z:governmentst joesph readiness center 2019construction ... final... · alt alternate alum aluminum...

21
PROJECT NO: SITE NO: ASSET NO: SHEET NUMBER E L L I S O N - A U X I E R A R C H I T E C T S 924 FRANCIS ST. ST. JOSEPH, MO 64501 P: 816-233-8003 F: 816-233-7793 www.ellison-auxier.com RENOVATE INTERIOR SAINT JOSEPH READINESS CENTER T1905 - 01 6255 8136264001 G - 001 DEC. 9 2019 SAINT JOSEPH, MISSOURI OWNER: PROJECT MANAGEMENT: STATE OF MISSOURI MICHAEL L. PARSON, GOVERNOR DEPARTMENT OF PUBLIC SAFETY MISSOURI NATIONAL GUARD OFFICE OF ADJUTANT GENERAL OFFICE OF ADMINISTRATION DIVISION OF FACILITIES MANAGEMENT, DESIGN AND CONSTRUCTION DESIGNERS: ARCHITECTS: ELLISON - AUXIER ARCHITECTS, INC. 924 FRANCIS ST. JOSEPH, MO 64501 ENGINEER: HENDERSON ENGINEERS, INC. 1617 WALNUT STREET KANSAS CITY, MO 64108 1 of 21 SHEETS CODE INFORMATION: INTERNATIONAL BUILDING CODE (IBC) 2018 UNIFORM PLUMBING CODE (UPC) 2012 NATIONAL ELECTRIC CODE (NEC) 2011 INTERNATIONAL CODE COUNCIL (ICC)/AMERICAN NATIONAL STANDARDS INSTITUTE (ANSI) A117.1 2003 CONSTRUCTION TYPE: 2B USE GROUP: B (BUSINESS) & A - 2 (ASSEMBLY) LOCATION MAP:

Upload: others

Post on 10-Jul-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Z:GovernmentSt Joesph Readiness Center 2019Construction ... Final... · alt alternate alum aluminum anch anchor bolt anno anodized appd approved approx approximate arch architectural

PROJECT NO:

SITE NO:ASSET NO:

SHEET NUMBER

E L L I S O N - A U X I E RA R C H I T E C T S

924 FRANCIS ST.ST. JOSEPH, MO 64501

P: 816-233-8003 F: 816-233-7793www.ellison-auxier.com

RENOVATE INTERIOR SAINT JOSEPH READINESS CENTER

T1905-01

62558136264001

G-001

DEC. 9 2019

SAINT JOSEPH, MISSOURI

OWNER:

PROJECT MANAGEMENT:

STATE OF MISSOURIMICHAEL L. PARSON,GOVERNOR

DEPARTMENT OF PUBLIC SAFETY MISSOURI NATIONAL GUARDOFFICE OF ADJUTANT GENERAL

OFFICE OF ADMINISTRATIONDIVISION OF FACILITIES MANAGEMENT,DESIGN AND CONSTRUCTION

DESIGNERS:

ARCHITECTS: ELLISON-AUXIER ARCHITECTS, INC. 924 FRANCIS ST. JOSEPH, MO 64501

ENGINEER: HENDERSON ENGINEERS, INC. 1617 WALNUT STREET KANSAS CITY, MO 64108

1 of 21 SHEETS

CODE INFORMATION:

INTERNATIONAL BUILDING CODE (IBC) 2018UNIFORM PLUMBING CODE (UPC) 2012NATIONAL ELECTRIC CODE (NEC) 2011INTERNATIONAL CODE COUNCIL (ICC)/AMERICAN NATIONAL STANDARDS INSTITUTE (ANSI) A117.1 2003

CONSTRUCTION TYPE: 2B

USE GROUP: B (BUSINESS) & A-2 (ASSEMBLY)

LOCATION MAP:

Page 2: Z:GovernmentSt Joesph Readiness Center 2019Construction ... Final... · alt alternate alum aluminum anch anchor bolt anno anodized appd approved approx approximate arch architectural

FIN

ISH

ED W

ALL

MAX.

6" 3' - 0"

33"-3

6"

3' - 6" MIN.

MAX.

1' - 0"

1' -

10" M

IN.

1 1/

2" M

IN.

33"-3

6"

39"-

41"

1' -

6"

39"- 41"

HC STAINLESS STEEL GRAB BAR 1 1/2" DIA.

NOTE:WHEN VERTICAL BAR BRIDGES BETWEEN DIFFERING WALL MATERIALS, PROVIDE TRIM BEHIND BAR MOUNTING SO THAT MOUNTING SURFACE IS WITHIN THE SAME PLANE AS THE FARTHEST PROTRUDING FINISH MATERIAL

16" - 18"

17" -

19"

WATER CLOSET (WALL MOUNTED)

2' -

10" (

MAX

.)6"

27" M

IN.

