017/18

    ForConsiderationattheJanuary2017ParishCouncilMeeting

    4of13

    Theprincipalchangesintheproposedbudgetexpenditurecomparedtotheforecastoutturnforthecurrentyearareasfollows.6.1. Grants–proposedbudget£13,687anincreaseof£2,016Theparishcouncilmakesgrantstoanumberofbodieswhoprovideservicesandsupporttovillageresidents.ThelargestgrantsaretotheVillageHallmanagementcommitteeandtheSportsTrustthatrunstheWestHillrecreationground.Anoverallincreaseinexpenditureongrantsof£2,016isproposedfor2017/18.TheVillageHallhashistoricallyreceivedthelargestgrantcontributionof£4,137perannumwhichitusesprincipallytopayfortheupkeepandrefurbishmentofthebuilding,supplementinglargergrantsreceivedfromotherbodies.The2016/17grantincludes£2,019broughtforwardfromthepreviousyearwhichisnotrepeatedin2017/18leadingtoareductioninthebudgetfor2017/18comparedtothepreviousyear.TheSportsTrustreliesonagrantof£3,000peryearfromtheParishCounciltopayfortheregulargrasscuttingoftheplayingfieldswithitsothercostsmetfromrentsreceivedfromteamsandotherswhousethepitchesandotherfundraisingactivities.Anadditionalgrantof£1,000hasbeenincludedintheforecastoutturnfor2016/17asacontributiontorepairingorreplacingtheroofontheequipmentstorewhichisinapoorstateofrepairandinneedofurgentattention.Noequivalentsumisincludedinthebudgetfor2017/18.Bothofthesebodiesarefacedwiththeneedtoraiseconsiderableadditionalfundinginthecomingyears,inthecaseoftheVillageHalltocarryoutmuchneededoverduerepairsandtobringthestandardofthefacilityuptothestandardofsimilarhallsinthearea,forexamplebyupgradingthekitchen.TheSportsTrustneedstoprovideadditionalchangingfacilitiestomeetnewECBregulationswhichcouldrequireanewpaviliontobebuiltwithoutwhichcompetitivecricketmaynolongerbepossible.Theamountsinvolved,possiblyinexcessof£100,000,arenotfeasibletobemetfromadditionalParishCouncilgrantsfromthecurrentlevelofprecept.Anadditionalbudgetof£5,000isthereforeproposedfor2017/18toassistbothbodiesinplanningforandraisingthefundstomeetthesechallenges.6.2. AdministrationincludingVAT-proposedbudget£12,278adecreaseof£3,811Themajorchangeinadministrationcostsbetweenthecurrentyearandthebudgetproposedfor2017/18arisesfromthetimingdifferencebetweentheVATsufferedoncurrentyearexpenditurewhichisrecoveredthefollowingyear.Thisresultsinanoverallreductioninadministrationcostsof£3,811whichiseffectivelybeingusedtofinancetheadditionalproposedexpenditureongrantsandstreetlights.AbsentthemovementinVAT,administrationcostsareproposedtoincreaseby1%.

