zp old guest house_repairs_5.00 lakhs

Upload: dvsrinivasa-rao

Post on 02-Jun-2018

227 views

Category:

Documents


1 download

TRANSCRIPT

  • 8/11/2019 ZP Old Guest House_Repairs_5.00 Lakhs

    1/27

    DISTRICT : WEST GODAVARI

    CIRCLE : ELURU

    DIVISION : ELURU

    SUB-DIVISION : ELURU

    MANDAL : ELURU

    GOVERNMENT OF ANDHRA PRADESH

    PANCHAYATRAJ ENGINEERING DEPARTMENT

    Name of the Work : Repairs & Renovation of Old Guesthouse in Zilla ParishadCompound at Eluru

    Estimate Amount Rs. 5.00 Lakhs

    DETAILED PROPOSAL ESTIMATE

  • 8/11/2019 ZP Old Guest House_Repairs_5.00 Lakhs

    2/27

    Name of the Work : Repairs & Renovation of Old Guesthouse in Zilla Parishad Compound at Eluru

    Estimate Amount Rs. 5.00 Lakhs

    As per the instructions of the higher authorities and as per the request of the Hon'ble

    MLA,Denduluru,proposal estimate is prepared for the work"Repairs & Renovation of Old Guesthouse in Zilla

    Parishad Compound at Eluru",Est.Cost.Rs.7.50 lakhs.

    The roof of the old guest house is leaking and hence,it requires covering with GI sheets

    Certain petty repairs are required along with one T.V. including paintings inside and out side.Dewan cot,Table & Chair are to be proposed in the Room No.1 as per the instructions of the Hon'ble MLA,Denduluru

    Accordingly,a proposal estimate is prepared with the above provisions.

    Further lump sum provisions are made in the estimate for the following items:-

    1)Provision for VAT @ 5.00%

    2)QC charges @ 0.5%

    The estimate is prepared as per the current SSR,i.e.2013-2014 rates and as per

    the A.P Revised Standard data work will be carried out as per APDSS after administrative sanction

    Dy.Executive Engineer Asst.Executive Engineer

    PRI,Eluru PRI,Eluru

    SPECIFICATION REPORT

  • 8/11/2019 ZP Old Guest House_Repairs_5.00 Lakhs

    3/27

    Sl.

    No.

    Description of Item Length (m) Width (m) Thickne

    ss (m)

    Quantity Unit Rate

    1 2 3 4 5 6 7 8 9

    A)Repairs&Renovation:-

    1

    Columns over slab 1 x 12 1.22 0.23 0.23 0.77

    0.77 cum 8355.56

    2

    0.077

    0.077 MT 61542.90

    3

    Brick pillars for bench N/S 1 x 11 0.50 0.23 0.50 0.63

    -----do---- E/S 1 x 12 0.50 0.23 0.50 0.691.32 cum 3697.39

    4

    Brick pillars for bench N/S 1 x 11 0.50 ----- 1.23 6.77

    -----do---- E/S 1 x 12 0.50 ----- 1.23 7.38

    14.15 sqm 162.37

    5

    Old guest house L/S 1 x 1 10.10 ----- 7.60 76.76

    Paintingto New walls with two coats of snowcem paintsof approved brand and shade

    over old painted surface of approved brandmaking two coatsin all to give an even

    shade after thoroughly brushing the surface to remove all loose powdered materials, lift

    charges, curing etc.,complete for finished item of work in all floors for external

    Walls.(APSS No. 911) (CSSR)

    Brick Masonryin superstructure with traditional bricks 23x11x7cms in CM (1:6) prop:

    mixing cement mortar, constructing masonry, scaffolding charges, lift charges, curing,

    etc., complete for finished item of work. (APSS No. 501 & 504).(CSSR) for basement

    DETAILED CUM ABSTRACT ESTIMATE

    Estimate Amount R

    Name of the Work : Repairs & Renovation of Old Guesthouse in Zilla Parishad Compound at Eluru

    No

    Vibrated reinforced Cement Concrete M20 grade nominal mix using 400 kg. of cement,

