CHECK LIST RUNNING GENSET PACIFIC PLACE JAKARTA MONITORING RUNNING GENSET Location Time Status Voltage Ampere KW PF Hz RPM Breaker RUN OFF GCP GCB R S T R S T Genset No. PT.M A STER ENG INEERING SERV IC E O ffice :Tam an Harapan Baru Blok A 1 No.16 Bekasi 17131 Telp.(021)88865043-88978144 Fax. (021)88866099

Upload: farhan-ar-raziq

Post on 24-Nov-2014

102 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: 0perasional MV

CHECK LIST RUNNING GENSET

PACIFIC PLACE JAKARTA

MONITORING RUNNING GENSET

LocationTime

StatusVoltage Ampere

KW PF Hz RPMBreaker

RUN OFF GCP GCB R S T R S T

Genset No.

Water Temp.

PT.MASTER ENGINEERING SERVICE

Office : Taman Harapan Baru

Blok A1 No.16 Bekasi 17131

Telp. (021) 88865043-88978144

Fax. (021) 88866099

Page 2: 0perasional MV

Jakarta, 2010Checked by, Acknowledge by, Acknowledge by,

(……………………….........) (…………………………..) (…………………………..)

Page 3: 0perasional MV

CHECK LIST RUNNING GENSET

PACIFIC PLACE JAKARTA

Engineering Dept.Date :Shift :

MONITORING RUNNING GENSET

Battery Running HoursRemark

V AWAL AKHIR

Oil Pressure

Page 4: 0perasional MV
Page 5: 0perasional MV

CHECK LIST GENSET HARIANPACIFIC PLACE JAKARTA

Engineering Dept.

Date :Shift :

NO. DESCRIPTION

PEMERIKSAAN GENSET HARIAN

KETERANAGNLOKASI GENSET

GENSET RETAIL EAST WEST HOTEL CHILLER

G1 G2 G3 G4 G5 G6 G7 G8 G1 G2 G1 G2 G1 G2 G3 G4 G1 G2 G3 G4ENGINE

1 Fuel Solar2 Tank & Valve3 Air Radiator4 Oil Mesin5 Accu (Volt)6 V-Belt7 Baut-baut Mesin8 Hour Counter

ELECTRICAL1 Status Control

a. GCP -21b. ATS (CB/MCCB)c. Synchron Switchd. Engine Leader/Basice.Load Monitoringf. Synchrone

2 Charger GCPa. DC Voltageb. DC Ampere

3 UPS4 Hour Counter5 Charger MSB

a. Supply Powerb. DC Voltagec. DC Ampere

Jakarta, 2010Checked by, Acknowledge by, Acknowledge by,

(……………………….........) (…………………………..) (…………………………..)

PT.MASTER ENGINEERING SERVICE

Office : Taman Harapan Baru

Blok A1 No.16 Bekasi 17131

Telp. (021) 88865043-88978144

Fax. (021) 88866099

Page 6: 0perasional MV
Page 7: 0perasional MV

CHECK LIST MSB-SSPACIFIC PLACE JAKARTA

No Description Lokasi

PM

V A KW

MSB-A / SS-11 Incoming PLN S/S South Side Line-1 S/S-1 LT.6A

2 Incoming PLN S/S South Side Line-2 S/S-1 LT.6A 3 Outgoing Sub-3 S/S-1 LT.6A 4 Outgoing Sub-5+4 S/S-1 LT.6A 5 Incoming Genset A S/S-1 LT.6A 6 Incoming Genset B S/S-1 LT.6A 7 Battery Charger for MSB-A S/S-1 LT.6A 8 Battery Charger KBC 24/50 S/S-1 LT.6A

MSB-B / GENSET RETAIL1 Incoming Genset-1 Genset Retail LT.62 Incoming Genset-2 Genset Retail LT.63 Incoming Genset-3 Genset Retail LT.64 Incoming Genset-4 Genset Retail LT.65 Incoming Genset-5 Genset Retail LT.66 Incoming Genset-6 Genset Retail LT.67 Incoming Genset-7 Genset Retail LT.68 Incoming Genset-8 Genset Retail LT.69 Outgoing MSB-A Busbar-1

