    Company Confidential

    EASA Other Party Supplier Control" Workshop10 May 2011 Cologne

    Presented byGuy DIONEAQG Leader

    ZODIAC Aerospace

    9100 Requirements

  • 8/12/2019 04 - 9100 Requirements

    2/28

    Company Confidential 2

    IAQG &9100

    -Background

  • 8/12/2019 04 - 9100 Requirements

    3/28

    3

    IAQG Organization

    International Aerospace Quality GroupInternational Aerospace Quality Group

    IAQG Council

    IAQG started in 1998

    EAQG(Europe)

    AAQG(Americas)

    APAQG(Asia & Pacific)

    67 Major OEMs worldwide

  • 8/12/2019 04 - 9100 Requirements

    4/28

    4

    IAQG Mission

    Achieve significant performance improvements inQuality, Delivery, and consequently Cost, on allproducts and services throughout the value stream

    Through the establishment of effective preventionoriented practices and processes

    By standardising Requirements, providing Process

    Guidelines and spreading Best Practices By introducing a Culture of Quality as early as

    possible in the value stream thus reducing the costof poor quality

    Through establishing and maintaining dynamiccooperation between international Aviation, Spaceand Defense companies

  • 8/12/2019 04 - 9100 Requirements

    5/28

    5

    IAQG Objectives

    Establish commonality of aviation, space and defensequality systems, as documented and as applied

    Establish and implement a process of continualimprovement to bring initiatives to life

    Establish methods to share best practices in theaviation, space and defense industry

    Coordinate initiatives and activities withregulatory/government agencies and other industryStakeholders

    Only 1 management systemthroughout the whole Supply Chain

  • 8/12/2019 04 - 9100 Requirements

    6/28

  • 8/12/2019 04 - 9100 Requirements

    7/28

    7

    IAQG Vision Goals

    Product and Services Quality & Delivery will have

    improved 20% per year throughout the productlifecycle

    Robust processes achieved throughout the Supply

    Chain (SCMH supplier maturity assessment level 3or better)

    90% of the industry Supply Chain certified to IAQG

    Quality Management System Standards

    IAQG Quality management system certification(ICOP) program robust, recognized and valued

    5 years IAQG Vision

  • 8/12/2019 04 - 9100 Requirements

    8/28

    8

    IAQG Enlarged Strategy

    Enlarged IAQG Strategy defined in 2010 withaddition of topics within the 4 ImprovementStrategy streams

    Definition of 2011 priorities within Enlarged

    Strategy

  • 8/12/2019 04 - 9100 Requirements

    9/28

    9

    IAQG Initiative - QMS

    Before IAQG implementation:

    1 set of QMS (Quality Management System)requirements per OEM for their Aviation, Space &

    Defense Suppliers

    After IAQG implementation:

    Only 1 set of QMS requirements fully harmonized

    worldwide through the 9100 standard and usedwithin the Aviation, Space & Defense Supply Chain

    Only 1 Certification scheme for organizationcompliant with 9100 standard controlled by theICOP scheme

    About 70 % of Industry Supply Chain (Eligiblesuppliers) 9100 certified (IAQG goal to reach 90 %

    certification rate in less than 5 years)

  • 8/12/2019 04 - 9100 Requirements

    10/28

    10

    9100 Principle

    9100 based on ISO 9001 QualityManagement Systems Requirements

    9100 with ISO 9001 structure with addition

    of specific requirements for Aviation, Space &Defense Industry

  • 8/12/2019 04 - 9100 Requirements

    11/28

    Company Confidential 11

    IAQG 9100:2009

    Revision Overview

  • 8/12/2019 04 - 9100 Requirements

    12/28

    9100 Revision Objectives

    Incorporate ISO 9001:2008 changes

    Expand scope to include land and sea based

    systems for defense applications Ensure alignment with IAQG strategy

    (on-time, on-quality performance)

    Adopt new requirements based onstakeholder needs

    Improve existing requirements where

    stakeholders identified need for clarification,including when a documented procedure isrequired.

