    M900/M1800 Base Station Controller Data Configuration Manual - Dynamic Configuration Contents

    Issue 08 (2006-08-20) Huawei Technologies Proprietary i

    Contents

    2 BSC Data Configuration...........................................................................................................2-1

    2.1 Modifying the BIE Visibility.........................................................................................................................2-3

    2.1.1 Task Description .................................................................... .............................................................. 2-3

    2.1.2 Procedure ............................................................ ................................................................. ................2-3

    2.1.3 Verification...........................................................................................................................................2-5

    2.1.4 Data Table .......................................................... .................................................................. ................2-5

    2.2 Modifying the GLAP Visibility.....................................................................................................................2-6

    2.2.1 Task Description .................................................................... .............................................................. 2-6

    2.2.2 Procedure ............................................................ ................................................................. ................2-6

    2.2.3 Verification...........................................................................................................................................2-8

    2.2.4 Data Table .......................................................... .................................................................. ................2-8

    2.3 Modifying the Phase Flag of the BSC Interface............................................................................................2-9

    2.3.1 Task Description .................................................................... .............................................................. 2-9

    2.3.2 Procedure ............................................................ ................................................................. ................2-9

    2.3.3 Verification.........................................................................................................................................2-10

    2.3.4 Data Table .......................................................... .................................................................... ............2-10

    2.4 Modifying the Local Advanced Property ................................................................ .................................... 2-11

    2.4.1 Task Description .................................................................... ............................................................ 2-11 2.4.2 Procedure ............................................................ ................................................................. .............. 2-11

    2.4.3 Verification.........................................................................................................................................2-12

    2.4.4 Data Table .......................................................... .................................................................... ............2-12

    2.5 Modifying the Voice Optimization Parameter............................................................. ................................2-12

    2.5.1 Task Description .................................................................... ............................................................ 2-12

    2.5.2 Procedure ............................................................ ................................................................... ............2-12

    2.5.3 Verification.........................................................................................................................................2-14

    2.5.4 Data Table .......................................................... .................................................................... ............2-14

  • 7/28/2019 01-2 Dynamic Configuration (BSC).pdf

    2/87

    ContentsM900/M1800 Base Station Controller

    Data Configuration Manual - Dynamic Configuration

    ii Huawei Technologies Proprietary Issue 08 (2006-08-20)

    2.6 Modifying the CRC4 Check of the BSC Transparent Transmission BIE................................ ....................2-14

    2.6.1 Task Description .................................................................... ............................................................ 2-14

    2.6.2 Procedure ............................................................ ................................................................... ............2-14

    2.6.3 Verification.........................................................................................................................................2-15

    2.6.4 Data Table .......................................................... .................................................................... ............2-15

    2.7 Configuring Monitor Timeslots...................................................................................................................2-16

    2.7.1 Task Description .................................................................... ............................................................ 2-16

    2.7.2 Procedure ............................................................ ................................................................... ............2-16

    2.7.3 Verification.........................................................................................................................................2-22

    2.7.4 Data Table .......................................................... .................................................................... ............2-22

    2.8 Modifying the Abis Bypass Switch.............................................................................................................2-23

    2.8.1 Task Description .................................................................... ............................................................ 2-23

    2.8.2 Procedure ............................................................ ................................................................... ............2-23

    2.8.3 Verification.........................................................................................................................................2-26

    2.8.4 Data Table .......................................................... .................................................................... ............2-26

    2.9 Dynamic Configuration Without Command .......................................................... ..................................... 2-27

    2.9.1 Configuring Trunk Circuits................................................................................................................2-28

    2.9.2 Configuring the BTS Software Index .................................................................. ..............................2-32

    2.9.3 Configuring Flow Control Parameters ....................................................................... ........................2-35

    2.9.4 Configuring Common Parameters......................................................................................................2-37

    2.9.5 Configuring Semi-Permanent Connection ...................................................................... ...................2-41

    2.9.6 Configuring Alarm Parameters ................................................................ .......................................... 2-43

    2.9.7 Configuring the GMEM.....................................................................................................................2-45

    2.9.8 Configuring Board Software Loading................................................................................................2-48

    2.9.9 Configuring Timer Data.....................................................................................................................2-50

    2.9.10 Modifying the Module Description Table ....................................................................... .................2-52 2.10 Importing Network Parameters .................................................................. ............................................... 2-54

    2.10.1 Task Description ............................................................. ................................................................. 2-54

    2.10.2 Procedure ............................................................... ........................................................................ ..2-54

    2.10.3 Verification.......................................................................................................................................2-55

    2.11 Exporting Network Parameters .................................................................. ............................................... 2-56

    2.11.1 Task Description...............................................................................................................................2-56

    2.11.2 Procedure ............................................................... .......................................................................... 2-56

  • 7/28/2019 01-2 Dynamic Configuration (BSC).pdf

    3/87

    M900/M1800 Base Station Controller Data Configuration Manual - Dynamic Configuration Contents

    Issue 08 (2006-08-20) Huawei Technologies Proprietary iii

    2.11.3 Verification.......................................................................................................................................2-57

    2.12 Modifying Reserved Parameters ................................................................. .............................................. 2-58

    2.12.1 Task Description ............................................................. ................................................................. 2-58

    2.12.2 Procedure ............................................................... ........................................................................ ..2-58

    2.12.3 Verification.......................................................................................................................................2-61

    2.12.4 Data Table ............................................................. ......................................................................... ..2-61

    2.13 Configuring the SS7 Property ........................................................................ ........................................... 2-61

    2.13.1 Task Description ............................................................. ................................................................. 2-61

    2.13.2 Procedure ............................................................... ........................................................................ ..2-62

    2.13.3 Verification.......................................................................................................................................2-64

    2.13.4 Data Table ............................................................. ......................................................................... ..2-64

    2.14 Modifying the PB Interface Property ..................................................................... ................................... 2-64

    2.14.1 Task Description ............................................................. ................................................................. 2-64

    2.14.2 Procedure ............................................................... ........................................................................ ..2-65

    2.14.3 Verification.......................................................................................................................................2-65

    2.14.4 Data Table ............................................................. ......................................................................... ..2-65

    2.15 Modifying the BIE Trunk Mode................................................................................................................2-66

    2.15.1 Task Description ............................................................. ................................................................. 2-66

    2.15.2 Procedure ............................................................... ........................................................................ ..2-66

    2.15.3 Verification.......................................................................................................................................2-70

    2.15.4 Data Table ............................................................. ......................................................................... ..2-70

    2.16 Moving a Site ............................................................ ................................................................... .............2-72

    2.16.1 Task Description ............................................................. ................................................................. 2-72

    2.16.2 Procedure ............................................................... ........................................................................ ..2-72

    2.16.3 Verification.......................................................................................................................................2-76

    2.16.4 Data Table ............................................................. ......................................................................... ..2-76

  • 7/28/2019 01-2 Dynamic Configuration (BSC).pdf

    4/87

    M900/M1800 Base Station Controller Data Configuration Manual - Dynamic Configuration Figures

    Issue 08 (2006-08-20) Huawei Technologies Proprietary v

    Figures

    Figure 2-1 Selecting a module and board...........................................................................................................2-3

    Figure 2-2 Command list for dynamic configuration ..................................................................... ....................2-4

    Figure 2-3 Dynamic configuration command.....................................................................................................2-5

    Figure 2-4 Selecting a GLAP ..................................................................... ........................................................ 2-7

    Figure 2-5 Command list for dynamic configuration ..................................................................... ....................2-8

    Figure 2-6 Configuring the property of each BSC interface ...................................................................... ........2-9

    Figure 2-7 Command list for dynamic configuration ...................................................................... .................2-10

    Figure 2-8 Modifying the local advanced property ......................................................................... ................. 2-11

    Figure 2-9 Modifying the voice optimization parameter..................................................................................2-13

    Figure 2-10 Command list for dynamic configuration ....................................................................... ..............2-13

    Figure 2-11 Selecting the transparent transmission BIE...................................................................................2-15

    Figure 2-12 Selecting a BIE board ........................................................... ........................................................ 2-17

    Figure 2-13 Selecting a BIE port......................................................................................................................2-18

    Figure 2-14 Configuring the monitor timeslot .................................................................... .............................2-18

    Figure 2-15 Information prompt.......................................................................................................................2-19

    Figure 2-16 Selecting a BIE board ........................................................... ........................................................ 2-20

    Figure 2-17 Selecting a BIE port and site.........................................................................................................2-20

    Figure 2-18 Configuring the site monitor timeslot...........................................................................................2-21

    Figure 2-19 Setting the end channel number....................................................................................................2-22

    Figure 2-20 Selecting a BIE board ........................................................... ........................................................ 2-24

  • 7/28/2019 01-2 Dynamic Configuration (BSC).pdf

    5/87

  • 7/28/2019 01-2 Dynamic Configuration (BSC).pdf

    6/87

    M900/M1800 Base Station Controller Data Configuration Manual - Dynamic Configuration Figures

    Issue 08 (2006-08-20) Huawei Technologies Proprietary vii

    Figure 2-47 Timer data.....................................................................................................................................2-51

    Figure 2-48 Dynamic configuration without command .................................................................. .................2-53

    Figure 2-49 Module description table .............................................................. ................................................ 2-53

    Figure 2-50 Selecting the text file ...................................................................... .............................................. 2-55