  • AspleyGuiseParishCouncilProposedBudgetandPreceptRequest2017/18

    ForConsiderationattheJanuary2017ParishCouncilMeeting

    5of13

    6.3. Streetlights-proposedbudget£8,725anincreaseof£2,004TheParishCouncilowns,operatesandmaintainsapproximatelyhalf,orjustover100,ofthestreetlightsinthevillage.TheremainderaretheresponsibilityofCentralBedsCouncil.Thestreetlightslikeallelectricalequipmentarerequiredtobeinspectedperiodicallywiththenextinspectiondueinthesecondhalfof2017atanestimatedcostof£2,207.Minorrepairsneededarecoveredbythisbudget,anystreetlightswhichcannotberepairedandneedreplacingwouldbemetfromtheStreetlightReplacementreserve,seebelow.Wehaveathreeyearfixedpricecontractfortheelectricitysupplywhichisunmeteredsonoincreaseinthecostofelectricityisincludedinthebudget.6.4. OpenandPlayAreas-proposedbudget£6,761anincreaseof£606Thisbudgetcoversthecostofgrasscutting,otherthantheWestHillplayingfield,maintenanceofourchildrens’playequipmentandlimitedgeneralmaintenanceoftheopenareasinthevillage.ThenetincreaseintheproposedbudgetfornextyearwillallowforimprovedgrasscuttingoftheTownlandsfieldwiththegrasscuttingsclearedfromtheplayingarea.7. Reserves7.1. NeedforReservesTheCouncil’sbudgetforthisyearhasbeensetagainstaveryuncertainbackground.OfcoursethereisgeneralpoliticalandeconomicuncertaintycausedbyBrexitandtheresultsoftheUSandnextyear’sEuropeanelections.ClosertohomethereistheuncertaintyofwhetherCentralBedswillchoosetheareaofthevillagenorthoftherailwaylineforamajornewhousingdevelopment,thepossibilitythatourlevelcrossingwillbeclosedwhentherailwaylineiselectrifiedandthepossibilityoftheproposedOxfordtoCambridgeExpresswaypassingthroughthevillage.Thoseuncertaintiesaresometimeinthefuture.Intheshorttermwehavethepossibilityofbeingaskedtomakeacontributiontowardsthecostofalongawaitedtrafficcalmingschemeandthepossibilitythatanumberofourstreetlightswillfailtheirperiodicinspectionandneedtobereplaced.TherearealsoanumberofsmallerscalehousingprojectsforwhichdevelopersmayseekplanningpermissionincludingthosesubmittedtoCentralBedsCouncil’sCallforSitesasshowninAttachmentV.SoundfinancialmanagementrequirestheParishCounciltosetasidereservestomeetthecostoftheseuncertaintiesshouldtheymaterialise.

  • AspleyGuiseParishCouncilProposedBudgetandPreceptRequest2017/18

    ForConsiderationattheJanuary2017ParishCouncilMeeting

    6of13

    7.2. HighwaysWorksReserveResidentshavebeenaskingtheParishCounciltofindawayofhavingtrafficcalmingortrafficmanagementmeasuresinstalledinthevillageforatleast20years.MeasureswereintroducedsomeyearsagoonWeathercockLane,largelypaidforfromthedevelopmentgainfromthedevelopmentoftheformerNampaksiteinWoburnSands.MorerecentlytheParishCouncilpersuadedCentralBedsCounciltointroducesomeverylimitedmeasuresonWestHill.CentralBedsCouncilhaveconsistentlyrefusedtopayforthemorecomprehensiveschemethatthevillageneeds,absentanywiderscaleroadimprovementssuchasduallingoftheA421.AsmuchofthetrafficisheadingtoorfromMiltonKeynestheParishCouncilthereforealsoapproachedMiltonKeynesCouncilwhichhadpreviouslypaidforatrafficcalmingschemeinthevillageofWhaddontothewestofMiltonKeynes.MKCagreedinprinciplein2013tomakeacontributiontowardsthecostoftrafficcalminginAspleyGuisefromthedevelopmentgainfromthemajornewhousingdevelopmentinWavendonbetweenLowerEndRoadandtheA421.Ithastaken3longyearsbutCentralBedsCouncilfinallysubmittedproposalsforaschemetoMKCafewweeksago.ItistooearlytosaywhetherMKCwillprovidealloramajorpartofthefundingfortheproposedscheme,withanestimatedcostof£150,000,butthereisadefinitepossibilitythatCentralBedsCouncilandtheParishCouncilwillbeexpectedtomakeacontributiontowardsthecost.RatherthanruntheriskofdelayingtheschemeitisproposedthatourHighwaysWorksreservebeincreasedto£15,000,or10%oftheestimatedcostofthescheme,toallowforthiscontributionshoulditberequired.7.3. StreetlightReplacementReserveAsnotedaboveourstreetlightswillbesubjecttoaperiodicinspectionin2017whichcouldresultinanumberneedingtobereplaced.Thecostofreplacementcanvarysignificantlydependingontheextentofrelatedworktotheelectricsupplytothelightsandtheneedforanyassociatedtrafficmeasureswhiletheworkiscarriedout.Inanyeventmanyofourstreetlightsareapproachingtheendof,orhavepasttheendof,theirusefullivesandsubjecttothenumberofanyneedingreplacementbasedontheresultsoftheinspectiontheParishCouncilwillthenconsiderembarkingonaprogrammeofsystematicreplacementofthelightsintheworstcondition.Itisproposedtoincreasethereserveforstreetlightreplacementsto£10,000,sufficienttoallowforthereplacementofbetween5and10streetlights,tocoverthisrisk.

