zpmc vessel construction presentation

Upload: bregaing

Post on 07-Apr-2018

260 views

Category:

Documents


1 download

TRANSCRIPT

  • 8/6/2019 ZPMC Vessel Construction Presentation

    1/23

    Shanghai Zhenhua Port Machinery Co.,Ltd (ZPMC)is a world-famous manufacturer of cranes and largesteel structures ZPMC has captured more than 70%of the world market share in the industry, ZPMCsproducts are in use at 60 countries and regions, and

    over 120 terminals around the worldZPMC endeavors to develop offshore heavy-dutyindustry. Large floating cranes heavy-dutyengineering vessels and heavy lifting vessel are ouradvantage.

    ( ) (ZPMC)70

    60 120ZPMC

    ZPMCBrief Introduction of ZP MC

    ZPMC 500

    ZPMC is one of the .500 strongest companies and has

    been successfully listed on the Shanghai Stock Exchanges.

    Please visit:

    ZPMC

    http://www.zpmc.com

  • 8/6/2019 ZPMC Vessel Construction Presentation

    2/23

    ZPMC has more t han 1 ,000 p ro fess iona le n g i n ee r s w o r k i n g a t h u l l e n g i n e a n d el e c t r i c .

    T h e r e a r e a b ou t 2 6 0 t e c h n i c a l i n s t i t u t e s a n d

    t e n s o f U n i v e r s i t i e s i n Sh a n g h ai w h i c h a r e a l lt h e r e s o u r c e t h a t Z P M C c a n u s e , s u c h a s S J T U7 04 a nd 7 08 a c a de m i c i n st i t u t i o n .

    ZPMC 1000

    260

    704 708

  • 8/6/2019 ZPMC Vessel Construction Presentation

    3/23

    ZPMC has m ore t han 7000 w elders . They a l l ho ld CCS,

    a m o n g t h e m , m o r e t h a n 2000 are ho ld ing in t e rna t iona l

    w e ld ing c e r t i f i c a t ion . (ABS,GL,DNV......)ZPMC 7000 CCS 2000

    ABS GL DNV

  • 8/6/2019 ZPMC Vessel Construction Presentation

    4/23

    ZPMC ---------

    The key points for the welding of high strength steel plates are:

    Proper preheating before welding and temperature preservation after

    welding.To carry out welding strictly according to the welding procedurespecificationTo have high level welders and heat rectifiers.

    L a s t y e a r, t h e s t e e l q u a n t i t y c o n s u m e d b y Z PM C i sm o r e t h a n 6 0 0 ,0 0 0 t o n s , t h i s y e a r, i t w i l l b e m o r et h a n 8 0 0 ,0 0 0 t o n s .

    ZPMC 600,000800,000

  • 8/6/2019 ZPMC Vessel Construction Presentation

    5/23

    Raw material shall be purchased and checked strictlySteel plates Shall be classified for the project according to time, location, strength group and toughness gradeSteel plate shall be pretreated by automated plate pretreatment process line

    Welding parameters shall be as per approved WPSCut steel plate by using advanced equipment strictly according to the drawingsWelds requires high quality shall be performed by expert weldersTo guarantee the quality of painting, all of the structures re-blast cleaned by advanced equipment in workshopQuality Control system complying with international accepted standards

    To guarantee the high quality of the vesselZPMC regards the following as the key points

    ZPMC

    w e l d in g i n h ig h q u a li t y I SO 9000

  • 8/6/2019 ZPMC Vessel Construction Presentation

    6/23

  • 8/6/2019 ZPMC Vessel Construction Presentation

    7/23

  • 8/6/2019 ZPMC Vessel Construction Presentation

    8/23

    A

    E

    F

    ZPMC

  • 8/6/2019 ZPMC Vessel Construction Presentation

    9/23

    Z PM C i s i n po s s es s i on o f m o r e t h a n 1 0 s t e e l s t r u c t u r e s ho p s w i t h a t o t a l a re ao v e r 2 0 0 ,0 0 0 s q u a re m e t e r s , t h r e e o f w h i c h i s 3 0 m w i d e a n d 4 00 m l o n g .

    ZPMC 10 200 000

    3 400 30

    Recently, another two heavyduty workshops are built which will have liftingcapacity of 4x400t with 25m hook high.