10 Outgoing MSB-a Busbar-211 Battery Charger For MSB-B Genset Retail LT.6

MSB-C1 Incoming PLN S/S South Side Line-2 Genset Chiller LT.62 Outgoing Trafo CH-1/D Genset Chiller LT.63 Outgoing Trafo CH-2/C Genset Chiller LT.64 Outgoing Trafo CH-3/B Genset Chiller LT.65 Outgoing Trafo CH-4/A Genset Chiller LT.66 Battery Charger For MSB-C Genset Chiller LT.6

MSB-D / SS-111 Incoming PLN S/S North Side Line-1 S/S-11 LT.6 Hotel2 Outgoing Trafo TR-11A S/S-11 LT.6 Hotel3 Outgoing Trafo TR-11B S/S-11 LT.6 Hotel4 Battery Charger For MSB-D S/S-11 LT.6 Hotel

S/S-81 Incoming for S/S-8 S/S-8 Parkir P1

Jakarta, 2010

PT.MASTER ENGINEERING SERVICE

Office : Taman Harapan Baru

Blok A1 No.16 Bekasi 17131

Telp. (021) 88865043-88978144

Fax. (021) 88866099

Page 8: 0perasional MV

Checked by,

(……………………….........)

Page 9: 0perasional MV

CHECK LIST MSB-SSPACIFIC PLACE JAKARTA

Engineering Dept.Date :Shift :

PM Sepam Charger

RemarkKWH KVARH L1-A L2-A L3-A

AC Volt

DC Volt

DC Amp.

Page 10: 0perasional MV

Acknowledge by, Acknowledge by,

(…………………………..) (…………………………..)

Page 11: 0perasional MV
Page 12: 0perasional MV

CHECK LIST PANEL LVSMBPACIFIC PLACE JAKARTA

No Description Location

Volt Hertz Ampere

V HzL1 L2 L3

1 MCC-CH-A LT.7 Chiller Hotel2 MCC-CH-B LT.7 Chiller Hotel3 MCC-CH-C LT.7 Chiller Hotel4 MCC-CH-D LT.7 Chiller Hotel5 LVMSB-1A LT.6A Apartement6 LVMSB-1B LT.6A Apartement7 LVMSB-2A LT.6A Apartement8 LVMSB-2B LT.6A Apartement9 LVMSB-3A LT.7 Chiller Hotel

10 LVMSB-3B LT.7 Chiller Hotel11 LVMSB-4A LT.7 Chiller Hotel12 LVMSB-4B LT.7 Chiller Hotel13 LVMSB-4A LT.7 Mall14 LVMSB-5B LT.7 Mall15 LVMSB-6A LT.LG BLK R.ENG16 LVMSB-6B LT.LG BLK R.ENG17 LVMSB-7A Management Office18 LVMSB-7B Management Office19 LVMSB-8A Parkir P120 LVMSB-8B Parkir P121 LVMSB-9 LT.6 Tower West22 LVMSB-10 LT.6 Tower East23 LVMSB-11A LT.6 Hotel24 LVMSB-11B LT.6 Hotel25 LVMSB-12A LT.22 ME Hotel26 LVMSB-12B LT.22 ME Hotel

Jakarta, 2010Checked by, Acknowledge by,

(……………………….........) (…………………………..)

PT.MASTER ENGINEERING SERVICE

Office : Taman Harapan Baru

Blok A1 No.16 Bekasi 17131

Telp. (021) 88865043-88978144

Fax. (021) 88866099

PT.MASTER ENGINEERING SERVICE

Office : Taman Harapan Baru

Blok A1 No.16 Bekasi 17131

Telp. (021) 88865043-88978144

Fax. (021) 88866099

Page 13: 0perasional MV

CHECK LIST PANEL LVSMBPACIFIC PLACE JAKARTA

Engineering Dept.Date :Shift :

WBP LWBP KVARH 1 KVARH 2 KW KVA

Capasitor Bank

PF Step

Acknowledge by,

(…………………………..) (…………………………..)