LAVATORY w/ MIRROR

TYPICAL MOUNTING HEIGHTS

4' -

0" M

AX.

FIRE EXT. CABINET ROOM SIGNAGE

4"

48" (

MIN

.) TO

BR

AILL

E

FLOOR LINE

60" (

MAX

.) TO

LET

TER

S

CEILING LINE

4' -

7"1'

- 0"

3' -

6"1'

- 6"

TOILET PARTITION URINAL SCREEN

4' -

6" (M

AX.)

PAPER TOWEL DISP.

3' -

8"

SOAP DISP.2'

- 10

" (M

AX.)

BABY CHANGING STATION

(BO

T. O

F SU

RF.

)

27" M

IN.

4' -

0" (M

AX.)

OPERABLEPORTION

WORK SURFACE

CONCRETE

CONCRETE BLOCK

BRICK MASONRY

RIGID INSULATION

BATT OR BLOWN INSUL.

DIMENSIONAL LUMBER

EARTH/BACKFILL

FINISHED WOOD

GYPSUM BOARD

PLYWOOD

INSULATION BOARD

----

----

SYMBOL DESCRIPTION

DETAIL / ENLARGED PLAN REFERENCE (PLAN VIEW)

DETAIL REFERENCE (SECTION VIEW)

ROOM100 ROOM TAG

BUILDING SECTION MARKER

WALL SECTION MARKER

EXTERIOR / INTERIOR ELEVATION MARKER

G3.1.1 PARTITION TYPE TAG

100 DOOR NUMBER TAG

1 WINDOW NUMBER TAG

ABBREVIATIONS:AB ANCHOR BOLT

AC AIR CONDITIONING

ACC ACCESSIBLE

ACOUST ACOUSTICAL

ACT ACOUSTICAL CEILING TILE

AD AREA DRAIN

ADD ADDITIONAL

ADJ ADJUSTABLE

AFF ABOVE FINISHED FLOOR

AGGR AGGREGATE

ALT ALTERNATE

ALUM ALUMINUM

ANCH ANCHOR BOLT

ANNO ANODIZED

APPD APPROVED

APPROX APPROXIMATE

ARCH ARCHITECTURAL

AUTO AUTOMATIC

AV AUDIO VISUAL

BD BOARD

BLDG BUILDING

BLKG BLOCKING

BM BEAM

BO BOTTOM OF

BRK BRICK

BSMT BASEMENT

BT BOLT

CAB CABINET

CAT CATEGORY

CB CATCH BASIN

CEM CEMENT

CER CERAMIC

CC CENTER TO CENTER

CHAN CHANNEL

CIP CAST-IN-PLACE

CJ CONTROL JOINT

CG CORNER GUARD

CMU CONCRETE MASONRY UNIT

CONC CONCRETE

CL CENTER LINE

CLG CEILING

CLR CLEAR

CNTR COUNTER

CO CLEANOUT

COL COLUMN

CONT CONTINUOUS

CONTR CONTRACTOR

COORD COORDINATE

CORR CORRIDOR

CT CERAMIC TILE

DBL DOUBLE

DEG DEGREE

DEMO DEMOLITION

DEPT DEPARTMENT

DTL DETAIL

DF DRINKING FOUNTAIN

DIM DIMENSION

DS DOWNSPOUT

DIA DIAMETER

DIFF DIFFUSER

DISP DISPENSER

DN DOWN

DR DOOR

DWLS DOWEL

DWG DRAWING

E EAST

EXIST EXISTING

EJ EXPANSION JOINT

ELEV ELEVATION

EQ EQUAL

EA EACH

EQUIP EQUIPMENT

EXT EXTERIOR

FD FLOOR DRAIN

FEC FIRE EXTINGUISHER CABINET

FIN FINISH

FLR FLOOR

FB FACE BRICK

FDN FOUNDATION

FIXT FIXTURE

FLASH FLASH

FOW FACE OF WALL

FS FLOOR SINK

FT FEET

FTG FOOTING

FURN FURNITURE

GA GAUGE

GALV GALVANIZED

GYP GYPSUM

GB GRAB BAR

GR GRADE

GRD GROUND

GC GENERAL CONTRACTOR

HT HEIGHT

HB HOSE BIBB

HC HOLLOW CORE

HCP HANDICAPPED

HDW HARDWARE

HDWD HARDWARE

HM HOLLOW METAL

HNDRL HANDRAIL

HORIZ HORIZONTAL

HR HOUR

HVAC HEATING, VENTILATING & AIR

ID INSIDE DIAMETER

IN INCH

INCL INCLUDED / INCLUDING

INFO INFORMATION

INSUL INSULATION

INT INTERIOR

FE FIRE EXTINGUISHER

FV FIELD VERIFY

CONDITIONING

JAN JANITOR

JC JANITOR CLOSET

JST JOIST

JT JOINT

LAV LAVATORY

LDG LANDING

LB POUND

LF LINEAR FOOT

LT LIGHT

M METER / METRIC

MACH MACHINE

MAINT MAINTENANCE

MAX MAXIMUM

MECH MECHANICAL

MEMB MEMBRANE