    Figure 2-51 Command list for dynamic configuration ....................................................................... ..............2-55

    Figure 2-52 Exporting network parameters......................................................................................................2-56

    Figure 2-53 Saving the text file........................................................................................................................2-57

    Figure 2-54 Information prompt.......................................................................................................................2-57

    Figure 2-55 Selecting TRXs.............................................................................................................................2-59

    Figure 2-56 Selecting a module........................................................................................................................2-59

    Figure 2-57 Modifying the reserved parameters ................................................................. .............................2-60

    Figure 2-58 Reserved Parameters Configuration dialog box............................................................................ 2-60

    Figure 2-59 Confirmation prompt ................................................................ .................................................... 2-62

    Figure 2-60 Configuring the SS7 property.......................................................................................................2-62

    Figure 2-61 Configuring the E3M board property ................................................................. ..........................2-63

    Figure 2-62 Modifying PB Interface Property..................................................................................................2-65

    Figure 2-63 Selecting a BIE ............................................................ ................................................................. 2-67

    Figure 2-64 Modifying the BIE trunk mode.....................................................................................................2-67

    Figure 2-65 Information prompt.......................................................................................................................2-68

    Figure 2-66 Adjusting the BIE property...........................................................................................................2-68

    Figure 2-67 Manual site list..............................................................................................................................2-69

    Figure 2-68 Command list for dynamic configuration ....................................................................... ..............2-70

    Figure 2-69 Selecting a site .................................................................... .......................................................... 2-73

    Figure 2-70 Moving the site .............................................................. ............................................................... 2-74

    Figure 2-71 Information prompt.......................................................................................................................2-74

    Figure 2-72 Moved sites and cell list................................................................................................................2-75

  • 7/28/2019 01-2 Dynamic Configuration (BSC).pdf

    7/87

    FiguresM900/M1800 Base Station Controller

    Data Configuration Manual - Dynamic Configuration

    viii Huawei Technologies Proprietary Issue 08 (2006-08-20)

    Figure 2-73 Adjusting site TRX information....................................................................................................2-75

    Figure 2-74 Adjusting the BIE port ................................................................. ................................................. 2-76

  • 7/28/2019 01-2 Dynamic Configuration (BSC).pdf

    8/87

    M900/M1800 Base Station Controller Data Configuration Manual - Dynamic Configuration Tables

    Issue 08 (2006-08-20) Huawei Technologies Proprietary ix

    Tables

    Table 2-1 Data table modified during the modification of the BIE visibility ..................................................... 2-5

    Table 2-2 Data table modified during the modification of the GLAP visibility ................................................. 2-8

    Table 2-3 Data table modified during the modification of the phase flag of the BSC interface ....................... 2-10

    Table 2-4 Data table modified during the modification of the local advanced property...................................2-12

    Table 2-5 Data table modified during the modification of the voice optimization parameter .......................... 2-14

    Table 2-6 Data tables modified during the modification of the CRC4 check of a transparent transmission BIE.2-16

    Table 2-7 Data tables modified during the modification of monitor timeslots ................................................. 2-22

    Table 2-8 Data tables modified during the modification of the Abis bypass switch......................................... 2-26

    Table 2-9 Data tables modified during the modification of trunk circuits ........................................................ 2-32

    Table 2-10 Data table modified during the modification of the BTS software index....................................... 2-35

    Table 2-11 Data table modified during the modification of the flow control parameters ................................. 2-37

    Table 2-12 Meaning of the software parameters...............................................................................................2-39

    Table 2-13 Data tables modified during the modification of common parameters...........................................2-40

    Table 2-14 Data table modified during the modification of semi-permanent connection................................. 2-43

    Table 2-15 Data tables modified during the modification of alarm parameters................................................2-45

    Table 2-16 Data table modified during the modification of the IP address of the GMEM............................... 2-48

    Table 2-17 Data table modified during the modification of the loading information of board software ..........2-50

    Table 2-18 Data table modified during the modification of timer data.............................................................2-52

    Table 2-19 Data table modified during the modification of the module description ........................................ 2-54

  • 7/28/2019 01-2 Dynamic Configuration (BSC).pdf

    9/87

    TablesM900/M1800 Base Station Controller

    Data Configuration Manual - Dynamic Configuration

    x Huawei Technologies Proprietary Issue 08 (2006-08-20)

    Table 2-20 Data tables modified during the modification of the reserved parameters ..................................... 2-61

    Table 2-21 Data tables modified during the modification of the SS7 property ................................................ 2-64

    Table 2-22 Data table modified during the modification of the property of the PB interface ..........................2-66

    Table 2-23 Data tables modified during the modification of the BIE trunk mode............................................2-70

    Table 2-24 Modified data tables during site movement....................................................................................2-77

  • 7/28/2019 01-2 Dynamic Configuration (BSC).pdf

    10/87

    M900/M1800 Base Station Controller Data Configuration Manual - Dynamic Configuration 2 BSC Data Configuration

    Issue 08 (2006-08-20) Huawei Technologies Proprietary 2-1

    2 BSC Data ConfigurationAbout This Chapter

    The following table lists the contents of this chapter.

    Title Description

    2.1 Modifying the BIEVisibility

    Describes how to modify the BIE visibility.

    2.2 Modifying the GLAPVisibility

    Describes how to modify the GLAP visibility.

    2.3 Modifying the Phase Flagof the BSC Interface

    Describes how to modify the phase flag of the BSCinterface.

    2.4 Modifying the LocalAdvanced Property

    Describes how to modify the local advanced property.

    2.5 Modifying the VoiceOptimization Parameter

    Describes how to modify the voice optimize parameter.

    2.6 Modifying the CRC4Check of the BSC TransparentTransmission BIE

    Describes how to modify the BSC transparenttransmission BIE CRC4 check.

    2.7 Configuring Monitor Timeslots

    Describes how to configure monitor timeslots.

    2.8 Modifying the AbisBypass Switch

    Describes how to modify the Abis bypass switch.

    2.9 Dynamic ConfigurationWithout Command

    Describes the dynamic configuration without command.

    2.10 Importing Network

    Parameters

    Describes how to import network parameters.

  • 7/28/2019 01-2 Dynamic Configuration (BSC).pdf

    11/87

    2 BSC Data ConfigurationM900/M1800 Base Station Controller

    Data Configuration Manual - Dynamic Configuration

    2-2 Huawei Technologies Proprietary Issue 08 (2006-08-20)

    Title Description

    2.11 Exporting Network Parameters

    Describes how to export network parameters.

    2.12 Modifying ReservedParameters

    Describes how to modify reserved parameters.

    2.13 Configuring the SS7Property

    Describes how to configure the SS7 property.

    2.14 Modifying the PBInterface Property

    Describes how to modify the PB interface property.

    2.15 Modifying the BIE Trunk Mode

    Describes how to modify the BIE trunk mode.

    2.16 Moving a Site Describes how to move a site.

  • 7/28/2019 01-2 Dynamic Configuration (BSC).pdf

    12/87

    M900/M1800 Base Station Controller Data Configuration Manual - Dynamic Configuration 2 BSC Data Configuration

    Issue 08 (2006-08-20) Huawei Technologies Proprietary 2-3

    2.1 Modifying the BIE Visibility

    2.1.1 Task Description

    Purpose To modify the visibility of a BIE

    Prerequisite The BIE is configured on the BSC Data Auto Configuration System.

    Note

    z The boards not configured with hardware are invisible and cannot bedeleted. You can only add sites to the visible BIE.

    z You can modify the visibility of more than one BIE in a module in oneoperation. In a multi-module BSC, the transparent transmission BIEcannot be set to invisible.

    2.1.2 Procedure

    This part uses an example to show how to modify the visibility of BIEs. Assume that youhave to set the BIEs numbered 4 and 5 in BM1 to visible, and the ones numbered 7, 8 and 9 toinvisible.

    The procedure is as follows:

    Step 1 On the BSC Data Auto Configuration System, choose BSC > Modify BIE Visibility .

    The Modify BIE Visibility dialog box as shown in Figure 2-1 is displayed.

    Figure 2-1 Selecting a module and board

  • 7/28/2019 01-2 Dynamic Configuration (BSC).pdf

    13/87

    2 BSC Data ConfigurationM900/M1800 Base Station Controller

    Data Configuration Manual - Dynamic Configuration

    2-4 Huawei Technologies Proprietary Issue 08 (2006-08-20)

    In the Modify BIE Visibility dialog box, except for the transparent transmission BIE, no other BIEconnects to any site. Do not set a transparent transmission BIE to invisible.

    You can press Ctrl or Shift to select more than one BIE.

    Step 2 Select Module 1 from the Select Module drop-down list.

    Step 3 Select No.4 BIE Board, Invisible , No.5 BIE Board, Invisible , No.7 BIE Board, Visible , No.8 BIE Board, Visible , and No.9 BIE Board, Visible from the Select BIE box.

    Step 4 Click Next .

    The Modify BIE Visibility dialog box is refreshed, as shown in Figure 2-2 .

    Figure 2-2 Command list for dynamic configuration

    Step 5 Click Browse Command Table .

    The Dynamic Configuration Command Word's Parameter Table dialog box as shown inFigure 2-3 is displayed.

