    Pearl GTLProject

    LINDE ENGINEERING

    Shell Project No: HP-3000-QAT Contractor Project No:5887

    Project Document Number: T- 4.250.920 Project Rev.: B Page 2 of 8

    Purchase Order Number: 2MH127

    Tag/Item Number(s): N/A

  • 7/21/2019 031-ITP FOR PIPING FABRICATION AG AND UG.pdf

    6/11

    QATAR SHELL GTL PROJECT (PEARL)

    C2 AIR SEPARATION UNITS CONSTRUCTION

    E B 03.09.08 Ready for Construction AB EO AG RFC

    D A 14.07.08 Issued for Company Comments AB EO AG ICC

    C O 23.12.07 Issued for Company Comments

    BR AU/MC ZG ICC

    B 15.12.07 Issued for Review

    BR AU/MC ZG IFR

    A 02.12.07 Issued for Internal Review BR AU/MC ZG IIR

    GAMARev.

    ProjectRev

    Date DescriptionPrepared

    ByChecked

    By

    ApprovedBy Status

    No. No. ORIGINATOR

  • 7/21/2019 031-ITP FOR PIPING FABRICATION AG AND UG.pdf

    7/11

    QSGTL PEARL PROJECTDocument No.:GAM-ITP-QAC-GTL-031

    C2 ASU Construction Works

    ITP FOR PIPING FABRICATION -AG/UG (FSI) DATE: 03.09.08 REV. E

    S. GAMA QATAR X. CONTRACTOR QC C. COMPANY A. THIRD PARTY (TPI)

    I: INSPECTION / TEST R: DOCUMENT ISSUED/REPORT REVIEW S: SURVEILANCEH: HOLD POINT (Notification Required and Presence Mandatory). W: WITNESS(Notification Required but Presence not Mandatory)

    Item ActivityTest

    FrequencyReference Document Acceptance Criteria

    Responsible

    PartyVerifying Documents S X C A

    T-4.250.920 Rev. B Page 4 of 8

    1.0 DOCUMENTATION

    1.1Contractor isometric drawings /Spool drawings

    100%T.4.234.542;T.4.250.935;

    T.4.250.936RFC QCI RFC R R R

    1.2 Approved W.P.S.100% T.4.251.025; T.4.250.938

    DEP 30.10.60.18;ASME SECIX;ASME B31.3;

    T.13.377.441;T.13.377.433E;

    WI GAM-QCR-QAC-GTL-106 H H R

    1.3 Approved PQRs 100% T.4.251.025; T.4.250.938 WI GAM-QCR-QAC-GTL-105 H H R H

    1.4Welder PerformanceQualifications 100%

    T.4.250.939 WI

    GAM-QCR-QAC-GTL-100

    WSD-QC 2

    WSD-QC 3

    H H W

    1.5Verify calibration of inspection,measuring and test equipment 100%

    T.4.250.915DEP 30.10.60.18; T.13.377.433E;

    T.13.377.441; T.13.377.437EQCI Calibration certificate I R R

    2.0 MATERIALS

    2.1Receiving inspection /Verification of Material 100% T.4.250.927;T.4.250.928; T.13.376.797E; T.13.377.438E QCI LINDE MRCR SYSTEM H R S

    2.2Storage & Segregation ofMaterial 100%

    T.4.250.927;T.4.250.928;T.4.250.932

    T.13.377.454E; T.13.377.438E QCI H S S

  • 7/21/2019 031-ITP FOR PIPING FABRICATION AG AND UG.pdf

    8/11

    QSGTL PEARL PROJECTDocument No.:GAM-ITP-QAC-GTL-031

    C2 ASU Construction Works

    ITP FOR PIPING FABRICATION -AG/UG (FSI) DATE: 03.09.08 REV. E

    S. GAMA QATAR X. CONTRACTOR QC C. COMPANY A. THIRD PARTY (TPI)

    I: INSPECTION / TEST R: DOCUMENT ISSUED/REPORT REVIEW S: SURVEILANCEH: HOLD POINT (Notification Required and Presence Mandatory). W: WITNESS(Notification Required but Presence not Mandatory)

    Item ActivityTest

    FrequencyReference Document Acceptance Criteria

    Responsible

    PartyVerifying Documents S X C A

    T-4.250.920 Rev. B Page 5 of 8

    2.3Welding consumable control &storage procedure 100%

    WPSs / PQRs; T.4.250.931

    ASME SEC II PART C

    DEP 30.10.60.18; T.13.377.433E;T.13.377.437E

    T.13.377.441;T.4.096.687

    WI Test certificate 3.1 B H R R

    2.4 Cutting /Transfer of heat No.s 100%

    Drawings;T.4.250.928

    DEP 30.10.60.18; ASME B 31.3T.13.377.433E; T.13.376.815E DEP

    31.38.01.11; DEP 31.38.01.31;T.13.376.796E;