    12

  • 8/12/2019 04 - 9100 Requirements

    13/28

    9100:2009 Key Changes

    New Definitions

    Clause 3.1 Risk An undesirable situation or circumstance that has

    both a likelihood of occurring and a potentiallynegative consequence.

    Clause 3.2 - Special Requirements Those requirements which have high risks to

    being achieved thus, requiring their inclusion inthe risk management process.

    Clause 3.3 - Critical Items Those items (e.g., functions, parts, software,

    characteristics, processes) having significant effect

    on the product realization and use of the product;including safety, performance, form, fit, function,

    producibility, service life, etc.that require specific actions to ensure they areadequately managed.

    13

  • 8/12/2019 04 - 9100 Requirements

    14/28

    14

    7.1 Planning of Product Realization

    9100:2009 Key Changes

    7.4Purchasing -

    Vendor/SupplierProvidedProducts

    Statutory,Regulatory, and

    Other

    Requirements

    CustomerRequirements

    includingRequirementsidentified as

    special by the

    customer

    7.2Determinationand Review ofRequirementsRelated to the

    ProductSpecial

    Requirementsas determinedby customer or

    organization

    7.3 Design &Development

    7.3.3.e criticalitems,

    including KeyCharacteristics

    7.5 Production& serviceprovision

    (Drawings,Instructions,

    Plans. etc.)

    8.2.3/8.2.4 - Monitoring & Measurement of Processes/Products8.4 Analysis of Data

    8.5 Improvement (CI, C/A, P/A)

    DesignInputs

    DesignOutputs

    7.1.2 Risk Management

    Interrelationship between Special Requirements, Critical Items,Key Characteristics, and Risk Management process

    7.5.1appropriate

    processes tomanage

    critical items

    7.4.2 flowdown reqtto suppliers

  • 8/12/2019 04 - 9100 Requirements

    15/28

    15

    9100:2009 Key Changes

    Clauses 5.2/8.2.1 Customer Focus/Satisfaction

    Addition:

    Top management shall ensure that product conformityand on-time delivery performance are measured and

    that appropriate action is taken if planned results arenot, or will not be, achieved. (5.2)

    Information to be monitored and used for the evaluationof customer satisfaction shall include, but is not limited

    to: product conformity

    on-time delivery performance

    customer complaints

    corrective action requests. Organizations shall develop and implement plans for

    customer satisfaction improvement that addressdeficiencies identified by these evaluations, and assessthe effectiveness of the results. (8.2.1)

  • 8/12/2019 04 - 9100 Requirements

    16/28

    16

    9100:2009 Key Changes

    Clauses 5.2/8.2.1 Customer Focus/Satisfaction (Continued)

    Rationale:

    Establish clear relationship between the QMS andorganizational performance, in line with IAQGstrategy

    To promote continuous improvement of customersatisfaction

    Implementation/Audit Considerations:

    Review of management focus and organizationalprocess to measure customer satisfaction and planimprovements

  • 8/12/2019 04 - 9100 Requirements

    17/28

    9100:2009 Key Changes

    7.1.1 - Project Management Addition:

    New requirement for planning and managingproduct realization in a structured and controlled

    way to meet requirements at acceptable risk,within resource and schedule constraints. Rationale:

    Most aviation, space and defense products arecomplex and involve multi-tier partners and

    suppliers This clause provides additional focus on upfront

    planning and the management of project plansthroughout product realization

    Implementation/Audit Considerations:

    Does the organization have a process to manageproduct realization planning to ensure quality andschedule are not compromised?

    How are project plans used to manage the

    successful completion of projects?17

  • 8/12/2019 04 - 9100 Requirements

    18/28

    18

    7.1.2 - Risk Management Addition:

    New requirement to implement a risk managementprocess applicable to the product and organizationcovering: responsibility, criteria, mitigation andacceptance.

    The concept of risk is integrated within the revised9100.

    Rationale:

    Risk Management was placed in clause 7.1.2 toprovide additional focus on product risk duringproduct realization.

    Implementation/Audit Considerations: Does the organization have a risk management

    process that addresses all of the applicablerequirements? Is the definition of risk appropriately understood

    and applied in that process? Are risks successfully managed in the

    organization?