  • 7/28/2019 01-2 Dynamic Configuration (BSC).pdf

    14/87

  • 7/28/2019 01-2 Dynamic Configuration (BSC).pdf

    15/87

    2 BSC Data ConfigurationM900/M1800 Base Station Controller

    Data Configuration Manual - Dynamic Configuration

    2-6 Huawei Technologies Proprietary Issue 08 (2006-08-20)

    The modified data tables in the BSC Data Management System list all the data tables related to thedynamic configuration. These data tables are refreshed and set to the GMPU during the dynamicconfiguration.

    Hereafter, modified data tables have the same meaning as that explained here.

    2.2 Modifying the GLAP Visibility

    2.2.1 Task Description

    Purpose To display or hide the GLAP

    Prerequisite The GLAP is configured on the BSC Data Auto Configuration System.

    Note

    z The LAPD links can be assigned to only a visible GLAP.

    z You can change the visibility of more than one GLAP in a module inone operation.

    2.2.2 Procedure

    This part uses an example to show how to modify the visibility of the GLAP. Assume that you

    have to set the GLAP numbered 6 in BM1 to invisible and the one numbered 7 to visible.

    The procedure is as follows:

    Step 1 On the BSC Data Auto Configuration System, choose BSC > Modify GLAP Visibility .

    The Modify GLAP Visibility dialog box as shown in Figure 2-4 is displayed.

  • 7/28/2019 01-2 Dynamic Configuration (BSC).pdf

    16/87

    M900/M1800 Base Station Controller Data Configuration Manual - Dynamic Configuration 2 BSC Data Configuration

    Issue 08 (2006-08-20) Huawei Technologies Proprietary 2-7

    You can press Ctrl or Shift to select more than one GLAP.

    Figure 2-4 Selecting a GLAP

    The GLAPs in the Modify GLAP Visibility dialog box as shown in Figure 2-4 are out of service. Nosignaling link is assigned to these GLAPs.

    Step 2 Select Module 1 from the Select Module drop-down list.

    Step 3 Select No.6 GLAP Board, Visible and No.7 GLAP Board, Invisible from the Select GLAP box.

    Step 4 Click Next .

    The Modify GLAP Visibility dialog box is refreshed, as shown in Figure 2-5 .

  • 7/28/2019 01-2 Dynamic Configuration (BSC).pdf

    17/87

    2 BSC Data ConfigurationM900/M1800 Base Station Controller

    Data Configuration Manual - Dynamic Configuration

    2-8 Huawei Technologies Proprietary Issue 08 (2006-08-20)

    Figure 2-5 Command list for dynamic configuration

    Step 5 Click Start Dynamic Configuration to activate the data.

    ----End

    2.2.3 Verification

    Check the status of the GLAP on the BSC Maintenance System.

    2.2.4 Data Table

    Table 2-2 lists the modified data table in the BSC Data Management System.

    Table 2-2 Data table modified during the modification of the GLAP visibility

    No. Table Name

    1 Slot Description Table

  • 7/28/2019 01-2 Dynamic Configuration (BSC).pdf

    18/87

    M900/M1800 Base Station Controller Data Configuration Manual - Dynamic Configuration 2 BSC Data Configuration

    Issue 08 (2006-08-20) Huawei Technologies Proprietary 2-9

    2.3 Modifying the Phase Flag of the BSC Interface

    2.3.1 Task Description

    Purpose z To modify the GSM protocol standards used by the BSC interfacesz To modify the locating service (Cell ID+TA) status and the inter system

    HO status

    Prerequisite None

    Note None

    2.3.2 ProcedureThis part uses an example to show how to modify the phase flag of the BSC interface.Assume that you have to change the version of the Abis interface into GSM_Phase_2.

    The procedure is as follows:

    Step 1 On the BSC Data Auto Configuration System, choose BSC > Modify BSC Interface PhaseFlag .

    The Modify BSC Interface Phase Flag dialog box as shown in Figure 2-6 is displayed.

    Figure 2-6 Configuring the property of each BSC interface

    Step 2 Select GSM_Phase_2 from the Abis Interface Version drop-down list.

  • 7/28/2019 01-2 Dynamic Configuration (BSC).pdf

    19/87

    2 BSC Data ConfigurationM900/M1800 Base Station Controller

    Data Configuration Manual - Dynamic Configuration

    2-10 Huawei Technologies Proprietary Issue 08 (2006-08-20)

    Step 3 Click Next .

    The Modify BSC Interface Phase Flag dialog box is refreshed, as shown in Figure 2-7 .

    Figure 2-7 Command list for dynamic configuration

    Step 4 Click Start Dynamic Configuration to activate the data.

    ----End

    2.3.3 Verification

    After changing the BSC interface phase flag, check that:

    z The related data in the Local Office Information Table are correctly modified.

    To view the Local Office Information Table, choose Task > Data Management >Local-office > Local Office Information Table .

    z The related host data are set to each module of the BSC.

    To view the host data, choose Task > Data Management > Operations > View HostData .

    2.3.4 Data Table

    Table 2-3 lists the modified data table in the BSC Data Management System.

    Table 2-3 Data table modified during the modification of the phase flag of the BSC interface

    No. Table Name

    1 Local Office Information Table

  • 7/28/2019 01-2 Dynamic Configuration (BSC).pdf

    20/87

    M900/M1800 Base Station Controller Data Configuration Manual - Dynamic Configuration 2 BSC Data Configuration

    Issue 08 (2006-08-20) Huawei Technologies Proprietary 2-11

    2.4 Modifying the Local Advanced Property2.4.1 Task Description

    Purpose To modify the local advanced properties

    Prerequisite None

    Note None

    2.4.2 Procedure

    To change the advanced properties, perform the following steps:

    Step 1 On the BSC Data Auto Configuration System, choose BSC > Modify Local AdvancedProperty .

    The Modify Local Advanced Property dialog box as shown in Figure 2-8 is displayed.

    Figure 2-8 Modifying the local advanced property

    Step 2 Set the values in the OWA Check Time text box and the GPRS Suspend Timer Value(s)

    text box.

  • 7/28/2019 01-2 Dynamic Configuration (BSC).pdf

    21/87

    2 BSC Data ConfigurationM900/M1800 Base Station Controller

    Data Configuration Manual - Dynamic Configuration

    2-12 Huawei Technologies Proprietary Issue 08 (2006-08-20)

    Step 3 Click Next .

    Step 4 Click Start Dynamic Configuration to activate the data.

    ----End

    2.4.3 Verification

    After changing the advanced property, check that:

    z The related data in the Local Office Information Table are correctly modified.

    z The related host data are set to each module of the BSC.

    2.4.4 Data TableTable 2-4 lists the modified data table in the BSC Data Management System.

    Table 2-4 Data table modified during the modification of the local advanced property

    No. Table Name

    1 Local Office Information Table

    2.5 Modifying the Voice Optimization Parameter

    2.5.1 Task Description

    Purpose To modify the voice encoding and decoding of the BSC

    Prerequisite None

    Note None

    2.5.2 Procedure

    To change the voice encoding and decoding of the BSC, perform the following steps:

    Step 1 On the BSC Data Auto Configuration System, choose BSC > Modify Voice OptimizeParameter .

  • 7/28/2019 01-2 Dynamic Configuration (BSC).pdf

    22/87

    M900/M1800 Base Station Controller Data Configuration Manual - Dynamic Configuration 2 BSC Data Configuration

    Issue 08 (2006-08-20) Huawei Technologies Proprietary 2-13

    The Modify Voice Optimization Parameter dialog box as shown in Figure 2-9 is displayed.

    Figure 2-9 Modifying the voice optimization parameter

    Step 2 Select Normal Encode/Decode from the Voice Encode/Decode Optimization drop-downlist.

    Step 3 Click Next .

    The Modify Voice Optimization Parameter dialog box is refreshed, as shown in Figure 2-10 .

    Figure 2-10 Command list for dynamic configuration

    Step 4 Click Start Dynamic Configuration to activate the data.

    ----End

  • 7/28/2019 01-2 Dynamic Configuration (BSC).pdf

    23/87

    2 BSC Data ConfigurationM900/M1800 Base Station Controller

    Data Configuration Manual - Dynamic Configuration

    2-14 Huawei Technologies Proprietary Issue 08 (2006-08-20)

    2.5.3 Verification

    After changing the voice optimization parameter, check that:

    z The related data in the Local Office Information Table are correctly modified.z The related host data are set to each module of the BSC.

    2.5.4 Data Table

    Table 2-5 lists the modified data table in the BSC Data Management System.

    Table 2-5 Data table modified during the modification of the voice optimization parameter

    No. Table Name

    1 Local Office Information Table

    2.6 Modifying the CRC4 Check of the BSC TransparentTransmission BIE

    2.6.1 Task DescriptionPurpose To modify the CRC4 check of a transparent transmission BIE

    Prerequisite None

    Note You can change the CRC4 check values of all the transparent transmissionBIE in one operation.

    2.6.2 ProcedureThis part uses an example to show how to change the CRC4 check of a transparenttransmission BIE. Assume that you have to change the value of transparent transmission BIECRC4 of BM1 into 110011, and that of BM2 into 001100.

    The procedure is as follows:

    Step 1 On the BSC Data Auto Configuration System, choose BSC > Modify BSC TransparentTransmission BIE CRC4 Check .

  • 7/28/2019 01-2 Dynamic Configuration (BSC).pdf

    24/87

    M900/M1800 Base Station Controller Data Configuration Manual - Dynamic Configuration 2 BSC Data Configuration

    Issue 08 (2006-08-20) Huawei Technologies Proprietary 2-15

    The Modify BSC Transparent Transmission BIE CRC4 Check dialog box as shown inFigure 2-11 is displayed.