MIN MINIMUM

MISC MISCELLANEOUS

MO MASONRY OPENING

MTD MOUNTED

MTG MOUNTING

MULL MULLION

NA NOT APPLICABLE

NIC NOT IN CONTRACT

NTS NOT TO SCALE

OC ON CENTER

OD OUTSIDE DIAMETER

OH OVERHEAD

OFD OVERFLOW DRAIN

OPG OPENING

OPP OPPOSITE

PAV PAVING

PTN PARTITION

PATD PAPER TOWEL DISPENSER

PBD PARTICLEBOARD

PC PRECAST CONCRETE

PERF PERFORATED

PERIM PERIMETER

PERP PERPENDICULAR

PL PLATE

PLAM PLASTIC LAMINATE

PLYWD PLYWOOD

PLBG PLUMBING

PREFAB PREFABRICATED

PROJ PROJECT

PT POINT

PTD PAINTED

QT QUARRY TILE

QTY QUANTITY

MTL METAL

N NORTH

PANEL

LAM LAMINATE / LAMINATION

MATL MATERIAL

PNL

PR PAIR

REQ'D REQUIRED

REV REVERSE / REVISE

RAD RADIUS

RCP REFLECTED CEILING PLAN

REL RELOCATE

REM REMOVABLE

RTD RATED

RD ROOF DRAIN

S SOUTH

SC SEALED CONCRETE

SHT SHEET

SIM SIMILAR

SPEC SPECIFICATION

STRUCT STRUCTURAL

SUSP SUSPENDED

SHR SHOWER

SQ SQUARE FEET / FOOT

STD STANDARD

STOR STORAGE

SYS SYSTEM

TO TOP OF:

TEMP TEMPERED

THK THICKNESS

TPD TOILET PAPER DISPENSER

UL UNDERWRITERS LABORATORIES

UNO UNLESS NOTED OTHERWISE

UR URINAL

UNFIN UNFINISHED

VCT VINYL COMPOSITION TILE

VERT VERTICAL

VEST VESTIBULE

W/ WITH

W WEST

WC WATER CLOSET

WD WOOD

W/O WITHOUT

WP WATERPROOFING

WSCT WAINSCOT

WT WEIGHT

SECT SECTION

TYP TYPICAL

RO ROUGH OPENING

STL STEEL

REINF REINFORCED / REINFORCING

ETR EXISTING TO REMAIN

STATE OF MISSOURIMICHAEL L. PARSONGOVERNOR

PROFESSIONAL SEAL

OFFICE OF ADMINISTRATIONDIVISION OF FACILITIESMANAGEMENT,DESIGN AND CONSTRUCTION

REVISION:

SITE #:ASSET#:

DATE:REVISION:

DATE:REVISION:

DATE:ISSUE DATE:

CAD DWG FILE:DRAWN BY:CHECKED BY:DESIGNED BY:

SHEET TITLE:

SHEET NUMBER:

PROJECT #:

MISSOURI NATIONAL GUARD

E L L I S O N - A U X I E RA R C H I T E C T S

924 FRANCIS ST.ST. JOSEPH, MO 64501

P: 816-233-8003 F: 816-233-7793www.ellison-auxier.com

T1905-0162558136264001

RENOVATE INTERIORSAINT JOSEPHREADINESS CENTER

301 N. WOODBINESAINT JOSEPH, MISSOURI64501

SHEET INDEX, SYMBOLS& LEGENDS, MOUNTINGHEIGHTS &ABBREVIATIONS

G-002

DEC. 9 2019

JKEAML

JKE

T1905-01-6255-G-002

LIST OF DRAWINGS

SHEETNUMBER SHEET NAME

01 GENERALG-001 COVER SHEETG-002 SHEET INDEX, SYMBOLS & LEGENDS, MOUNTING HEIGHTS & ABBREVIATIONS02 ARCHITECTURALA-101 FIRST FLOOR PLANA-201 INTERIOR ELEVATIONS AND DETAILSA-601 SCHEDULESA-701 NEW REFLECTED CEILING PLAND-101 FIRST FLOOR DEMOLITION PLAN03 PLUMBINGP-001 PLUMBING SYMBOLS, SCHEDULES, LEGENDS & DETAILSP-111 PLUMBING FLOOR PLANP-401 MECHANICAL ENLARGED PLANSP-501 PLUMBING SCHEDULES & DETAILS04 MECHANICALM-001 MECHANICAL SYMBOLS & LEGENDSM-111 MECHANICAL FLOOR PLANM-501 MECHANICAL DETAILSM-601 MECHANICAL SCHEDULES05 ELECTRICALE-001 ELECTRICAL SYMBOLS, LEGENDS & NOTESE-110 ELECTRICAL POWER DEMO PLANE-111 ELECTRICAL POWER PLANE-601 ELECTRICAL SCHEDULESE-602 ELECTRICAL SCHEDULES AND DETAILSE-701 ELECTRICAL LIGHTING PLANGrand total: 21