    9100:2009 Key Changes

  • 8/12/2019 04 - 9100 Requirements

    19/28

    9100:2009 Key Changes

    7.1.3 - Configuration Management Revision/Relocation:

    Moved from Clause 4.3 to 7.1.3.

    Structured in line with ISO 10007 requirements

    Rationale: Focuses configuration management on the product

    and how it is sustained throughout productrealization

    Implementation/Audit Considerations: Some level of configuration management is

    expected for all products at all levels of the supplychain in compliance with exclusion criteria (seeclause 1.2).

    19

  • 8/12/2019 04 - 9100 Requirements

    20/28

    20

    9100:2009 Key Changes

    7.1.4 Work Transfer Revision/Relocation:

    Moved from clause 7.5.1.4 (Production) to clause7.1.4

    The organization must have a process to plan andcontrol the transfer activities

    Expanded to cover permanent transfer (e.g. fromone organization to another, from one organizationto supplier, from one supplier to another).

    Rationale:

    Work transfer can occur at anytime during productrealization

    Addresses problems that often occur during work

    transfers Implementation/Audit Considerations:

    A process must exist to control the transfer of workincluding planning and subsequent control of the

    transfer.

  • 8/12/2019 04 - 9100 Requirements

    21/28

    21

    9100:2009 Key Changes

    Clause 7.4.1 Recognition of Supplier Quality Data

    Revision:

    Added note to recognize that one factor that maybe used during supplier selection and evaluation is

    objective and reliable data from external sources

    Rationale:

    Recognition that the industry trend is to useexternally provided supplier performance data (e.g.

    Online Aerospace Supplier Information System OASIS, Nadcap)

    Implementation/Audit Considerations:

    Even though this is only a Note, IAQG encourages

    use of external sources to understand supplierrisks.

  • 8/12/2019 04 - 9100 Requirements

    22/28

    22

    Clause 7.4.1 Approval status for suppliers

    Revision:

    Added and provided examples of approval status(e.g. approved, conditional, disapproved) and

    examples of scope of approval (e.g. producttype, process family).

    The organization must define the process forsuppliers approval status decisions or changes.

    Rationale: Clarify that the conditions for using a supplier

    depends on its approval status

    Implementation/Audit Considerations:

    The process, responsibilities and authority must bedefined for this process

    9100:2009 Key Changes

  • 8/12/2019 04 - 9100 Requirements

    23/28

    23

    9100:2009 Key Changes

    Clause 7.5.1.1 Production Process Verification Revision/Relocation:

    Moved from 8.2 (measurement) to 7.5 (production) Requirement to verify the production processes,

    documentation and tooling are capable of producing

    parts and assemblies that meet requirements. Thisprocess shall be repeated when changes occur thatinvalidate the original results (e.g. engineering ormanufacturing processes changes, tooling changes).

    Rationale:

    Movement to clause 7 acknowledges that thisrequirement (previously called first article inspection -FAI) is not primarily a measuring and monitoringprocess, but a process that will be used to assureproduct realization capability under controlled

    conditions. Allows justifiable exclusion for unique and individualproducts

    Implementation/Audit Considerations: Validation of requests for exclusion (unique and

    individual products vs. production run).

  • 8/12/2019 04 - 9100 Requirements

    24/28

    In Closing

    The 9100 Team goals and objectives were to:

    Emphasis on product and process improvement(e.g. risk management, critical items, project management)

    Expand the 9100 scope to include Aviation, Space &Defense

    Provide additional focus on IAQG objective of on-time andon-quality deliveries

    Ensure 9100 standard is compatible for use by allstakeholder segments and by organizations of all typesand sizes

    Ensure 9100 stays recognized by authorities

    Ensure extensive stakeholder involvement in revisioneffort by the use of a project management approach tosolicit input and manage the revision

    24

  • 8/12/2019 04 - 9100 Requirements

    25/28

  • 8/12/2019 04 - 9100 Requirements

    26/28

    26

  • 8/12/2019 04 - 9100 Requirements

    27/28

    27

  • 8/12/2019 04 - 9100 Requirements

    28/28

    28

    Questions