    20mm size HBG (SS5) metal complete for finished item of work for Columns (APSSNo. 402) (CSSR)

    Plastering 20mmthick in CM(1:5) including cost and conveyance of all materials and all

    labour charges etc.complete for basement

    Providing high yield strength deformed (HYSD) steel TMT bars (Fe 415 grade as per IS

    1786-1985) of 8mm to 40mm diameters cutting, bending, to required sizes and shapes

    placing in position with cover blocks of approved size and binding wire of 20SWG,

    forming grills for reinforcement work as per approved designs and drawings including

    Cost and Conveyance of bars from approved sources to site of work with all taxes

    complete for finished item of work (APSS No.126) in all floors (CSSR)

  • 8/11/2019 ZP Old Guest House_Repairs_5.00 Lakhs

    4/27

    Sl.

    No.

    Description of Item Length (m) Width (m) Thickne

    ss (m)

    Quantity Unit Rate

    1 2 3 4 5 6 7 8 9

    No

    Out side compound wall 1 x 1 5.80 ----- 2.60 15.08

    Pillaster sides 2 x 2 0.35 ----- 0.75 1.05

    ----do---- top 1 x 2 0.30 ----- 0.60 0.36Gate Pillasters 1 x 2 2.00 ----- 2.05 8.20

    E/S Compound wall R/S 1 x 1 29.60 ----- 2.90 85.84

    Pillaster sides 2 x 13 0.35 ----- 0.75 6.83

    ----do---- top 1 x 13 0.30 0.60 ----- 2.34

    A/R end pillars 1 x 1 0.80 ----- 0.60 0.48

    N/S Compound wall L/S 1 x 1 26.00 ----- 2.60 67.60

    Pillaster sides 2 x 11 0.35 ----- 0.75 5.78

    ----do---- top 1 x 1 0.30 0.60 ----- 0.18

    A/R end pillasters 1 x 1 0.80 ----- 0.60 0.48

    Gate Pillasters 1 x 2 2.00 ----- 2.50 10.00Top 1 x 2 0.50 0.50 ----- 0.50

    N/S Compound wall R/S 1 x 1 35.60 ----- 3.40 121.04

    Pillaster sides 2 x 16 0.35 ----- 0.75 8.40

    Top 1 x 16 0.30 ----- 0.60 2.88

    Wall A/R 1 x 1 6.40 ----- 3.20 20.48

    Pillasters 4 x 2 0.35 ----- 0.55 1.54

    Top 1 x 4 0.30 ----- 0.60 0.72

    Park front side wall 1 x 1 17.25 ----- 2.15 37.09

    Pillaster sides 9 x 2 0.25 ----- 0.75 3.38

    Top 9 x 1 0.25 ----- 0.40 0.902nd lift 1 x 1 29.05 ----- 2.20 63.91

    Pillaster sides 2 x 12 0.25 ----- 0.70 4.20

    Pillaster top 1 x 12 0.25 0.40 ----- 1.20

    S/S wall L/S 1 x 1 10.10 ----- 2.65 26.77

    Pillaster sides 5 x 2 0.35 ----- 0.75 2.63

    Top 1 x 5 0.25 0.60 ----- 0.75

    Gate Pillasters 1 x 2 2.00 ----- 1.65 6.60

    773.45 sqm 90.45

    6

    Ceilings

    Varandah 1 x 1 11.75 2.42 ----- 28.44

    ----do--- 1 x 1 7.35 3.90 ----- 28.67

    Beams 1 x 1 0.37 0.37 ----- 0.14

    Portico 1 x 1 5.50 4.00 ----- 22.00----do--- 1 x 2 3.40 0.30 ----- 2.04

    Building L/S sunshades 1 x 1 5.25 0.45 ----- 2.36

    Underneath slab 1 x 1 10.60 0.50 ----- 5.30

    Staircase landing ceiling 1 x 1 2.10 1.50 ----- 3.15

    ----do--- 1 x 1 0.60 1.80 ----- 1.08

    Painting to new walls with 2 coats of acrylic exterior emulsion painthaving VOC(Volatile Organic Compound) content less than 50 grams/ litre.of approved brand and

    shade after thoroughly brushing the surface to remove all dirt and remains of loose

    powdered materials, including cost and conveyance of all materials to work site and all

    operational, incidental, labour charges etc. complete for finished item of work as per SS

    911 for internal walls

  • 8/11/2019 ZP Old Guest House_Repairs_5.00 Lakhs

    5/27

    Sl.