    Figure 2-11 Selecting the transparent transmission BIE

    Step 2 Select the transparent transmission BIE of Module[1] . Then select Port 0 , Port 1 , Port 4 , andPort 5 from the CRC4 Check list box. The BIE CRC4 value becomes 110011.

    Step 3 Select the transparent transmission BIE of Module[2] . Then select Port 2 and Port 3 from theCRC4 Check list box. The BIE CRC4 value becomes 001100.

    Step 4 Click Next .

    Step 5 Click Start Dynamic Configuration to activate the data.

    ----End

    2.6.3 Verification

    After modifying the CRC4 check of a transparent transmission BIE, check that:

    z The related data in the data tables are correctly modified.

    z The related data are correctly configured to each module of the host.

    2.6.4 Data Table

    Table 2-6 lists the modified data tables in the BSC Data Management System.

  • 7/28/2019 01-2 Dynamic Configuration (BSC).pdf

    25/87

    2 BSC Data ConfigurationM900/M1800 Base Station Controller

    Data Configuration Manual - Dynamic Configuration

    2-16 Huawei Technologies Proprietary Issue 08 (2006-08-20)

    Table 2-6 Data tables modified during the modification of the CRC4 check of a transparenttransmission BIE

    No. Table Name

    1 BSC BIE Description Table2 BSC BIE Active/Stby. Group Table

    2.7 Configuring Monitor Timeslots

    2.7.1 Task Description

    Purpose To configure monitor timeslots

    Prerequisite None

    Note

    You can configure monitor timeslots in two modes: auto calculate modeand manual mode.

    If the site is in manual adjustment mode, use the manual mode. Otherwiseuse the auto calculate mode.

    2.7.2 Procedure

    Procedure for Manual Configuration

    To configure the monitor timeslot in manual mode, perform the following steps:

    Step 1 On the BSC Data Auto Configuration System, choose BSC > Configure Monitor Timeslot .

    The Configure Monitor Timeslot dialog box as shown in Figure 2-12 is displayed.

  • 7/28/2019 01-2 Dynamic Configuration (BSC).pdf

    26/87

    M900/M1800 Base Station Controller Data Configuration Manual - Dynamic Configuration 2 BSC Data Configuration

    Issue 08 (2006-08-20) Huawei Technologies Proprietary 2-17

    Figure 2-12 Selecting a BIE board

    Step 2 Select a BIE board.

    If no site connects to the BIE, the Next button in the Configure Monitor Timeslot dialog box isunavailable.

    Step 3 Click Next .

    The Configure Monitor Timeslot dialog box is refreshed.

    Step 4 Select a BIE port.

    The Confirm dialog box as shown in Figure 2-13 is displayed.

  • 7/28/2019 01-2 Dynamic Configuration (BSC).pdf

    27/87

  • 7/28/2019 01-2 Dynamic Configuration (BSC).pdf

    28/87

    M900/M1800 Base Station Controller Data Configuration Manual - Dynamic Configuration 2 BSC Data Configuration

    Issue 08 (2006-08-20) Huawei Technologies Proprietary 2-19

    If you click No in the Confirm dialog box, the Information dialog box as shown inFigure 2-15 is displayed.

    Figure 2-15 Information prompt

    Step 6 Select the site. Then configure Site Trunk Mode Description , Semi-permanent Connection and BIE Port Property one by one.

    If the relay mode of the selected BIE is Full Rate Ring Topology, Half Rate Ring Topology, or 6 E1 Port Half Rate Topology, you have to configureBSC BIE Semi-perm. Con. at the same time.

    If the selected site is configured with idle timeslots in initial mode, the Idle Timeslot button is available.If necessary, you can adjust the idle timeslot of the site.

    You have to enter all the information and ensure its correctness

    Step 7 Click Next in the Configure Monitor Timeslot dialog box as shown inFigure 2-14 .

    Step 8 Click Start Dynamic Configuration to activate the data.

    ----End

    Procedure for Auto Calculate Mode

    To configure the monitor timeslot in auto calculate mode, perform the following steps:

  • 7/28/2019 01-2 Dynamic Configuration (BSC).pdf

    29/87

  • 7/28/2019 01-2 Dynamic Configuration (BSC).pdf

    30/87

    M900/M1800 Base Station Controller Data Configuration Manual - Dynamic Configuration 2 BSC Data Configuration

    Issue 08 (2006-08-20) Huawei Technologies Proprietary 2-21

    Step 4 Select a BIE port and site.

    Step 5 Click Site Monitor Timeslot .

    The Configure Site Monitor Timeslot dialog box as shown in Figure 2-18 is displayed.

    Figure 2-18 Configuring the site monitor timeslot

    Step 6 Configure the site monitor timeslot.

    z To delete a monitor timeslot, select it and then click Delete .

    z To add a monitor timeslot, click Add , and then change the default value.

    z To modify Site BIE Port No. Connects Monitor Device or Abis Timeslot No.Connects Monitor Device , click the form and select the value.

    z To modify End Channel No. , double-click the form to display the Set End Channel No. dialog box as shown in Figure 2-19 . Select End Equipment Type , BIE Port No. andBIE Timeslot No. , and then click OK . The system will calculate End Channel No.automatically.

    You can select User Input to enter the value of End Channel No. if you want, and then

    click OK to return to the Configure Site Monitor Timeslot dialog box.

  • 7/28/2019 01-2 Dynamic Configuration (BSC).pdf

    31/87

    2 BSC Data ConfigurationM900/M1800 Base Station Controller

    Data Configuration Manual - Dynamic Configuration

    2-22 Huawei Technologies Proprietary Issue 08 (2006-08-20)

    Figure 2-19 Setting the end channel number

    Step 7 In the Configure Site Monitor Timeslot dialog box, click OK to return to the ConfigureMonitor Timeslot dialog box as shown in Figure 2-17 .

    Step 8 Click Next .

    Step 9 Click Start Dynamic Configuration to activate the data.

    ----End

    2.7.3 Verification

    After configuring the monitor timeslots, check that:

    z The related data in the data tables are correctly modified.

    z The related host data are set to each module of the BSC.

    2.7.4 Data Table

    Table 2-7 lists the modified data tables in the BSC Data Management System.

    Table 2-7 Data tables modified during the modification of monitor timeslots

    No. Table Name

    1 Semi-permanent Connection Table

    2 Site BIE Trunk Mode Description Table

    3 Site BIE Configuration Table

    4 Signaling Channel Link Table

  • 7/28/2019 01-2 Dynamic Configuration (BSC).pdf

    32/87

    M900/M1800 Base Station Controller Data Configuration Manual - Dynamic Configuration 2 BSC Data Configuration

    Issue 08 (2006-08-20) Huawei Technologies Proprietary 2-23

    No. Table Name

    5 BSC BIE Description Table

    6 BSC BIE Active/Stby. Group Table

    7 BSC BIE Semi-permanent Connection Table

    8 Trunk Circuit Table

    2.8 Modifying the Abis Bypass Switch

    2.8.1 Task DescriptionPurpose To modify the Abis bypass switch of a BIE port

    Prerequisite None

    Note None

    2.8.2 Procedure

    To modify the Abis bypass switch of a BIE port, perform the following steps:

    Step 1 On the BSC Data Auto Configuration System, choose BSC > Modify Abis Bypass Switch .

    The Modify Abis Bypass Switch dialog box as shown in Figure 2-20 is displayed.

  • 7/28/2019 01-2 Dynamic Configuration (BSC).pdf

    33/87

    2 BSC Data ConfigurationM900/M1800 Base Station Controller

    Data Configuration Manual - Dynamic Configuration

    2-24 Huawei Technologies Proprietary Issue 08 (2006-08-20)

    Figure 2-20 Selecting a BIE board

    Step 2 Select a BIE board.

    If no site connects to the BIE, the Next button in the Modify Abis Bypass Switch dialog box as shownin Figure 2-20 is unavailable.

    Step 3 Click Next .

    The Modify Abis Bypass Switch dialog box is refreshed, as shown in Figure 2-21 .

    Figure 2-21 Selecting a port and Abis Bypass Switch

    Step 4 Select the BIE port and Abis Bypass Switch .

  • 7/28/2019 01-2 Dynamic Configuration (BSC).pdf

    34/87

    M900/M1800 Base Station Controller Data Configuration Manual - Dynamic Configuration 2 BSC Data Configuration

    Issue 08 (2006-08-20) Huawei Technologies Proprietary 2-25

    If the selected BIE port does not connect to any site, the Abis Bypass Switch checkbox and the Next button are unavailable.

    Step 5

    Click Next .

    The Modify Abis Bypass Switch dialog box is refreshed, as shown in Figure 2-22 .

    If the selected BIE port is in auto mode, the Confirm dialog box as shown in Step 8 is displayed.

    Figure 2-22 Modifying the TRX property

    Step 6 Click TRX Property . Enter the values of all the TRX properties.

    If the sites are in cascade mode, you have to configure Site Trunk Mode Description and BIE Port Property at the same time.

    Step 7 Click Next .

    The Confirm dialog box as shown in Step 8 is displayed.