    QCI GAM-QCR-QAC-GTL-072 H S S

    2.5 PMI (If applicable) 100% T.4.250.934;T.4.250.938 WI WSD-QC 4 H W S

    3.0 WELDING

    3.1Welder identification and

    performance verification100% T.4.250.938;T.4.250.939

    DEP 30.10.60.18; T.13.377.433E ;T.13.377.441 ASME B 31.3

    WI WSD-QC 2 R R R

    3.2 Issue of welding consumable towelder

    100%T.4.250.931: T.4.250.938 WI GAM-QCR-QAC-GTL-060 R R R

    3.3 Fit-up and tack welding 100%

    T.4.250.938;T.4.250.936

    WPSs / PQRs

    DEP 30.10.60.18;ASME B 31.3

    T.13.377.433E; DEP 31.38.01.31;T.13.376.796E; T.13.377.441 WI GAM-QCR-QAC-GTL-098 H H S

    3.4 Root pass visual inspection100%

    T.4.250.938;T.4.250.935;T.4.250.937

    DEP 30.10.60.18; ASME B31.3T.13.377.433E; T.13.377.441

    WI I I S

  • 7/21/2019 031-ITP FOR PIPING FABRICATION AG AND UG.pdf

    9/11

    QSGTL PEARL PROJECTDocument No.:GAM-ITP-QAC-GTL-031

    C2 ASU Construction Works

    ITP FOR PIPING FABRICATION -AG/UG (FSI) DATE: 03.09.08 REV. E

    S. GAMA QATAR X. CONTRACTOR QC C. COMPANY A. THIRD PARTY (TPI)

    I: INSPECTION / TEST R: DOCUMENT ISSUED/REPORT REVIEW S: SURVEILANCEH: HOLD POINT (Notification Required and Presence Mandatory). W: WITNESS(Notification Required but Presence not Mandatory)

    Item ActivityTest

    FrequencyReference Document Acceptance Criteria

    Responsible

    PartyVerifying Documents S X C A

    T-4.250.920 Rev. B Page 6 of 8

    3.5Root pass magnetic check for

    Stainless steel materials 100% T.4.250.938DEP 30.10.60.18 T.13.377.433E

    WI GAM-QCR-QAC-GTL-098 I I S

    3.6Dissimilar joint welding

    100% WI GAM-QCR-QAC-GTL-107 H H H

    3.7

    Inter pass temp controlling /

    cleaning 100% T.4.250.938

    DEP 31.38.01.31;ASME B31.3

    T.13.376.796E; WI S S S

    3.8 Arc strike control and repair 100% T.4.250.938 DEP 30.10.60.18;ASME B 31.3T.13.377.433E; T.13.377.441

    WIGAM-QCR-QAC-GTL-042GAM-QCR-QAC-GTL-043

    S S S

    3.9Weld identification and marking 100%

    T.4.250.938;T.4.250.935 WI GAM-QCR-QAC-GTL-098 I I S

    3.10 Welding, purge log (St-steel),process parameter monitoring

    100%T.4.250.938; T.4.250.901

    WPSs / PQRs

    DEP 30.10.60.18;ASME B31.3T.13.377.433E; T.13.377.441 DEP

    31.38.01.31; T.13.376.796E;WI GAM-QCR-QAC-GTL-090 I I S

    3.11Visual Inspection of Welds

    100% T.4.250.931DEP 30.10.60.18; ASME B31.3T.13.377.433E; T.13.377.441

    WI GAM-QCR-QAC-GTL-098 H W S

    4.0 POST WELD HEAT TREATMENT

    4.1 PWHT 100%T.4.250.913;T.4.250.938

    DEP 30.10.60.18;ASME B31.3T.13.377.433E DEP 31.38.01.31;

    T.13.376.796E; T.13.377.441

    WI GAM-QCR-QAC-GTL-083 S/R S/R S/R

    4.2HARDNESS Test (if required) 100%

    WI WSD-QC 5 H W S

  • 7/21/2019 031-ITP FOR PIPING FABRICATION AG AND UG.pdf

    10/11

    QSGTL PEARL PROJECTDocument No.:GAM-ITP-QAC-GTL-031

    C2 ASU Construction Works

    ITP FOR PIPING FABRICATION -AG/UG (FSI) DATE: 03.09.08 REV. E

    S. GAMA QATAR X. CONTRACTOR QC C. COMPANY A. THIRD PARTY (TPI)

    I: INSPECTION / TEST R: DOCUMENT ISSUED/REPORT REVIEW S: SURVEILANCEH: HOLD POINT (Notification Required and Presence Mandatory). W: WITNESS(Notification Required but Presence not Mandatory)