    No.

    Description of Item Length (m) Width (m) Thickne

    ss (m)

    Quantity Unit Rate

    1 2 3 4 5 6 7 8 9

    No

    Doors D 2.25 x 10 1.20 ----- 2.55 68.85

    Windows D 2.75 x 11 1.20 ----- 2.55 92.57

    161.42 sqm 119.94

    8

    Lawn wall gate E/S 1 x 1 2.10 ----- 1.83 3.84

    -----do---- S/S 1 x 1 1.50 ----- 1.83 2.75

    6.59 sqm 112.28

    9

    Old guest house Roof 1 x 2 12.28 6.25 ----- 153.50

    Side sheets 0.5 x 2 10.50 2.00 ----- 21.00

    174.50 sqm 746.00

    10

    For truss and purlin membersover roof

    650.000

    650.000 kg 80.40

    11

    For E/S bench 1 x 1 15.50 0.50 ----- 7.75

    ----do--- S/S bench 1 x 1 15.00 0.50 ----- 7.50

    15.25 sqm 128.70

    12

    In Room No1 Toilet 1 x 1 ----- ----- ----- 1.00

    1.00 sqm 9941.00

    13

    Table top 1 x 1 2.45 1.22 ----- 2.99

    Cup board shutters 1 x 1 1.15 ----- 1.90 2.19

    -----do--- A/R 1 x 1 6.10 0.20 ----- 1.22

    Add t f t 0 60

    Cost and supply of polished black Cuddapah slabs 15mm thick including transportationa

    and labour charges etc.complete

    Painting with Synthetic enamil paint Gr-I two coats over a primary coat of Red oxide

    primer for new iron workincluding cost and conveyance of all materlas and all labour

    charges etc.complete

    Cost,fabrication,supply and fixing charges of MS Iron grills of any design including cost

    of materials,welding charges,transportation and fixing charges etc.complete

    Supply, Transportation and fixing of storage / Pressure type Horizontal230/250V singlephase 2000watts ISI mark 5 Star rated water heaterwith SS tank and ABS plastic body

    of 25 Ltrs capacity to withstand up to 6.5 bar of water pressure including all standard

    accessories and dead weight pressure reducing valve on out let side, including cost of 2

    Nos nylon / PVC / Metallic hose pipe, testing and all labour charges etc., complete.

    Makes:makes Crompton model No. solarium plus SWH 725, Class 1 rated or its

    equivalent make of Bajaj / Venus / Racold / Usha.

    Roofing: - Roofing will be provided with 0.5mm thick galvanized / pre painted G.I.

    profiled sheets fixed to the purlins with 14 size self drilling screws with neoprene washer.Side laps are stitched with self tapping / drilling screws. End laps are to be sealed with

    25x3 mm Butyl tape. The sheets are provided with anti capillary grove.

    Cost and supply of 18mm thick MDF exterior grade both sides laminated includingtransportation to site

  • 8/11/2019 ZP Old Guest House_Repairs_5.00 Lakhs

    6/27

    Sl.

    No.