SYMBOLS LEGEND:

MATERIALS LEGEND:

2 of 21 SHEETS

Page 3: Z:GovernmentSt Joesph Readiness Center 2019Construction ... Final... · alt alternate alum aluminum anch anchor bolt anno anodized appd approved approx approximate arch architectural

EXISTING WALL

NEW WALL

EXISTING WINDOW

1. SEE FINISH SCHEDULE FOR ALL ROOM FINISHES.2. ALL WINDOWS GET NEW ALUM. BLINDS.3. INSTALL GYP. BD. AT BASE AS NECESSARY FOR NEW

BASE4. CLEAN ALL DIFFUSERS AND REPAINT IF HAS RUST5. PATCH ALL WALLS BEFORE PAINTING6. GROUT & TUCK POINT ALL INTERNAL CRACKS IN CMU

BEFORE PAINTING7. COORDINATE w/ OWNER FOR EQUIPMENT RELOCATION

WHERE REQUIRED8. PATCH/REPAIR ALL SURFACES AFTER DEMO TO PREP

FOR NEW FINISHES

GENERAL NOTES:

G.X.X PARTITION TYPE TAG, RE: 4/A-601

EXISTING DOORSEE DOOR SCHEDULE

NEW DOORSEE DOOR SCHEDULE

DOOR NUMBER TAG, RE: DOOR SCHEDULE A-601

XXX

PLAN NOTEX

G2.0.1(1)

G2.0.1(1)

G2.0.1(1)

G2.0.1(1)

G2.0.1(1)

G2.0.1(1)G2.0.1(1)

G2.0.1(1)

G3.0.1

G3.0.1

G3.0.1

105B

132A

132B

134C134A

102A 102B

11

7' -

0"VESTIBULE100

RECRUITER101

LOBBY102

OFFICE103OFFICE

104OFFICE

105

CORRIDOR106

OFFICE107

OFFICE108

OFFICE109

OFFICE110

OFFICE111

OFFICE112

LIBRARY113

LEARNING114

CLASSROOM115

CLASSROOM116

STORAGE117

CORRIDOR118

MEN LOCKER119

MAINTENANCE120

TOILET121

MEN122 WOMEN

123

SHOWER124

WOMEN LOCKER125

ASSEMBLY HALL126

MECH127

FOOD STORAGE128

FOOD PREP129

SCULLERY130

SUPPLY131

STORAGE132

CORRIDOR133

STORAGE134

CORRIDOR135

LOCKER136 WEIGHT ROOM

137

100A 100B

110

109

108

105A

106A

124

125A

127

129A

130C

130A

101

119A

111

102C 102D

126C

126A

125B

140

141

102E

129B

130B

136

107A120

122B 123

119B

118

116B

106B

128

103

104

113

114

115

116A

106C

135

133A

117

131

122A

107B

112

126B

137

134B

3

3

4

4

2

5

A-2011

4A-201

5' - 0"

10' -

0"

5' - 0"

10' -

0"

2

9

LINTEL:

W8 X 24 w/ 5/16" PLATE. BEAM TO BEAR 6" ONTO EXISTING MASONRY, EACH END.

PROVIDE (2) 5/8" DIAMETER X 10 LONG ANCHORS IN BEAM BOTTOM FLANGEINTO NEWLY GROUTED EXISTING CMU AND VOID

MECH. EQUIP.139

SUPPLY138

G3.0.1

4A-201

Sim

VAULT140

VAULT141

121

5A-201

STATE OF MISSOURIMICHAEL L. PARSONGOVERNOR

PROFESSIONAL SEAL

OFFICE OF ADMINISTRATIONDIVISION OF FACILITIESMANAGEMENT,DESIGN AND CONSTRUCTION

REVISION:

SITE #:ASSET#:

DATE:REVISION:

DATE:REVISION:

DATE:ISSUE DATE:

CAD DWG FILE:DRAWN BY:CHECKED BY:DESIGNED BY:

SHEET TITLE:

SHEET NUMBER:

PROJECT #:

MISSOURI NATIONAL GUARD

E L L I S O N - A U X I E RA R C H I T E C T S

924 FRANCIS ST.ST. JOSEPH, MO 64501

P: 816-233-8003 F: 816-233-7793www.ellison-auxier.com

T1905-0162558136264001

RENOVATE INTERIORSAINT JOSEPHREADINESS CENTER

301 N. WOODBINESAINT JOSEPH, MISSOURI64501

FIRST FLOOR PLAN

A-101

DEC. 9 2019

JKEAML

JKE

T1905-01-6255-A-101

3 of 21 SHEETSTRUE PLAN

PLAN NOTES

NUMBER NOTE

1 NEW 1/4" SOLID SURFACE WINDOW SILL, RE: DTL. 5/A-2012 NEW PORCELAIN TILE ON FLOOR AND BASE TO MATCH EXISTING @ WALL DEMO3 NEW CONC. STOOP4 NEW HDPE PARTITIONS, INTALL TO MATCH EXIST. LAYOUT5 INSTALL EPOXY ON FLOOR AND WALLS6 CLEAN ALL DIFFUSERS AND REPAINT IF ANY SIGNS OF RUST.7 NEW CEILING TILE AND GRID8 NEW METAL SOFFIT PANEL ON EXIST. FRAMING9 INSTALL CEMENT BD. ON EXISTING FRAMING

#

LEGEND

SCALE: 1/8" = 1'-0"1 LEVEL 1

Page 4: Z:GovernmentSt Joesph Readiness Center 2019Construction ... Final... · alt alternate alum aluminum anch anchor bolt anno anodized appd approved approx approximate arch architectural

EXISTING CONSTRUCTION

EXISTING SOFFIT FRAMING (1 1/2" CHANNELS @ 48" o.c. WITH 3/4" HAT CHANNELS @ 12" o.c.)

EXISTING MTL TRIM

NEW MTL SOFFIT PANEL(PER SPEC) ON EXISTING FRAMING

PRE-FINISH TRIM WITH SEALANT

EXISTING STOREFRONT SYSTEM

LEVEL 1100' - 0"

5' - 0"

3' -

0"

8"

4" CONC. w/ 6X6 10/10 WWF

1/8" PER FOOT SLOPE AWAY FROM BUILDING

#4 REBAR

#4 X 2'-0" LG. DWLS @ 16" o.c.

#4 REBAR T&B

4" ROCK BASE

EXISTING FOUNDATION

BACKER ROD AND SEALANT

DRILL & DOWL TO EXISTING

3' - 0" 3' - 0" 3' - 0" 3' - 0"

8' -

0"NEW SHOWER CONTROLSRE: PLUMBING

NEW PRECAST TERRAZZO SHOWER RECEPTOR36" X 36" X 4 1/2" WITH INTEGRAL DRAIN BODY AND FLANGES FOR WALL BOARD. RECEPTORS TO BE EQUAL TO: FIAT PRODUCTS, FLORESTONE OR ACORN ENGINEERING

EPOXY ALL WALLS & FLOORSRE: SPEC

NEW WALL HUNG LAVS

NEW MIRRORSRE: SPEC

MAX

.

2' -

10"

6"

6" EPOXY BASE

1/2"

1/2" SOLID SURFACE WINDOW SILL

5/8" GYP. BD.

1 5/8" MTL. STUD @ 16" o.c.

EXISTING WINDOW

EXISTING WALL

STATE OF MISSOURIMICHAEL L. PARSONGOVERNOR

PROFESSIONAL SEAL

OFFICE OF ADMINISTRATIONDIVISION OF FACILITIESMANAGEMENT,DESIGN AND CONSTRUCTION

REVISION:

SITE #:ASSET#:

DATE:REVISION:

DATE:REVISION:

DATE:ISSUE DATE:

CAD DWG FILE:DRAWN BY:CHECKED BY:DESIGNED BY:

SHEET TITLE:

SHEET NUMBER:

PROJECT #:

MISSOURI NATIONAL GUARD

E L L I S O N - A U X I E RA R C H I T E C T S

924 FRANCIS ST.ST. JOSEPH, MO 64501

P: 816-233-8003 F: 816-233-7793www.ellison-auxier.com

T1905-0162558136264001

RENOVATE INTERIORSAINT JOSEPHREADINESS CENTER

301 N. WOODBINESAINT JOSEPH, MISSOURI64501

INTERIOR ELEVATIONSAND DETAILS

A-201

DEC. 9 2019

JKEAML

JKE

T1905-01-6255-A-201

SCALE: 1" = 1'-0"3 SOFFIT DETAIL

SCALE: 1" = 1'-0"4 STOOP DETAIL

SCALE: 1/4" = 1'-0"1 SHOWER 124 NORTHSCALE: 1/4" = 1'-0"2 SHOWER 124 SOUTH

SCALE: 1 1/2" = 1'-0"5 WINDOW SILL DETAIL

4 of 21 SHEETS

Page 5: Z:GovernmentSt Joesph Readiness Center 2019Construction ... Final... · alt alternate alum aluminum anch anchor bolt anno anodized appd approved approx approximate arch architectural

F1

HEI

GH

T PE

R S

CH

ED.