  • AspleyGuiseParishCouncilProposedBudgetandPreceptRequest2017/18

    ForConsiderationattheJanuary2017ParishCouncilMeeting

    7of13

    7.4. ReserveforPlanningAdviceTheParishCouncilisawarethatanumberofplanningapplicationsmaycomeforwardin2017thatareagainstthewishesofmanyresidents.WearealsofacedwiththetaskofrespondingtothenextdraftofCentralBedsCouncil’sLocalPlanwhichmayallocatemajorareasofthevillagenorthoftherailwaylinefornewhousingandthepossibilitythatthedeveloperwhohasaninterestinthatlandmaybringforwardaspeculativeplanningapplicationforalargenumberofnewhousesoutsidetheLocalPlanprocess.WhiletheParishCouncilhashadsomesuccessinrecentyearsinprotectingthevillagefromunwanteddevelopmentnoneofusareprofessionalplannersandwemayneedtocallonexpertprofessionaladvicetomeetthesechallengesinfuture.Anewspecificreserveof£2,500isproposedforthispurpose.7.5. GeneralReservesAllcouncilsareexpectedtomaintainreservestomeetneedsforfundsthatcannotbepredictedwithsufficientcertaintytobeincludedinthenormalbudget.Aswellasthe“knownunknowns”suchasthethreeissuesidentifiedaboveitisconsideredbestpractisetoalsomaintainageneralreservetocover“unknownunknowns”.Thereisnospecificguidanceonthelevelofreservesthatshouldbemaintainedalthoughtheregulationrequiringanexplanationtotheauditorsofthereasonsforholdinggeneralreservesinexcessofayear’sexpenditurehasledtothatbecomingamoreorlessacceptedmaximumbymany.TheParishCouncilmaintainedthatmaximumlevelofreservesforanumberofyearsbutdecidedafewyearsagotoworktoreducethelevelofthereservestothehalfwaymarkbetweenthedefactomaximumofayearandtheminimumofzeroie6months.Giventheneedexplainedabovetocreatethespecificreservesitisnowproposedtoreducethegeneralreservetothisleveltoreducethelevelofpreceptincreasewhichwouldotherwiseberequired.8. LongRangePlanOurFinancialRegulationsalsocallforathreeyearplantobepreparedwhenconsideringthelevelofpreceptforthefollowingyear.AnoutlineThreeYearPlanisincludedatAttachmentIIIwhichshowsthatfollowingthehigherthanusualpreceptproposedfor2017/18morenormalpreceptincreasesinlinewithinflationshouldbesufficientinfutureyears.

  • AspleyGuiseParishCouncilProposedBudgetandPreceptRequest2017/18

    ForConsiderationattheJanuary2017ParishCouncilMeeting

    8of13

    9. StressTestingBestpractiserequiresfinancialplanstobesubjecttostresstestingconsideringscenariosotherthanthebasecaseonwhichtheplanisbased.Forthisyearthemostlikelyalternativescenariosrelatetothosewhichthereserveshavebeencreatedfor.9.1. WorseCaseInthisscenarioweshouldconsiderhowwewouldrespondifeitheralargercontributionisrequiredformtheParishCounciltoatrafficcalmingschemeorifasignificantnumberofstreetlightsfailtheperiodicinspection.InthiscasetheParishCouncilcouldallowitsGeneralReservetotemporarilyreducebelowtheproposedlevel.Theabsolutesuggestedminimumlevelissufficienttocoverthreemonthscommittedexpenditurewhichwouldallowafurther£10,000tobespentonthetrafficcalmingschemeorstreetlightreplacementwithahigherpreceptincreaseinfutureyearstorebuildtheGeneralReserves.9.2. BestCaseInthisscenarionocontributionwouldberequiredtowardsthecostoftrafficcalmingandnostreetlightswouldneedreplacing.InthisscenariotheParishCouncilcoulddecidetoeither:

    • Beginasystematicprocessofreplacingthestreetlightsintheworstconditionasoutlinedabove

    • PursuesomeoftheotherissueslistedinSection3aboveincludingadditionaltrafficfeatures

    • Usethesavingtoreducethelevelofpreceptinfutureyears10. ConclusionTheParishCouncilisaskedtoconsiderraisingthepreceptfor2017/18inlinewiththerecommendationssetoutinthispaper.