    Description of Item Length (m) Width (m) Thickne

    ss (m)

    Quantity Unit Rate

    1 2 3 4 5 6 7 8 9

    No

    Add for wastage 0.0003

    0.0030 cum 137729.00

    16

    Room No 2 Door 1 x 1 1.05 ----- 2.10 2.21

    Toilet door two sides 1 x 2 0.80 ----- 1.85 2.96

    Room No 1 Door 1 x 1 1.10 ----- 1.80 1.98

    Toilet door two sides 1 x 2 0.70 ----- 1.80 2.52

    9.67 sqm 774.00

    17

    Table top 1 x 1 2.45 1.22 ----- 2.99

    Cup board shutters 1 x 1 1.15 ----- 1.90 2.19

    -----do--- A/R 1 x 1 6.10 0.20 ----- 1.22

    Add extra for wastage 0.60

    7.00 sqm 583.75

    18

    In Room No.1 1 x 1 ----- ----- ----- 1.00

    1.00 No 2040.2

    19

    In Room No.1 1 x 1 ----- ----- ----- 1.00

    1.00 No 139.90

    20

    In old guest house 1 x 5 ----- ----- ----- 5

    5.00 No 599

    21

    In old guest house 1 x 5 ----- ----- ----- 55.00 No 166.9

    22

    Labour charges for Fixing of Ceiling fan and regulator including transportation and giving

    connections with twin core wire etc., complete.

    Supply of 1 x 36/40W Box type tube light luminaire powder coated CRCA sheet steel

    housing with VPIT Chokes and all standard accessories of makes Crompton / Bajaj /

    Surya / Havells / HPL.

    Fixing of 40W tube light luminaire on wall / Ceiling with / TW round blocks with all

    accessories including giving connections and all labour charges etc., complete.

    Supplying and Fixing best Indian make plastic seat and lid for European water closets

    with rubber or plastic Buffers as per IS 2548-1996

    Labour charges for making, fabricating office furniture, racks, work-station furniture,

    cup-board shutters with ply-wood/ MDF sheets, decolam/ veneer laminations includingfixing cutting, making, assembling, fixing hinges, fixing fixtures, fixing locks, pasting

    sheets/ laminations fixing in position with necessary screws excluding cost of materials,

    accessories, fittings(SSR item No.927)

    Cost and supply of Teak Veneer Lamination - 4 mm thick - Natural Grains including

    transportation to site

    Supply of 48" (1200mm) Sweep 5 Star rated Ceiling Fan without Regulator of makesCrompton High Speed Havells Fusion 50decorative

  • 8/11/2019 ZP Old Guest House_Repairs_5.00 Lakhs

    7/27

    Sl.

    No.

    Description of Item Length (m) Width (m) Thickne

    ss (m)

    Quantity Unit Rate

    1 2 3 4 5 6 7 8 9

    No

    Deputy Executive Engineer, Assistant Executive Enginee

    PRI Sub-Division, Eluru PRI, Eluru

  • 8/11/2019 ZP Old Guest House_Repairs_5.00 Lakhs

    8/27

    Amount

    10

    6434

    4739

    4881

    2298

    . 5.00 Lakhs

  • 8/11/2019 ZP Old Guest House_Repairs_5.00 Lakhs

    9/27

    Amount

    10

    69959

  • 8/11/2019 ZP Old Guest House_Repairs_5.00 Lakhs

    10/27

    Amount

    10

    19360

    740

    130177

    52260

    1963

    9941

  • 8/11/2019 ZP Old Guest House_Repairs_5.00 Lakhs

    11/27

    Amount

    10

    413

    7485

    4086

    2040

    140

    2995

    835

  • 8/11/2019 ZP Old Guest House_Repairs_5.00 Lakhs

    12/27

    Amount

    10

    ,

  • 8/11/2019 ZP Old Guest House_Repairs_5.00 Lakhs

    13/27

    Sl.

    No.

    Index-code Description Unit Quantity Rate Rs.