2"

2"PER SCHED.

WIDTH

2"

F2

HEI

GH

T PE

R S

CH

ED.

4"

2"PER SCHED.

WIDTH

2"

D1FLUSH

D2FULL LITE

TEMPERED

D3VISION LITE

6"6"

6"3'

- 0"

D4LOUVER

1' - 0" 1' - 0" 1' - 0"

10"

8"

4"6"

4 1/2"4 1/2"

1/2"

VAR

IES

1/2"

1 15

/16"

VAR

IES

1 9/

16"

VAR

IES

H.M DOOR FRAMESEALANT EA. SIDE. TYP

MTL. STUD ANCHOR TYP2"

DOOR PANEL SEE: SCHEDULE

1/2"

VAR

IES

1/2"

H.M DOOR FRAME

SEALANT EA. SIDE. TYP

DOOR PANEL SEE: SCHEDULE

GROUT FULL

1 15

/16"

VAR

IES

1 9/

16"

VAR

IES

MTL. STUD PARITITION PER PLAN

CMU PARITITION PER PLAN

2"

DOOR PER SCHEDULE

DOOR PER SCHEDULE 8'

- 0"

3' -

2"3'

- 6"

EQ.EQ.EQ.EQ.

F3

5/8" GYP. BD. EA. SIDE(MR @ WET LOCATIONS)

3-5/8" MTL. STUDS (20 GA.) @ 16"o.c.

CEILING LINE WHERE APPLICABLE

SEALANT, TYP. EA.SIDE

BOTTOM OF ROOF/CLG.DECK ABOVE

SEALANT, TYP.

SLIP TRACK, TYP.

G3.0 FIRE RATING: 0 HR.G3.0.1 3-5/8" METAL STUDS

UL #: N/A

5/8" GYP. BD. EA. SIDE(MR @ WET LOCATIONS)

1-5/8" MTL. STUDS (20 GA.) @ 16"o.c.

CEILING LINE WHERE APPLICABLE

SEALANT, TYP. EA.SIDE

BOTTOM OF ROOF/CLG.DECK ABOVE

SEALANT, TYP.

SLIP TRACK, TYP.

G2.0 FIRE RATING: 0 HR.G2.0.1(1) 1-5/8" METAL STUDS GYP. BD. ONE SIDE

UL #: N/A

STATE OF MISSOURIMICHAEL L. PARSONGOVERNOR

PROFESSIONAL SEAL

OFFICE OF ADMINISTRATIONDIVISION OF FACILITIESMANAGEMENT,DESIGN AND CONSTRUCTION

REVISION:

SITE #:ASSET#:

DATE:REVISION:

DATE:REVISION:

DATE:ISSUE DATE:

CAD DWG FILE:DRAWN BY:CHECKED BY:DESIGNED BY:

SHEET TITLE:

SHEET NUMBER:

PROJECT #:

MISSOURI NATIONAL GUARD

E L L I S O N - A U X I E RA R C H I T E C T S

924 FRANCIS ST.ST. JOSEPH, MO 64501

P: 816-233-8003 F: 816-233-7793www.ellison-auxier.com

T1905-0162558136264001

RENOVATE INTERIORSAINT JOSEPHREADINESS CENTER

301 N. WOODBINESAINT JOSEPH, MISSOURI64501

SCHEDULES

A-601

DEC. 9 2019

JKEAML

JKE

T1905-01-6255-A-601

DOOR SCHEDULE

MARK WIDTH HEIGHT THICKNESSDOORTYPE

DOORMATERIAL

DOORFINISH

FRAMETYPE

FRAMEMATERIAL

FRAMEFINISH

DOORHARDWARE

FIRERATING COMMENTS

100A 6' - 0" 7' - 0" 1 3/4" D2 ALUM. ALUM. ETR. ETR. ALUM. NOTE #1 --100B 6' - 0" 7' - 0" 1 3/4" D2 ALUM. ALUM. ETR. ETR. ALUM. NOTE #1 --101 3' - 0" 7' - 0" 1 3/4" ETR. ETR. PAINT ETR. ETR. PAINT SET 1 --102A 6' - 0" 7' - 0" 1 3/4" D2 ALUM. ALUM. F3 ALUM. ALUM. NOTE #1 --102B 6' - 0" 7' - 0" 1 3/4" D2 ALUM. ALUM. F3 ALUM. ALUM. NOTE #1 --102C 6' - 0" 7' - 0" 1 3/4" ETR. ETR. PAINT ETR. ETR. PAINT SET 2 90 MIN.102D 6' - 0" 7' - 0" 1 3/4" ETR. ETR. PAINT ETR. ETR. PAINT SET 2 90 MIN.102E 3' - 4" 7' - 0" 1 3/4" -- -- -- ETR. ETR. PAINT -- -- CASED OPENING103 3' - 0" 7' - 0" 1 3/4" D1 HM PAINT ETR. ETR. PAINT SET 1 --104 3' - 0" 7' - 0" 1 3/4" D3 HM PAINT ETR. ETR. PAINT SET 1 45 MIN.105A 3' - 0" 7' - 0" 1 3/4" ETR. ETR. PAINT ETR. ETR. PAINT SET 1 45 MIN.105B 3' - 0" 7' - 0" 1 3/4" D3 HM PAINT F1 HM PAINT SET 1 --106A 3' - 0" 7' - 0" 1 3/4" ETR. ETR. PAINT ETR. ETR. PAINT SET 2 90 MIN.106B 3' - 0" 7' - 0" 1 3/4" D3 HM PAINT F2 HM PAINT SET 3 90 MIN.106C 3' - 0" 7' - 0" 1 3/4" D1 HM PAINT ETR. ETR. PAINT SET 4 45 MIN.107A 3' - 0" 7' - 0" 1 3/4" D3 HM PAINT ETR. ETR. PAINT SET 1 45 MIN.107B 3' - 0" 7' - 0" 1 3/4" D3 HM PAINT ETR. ETR. PAINT SET 1 45 MIN.108 3' - 0" 7' - 0" 1 3/4" ETR. ETR. PAINT ETR. ETR. PAINT SET 1 --109 3' - 0" 7' - 0" 1 3/4" ETR. ETR. PAINT ETR. ETR. PAINT SET 1 --110 3' - 0" 7' - 0" 1 3/4" ETR. ETR. PAINT ETR. ETR. PAINT SET 1 --111 3' - 0" 7' - 0" 1 3/4" ETR. ETR. PAINT ETR. ETR. PAINT SET 1 --112 3' - 0" 7' - 0" 1 3/4" D3 HM PAINT ETR. ETR. PAINT SET 1 45 MIN.113 3' - 0" 7' - 0" 1 3/4" D3 HM PAINT ETR. ETR. PAINT SET 2 45 MIN.114 3' - 0" 7' - 0" 1 3/4" D3 HM PAINT ETR. ETR. PAINT SET 2 45 MIN.115 3' - 0" 7' - 0" 1 3/4" D3 HM PAINT ETR. ETR. PAINT SET 2 45 MIN.116A 3' - 0" 7' - 0" 1 3/4" D3 HM PAINT ETR. ETR. PAINT SET 2 45 MIN.116B 3' - 0" 7' - 0" 1 3/4" D3 HM PAINT ETR. ETR. PAINT SET 2 45 MIN.117 6' - 0" 7' - 0" 1 3/4" D1 HM PAINT ETR. ETR. PAINT SET 4 --118 3' - 0" 7' - 0" 1 3/4" D3 HM PAINT ETR. ETR. PAINT SET 2 90 MIN.119A 3' - 0" 7' - 0" 1 3/4" ETR. ETR. PAINT ETR. ETR. PAINT SET 2 --119B 3' - 0" 7' - 0" 1 3/4" D1 HM PAINT ETR. ETR. PAINT SET 2120 3' - 0" 7' - 0" 1 3/4" D1 HM PAINT F2 HM PAINT SET 4 45 MIN.121 3' - 0" 7' - 0" 1 3/4" D1 HM PAINT F2 HM PAINT SET 5 --122A 3' - 0" 7' - 0" 1 3/4" D1 HM PAINT F2 HM PAINT SET 2 --122B 3' - 0" 7' - 0" 1 3/4" D4 HM PAINT F2 HM PAINT SET 6 45 MIN.123 3' - 0" 7' - 0" 1 3/4" D4 HM PAINT F2 HM PAINT SET 6 45 MIN.124 3' - 0" 7' - 0" 1 3/4" ETR. ETR. PAINT ETR. ETR. PAINT SET 5 --125A 3' - 0" 7' - 0" 1 3/4" ETR. ETR. PAINT ETR. ETR. PAINT SET 2 --125B 3' - 0" 7' - 0" 1 3/4" ETR. ETR. PAINT ETR. ETR. PAINT SET 6 --126A 16' - 0" 14' - 0" 1 1/2" ETR. ETR. -- ETR. ETR. -- ETR. -- REPLACE WEATHER STRIPPING.126B 3' - 0" 7' - 0" 1 3/4" D3 HM PAINT F2 HM PAINT SET 3 90 MIN.126C 3' - 0" 7' - 0" 1 3/4" -- -- -- ETR. ETR. PAINT -- -- PATCH HINGE AND BOLT HOLES127 3' - 0" 7' - 0" 1 3/4" ETR. ETR. PAINT ETR. ETR. PAINT SET 4 --128 3' - 0" 7' - 0" 1 3/4" D4 HM PAINT ETR. ETR. PAINT SET 7 --129A 3' - 0" 7' - 0" 1 3/4" ETR. ETR. PAINT ETR. ETR. PAINT SET 2 90 MIN. TALL KICK PLATE129B 11' - 0" 4' - 6" 1 1/2" ETR. ETR. -- ETR. ETR. -- ETR. --130A 3' - 0" 7' - 0" 1 3/4" ETR. ETR. PAINT ETR. ETR. PAINT SET 2 90 MIN.130B 4' - 0" 4' - 6" 1 1/2" ETR. ETR. -- ETR. ETR. -- ETR. --130C 3' - 0" 7' - 0" 1 3/4" ETR. ETR. PAINT ETR. ETR. PAINT SET 3 --131 6' - 0" 7' - 0" 1 3/4" D1 HM PAINT ETR. ETR. PAINT SET 4 90 MIN. REUSE ELEC. ACCESS PER SPEC.132A 3' - 6" 7' - 0" 1 3/4" D1 HM PAINT F1 HM PAINT SET 4 --132B 6' - 0" 7' - 0" 1 3/4" D1 HM PAINT F2 HM PAINT SET 3 -- 5x3-1/2 x 5/16 ANGLE BRG. 8" EA. SIDE133A 6' - 0" 7' - 0" 1 3/4" D1 HM PAINT ETR. ETR. PAINT SET 4 90 MIN. REUSE ELEC. ACCESS PER SPEC.134A 3' - 6" 7' - 0" 1 3/4" D1 HM PAINT F1 HM PAINT SET 4 --134B 3' - 0" 7' - 0" 1 3/4" D1 HM PAINT ETR. ETR. PAINT --134C 6' - 0" 7' - 0" 1 3/4" D1 HM PAINT F2 HM PAINT SET 3 -- 5x3-1/2 x 5/16 ANGLE BRG. 8" EA. SIDE135 6' - 0" 7' - 0" 1 3/4" D1 HM PAINT ETR. ETR. PAINT SET 4 90 MIN. REPLACE WEATHER STRIPPING.136 3' - 0" 7' - 0" 1 3/4" D1 HM PAINT ETR. ETR. PAINT SET 2 90 MIN.137 3' - 0" 7' - 0" 1 3/4" D3 HM PAINT F1 HM PAINT SET 7 --140 4' - 0" 7' - 0" 1 3/4" ETR. ETR. PAINT ETR. ETR. PAINT ETR. --141 4' - 0" 7' - 0" 1 3/4" ETR. ETR. PAINT ETR. ETR. PAINT ETR. --