  • 7/28/2019 01-2 Dynamic Configuration (BSC).pdf

    35/87

    2 BSC Data ConfigurationM900/M1800 Base Station Controller

    Data Configuration Manual - Dynamic Configuration

    2-26 Huawei Technologies Proprietary Issue 08 (2006-08-20)

    Figure 2-23 Command list for dynamic configuration

    Step 8 Click Yes .

    Step 9 Click Start Dynamic Configuration to activate the data.

    ----End

    2.8.3 Verification

    After modifying the Abis bypass switch, check that:

    z The related data in the data tables are correctly modified.

    z The related host data are set to each module of the BSC.

    2.8.4 Data Table

    Table 2-8 lists the modified data tables in the BSC Data Management System.

    Table 2-8 Data tables modified during the modification of the Abis bypass switch

    No. Table Name

    1 Radio Channel Configuration Table

    2 BSC BIE Description Table

    3 Site BIE Trunk Mode Description Table

  • 7/28/2019 01-2 Dynamic Configuration (BSC).pdf

    36/87

    M900/M1800 Base Station Controller Data Configuration Manual - Dynamic Configuration 2 BSC Data Configuration

    Issue 08 (2006-08-20) Huawei Technologies Proprietary 2-27

    No. Table Name

    4 Site BIE Configuration Table

    5 Signaling Channel Link Table

    6 Site Description Table

    7 BSC BIE Semi-permanent Connection Table

    8 Trunk Circuit Table

    9 BSC BIE Active/Stby. Group Table

    2.9 Dynamic Configuration Without CommandThis section shows how to maintain the data tables conveniently.

    The section has the following parts:

    z Configuring Trunk Circuits

    z Configuring the BTS Software Index

    z Configuring Flow Control Parameters

    z Configuring Common Parameters z Configuring Semi-Permanent Connection

    z Configuring Alarm Parameters

    z Configuring the GMEM

    z Configuring Board Software Loading

    z Configuring Timer Data

    z Modifying the Module Description

  • 7/28/2019 01-2 Dynamic Configuration (BSC).pdf

    37/87

    2 BSC Data ConfigurationM900/M1800 Base Station Controller

    Data Configuration Manual - Dynamic Configuration

    2-28 Huawei Technologies Proprietary Issue 08 (2006-08-20)

    2.9.1 Configuring Trunk Circuits

    Task Description

    Purpose To modify the visibility of the FTC and the properties of trunk circuits onthe FTC

    Prerequisite The FTC has been configured in the initial data configuration on the BSCData Auto Configuration System.

    NoteThe boards such as the FTC, BIE and GLAP in the BSC use fullconfiguration. The FTC that is out of service cannot be deleted in theinitial data configuration.

    Procedure

    This part uses an example to show how to modify the property of the trunk circuit on the FTC.Assume that you have to modify the CIC value of No.72 FTC in BM1 as 31, 65535, 32, 33 61. The integers from 32 to 61 have an increment of 1.

    The procedure is as follows:

    Step 1 On the BSC Data Auto Configuration System, choose BSC > Dynamic Configurationwithout Command > Trunk Circuit .

    The Dynamic Configuration without Command dialog box as shown in Figure 2-24 is displayed.

    Figure 2-24 Configuring FTC trunk circuit parameters

    Step 2 Click Trunk Circuit .

  • 7/28/2019 01-2 Dynamic Configuration (BSC).pdf

    38/87

    M900/M1800 Base Station Controller Data Configuration Manual - Dynamic Configuration 2 BSC Data Configuration

    Issue 08 (2006-08-20) Huawei Technologies Proprietary 2-29

    The Select FTC dialog box as shown in Figure 2-25 is displayed.

    Figure 2-25 Selecting a FTC

    Step 3 Select Module 1 from the Select Module drop-down list. Select 72 FTC from the All FTC inCurrent Module list box.

    Step 4

    Click Property or double-click 72 FTC .

    The Set FTC Property dialog box as shown in Figure 2-26 is displayed.

  • 7/28/2019 01-2 Dynamic Configuration (BSC).pdf

    39/87

    2 BSC Data ConfigurationM900/M1800 Base Station Controller

    Data Configuration Manual - Dynamic Configuration

    2-30 Huawei Technologies Proprietary Issue 08 (2006-08-20)

    Figure 2-26 Configuring the FTC property

    Step 5 In the Circuit Property tab page, deselect Auto-Calculate Circuit Property . Then changethe CIC values to 31, 65535, 32, 33 62. In the Advanced tab page, change the value of Start CIC to 31.

    z If you select Auto-Calculate Circuit Property , the system calculates the FTC circuit propertyautomatically. You need to enter the value of Start CIC in the Advanced tab page. For details, seethe M900/M1800 BSC Data Configuration Manual Initial Configuration .

    z If you do not want to assign the CIC to a timeslot, set the CIC value of the timeslot to 65535.

    z The value of Start CIC should be the minimum value among the 32 CIC values.

    You can change the visibility of the FTC board in the Basic Information tab page as shownin Figure 2-27 .

  • 7/28/2019 01-2 Dynamic Configuration (BSC).pdf

    40/87

    M900/M1800 Base Station Controller Data Configuration Manual - Dynamic Configuration 2 BSC Data Configuration

    Issue 08 (2006-08-20) Huawei Technologies Proprietary 2-31

    Figure 2-27 Changing the FTC visibility

    If the FTC is invisible, you cannot change the parameters of circuit visibility in the Advanced tab pageand the Circuit Property tab page.

    Step 6 Click OK to return to the Select FTC dialog box as shown in Figure 2-25 .

    Step 7 Click OK to return to the Dynamic Configuration without Command dialog box as shownin Figure 2-24 .

    Step 8 Click Next .

    Step 9 Click Start Dynamic Configuration to activate the data.

    ----End

    Verification

    Check that the related data in the data tables and in the host are correctly modified.

    Data Table

    Table 2-9 lists the modified data tables in the BSC Data Management System.

  • 7/28/2019 01-2 Dynamic Configuration (BSC).pdf

    41/87

    2 BSC Data ConfigurationM900/M1800 Base Station Controller

    Data Configuration Manual - Dynamic Configuration

    2-32 Huawei Technologies Proprietary Issue 08 (2006-08-20)

    Table 2-9 Data tables modified during the modification of trunk circuits

    No. Table Name

    1 Trunk Circuit Table

    2 CIC Module Table

    2.9.2 Configuring the BTS Software Index

    Task Description

    Purpose To configure the BTS software index for the software loading of the BTS

    Prerequisite None

    Note None

    Procedure

    Using an example, this part describes how to configure the BTS software index. Assume thatyou have to add the BTS 3002C IOMU software index.

    The procedure is as follows:

    Step 1 On the BSC Data Auto Configuration System, choose BSC > Dynamic Configurationwithout Command > BTS Software Index .

    The Dynamic Configuration without Command dialog box as shown inFigure 2-28 is displayed.

  • 7/28/2019 01-2 Dynamic Configuration (BSC).pdf

    42/87

    M900/M1800 Base Station Controller Data Configuration Manual - Dynamic Configuration 2 BSC Data Configuration

    Issue 08 (2006-08-20) Huawei Technologies Proprietary 2-33

    Figure 2-28 Configuring the BTS software index parameters

    Step 2 Click BTS Software Index .

    The BTS Software Configuration dialog box as shown in Figure 2-29 is displayed.

    Figure 2-29 BTS Software Configuration dialog box

    Step 3 Click Add .

    The Add Configuration Item dialog box as shown in Figure 2-30 is displayed.

  • 7/28/2019 01-2 Dynamic Configuration (BSC).pdf

    43/87

    2 BSC Data ConfigurationM900/M1800 Base Station Controller

    Data Configuration Manual - Dynamic Configuration

    2-34 Huawei Technologies Proprietary Issue 08 (2006-08-20)

    Figure 2-30 Adding configuration items

    Step 4 Select IOMU_MAIN in the Software Serial No. drop-down list. Enter the related valuessuch as software name and version No. in the corresponding fields.

    Step 5 Click OK to return to the BTS Software Configuration dialog box.

    Step 6 Click OK to return to the Dynamic Configuration without Command dialog box.

    The Software Version Index No. is generated by the system. The Software Name should be thecomplete saving path of the software file.

    Step 7 Click Next .

    Step 8 Click Start Dynamic Configuration to activate the data.

    ----End

    Verification

    The software loading on the Site Maintenance System is successful.

    Data Table

    Table 2-10 lists the modified data table in the BSC Data Management System.

  • 7/28/2019 01-2 Dynamic Configuration (BSC).pdf

    44/87

    M900/M1800 Base Station Controller Data Configuration Manual - Dynamic Configuration 2 BSC Data Configuration

    Issue 08 (2006-08-20) Huawei Technologies Proprietary 2-35

    Table 2-10 Data table modified during the modification of the BTS software index

    No. Table Name

    1 Site Software Configuration Table

    2.9.3 Configuring Flow Control Parameters

    Task Description

    Purpose To configure the parameters of the flow control

    Prerequisite None

    Note None

    Procedure

    This part uses an example to show how to configure the parameters of flow control. Assumethat you have to change Abis Flow Control Counter T1 .

    The procedure is as follows:

    Step 1 On the BSC Data Auto Configuration System, choose BSC > Dynamic Configurationwithout Command > Flow Control .

    The Dynamic Configuration without Command dialog box as shown inFigure 2-31 is displayed.