    1 2 3 4 5 6

    A)CIVIL WORK:-

    1 BLD- Cement Mortar (1 : 3)

    CSTN-1-4 Unit : 1cum

    A. MATERIALS:Cement kg. 480.00 6.00

    Sand (including 5% wastage) cum 1.05 1206.75

    Seigniorage charges for Fine Sand cum 1.05 40.00

    B. MACHINERY

    - Nil -

    C. LABOUR:

    Man mazdoor for mixing mortar day 0.20 280.00

    Add MA@25%

    Grand Total

    2 BLD- Cement Mortar (1 : 5)

    CSTN-1-6 Unit : 1cum

    A. MATERIALS:

    Cement kg. 288.00 6.00

    Sand (including 5% wastage) cum 1.05 1206.75

    Seigniorage charges for Fine Sand cum 1.05 40.00

    B. MACHINERY

    - Nil -

    C. LABOUR:Man mazdoor for mixing mortar day 0.20 280.00

    Add MA@25%

    Grand Total

    3 BLD- Cement Mortar (1 : 6)

    CSTN-1-7 Unit : 1cum

    A. MATERIALS:

    Cement kg. 240.00 6.00

    Sand (including 5% wastage) cum 1.05 1206.75

    Seigniorage charges for Coarse Sand cum 1.05 40.00

    B. MACHINERY

    - Nil -

    C. LABOUR:

    Man mazdoor for mixing mortar day 0 20 280 00

    DATA SHEET

    Name of the Work : Repairs & Renovation of Old Guesthouse in Zilla Parishad Compound at Elur

    Estimate Amount

  • 8/11/2019 ZP Old Guest House_Repairs_5.00 Lakhs

    14/27

    Sl.

    No.

    Index-code Description Unit Quantity Rate Rs.

    5 BLD-CSTN-2-13 COLUMNS, LINTELS, WATER TANKS, RCC

    WALLS IN BUILDINGS

    A. MATERIALS:

    20mm HBG graded metal cum 0.900 2028.07Sand cum 0.450 1086.75

    Cement Kgs 400.000 6.00

    Seigniorage charges for C.A cum 0.90 50.00

    Seigniorage charges for F.A cum 0.45 40.00

    B. LABOUR:

    1st Class Mason day 0.167 350.00

    2nd Class Mason day 0.167 320.00

    Mazdoor (Both Men and Women) day 4.700 280.00

    Add MA@25%B. MACHINERY

    Concrete Mixer 10 / 7 cft (0.2 / 0.8 cum)

    capacity

    hour 1.000 417.40

    BASIC COST per 1 cum

    6 COLUMNS

    BASIC COST per 1 cum cum 1.00 6979.56

    Centering charges cum 1.00 1376.00

    Total

    7 BLD-CSTN-2-18

    Unit = t

    (a) Material

    HYSD bars including 5 per cent for overlaps

    and wastage

    t 1.05 48000.00

    Binding wire kg 6.00 70.00

    (b) Labour for cutting, bending, shifting tosite, tying and placing in position

    Blacksmith / Bar bender day 2.00 370.00

    Mazdoor (Unskilled) day 6.40 280.00

    Add MA@25%

    Sundries on Material

    Add contractor's profit&over heads@14%

    Rate per t = a+b

    8 Cost,fabrication,supply and fixing charges of

    MS Iron gri lls of any design including cost of

    materials,welding charges,transportation and

    fixing charges etc.complete

    Cost of Mild Steel sections Kg 1.050 48.00

    Labour charges for fabrication of grills Kg 1 000 20 00

    Supplying, fitting and placing HYSD bar reinforcement in foundation

    complete as per drawings and technical specifications for Bars below 36

    mm dia including over laps and wastage, where they are not welded

  • 8/11/2019 ZP Old Guest House_Repairs_5.00 Lakhs

    15/27

    Sl.

    No.

    Index-code Description Unit Quantity Rate Rs.

    Mason 2nd

    class day 0.56 320.00

    Mazdoor (unskilled) day 1.89 280.00

    Add MA@25%

    Total

    10 BLD-CSTN-3-1

    Unit = 1cum

    A. MATERIALS:

    Cement kg 48.00 6.00

    Bricks traditional size 23 x 11 x 7 cms 2nd

    class

    Nos 512.00 4237.39

    Fine aggregate (Sand) cum 0.20 1206.75

    Seigniorage charges for F.A cum 0.20 40.00B. LABOUR:

    Mason 1stclass day 0.24 350.00

    Mason 2nd

    class day 0.56 320.00

    Mazdoor (unskilled) day 1.89 280.00

    Add MA@25%

    C. SCAFOLDING

    Access Scafolding charges per sqm

    (1cum/0.23m thick = 4.35sqm)

    sqm 4.35 0.00

    Total

    11 BLD-CSTN-6-3 Plastering with CM (1:5), 12 mm thick

    including cost and conveyance of all materials

    and all labour charges etc.complete

    Unit = 10 sqm

    A. MATERIALS:

    Cement Mortor (1:5) cum 0.150 3107.09

    B. LABOUR:

    Mason 1stclass day 0.60 350.00

    Mazdoor (unskilled) day 0.96 280.00

    Add MA@25%

    C. SCAFOLDING

    Access Scafolding charges sqm 10.00 0.00

    Grand Total

    Total per 1 sqm

    12 BLD-CSTN-6-3 Plastering with CM (1:5), 20 mm thick

    including cost and conveyance of all materialsand all labour charges etc.complete

    Unit = 10 sqm

    A. MATERIALS:

    Cement Mortor (1:5) cum 0 21 3107 09

    Brick Masonry in CM (1:6) with Bricks traditional size 23 x 11 x 7 cms 2nd

    Class for Basement

  • 8/11/2019 ZP Old Guest House_Repairs_5.00 Lakhs

    16/27

    Sl.

    No.

    Index-code Description Unit Quantity Rate Rs.

    13 BLD-CSTN-10-5

    Unit: 10 sqm

    Cost of water proof cement Paint of approved

    quality

    kg 3.50 47.00

    B. LABOUR

    1st class painter day 0.15 400.00

    2nd class painter day 0.35 320.00

    Mazdoor (unskilled) day 1.50 280.00

    Add MA@25%

    Total cost

    Total per 1 sqm

    14 BLD-CSTN-10-6 Painting, Priming Coat on New Wood Work

    Unit: 10 sqm

    A. MATERIALS :

    Wood Primer L 0.700 135.00

    B. LABOURPainter--1st Class day 0.210 400.00

    Painter--2nd Class day 0.490 320.00

    Add MA@25%

    Sundries including brushes, soap, putty etc., 1.000%

    Total cost for 10 sqm

    15 BLD-CSTN-10-7 Painting, Priming Coat on New Iron Work

    Unit: 10 sqm

    A. MATERIALS :

    Red Oxide Primer L 0.70 121.00

    B. LABOUR

    Painter--1st Class day 0.210 400.00

    Painter--2nd Class day 0.490 320.00

    Add MA@25%

    Sundries including brushes, soap, putty etc., 1.000%

    Total cost for 10 sqm

    16 BLD-CSTN-10-12 Painting with Synthetic Enamel paints -

    Two Coats - for New Wood Work

    A MATERIALS :

    Painting to new walls with 2 coats of water proof cement paint of apporved

    brand and shade over a base coat of approved cement primer grade I

    making making 3 coats in all to give an even shade after thourughly

    brushing the surface to remove all dirt and remains of loose powdered

    materials, including cost and conveyance of all materials to work site and alloperational, incidental, labour charges etc. complete for finished item of

    work as per SS 912 for internal walls

  • 8/11/2019 ZP Old Guest House_Repairs_5.00 Lakhs

    17/27

    Sl.

    No.

    Index-code Description Unit Quantity Rate Rs.

    B. LABOUR

    Painter--1st Class day 0.330 400.00

    Painter--2nd Class day 0.770 320.00

    Add MA@25%

    Sundries including brushes, soap, putty etc.,

    Total cost for 10 sqm

    18 BLD-CSTN-10-

    6&12

    Painting with Synthetic enamil paint Gr-I

    two coats over a primary coat of wood primer

    for new wood work including cost and

    conveyance of all materlas and all labour

    char es etc.com leteBLD-CSTN-10-6

    BLD-CSTN-10-12

    Total cost for 10 sqm

    19 BLD-CSTN-10-

    7&12

    Painting with Synthetic enamil paint Gr-I

    two coats over a primary coat of Red oxide

    primer for new iron work including cost and

    conveyance of all materlas and all labour

    charges etc.complete

    BLD-CSTN-10-7

    BLD-CSTN-10-12Total cost for 10 sqm

    20 BLD-CSTN-2-5

    Unit = 10sqm

    A. MATERIALS:

    acrylic exterior emulsion paint having VOC

    (Volatile Organic Compound) content less than

    50 grams/ litre (at 20 sqm / liter as per British

    Paints (I) Ltd.