    Item ActivityTest

    FrequencyReference Document Acceptance Criteria

    Responsible

    PartyVerifying Documents S X C A

    T-4.250.920 Rev. B Page 7 of 8

    5.0 NON DESTRUCTIVE EXAMINATION

    5.1Radiographic Film Interpretation/

    ultrasonic examination 100%T.4.250.914;T.4.250.938

    DEP 31.38.01.31; ASME B31.3

    T.13.376.796E;

    WIWSD-QC 6WSD-QC 7

    H W/R R

    5.2Liquid Penetrant 100% T.4.250.909;T.4.250.938

    WI WSD-QC 9 H S / R S / R

    5.3Magnetic particle 100% T.4.250.911;T.4.250.938

    WI WSD-QC 8 H S / R S / R

    5.4 FERRITE CHECK100%

    T.4.250.933; DEP30.10.60.18; T.13.377.433E

    ;T.13.377.441

    3-8 FN WI WSD-QC 10 H W R

    6.0 REPAIR CONTROL

    6.1 Repair Authorization 100%

    T.4.250.940

    DEP 30.10.60.18; T.13.377.433E WI

    GAM-QCR-QAC-GTL-097

    H H R

    6.2 Removal of defects 100% ASME B31.3 WI H H S

    6.3 Repair welding 100% T.4.250.940; T.4.250.901DEP 30.10.60.18;ASME B31.3T.13.377.433E;T.13.377.441

    WI H W S

    6.4 PWHT control 100% T.4.250.913 DEP 30.10.60.18;ASME B31.3T.13.377.433E; T.13.377.441 DEP

    31.38.01.31; T.13.376.796E;

    WI GAM-QCR-QAC-GTL-083 S / R S / R S / R

    6.5 Hardness test (if required) 100% T.4.250.912 WI WSD-QC 5 H W S

  • 7/21/2019 031-ITP FOR PIPING FABRICATION AG AND UG.pdf

    11/11

    QSGTL PEARL PROJECTDocument No.:GAM-ITP-QAC-GTL-031

    C2 ASU Construction Works

    ITP FOR PIPING FABRICATION -AG/UG (FSI) DATE: 03.09.08 REV. E

    S. GAMA QATAR X. CONTRACTOR QC C. COMPANY A. THIRD PARTY (TPI)

    I: INSPECTION / TEST R: DOCUMENT ISSUED/REPORT REVIEW S: SURVEILANCEH: HOLD POINT (Notification Required and Presence Mandatory). W: WITNESS(Notification Required but Presence not Mandatory)

    Item ActivityTest

    FrequencyReference Document Acceptance Criteria

    Responsible

    PartyVerifying Documents S X C A

    T-4.250.920 Rev. B Page 8 of 8

    6.6 NDE of repaired weld 100% T.4.250.940;T.4.250.938DEP 31.38.01.31;ASME B 31.3

    T.13.376.796E; WI SAME AS ACTIVITY 5.0 H R R

    6.7 NDE (TRACERS) 100% T.4.250.940;T.4.250.938 ASME B 31.3 WI WSD-QC 11 H R R

    7.0 FINAL INSPECTION

    7.1Marking of spool, identificationand Material traceability 100%

    T.4.250.928;T.4.250.935 T.13.377.437E;T.13.376.797E QCI WSD-QC 12 H H S

    7.2 Dimensional check 100%T.4.250.935;

    Spool Drawings

    ASME B 31.3;DEP 31.38.01.31;T.13.376.796E;DEP 31.38.01.11;

    T.13.376.815EQCI GAM-QCR-QAC-GTL-086 H S S

    7.3 Reinforcement pad leak test100%

    T.4.250.908DEP 31.38.01.11;ASME B 31.3

    T.13.376.815E;QCI GAM-QCR-QAC-GTL-109 H H S / R

    7.4 Orifice flange internal verification100%

    T.4.250.935DEP 31.38.01.11;T.13.376.815E;T.13.375.791E;DEP61.38.10.10

    QCI GAM-QCR-QAC-GTL-095 H H S

    7.5 Piping internal cleanliness 100% T.4.250.930 T.4.096.688;DEP 61.10.08.11 QCI GAM-QCR-QAC-GTL-070 H H I

    7.6Closure of all openings andprotection of flanges in eachspool

    100%T.4.250.935

    DEP 31.38.01.11;T.13.376.815E;ASME B 31.3

    QCI GAM-QCR-QAC-GTL-086 H H S

    7.7 Piping spools release forpainting and updating spooltracking system

    100% T.4.250.938; T.4.250.935;WSD; SPOOL DRAWINGS

    DEP 31.38.01.11; T.13.376.815E;DEP 31.38.01.31; T.13.376.796E

    QCI/WI GAM-QCR-QAC-GTL-086 H H S

    7.8Flawless Start-up Initiative (FSI)- Cleanliness

    InternalCleaning

    T.13.377.360 Rev E& T.4.096.688

    No external materials inside the pipe& Internal Cleaning shall be done

    Site Eng Visual I R R