    Figure 2-31 Configuring flow control parameters

  • 7/28/2019 01-2 Dynamic Configuration (BSC).pdf

    45/87

    2 BSC Data ConfigurationM900/M1800 Base Station Controller

    Data Configuration Manual - Dynamic Configuration

    2-36 Huawei Technologies Proprietary Issue 08 (2006-08-20)

    Step 2 Click Flow Control , and then enter the password.

    Step 3 Click OK .

    The Set Flow Control Table dialog box as shown in Figure 2-32 is displayed.

    Figure 2-32 Configuring the flow control parameter table

    Step 4 Change the value of Abis Flow Control Counter T1.

    Step 5 Click OK to return to the Dynamic Configuration without Command dialog box as shownin Figure 2-31 .

    Step 6 Click Next .

    Step 7 Click Start Dynamic Configuration to activate the data.

    ----End

    Verification

    Check that the related data in the data tables are correctly modified.

    Data Table

    Table 2-11 lists the modified data tables in the BSC Data Management System.

  • 7/28/2019 01-2 Dynamic Configuration (BSC).pdf

    46/87

    M900/M1800 Base Station Controller Data Configuration Manual - Dynamic Configuration 2 BSC Data Configuration

    Issue 08 (2006-08-20) Huawei Technologies Proprietary 2-37

    Table 2-11 Data table modified during the modification of the flow control parameters

    No. Table Name

    1 Flow Control Parameter Table

    2.9.4 Configuring Common Parameters

    Task Description

    Purpose To configure the common parameters

    Prerequisite None

    Note None

    Procedure

    This part uses an example to show how to change common parameters. Assume that you haveto change the value of Encryption Algorithm of Destination BSC into A5/7 .

    The procedure is as follows:

    Step 1 On the BSC Data Auto Configuration System, choose BSC > Dynamic Configurationwithout Command > Common Parameter .

    The Dynamic Configuration without Command dialog box as shown inFigure 2-33 is displayed.

    Figure 2-33 Configuring common parameters

  • 7/28/2019 01-2 Dynamic Configuration (BSC).pdf

    47/87

    2 BSC Data ConfigurationM900/M1800 Base Station Controller

    Data Configuration Manual - Dynamic Configuration

    2-38 Huawei Technologies Proprietary Issue 08 (2006-08-20)

    Step 2 Click Common Parameter .

    The Common parameter Tables dialog box as shown in Figure 2-34 is displayed.

    Figure 2-34 Common parameter tables

    Step 3 In the Software Parameter Table tab page as shown in Figure 2-35 , select A5/7 from theEncryption Algorithm of Destination BSC drop-down list.

  • 7/28/2019 01-2 Dynamic Configuration (BSC).pdf

    48/87

    M900/M1800 Base Station Controller Data Configuration Manual - Dynamic Configuration 2 BSC Data Configuration

    Issue 08 (2006-08-20) Huawei Technologies Proprietary 2-39

    Figure 2-35 Selecting the encryption algorithm of the destination BSC

    Table 2-12 lists the meaning of the parameters.

    Table 2-12 Meaning of the software parameters

    Parameter Name DefaultValue

    Description

    Encryption Algorithm of Destination BSC

    Any The options are A5/1, A5/2, A5/3, A5/4, A5/5,A5/6, A5/7, and Any.

    Type of Alarm Box New alarm box

    The options are old alarm box and new alarm box.

    BIE PCM Alarm Delay(s)

    5 Unit: second

    Value range: 015

    Include Speech VersionIE in SDCCH Handover Message

    Selected If it is selected, the SDCCH handover messagecarries the speech version IE.

    Always Include Cell IDIE in AssignmentComplete Message

    Not selected If it is selected, the assignment completemessage must carry the cell ID IE. If it is notselected, the assignment complete messagecarries the cell ID IE only when the servicecell changes during channel assignment.

  • 7/28/2019 01-2 Dynamic Configuration (BSC).pdf

    49/87

    2 BSC Data ConfigurationM900/M1800 Base Station Controller

    Data Configuration Manual - Dynamic Configuration

    2-40 Huawei Technologies Proprietary Issue 08 (2006-08-20)

    Parameter Name DefaultValue

    Description

    Exclude CIC Pool IE inAssignment CompleteMessage

    Not selected If it is selected, the assignment completemessage will not carry the CIC pool IE. If it isnot selected, the assignment complete messagewill keep the current CIC Pool IE processingmechanism.

    Exclude CIC Pool IE inHandover CompleteMessage

    Not selected If it is selected, the handover completemessage will not carry the CIC pool IE. If it isnot selected, the handover complete messagewill keep the current CIC pool IE processingmechanism.

    Support Group CircuitOperation on A-Interface

    Selected If it is selected, the group circuit operation onA-interface is available. If it is not selected,

    the group circuit operation on A-interface isunavailable.

    Step 4 Click OK to return to the Dynamic Configuration without Command dialog box.

    Step 5 Click Next .

    Step 6 Click Start Dynamic Configuration to activate the data.

    ----End

    Verification

    Check that the related data in the data tables and in the host are correctly modified.

    For the Software Parameter Table , ensure that the related data are set to each BSC module.For other data tables, check that the DBF is correctly refreshed.

    Data TableTable 2-13 lists the modified data tables in the BSC Data Management System.

    Table 2-13 Data tables modified during the modification of common parameters

    No. Table Name

    1 Cell Call Control Table

    2 Module Parameter Table

    3 Common Maximum Tuple Table

  • 7/28/2019 01-2 Dynamic Configuration (BSC).pdf

    50/87

    M900/M1800 Base Station Controller Data Configuration Manual - Dynamic Configuration 2 BSC Data Configuration

    Issue 08 (2006-08-20) Huawei Technologies Proprietary 2-41

    No. Table Name

    4 Module Maximum Tuple Table

    5 Software Parameter Table

    2.9.5 Configuring Semi-Permanent Connection

    Task Description

    Purpose To configure the parameters of semi-permanent connection

    Prerequisite None

    Note None

    Procedure

    To configure the parameters of semi-permanent connection, perform the following steps:

    Step 1 On the BSC Data Auto Configuration System, choose BSC > Dynamic Configurationwithout Command > Semi-permanent Connection .

    The Dynamic Configuration without Command dialog box as shown inFigure 2-36 is displayed.

    Figure 2-36 Configuring semi-permanent connection

    Step 2

    Click Semi-Permanent Connection .

  • 7/28/2019 01-2 Dynamic Configuration (BSC).pdf

    51/87

    2 BSC Data ConfigurationM900/M1800 Base Station Controller

    Data Configuration Manual - Dynamic Configuration

    2-42 Huawei Technologies Proprietary Issue 08 (2006-08-20)

    The Semi-permanent Connection Table dialog box as shown in Figure 2-37 is displayed.

    Figure 2-37 Semi-permanent connection table

    Step 3 Add, modify, or delete a record by clicking Add , Modify , or Delete respectively.

    Step 4 Click OK to return to the Dynamic Configuration without Command dialog box.

    Step 5 Click Next .

    Step 6 Click Start Dynamic Configuration to activate the data.

    ----End

    VerificationCheck that the related data in the data tables and in the host are correctly modified.

    Data Table

    Table 2-14 lists the modified data table in the BSC Data Management System.

  • 7/28/2019 01-2 Dynamic Configuration (BSC).pdf

    52/87

    M900/M1800 Base Station Controller Data Configuration Manual - Dynamic Configuration 2 BSC Data Configuration

    Issue 08 (2006-08-20) Huawei Technologies Proprietary 2-43

    Table 2-14 Data table modified during the modification of semi-permanent connection

    No. Table Name

    1 Semi-permanent Connection Table

    2.9.6 Configuring Alarm Parameters

    Task Description

    Purpose To configure alarm parameters

    Prerequisite None

    Note None

    Procedure

    This part uses an example to show how to configure alarm parameters. Assume that you haveto configure the BSC alarm parameters.

    Step 1 On the BSC Data Auto Configuration System, choose BSC > Dynamic Configurationwithout Command > Alarm > BSC Alarm Information Configuration .

    The Dynamic Configuration without Command dialog box as shown inFigure 2-38 is displayed.

    Figure 2-38 BSC alarm information configuration

    Step 2 Click BSC Alarm Information Configuration .

  • 7/28/2019 01-2 Dynamic Configuration (BSC).pdf

    53/87

    2 BSC Data ConfigurationM900/M1800 Base Station Controller

    Data Configuration Manual - Dynamic Configuration

    2-44 Huawei Technologies Proprietary Issue 08 (2006-08-20)

    The Supervisor dialog box as shown in Figure 2-39 is displayed.

    Figure 2-39 Password verification

    Step 3 Enter the password.

    The Alarm Parameter Table dialog box as shown in Figure 2-40 is displayed.

    Figure 2-40 Alarm parameter table

    Step 4 Modify the values of the BSC alarm parameters.

    You cannot modify the values of other alarm parameters.

    Step 5 Click OK to return to the Dynamic Configuration without Command dialog box.

    Step 6 Click Next .

  • 7/28/2019 01-2 Dynamic Configuration (BSC).pdf

    54/87

    M900/M1800 Base Station Controller Data Configuration Manual - Dynamic Configuration 2 BSC Data Configuration

    Issue 08 (2006-08-20) Huawei Technologies Proprietary 2-45

    Step 7 Click Start Dynamic Configuration to activate the data.

    ----End

    Verification

    The related data in the data tables and in the host are correctly modified.