    kg 0.80 183.00

    B. LABOUR:

    Painter-Ist class day 0.36 400.00

    Painter-IInd class day 0.84 320.00

    Add MA@25%Rate per 10sqm

    Rate per 1sqm

    21 BLD-CSTN-2-5

    Painting to new walls with 2 coats of acrylic exterior emulsion paint

    having VOC (Volatile Organic Compound) content less than 50 grams/

    litre.of approved brand and shade after thoroughly brushing the surface to

    remove all dirt and remains of loose powdered materials, including cost and

    conveyance of all materials to work site and all operational, incidental,

    labour charges etc. complete for finished item of work as per SS 911 for

    internal walls

    Painting to new walls with 2 coats of acrylic exterior emulsion paint

  • 8/11/2019 ZP Old Guest House_Repairs_5.00 Lakhs

    18/27

    Sl.

    No.

    Index-code Description Unit Quantity Rate Rs.

    Mazdoor (unskilled) day 1.50 280.00

    Add MA@25%

    Rate per 10sqm

    Rate per 1sqm

    22 Labour charges for making, fabricating office

    furniture, racks, work-station furniture, cup-

    board shutters with ply-wood/ MDF sheets,

    decolam/ veneer laminations including fixing

    cutting, making, assembling, f ixing hinges,

    fixing fixtures, f ixing locks, pasting sheets/

    laminations fixing in position with necessary

    screws excluding cost of materials,

    accessories, fittings(SSR item No.927)

    sqm 1.000 467.00

    Add MA@25%

    23 Bldngs_Elec-9-7-2 Supply of 1200 mm (48") sweep 230V, A.C 50

    Hz.Ceiling fan with 3 Blades and double ball

    bearings with all standard accessories.

    a) Material

    Supply of 48" (1200mm) Sweep 5 Star rated

    Ceiling Fan without Regulator of makesCrompton High Speed Decora / Bajaj Regal

    star / Havells Fusion 50 / Orient Summer

    Crown / Usha technix decorative

    each 1 2020.00

    Transportation Charges on Unit Cost 1%

    Rate per Each

    24 Bldngs_Elec-9-7-35Labour charges for Fixing of Ceiling fan and

    regulator including transportation and giving

    connections with twin core wire etc., complete.

    a) Material

    23/0060 Twin Core wire M 1 39.90

    Unforseen item works, such as painting to

    down rod, screws etc.,

    LS

    b) Labour charges.

    Skilled Electrician day 0.125 400.00

    Helper day 0.125 320.00

    Add MA@25%

    Rate per Each

    25 BLD-ELEC-7-9-3 Fixing of 40W tube light luminaire on wall /

    Ceiling with / TW round blocks with all

    accessories including giving connections and

  • 8/11/2019 ZP Old Guest House_Repairs_5.00 Lakhs

    19/27

    Sl.

    No.

    Index-code Description Unit Quantity Rate Rs.

    Deputy Executive Engineer, Assistant Executive EnginPRI Sub-Division, Eluru PRI, Eluru

  • 8/11/2019 ZP Old Guest House_Repairs_5.00 Lakhs

    20/27

    Amount Rs.

    7

    2880.00

    1267.09

    42.00

    56.00

    14.00

    4259.09

    1728.00

    1267.09

    42.00

    56.00

    14.00

    3107.09

    1440.00

    1267.09

    42.00

    56 00

    s. 5.00 Lakhs

  • 8/11/2019 ZP Old Guest House_Repairs_5.00 Lakhs

    21/27

    Amount Rs.