    4x400t 25m ,

  • 8/6/2019 ZPMC Vessel Construction Presentation

    10/23

  • 8/6/2019 ZPMC Vessel Construction Presentation

    11/23

    Large warehouse and steel storage areasZPMC

    ZPMC has warehouses and steel storage area of over 60,000 squaremeters to store all kinds of mechanical & electrical components andlarge quantities of steels.ZPMC 60,000

  • 8/6/2019 ZPMC Vessel Construction Presentation

    12/23

    L a rg e s t o r a ge a r ea s f or c o m p l e t e d s t e e l s t r u c t u r eZPMC

    ZPMC has over 500,000 square meters areas usedfor the assembly and storage of steel structures.ZPMC 500,000

  • 8/6/2019 ZPMC Vessel Construction Presentation

    13/23

    So m e h e a vy d u t y m a c h i n in g e q ui p m e n t sZPMC

    large-sized steel plate pretreatment working line,

    Leveler machine, rolling machine

    large-sized plasma cutting machine,

    milling machine, gear grinding machine, folding machine

    heavy duty hydraulic trailer : 500T 400T 250T 100T

    500T 400T 250T 100T

  • 8/6/2019 ZPMC Vessel Construction Presentation

    14/23

    Having quay w i t h enough dep th quays ide area fo r be r t h ing o f l argevesse l f ab r i ca t ion a reas i s c lose t o the sea fo r an easy sa i l ing o f thehuge vesse l

    ZPMCZPMCwill assign a special quaysidearea for hull construction of OFFSHORE ENGINEERING .

    ZPMC

    ZPMC world firs t-class fabrication base(Changxing Island) is located at themouth of Yangtse River and the water depth of the navigational channel to thesea is over 14 m,which will ensure the safe sailing of large engineering vessel.ZPMC

    14

  • 8/6/2019 ZPMC Vessel Construction Presentation

    15/23

    Eigh t l a rge f loa t ing c ranes and 22 heavy equ ipmen t c a r r i e r sZPMC 8 22

  • 8/6/2019 ZPMC Vessel Construction Presentation

    16/23

    ZPMC7500T

    DLV4400T 4000T

    2X4000T 4000T 1700T 1600T1200T 1200T 2X2000T

    22

    ZPMC DNV ABS LR GL CCS

    ZPMC has bu i l t o r i s bu i ld ing : 7500T fu l ly r evo lv ingf l o a t i n g c r a n e Derr ic k PIPELAY vesse l DLV4400 TK OREA 2X4000T f loa t ing c rane 4000T fu l l r evo lv ing

    f l o a t i n g c r a n e Se l f -use 4000T f loa t ing c rane1 7 0 0 T A m e r i c a n f l oa t i n g c r a n e 1 6 0 0 T f l o a t i n gc r a n e 1 2 0 0 T f l oa t i n g c r a n e 120 0T PIPELAY

    VESSEL 2X2000 sem i-subm ers ib l e vesse l o ff shorep l a t f o r m p o n t o o n an d e t c , h a s c o m p l e t e t h ea l t e r a t i o n o f t h e 2 2 h e a v y eq u i p m e n t c a r r i e r s.

    DNV A BS L R GL CCS and e t c . a re t he pa r t ne r s o fZPMC.

  • 8/6/2019 ZPMC Vessel Construction Presentation

    17/23

    Fabrication methods

  • 8/6/2019 ZPMC Vessel Construction Presentation

    18/23

    To fabricate the blocks and lift the completed blocks on the hydraulic trailer usingworkshop crane and in the large sandblasting workshop for sandblasting treatment

  • 8/6/2019 ZPMC Vessel Construction Presentation

    19/23

    To transport the completed blocks to a specialareas by large hydraulic trailer

  • 8/6/2019 ZPMC Vessel Construction Presentation

    20/23

    To lift the hull by large floating crane onto the floating dock.

  • 8/6/2019 ZPMC Vessel Construction Presentation

    21/23

    288002880019200288002880013440

    28

    18000t

    60.00m

    60.00m

    10.00m10.00m

    221.6m

    /

    21.50m

    8.50m

    1.20m

    6.00m

    15.70m

    18.50m

    8000 8000201600

    Z PM C i s i n p o s s e ss i o n o f l a rg e f l o a t i n g d o c k f o r t h e c o n s t r u c t i o n o f h e a v yl i ft i n g v e s se l . T h e fl o at i n g d o c k b r ea d t h i s 6 0 m e t e r s .

    ZPMC 60

    Floating dock: 225*60*8M

    225*60*8M

  • 8/6/2019 ZPMC Vessel Construction Presentation

    22/23

    Transport the hull to the dock and launch it, commissioning and testing thevessel after the assembly of superstructure and the crane in shore.

  • 8/6/2019 ZPMC Vessel Construction Presentation

    23/23

    Thank You !