    Data Table

    Table 2-15 lists the modified data tables in the BSC Data Management System.

    Table 2-15 Data tables modified during the modification of alarm parameters

    No. Table Name

    1 Alarm Parameter Configuration Table

    2 Alarm Environment Variable Table

    3 BTS Alarm Information Configuration Table

    4 BTS Alarm Environment Variable Table

    5 Alarm Information Parameter Table

    6 BM Alarm Screening Table

    7 AM Alarm Screening Table

    8 AM Alarm Environment Variable Table

    2.9.7 Configuring the GMEM

    Task Description

    Purpose To configure the IP address of the GMEM

    Prerequisite The GMEM information is configured in the initial data configuration atthe BSC Data Auto Configuration System.

    NoteYou can modify the attributes of all the GMEMs installed in the BM inone operation.

  • 7/28/2019 01-2 Dynamic Configuration (BSC).pdf

    55/87

  • 7/28/2019 01-2 Dynamic Configuration (BSC).pdf

    56/87

    M900/M1800 Base Station Controller Data Configuration Manual - Dynamic Configuration 2 BSC Data Configuration

    Issue 08 (2006-08-20) Huawei Technologies Proprietary 2-47

    Figure 2-42 Selecting a GMEM

    Step 3 Select Module 1 from the Select Module drop-down list.

    Step 4 Select 5 GMEM from the All GMEM in Current Module box. Then click Property or double-click 5 GMEM .

    The Set GMEM Property dialog box as shown in Figure 2-43 is displayed.

    Figure 2-43 Configuring the GMEM property

    Step 5 Click Add to add a GMEM IP address configuration item.

  • 7/28/2019 01-2 Dynamic Configuration (BSC).pdf

    57/87

    2 BSC Data ConfigurationM900/M1800 Base Station Controller

    Data Configuration Manual - Dynamic Configuration

    2-48 Huawei Technologies Proprietary Issue 08 (2006-08-20)

    Step 6 Click OK to return to the Select GMEM dialog box.

    Step 7 Click OK to return to the Dynamic Configuration without Command dialog box.

    Step 8 Click Next in the Dynamic Configuration without Command dialog box.

    Step 9 Click Start Dynamic Configuration to activate the data.

    ----End

    Verification

    Check that the related data in the data tables and in the host are correctly modified.

    Data Table

    Table 2-16 lists the modified data table in the BSC Data Management System.

    Table 2-16 Data table modified during the modification of the IP address of the GMEM

    No. Table Name

    1 GMEM Configuration Table

    2.9.8 Configuring Board Software Loading

    Task Description

    Purpose To configure the loading information of board software

    Prerequisite None

    Note None

    Procedure

    To configure the loading information of board software, perform the following steps:

    Step 1 On the BSC Data Auto Configuration System, choose BSC > Dynamic Configurationwithout Command > Board Software Loading .

  • 7/28/2019 01-2 Dynamic Configuration (BSC).pdf

    58/87

    M900/M1800 Base Station Controller Data Configuration Manual - Dynamic Configuration 2 BSC Data Configuration

    Issue 08 (2006-08-20) Huawei Technologies Proprietary 2-49

    The Dynamic Configuration without Command dialog box as shown inFigure 2-44 is displayed.

    Figure 2-44 Configuring loading information

    Step 2 Click Board Software Loading .

    The Board Software Loading Table dialog box as shown in Figure 2-45 is displayed.

    Figure 2-45 Board software loading table

    Step 3 Add, modify, or delete a record by clicking Add , Modify , or Delete respectively.

    Step 4 Click OK to return to the Dynamic Configuration without Command dialog box.

  • 7/28/2019 01-2 Dynamic Configuration (BSC).pdf

    59/87

    2 BSC Data ConfigurationM900/M1800 Base Station Controller

    Data Configuration Manual - Dynamic Configuration

    2-50 Huawei Technologies Proprietary Issue 08 (2006-08-20)

    Step 5 Click Next .

    Step 6 Click Start Dynamic Configuration to activate the data.

    ----End

    Verification

    Check that the related data in the data tables and in the host are correctly modified.

    Data Table

    Table 2-17 lists the modified data table in the BSC Data Management System.

    Table 2-17 Data table modified during the modification of the loading information of boardsoftware

    No. Table Name

    1 Board Software Loading Table

    2.9.9 Configuring Timer Data

    Task Description

    Purpose To configure timer data

    Prerequisite None

    Note None

    Procedure

    To configure timer data, perform the following steps:

    Step 1 On the BSC Data Auto Configuration System, choose BSC > Dynamic Configurationwithout Command > Timer Data .

    The Dynamic Configuration without Command dialog box as shown inFigure 2-46 is displayed.

  • 7/28/2019 01-2 Dynamic Configuration (BSC).pdf

    60/87

    M900/M1800 Base Station Controller Data Configuration Manual - Dynamic Configuration 2 BSC Data Configuration

    Issue 08 (2006-08-20) Huawei Technologies Proprietary 2-51

    Figure 2-46 Configuring timer data

    Step 2 Click Timer Data .

    The Local Data Default Config dialog box as shown in Figure 2-47 is displayed.

    Figure 2-47 Timer data

    Step 3 Modify the timer data.

    Step 4 Click OK to return to the Dynamic Configuration without Command dialog box.

    Step 5 Click Next .

    Step 6 Click Start Dynamic Configuration to activate the data.

  • 7/28/2019 01-2 Dynamic Configuration (BSC).pdf

    61/87

    2 BSC Data ConfigurationM900/M1800 Base Station Controller

    Data Configuration Manual - Dynamic Configuration

    2-52 Huawei Technologies Proprietary Issue 08 (2006-08-20)

    ----End

    Verification

    Check that the related data in the data tables and in the host are correctly modified.

    Data Table

    Table 2-18 lists the modified data table in the BSC Data Management System.

    Table 2-18 Data table modified during the modification of timer data

    No. Table Name

    1 Timer Table

    2.9.10 Modifying the Module Description Table

    Task Description

    Purpose To change the ID of the PCU that a module connects to

    Prerequisite None

    Note None

    Procedure

    To change the PCU ID, perform the following steps:

    Step 1

    On the BSC Data Auto Configuration System, choose BSC > Dynamic Configurationwithout Command > Module Description .

    The Dynamic Configuration without Command dialog box as shown inFigure 2-48 is displayed.

  • 7/28/2019 01-2 Dynamic Configuration (BSC).pdf

    62/87

    M900/M1800 Base Station Controller Data Configuration Manual - Dynamic Configuration 2 BSC Data Configuration

    Issue 08 (2006-08-20) Huawei Technologies Proprietary 2-53

    Figure 2-48 Dynamic configuration without command

    Step 2 Click Module Description Table .

    The Common Parameter Tables dialog box as shown in Figure 2-49 is displayed.

    Figure 2-49 Module description table

    Step 3 Change the PCU ID of the module.

  • 7/28/2019 01-2 Dynamic Configuration (BSC).pdf

    63/87

    2 BSC Data ConfigurationM900/M1800 Base Station Controller

    Data Configuration Manual - Dynamic Configuration

    2-54 Huawei Technologies Proprietary Issue 08 (2006-08-20)

    Step 4 Click OK to return to the Dynamic Configuration without Command dialog box.

    Step 5 Click Next .

    Step 6 Click Start Dynamic Configuration to activate the data.

    ----End

    Verification

    Check that the related data in the data tables and in the host are correctly modified.

    Data Table

    Table 2-19 lists the modified data table in the BSC Data Management System.

    Table 2-19 Data table modified during the modification of the module description

    No. Table Name

    1 Module Description Table

    2.10 Importing Network Parameters

    2.10.1 Task Description

    Purpose To import network parameters from template files

    Prerequisite None

    Note

    The template files can be edited only in Microsoft Excel. The files have to

    be exported to Microsoft Excel before being edited. For details, refer tosection 2.11 "Exporting Network Parameters ."

    2.10.2 Procedure

    To import network parameters, perform the following steps:

    Step 1 On the BSC Data Auto Configuration System, choose BSC > Import Network Parameters .

    The Open dialog box as shown in Figure 2-50 is displayed.

  • 7/28/2019 01-2 Dynamic Configuration (BSC).pdf

    64/87

    M900/M1800 Base Station Controller Data Configuration Manual - Dynamic Configuration 2 BSC Data Configuration

    Issue 08 (2006-08-20) Huawei Technologies Proprietary 2-55

    Figure 2-50 Selecting the text file

    Step 2 Select the text file, and then click Open .

    The Dynamic Configuration dialog box as shown in Figure 2-51 is displayed.

    Figure 2-51 Command list for dynamic configuration

    Step 3 Click Start Dynamic Configuration to activate the data.

    ----End

    2.10.3 Verification

    Check that the related data in the data tables and in the host are correctly modified.

  • 7/28/2019 01-2 Dynamic Configuration (BSC).pdf

    65/87

    2 BSC Data ConfigurationM900/M1800 Base Station Controller

    Data Configuration Manual - Dynamic Configuration

    2-56 Huawei Technologies Proprietary Issue 08 (2006-08-20)

    2.11 Exporting Network Parameters

    2.11.1 Task Description

    Purpose To export network parameters

    Prerequisite None

    NoteThe exported network parameters are saved as a text file. You can edit thisfile in Microsoft Excel and then import it. For details, refer to section 2.10"Importing Network Parameters ."