    1825.26489.04

    2400.00

    45.00

    18.00

    58.45

    53.44

    1316.00

    356.97

    417.40

    6979.56

    6979.56

    1376.00

    8355.56

    50400.00

    420.00

    740.00

    1792.00

    633.00

    0.00

    7557.90

    61542.90

    50.40

    20 00

  • 8/11/2019 ZP Old Guest House_Repairs_5.00 Lakhs

    22/27

    Amount Rs.

    179.20

    529.20

    198.10

    3625.39

    288.00

    2169.54

    241.35

    8.00

    84.00

    179.20

    529.20

    198.10

    0.00

    3697.39

    466.06

    210.00

    268.80

    119.70

    0.00

    1064.56

    106.46

    652 49

  • 8/11/2019 ZP Old Guest House_Repairs_5.00 Lakhs

    23/27

    Amount Rs.

    164.50

    60.00

    112.00

    420.00

    148.00

    904.50

    90.45

    94.50

    84.00

    156.80

    60.20

    3.96

    399.46

    84.70

    84.00

    156.80

    60.20

    3.86

    389.56

  • 8/11/2019 ZP Old Guest House_Repairs_5.00 Lakhs

    24/27

    Amount Rs.

    132.00

    246.40

    94.60

    7.26

    733.26

    399.46

    799.92

    1199.38

    389.56

    733.261122.82

    146.40

    144.00

    268.80

    103.20662.40

    66.24

  • 8/11/2019 ZP Old Guest House_Repairs_5.00 Lakhs

    25/27

    Amount Rs.

    420.00

    165.20

    972.40

    97.24

    467.00

    116.75

    583.75

    2020.00

    20.20

    2040.20

    39.90

    50.00

    40.00

    10.00

    139.90

  • 8/11/2019 ZP Old Guest House_Repairs_5.00 Lakhs

    26/27

    Amount Rs.

    er,

  • 8/11/2019 ZP Old Guest House_Repairs_5.00 Lakhs

    27/27

    Sl.

    No.Description of Material Unit

    Name of the

    Quarry

    Lead in

    KM

    Conveyanc

    e chargesInitial Cost

    Blasting

    charges

    Machine

    crushing

    charges

    Loading&

    Unloading

    charges

    Total

    Amount

    1 2 3 4 5 6 7 8 9 12

    1 Coarse Sand for Concrete 1.00 Cum Godavari 72.00 701.75 385.00 0.00 0.00 0.00 1086.75

    2 Coarse Sand for filling 1.00 Cum Godavari 72.00 701.75 285.00 0.00 0.00 0.00 986.75

    3 Coarse Sand for Mortor 1.00 Cum Godavari 72.00 701.75 505.00 0.00 0.00 0.00 1206.75

    3 Aggregates 10mm nominal size 1.00 Cum I.Pangidi 75.00 728.07 656.00 70.00 164.00 0.00 1618.07

    4 Aggregates 20mm nominal size 1.00 Cum I.Pangidi 75.00 728.07 984.00 70.00 246.00 0.00 2028.07

    5 Aggregates 40mm nominal size 1.00 Cum I.Pangidi 75.00 728.07 588.00 70.00 147.00 0.00 1533.07

    6 Gravel 1.00 Cum Janampeta 15.00 175.44 98.00 0.00 0.00 0.00 273.44

    7 Bricks 1000 Nos. Local 6.00 129.39 3707.00 0.00 0.00 401.00 4237.39

    8 Steel 1.00 MT 48000.00 0.00 0.00 0.00 48000.00

    9 Cement 1.00 MT 6000.00 0.00 0.00 0.00 6000.00

    1.Certified that the above leads are correct to the best of my knowledge

    2.The above work spot lies within 12 Km from Muncipal Corporation Boundary

    Deputy Executive Engineer, Assistant Executive Engineer,PRI Sub-Division, Eluru PRI, Eluru

    LEAD STATEMENT

    Name of the Work : Repairs & Renovation of Old Guesthouse in Zilla Parishad Compound at Eluru

    Estimate Amount Rs. 5.00 Lakhs