Page 14: 0perasional MV

CHECK LIST PANEL LVSMBPACIFIC PLACE JAKARTA

Remark

PT.MASTER ENGINEERING SERVICE

Office : Taman Harapan Baru

Blok A1 No.16 Bekasi 17131

Telp. (021) 88865043-88978144

Fax. (021) 88866099

Page 15: 0perasional MV

CHECK LIST TRANSFORMATOR 20000VPACIFIC PLACE JAKARTA

Engineering Dept.DateShift

No Description LocationStatus

RemarkTrafo Control

1 TR-GT-1 Genset Retail2 TR-GT-2 Genset Retail3 TR-GT-3 Genset Retail4 TR-GT-4 Genset Retail5 TR-GT-5 Genset Retail6 TR-GT-6 Genset Retail

7 TR-GT-7 Genset Retail8 TR-GT-8 Genset Retail9 TR-GAT-1 Genset Retail

10 TR-GAT-2 Genset Retail11 TR-1A S/S-112 TR-1B S/S-113 TR-2A S/S-214 TR-2B S/S-215 TR-3A S/S-316 TR-3B S/S-317 TR-4A S/S-418 TR-4A S/S-419 TR-5A S/S-520 TR-5B S/S-521 TR-6A S/S-622 TR-6B S/S-623 TR-7A S/S-724 TR-7B S/S-725 TR-8A S/S-826 TR-8B S/S-827 TR-9 S/S-928 TR-10 S/S-1029 TR-11A S/S-1130 TR-11B S/S-1131 TR-12A S/S-1232 TR-12B S/S-1233 TR-CH-1/D Chiller Hotel LT.7 34 TR-CH-2/C Chiller Hotel LT.7 35 TR-CH-3/B Chiller Hotel LT.7 36 TR-CH-4/A Chiller Hotel LT.7 37 TR-GCP-1 S/S Chiller LT.638 TR-GCP-2 S/S Chiller LT.639 TR-GCP-3 S/S Chiller LT.640 TR-GCP-4 S/S Chiller LT.6

Jakarta, 2010Checked by, Acknowledge by, Acknowledge by,

Imped.Volt %

PT.MASTER ENGINEERING SERVICE

Office : Taman Harapan Baru

Blok A1 No.16 Bekasi 17131

Telp. (021) 88865043-88978144

Fax. (021) 88866099

Page 16: 0perasional MV

(………………) (………………….) (………………….)

Page 17: 0perasional MV

KapasitasVoltage Ampere

KV LV KV LV

Page 18: 0perasional MV

CHECK LIST OPERASIONAL LVPACIFIC PLACE JAKARTA

Engineering Dept.DateShift

No. Description Location

Circuit Breaker

StatusLVBSB Coupler Cap.Bank

1 MCC-CHILLERMCC-CH-A LT.7 Chiller HotelMCC-CH-B LT.7 Chiller HotelMCC-CH-C LT.7 Chiller HotelMCC-CH-D LT.7 Chiller Hotel

2 LVSMB-1Incoming From TR-1A LT.6A MallIncoming From TR-1B LT.6A MallCapasitor Bank A LT.6A MallCapasitor Bank B LT.6A Mall

3 LVSMB-2Incoming From TR-2A LT.6 MallIncoming From TR-2B LT.6 MallCapasitor Bank A LT.6 MallCapasitor Bank B LT.6 Mall

4 LVSMB-3 LT.7 Chiller HotelIncoming From TR-3A LT.7 Chiller HotelIncoming From TR-3B LT.7 Chiller HotelCapasitor Bank A LT.7 Chiller HotelCapasitor Bank B LT.7 Chiller Hotel

5 LVSMB-4 LT.7 Chiller HotelIncoming From TR-4A LT.7 Chiller HotelIncoming From TR-4B LT.7 Chiller HotelCapasitor Bank A LT.7 Chiller HotelCapasitor Bank B LT.7 Chiller Hotel

6 LVSMB-5Incoming From TR-5AIncoming From TR-5BCapasitor Bank ACapasitor Bank B

7 LVSMB-6 LT.LG BLK R.ENGIncoming From TR-6A LT.LG BLK R.ENGIncoming From TR-6B LT.LG BLK R.ENGCapasitor Bank A LT.LG BLK R.ENGCapasitor Bank B LT.LG BLK R.ENG