    2.11.2 Procedure

    To export network parameters, perform the following steps:

    Step 1 On the BSC Data Auto Configuration System, choose BSC > Export Network Parameters .

    The Export Network Parameters dialog box as shown in Figure 2-52 is displayed.

    Figure 2-52 Exporting network parameters

    Step 2 Select the type of the export network parameters from the Select Export Network Parameter Type drop-down list, and then select cells or external cells.

    Step 3 Click Export Parameter .

    The Save As dialog box as shown in Figure 2-53 is displayed.

  • 7/28/2019 01-2 Dynamic Configuration (BSC).pdf

    66/87

    M900/M1800 Base Station Controller Data Configuration Manual - Dynamic Configuration 2 BSC Data Configuration

    Issue 08 (2006-08-20) Huawei Technologies Proprietary 2-57

    Figure 2-53 Saving the text file

    Step 4 Enter the file name, and then click Save .

    The Information prompt as shown in Figure 2-54 is displayed.

    Figure 2-54 Information prompt

    Step 5 Click OK to return to the Export Network Parameters dialog box.

    Step 6 Click Exit .

    If the selected cell or external cell contains redundant information, such as redundant frequencies, therelated prompt will be displayed. The redundant information will not be exported to the text file.

    ----End

    2.11.3 Verification

    Check that all the exported text files are correct.

  • 7/28/2019 01-2 Dynamic Configuration (BSC).pdf

    67/87

    2 BSC Data ConfigurationM900/M1800 Base Station Controller

    Data Configuration Manual - Dynamic Configuration

    2-58 Huawei Technologies Proprietary Issue 08 (2006-08-20)

    This operation does not change any data table.

    2.12 Modifying Reserved Parameters

    2.12.1 Task Description

    Purpose To modify the reserved parameters

    Prerequisite None

    Note

    The reserved parameters are used for the functions or software patches to be developed in the future. Each of the BM, site, cell, and TRX has its

    own reserved parameters. You can only change these parameters. If a sitedoes not exist, you cannot add reserved parameters for it.

    2.12.2 Procedure

    This part uses an example to show how to modify the reserved parameters. Assume that youhave to modify the reserved parameters of TRXs.

    The procedure is as follows:

    Step 1 On the BSC Data Auto Configuration System, choose BSC > Modify Reserved Parameters > TRX .

    The Modify TRX Reserved Parameter dialog box as shown in Figure 2-55 is displayed.

  • 7/28/2019 01-2 Dynamic Configuration (BSC).pdf

    68/87

    M900/M1800 Base Station Controller Data Configuration Manual - Dynamic Configuration 2 BSC Data Configuration

    Issue 08 (2006-08-20) Huawei Technologies Proprietary 2-59

    Figure 2-55 Selecting TRXs

    If you choose BSC > Modify Reserved Parameters > Module , the Modify TRX ReservedParameter dialog box as shown in Figure 2-56 is displayed.

    Figure 2-56 Selecting a module

    Step 2 Select TRXs, and then click Next .

    The Modify TRX Reserved Parameter dialog box as shown in Figure 2-57 is displayed.

  • 7/28/2019 01-2 Dynamic Configuration (BSC).pdf

    69/87

    2 BSC Data ConfigurationM900/M1800 Base Station Controller

    Data Configuration Manual - Dynamic Configuration

    2-60 Huawei Technologies Proprietary Issue 08 (2006-08-20)

    Figure 2-57 Modifying the reserved parameters

    Step 3 Select the TRX and click Modify Reserved Parameters .

    The Reserved Parameters Configuration dialog box as shown in Figure 2-58 is displayed.

    Figure 2-58 Reserved Parameters Configuration dialog box

    To modify the parameter, click the parameter and enter the value.

  • 7/28/2019 01-2 Dynamic Configuration (BSC).pdf

    70/87

    M900/M1800 Base Station Controller Data Configuration Manual - Dynamic Configuration 2 BSC Data Configuration

    Issue 08 (2006-08-20) Huawei Technologies Proprietary 2-61

    To modify a batch of parameters in one column in one operation, modify one parameter of them, and then right-click the parameter to choose Batch Modify > Current col fromcurrent row or Current col. from begin .

    Step 4

    Click OK to return to the Modify TRX Reserved Parameter dialog box as shown in Figure2-57 .

    Step 5 Click Next .

    Step 6 Click Start Dynamic Configuration to activate the data.

    ----End

    2.12.3 Verification

    Check that the related data in the data tables and in the host are correctly modified.

    2.12.4 Data Table

    Table 2-20 lists the modified data tables in the BSC Data Management System.

    Table 2-20 Data tables modified during the modification of the reserved parameters

    No. Table Name1 BM Reserved Parameter Table

    2 Site Reserved Parameter Table

    3 Cell Reserved Parameter Table

    4 TRX Reserved Parameter Table

    2.13 Configuring the SS7 Property

    2.13.1 Task Description

    Purpose To configure the SS7 property without resetting the BSC

    Prerequisite None

    Note None

  • 7/28/2019 01-2 Dynamic Configuration (BSC).pdf

    71/87

  • 7/28/2019 01-2 Dynamic Configuration (BSC).pdf

    72/87

    M900/M1800 Base Station Controller Data Configuration Manual - Dynamic Configuration 2 BSC Data Configuration

    Issue 08 (2006-08-20) Huawei Technologies Proprietary 2-63

    You can modify the values of BSC Signaling Point Code and MSC Signaling Point Code in theConfigure SS7 Property dialog box as shown in Figure 2-60 .

    Step 3

    Select an E3M, and then click Configure SS7 Property .

    The Set E3M Board Property dialog box as shown in Figure 2-61 is displayed.

    Figure 2-61 Configuring the E3M board property

    In the Set E3M Board Property dialog box, you can modify the properties of the existingSS7 links. These properties include MSM TS , BIE TS , FTC No ., TransparentTransmission BIE Port No. for SS7 Signaling , and Signaling Link . You can also add or delete SS7 signaling links.

    Step 4 Click OK to return to the Configure SS7 Property dialog box.

    Step 5 Click Next .

    Step 6 Click Start Dynamic Configuration to activate the data.

  • 7/28/2019 01-2 Dynamic Configuration (BSC).pdf

    73/87

    2 BSC Data ConfigurationM900/M1800 Base Station Controller

    Data Configuration Manual - Dynamic Configuration

    2-64 Huawei Technologies Proprietary Issue 08 (2006-08-20)

    ----End

    2.13.3 Verification

    Check that the modified SS7 signaling links are normal.

    2.13.4 Data Table

    Table 2-21 lists the modified data table in the BSC Data Management System.

    Table 2-21 Data tables modified during the modification of the SS7 property

    No. Table Name

    1 E3M E1 Configuration Table

    2 BM_E3M_E1 Configuration Table

    3 Local Office Information Table

    4 SCCP SSN Table

    5 SCCP DSP Table

    6 MTP DSP Table

    7 MTP Linkset Table

    8 MTP Link Table

    9 CIC Module Table

    10 Office Direction Table

    11 Trunk Circuit Table

    2.14 Modifying the PB Interface Property

    2.14.1 Task Description

    Purpose To configure the transmission modes on the PB interface without resettingthe BSC

    Prerequisite None

    Note None

  • 7/28/2019 01-2 Dynamic Configuration (BSC).pdf

    74/87

    M900/M1800 Base Station Controller Data Configuration Manual - Dynamic Configuration 2 BSC Data Configuration

    Issue 08 (2006-08-20) Huawei Technologies Proprietary 2-65

    2.14.2 Procedure

    To modify the PB interface property, perform the following steps:

    Step 1 On the BSC Data Auto Configuration System, choose BSC > Modify PB Interface Property .

    The Modify PB Interface Property dialog box as shown in Figure 2-62 is displayed.

    Figure 2-62 Modifying PB Interface Property

    Step 2 Change the value of Transmission Mode .

    Step 3 Click Next .

    Step 4 Click Start Dynamic Configuration to activate the data.

    ----End

    2.14.3 Verification

    Check that the modified PB links are normal.

    2.14.4 Data Table

    Table 2-22 lists the modified data table in the BSC Data Management System.

  • 7/28/2019 01-2 Dynamic Configuration (BSC).pdf

    75/87

    2 BSC Data ConfigurationM900/M1800 Base Station Controller

    Data Configuration Manual - Dynamic Configuration

    2-66 Huawei Technologies Proprietary Issue 08 (2006-08-20)

    Table 2-22 Data table modified during the modification of the property of the PB interface

    No. Table Name

    1 LAPD Signaling Connection Table

    2.15 Modifying the BIE Trunk Mode

    2.15.1 Task Description

    Purpose To modify the BIE trunk modes without changing the sites under the BIE

    Prerequisite None

    Note None

    2.15.2 Procedure

    To modify the BIE trunk mode, perform the following steps:

    Step 1 On the BSC Data Auto Configuration System, choose BSC > Modify BIE Trunk Mode .

    The Modify BIE Trunk Mode dialog box as shown in Figure 2-63 is displayed.

  • 7/28/2019 01-2 Dynamic Configuration (BSC).pdf

    76/87

    M900/M1800 Base Station Controller Data Configuration Manual - Dynamic Configuration 2 BSC Data Configuration

    Issue 08 (2006-08-20) Huawei Technologies Proprietary 2-67

    Figure 2-63 Selecting a BIE

    Step 2 Select the BIE board.

    The Modify BIE T