  • AspleyGuiseParishCouncilProposedBudgetandPreceptRequest2017/18

    ForConsiderationattheJanuary2017ParishCouncilMeeting

    9of13

    AttachmentIProposedBudgetSummaryandReserveMovements

    Budget YTD 4thQTR 9+3Fcast Budget Change %GeneralReservesBalancebroughtforward 46,644 46,644 48,734 46,644 32,682 (13,962)Precept 40,154 40,154 0 40,154 47,964 7,810 18.8%Interest 0 20 0 20 20 (0)Currentexpenditure (40,640) (24,584) (16,052) (40,636) (41,451) (815) 2%Highwaysreserveprovision (7,500) (7,500) 0 (7,500) (10,850) (3,350)Otherreservesprovisions 0 0 0 0 (2,500) (2,500)Streetlightreserveprovision (6,000) (6,000) 0 (6,000) (5,062) 938Balancecarriedforward 32,658 48,734 32,682 32,682 20,803 (11,879)

    HighwaysReserveBalancebroughtforward 0 0 7,500 0 4,150TransferfromGeneralReserve 7,500 7,500 0 7,500 10,850Highwaysworks 0 0 (3,350) (3,350) 0Balancecarriedforward 7,500 7,500 4,150 4,150 15,000

    PlanningReserveBalancebroughtforward 0 0 0 0 0TransferfromGeneralReserve 0 0 0 0 2,500Otherreserveexpenditure 0 0 0 0 0Balancecarriedforward 0 0 0 0 2,500

    StreetlightReserveBalancebroughtforward 0 0 4,938 0 4,938TransferfromGeneralReserve 6,000 6,000 0 6,000 5,062Streetlightworks 0 (1,062) 0 (1,062) (5,000)Balancecarriedforward 6,000 4,938 4,938 4,938 5,000

    TotalBalancebroughtforward 46,644 46,644 61,172 46,644 41,770Precept 40,154 40,154 0 40,154 47,964Interest 0 20 0 20 20Currentexpenditure (40,640) (24,584) (16,052) (40,636) (41,451)Reservemovements 0 0 0 0 0Highwaysworks 0 0 (3,350) (3,350) 0Otherreserveexpenditure 0 0 0 0 0Streetlightworks 0 (1,062) 0 (1,062) (5,000)Balancecarriedforward 46,158 61,172 41,770 41,770 43,303

    2016/17 2017/18

  • AspleyGuiseParishCouncilProposedBudgetandPreceptRequest2017/18

    ForConsiderationattheJanuary2017ParishCouncilMeeting

    10of13

    AttachmentIIProposedDetailedExpenditureBudget

    Budget YTD 4thQTR 9+3Fcast Budget Change %2016/17 2017/18

    CurrentExpenditureGrants 10,631 5,534 6,138 11,671 13,687 2,016 17%AdministrativeCostsinclVAT 16,003 9,562 6,527 16,089 12,278 (3,811) -24%Streetlights 5,814 4,577 2,145 6,721 8,725 2,004 30%OpenandPlayAreas 8,192 4,912 1,243 6,155 6,761 606 10%

    40,640 24,584 16,052 40,636 41,451 815 2.0%GrantsVillageHall 6,157 2,019 4,138 6,156 4,137 (2,019) -33%SportsTrust 3,000 3,000 1,000 4,000 3,000 (1,000) -25%FundRaising 0 0 0 0 5,000 5,000BobbyVan 500 0 500 500 500 0 0%WSTC 0 500 0 500 500 0 0%Churchyard 400 0 400 400 400 0 0%S137 400 15 0 15 50 35 233%Other 174 0 100 100 100 0 0%

    10,631 5,534 6,138 11,671 13,687 2,016 17%AdministrativeCostsClerk'sSalary 6,028 4,422 1,477 5,900 5,969 69 1%Clerk'sExpenses 1,122 699 225 924 1,000 76 8%Insurance 2,856 2,626 0 2,626 2,726 100 4%SportsTrustContribution (111) 0 (111) (111) (111) 0 0%Printing 1,632 664 700 1,364 1,200 (164) -12%BudgetLetter 0 0 350 350 350 0 0%Rent 862 863 0 863 863 1 0%Subscriptions 700 612 0 612 650 38 6%Training 500 25 0 25 100 75 300%FireCabinet 0 0 250 250 0 (250) -100%NeighbourhoodPlan 2,000 (347) 347 0 200 200AuditFee 204 200 0 200 200 0 0%VATRecoverable (3,795) (2,445) 0 (2,445) (5,531) (3,086) 126%VATPayable 4,005 2,242 3,289 5,531 4,662 (869) -16%