8 LVSMB-7Incoming From TR-7AIncoming From TR-7BCapasitor Bank A

PT.MASTER ENGINEERING SERVICE

Office : Taman Harapan Baru

Blok A1 No.16 Bekasi 17131

Telp. (021) 88865043-88978144

Fax. (021) 88866099

Page 19: 0perasional MV

Capasitor Bank B9 LVSMB-8

Incoming From TR-8AIncoming From TR-8BCapasitor Bank ACapasitor Bank B

10 LVSMB-9 LT.6 Tower WestIncoming From TR-9 LT.6 Tower WestCapasitor Bank LT.6 Tower West

11 LVSMB-10 LT.6 Tower EastIncoming From TR-10 LT.6 Tower EastCapasitor Bank LT.6 Tower East

12 LVSMB-11 LT.6 HotelIncoming From TR-11A LT.6 HotelIncoming From TR-11B LT.6 HotelCapasitor Bank A LT.6 HotelCapasitor Bank B LT.6 Hotel

13 LVSMB-12Incoming From TR-12A S/S-12 Lt.MEIncoming From TR-12B S/S-12 Lt.MECapasitor Bank A S/S-12 Lt.MECapasitor Bank B S/S-12 Lt.ME

Jakarta, 2010Checked by, Acknowledge by,

(………………) (………………….)

Page 20: 0perasional MV

CHECK LIST OPERASIONAL LVPACIFIC PLACE JAKARTA

Engineering Dept.::

Control RemarkCircuit Breaker

Merk Type Kap.

Page 21: 0perasional MV

Acknowledge by,

(………………….)

Page 22: 0perasional MV

CHECK LIST OPERASIONAL MVPACIFIC PLACE JAKARTA

Engineering Dept.Date :Shift :

No. Description LocationStatus

Remark

GCB LBS MCB Control

1 MSB-A Metering VT"S S/S-1 LT.6A Outgoing Trafro GAT-1 S/S-1 LT.6A Outgoing Sub-1 S/S-1 LT.6A Outgoing Sub-6 S/S-1 LT.6A Outgoing Sub-3 S/S-1 LT.6A Incoming Genset B S/S-1 LT.6A Incoming PLN S/S South Side Line-1 S/S-1 LT.6A Coupler S/S-1 LT.6A Incoming Genset B S/S-1 LT.6A Incoming PLN S/S South Side Line-1 S/S-1 LT.6A Outgoing Sub-5+4 S/S-1 LT.6A Outgoing Sub-8+7 S/S-1 LT.6A Outgoing Sub-2 S/S-1 LT.6A Battery Charger For MSB-A S/S-1 LT.6A Battery Charger KBC 24/50 S/S-1 LT.6A

2 SS-1Incoming From MSB-A SS-1 LT.6 Tower EastOutgoing Trafo TR-1A SS-1 LT.6 Tower EastOutgoing Trafo TR-1A SS-1 LT.6 Tower EastOutgoing To SS-2 SS-1 LT.6 Tower East

3 MSB-B / GENSET RETAILMetering VT"S Genset Retail LT.6Outgoing Trafo-2 Genset Retail LT.6Incoming Genset-8 Genset Retail LT.6Incoming Genset-7 Genset Retail LT.6Incoming Genset-6 Genset Retail LT.6Incoming Genset-5 Genset Retail LT.6Outgoing MSB-A Busbar-1 Genset Retail LT.6Coupler Genset Retail LT.6Outgoing MSB-a Busbar-2 Genset Retail LT.6Incoming Genset-4 Genset Retail LT.6Incoming Genset-3 Genset Retail LT.6Incoming Genset-2 Genset Retail LT.6Incoming Genset-1 Genset Retail LT.6Battery Charger For MSB-B Genset Retail LT.6

4 MSB-C / SS ChillerIncoming Genset GCP-1 Genset Chiller LT..6 HotelIncoming Genset GCP-2 Genset Chiller LT..6 HotelIncoming Genset GCP-3 Genset Chiller LT..6 HotelIncoming Genset GCP-4 Genset Chiller LT..6 HotelIncoming PLN S/S South Side Line-1 Genset Chiller LT..6 HotelOutgoing Trafo CH-1 Genset Chiller LT..6 HotelOutgoing Trafo CH-2 Genset Chiller LT..6 HotelOutgoing Trafo CH-3 Genset Chiller LT..6 HotelOutgoing Trafo CH-4 Genset Chiller LT..6 HotelBattery Charger For MSB-D SS-11 LT.6 Hotel

5 MSB-D / SS-11Incoming PLN S/S North Side Line-1OutGoing MSB-F Line-1 SS-11 LT.6 HotelOutGoing MSB-F Line-2 SS-11 LT.6 HotelOutgoing Trafo TR-11A SS-11 LT.6 HotelOutgoing Trafo TR-11B

6 MSB-E / SS-10Incoming PLN S/S South Side Line-3 SS-10 LT.6 Tower EastOutgoing Trafo TR-10 SS-10 LT.6 Tower EastOutgoing MSB-G / SS-9 SS-10 LT.6 Tower East

7 MSB-F / SS-12Incoming MSB-F Line-1 S/S-12 ME Hotel Lt.22 Incoming MSB-F Line-2 S/S-12 ME Hotel Lt.22 Outgoing Trafo TR-11A S/S-12 ME Hotel Lt.22 Outgoing Trafo TR-11B S/S-12 ME Hotel Lt.22

8 MSB-G / SS-9Incoming From MSB-E SS-9 LT.6 Tower WestOutgoing Trafo TR-9 SS-9 LT.6 Tower West

9 SS-2Incoming From MSB-A SS-2 Mall Lt.6Outgoing Trafo TR-2A SS-2 Mall Lt.6Outgoing Trafo TR-2B SS-2 Mall Lt.6

PT.MASTER ENGINEERING SERVICE

Office : Taman Harapan Baru

Blok A1 No.16 Bekasi 17131

Telp. (021) 88865043-88978144

Fax. (021) 88866099

Page 23: 0perasional MV

Outgoing To SS-1 SS-2 Mall Lt.610 SS-3

Incoming From MSB-A SS-3 Chiller LT.7Outgoing Trafo TR-3A SS-3 Chiller LT.7Outgoing Trafo TR-3\B SS-3 Chiller LT.7

11 SS-4Incoming From SS-5 SS-4 Chiller LT.7Outgoing Trafo TR-4A SS-4 Chiller LT.7Outgoing Trafo TR-4B SS-4 Chiller LT.7Incoming From SS-3 SS-4 Chiller LT.7

12 SS-5Incoming From MSB_A S/S-5 LT.7 HotelOutgoing Trafo TR-5AOutgoing Trafo TR-5BOutgoing To S/S-4

13 SS-2Incoming From MSB-A SS-2 Mall Lt.6Outgoing Trafo TR-2A SS-2 Mall Lt.6Outgoing Trafo TR-2B SS-2 Mall Lt.6Outgoing To SS-1 SS-2 Mall Lt.6

14 SS-6Incoming From MSB_A SS-6 BLK R.ENG LT.LGOutgoing Trafo TR-6A SS-6 BLK R.ENG LT.LGOutgoing Trafo TR-6B SS-6 BLK R.ENG LT.LGOutgoing To SS-7 SS-6 BLK R.ENG LT.LG

15 SS-7Incoming From S/S-6 Management Office Lt.B1Incoming From S/S-8 Management Office Lt.B1Outgoing Trafo TR-6A Management Office Lt.B1Outgoing Trafo TR-6B Management Office Lt.B1

16 SS-8Incoming From MSB-A S/S-8 Parkir P1Incoming From S/S-7 S/S-8 Parkir P1Outgoing Trafo TR-8A S/S-8 Parkir P1Outgoing Trafo TR-8B S/S-8 Parkir P1Outgoing Equity Tower S/S-8 Parkir P1

Jakarta, 2010Checked by, Acknowledge by, Acknowledge by,

(………………) (………………….) (………………….)