    16,003 9,562 6,527 16,089 12,278 (3,811) -24%StreetlightsMaintenance&Testing 714 896 900 1,796 3,800 2,004 112%Electricity 5,100 3,680 1,245 4,925 4,925 (0) 0%

    5,814 4,577 2,145 6,721 8,725 2,004 30%OpenandPlayAreasGrassCutting 5,406 3,736 0 3,736 4,234 498 13%CBCContribution (673) (673) 0 (673) (673) (0) 0%PlayEquipmentMaintenance 1,734 375 814 1,189 1,000 (189) -16%RepairstoSquare/Benches 0 525 150 675 800 125 19%PlayEquipment 0 0 11,386 11,386 0 (11,386) -100%S106Contribution 0 0 (11,386) (11,386) 0 11,386StreetCleaning 836 600 200 800 800 0 0%OpenAreas 510 220 29 249 250 1 0%SaltBins 200 29 0 29 200 171 594%Plants 179 100 50 150 150 0 0%

    8,192 4,912 1,243 6,155 6,761 606 10%

    AdminexclVAT 15,793 9,765 3,238 13,003 13,147 144 1%

  • AspleyGuiseParishCouncilProposedBudgetandPreceptRequest2017/18

    ForConsiderationattheJanuary2017ParishCouncilMeeting

    11of13

    AttachmentIIIThreeYearPlan

    2017/18 2018/19 2019/20Preceptincrease 18.8% 2.0% 2.0%GeneralReservesBalancebroughtforward 32,682 20,803 19,966Precept 47,964 48,923 49,901Interest 20 20 20Currentexpenditure (41,451) (42,280) (43,126)Highwaysreserveprovision (10,850)Planning&ElectionReserve (2,500) (2,500)Streetlightreserveprovision (5,062) (5,000) (5,000)Balancecarriedforward 20,803 19,966 21,761

    Months 6.0 5.7 6.1HighwaysReserveBalancebroughtforward 4,150 15,000 15,000TransferfromGeneralReserve 10,850 0 0Highwaysworks 0Balancecarriedforward 15,000 15,000 15,000

    Planning&ElectionReserveBalancebroughtforward 0 2,500 5,000TransferfromGeneralReserve 2,500 2,500 0Otherreserveexpenditure 0Balancecarriedforward 2,500 5,000 5,000

    StreetlightReserveBalancebroughtforward 4,938 5,000 5,000TransferfromGeneralReserve 5,062 5,000 5,000Streetlightworks (5,000) (5,000) (5,000)Balancecarriedforward 5,000 5,000 5,000

    TotalBalancebroughtforward 41,770 43,303 44,966Precept 47,964 48,923 49,901Interest 20 20 20Currentexpenditure (41,451) (42,280) (43,126)Reservemovements 0 0 0Highwaysworks 0 0 0Otherreserveexpenditure 0 0 0Streetlightworks (5,000) (5,000) (5,000)Balancecarriedforward 43,303 44,966 46,761

  • AspleyGuiseParishCouncilProposedBudgetandPreceptRequest2017/18

    ForConsiderationattheJanuary2017ParishCouncilMeeting

    12of13

    AttachmentIV

    Comparisonof2016/17PreceptbyParishandPotentialImpactofProposedIncrease(SourceCentralBedsCouncil–allcouncilswithbetween800and1,250dwellings)

    No Council

    BandDEquivalentProperties

    2016/17Total

    Precept£

    2016/17BandDActual£

    AssumedIncrease

    2017/18BandD

    Assumed£1 Westoning 866 28,335 32.72 2% 33.37 2 Clifton 1,207 43,000 35.63 2% 36.34 3 Aspley Guise 1,047 40,154 38.35 18.8% 45.55 4 Silsoe 1,174 50,977 43.42 2% 44.29 5 Shillington 814 35,935 44.15 2% 45.03 6 Stondon 982 50,475 51.40 2% 52.43 7 Northill 974 59,000 60.57 2% 61.78 8 Eaton Bray 1,151 83,000 72.11 2% 73.55 9 Fairfield 1,143 88,940 77.81 2% 79.37 10 Harlington 884 99,362 112.40 2% 114.65

  • AspleyGuiseParishCouncilProposedBudgetandPreceptRequest2017/18

    ForConsiderationattheJanuary2017ParishCouncilMeeting

    13of13

    AttachmentV

    SitesSubmittedtoCentralBedsCouncil’sCallforSites