SCALE: 1/4" = 1'-0"1 DOOR FRAME TYPE ELEVATIONSSCALE: 1/4" = 1'-0"2 DOOR TYPE ELEVATIONS

SCALE: 3" = 1'-0"3 JAMB DETAILS

5 of 21 SHEETSSCALE: 1 1/2" = 1'-0"4 PARTITION TYPES

FINISH SCHEDULE

NUMBER NAMEFLOORFINISH BASE

NORTHWALL

EASTWALL

SOUTHWALL

WESTWALL

CEILINGFINISH COMMENTS

100 VESTIBULE VCT RUBBER PAINT PAINT PAINT PAINT 2x2 ACT PAINT ABOVE BRICK101 RECRUITER VCT RUBBER PAINT PAINT PAINT PAINT 2x2 ACT PAINT ABOVE BRICK102 LOBBY VCT RUBBER PAINT PAINT PAINT PAINT 2x2 ACT103 OFFICE VCT RUBBER PAINT PAINT PAINT PAINT 2x2 ACT104 OFFICE VCT RUBBER PAINT PAINT PAINT PAINT 2x2 ACT105 OFFICE VCT RUBBER PAINT PAINT PAINT PAINT 2x2 ACT106 CORRIDOR VCT RUBBER PAINT PAINT PAINT PAINT 2x2 ACT107 OFFICE VCT RUBBER PAINT PAINT PAINT PAINT 2x2 ACT108 OFFICE VCT RUBBER PAINT PAINT PAINT PAINT 2x2 ACT109 OFFICE VCT RUBBER PAINT PAINT PAINT PAINT 2x2 ACT110 OFFICE VCT RUBBER PAINT PAINT PAINT PAINT 2x2 ACT111 OFFICE VCT RUBBER PAINT PAINT PAINT PAINT 2x2 ACT112 OFFICE VCT RUBBER PAINT PAINT PAINT PAINT 2x2 ACT113 LIBRARY VCT RUBBER PAINT PAINT PAINT PAINT 2x2 ACT114 LEARNING VCT RUBBER PAINT PAINT PAINT PAINT 2x2 ACT115 CLASSROOM VCT RUBBER PAINT PAINT PAINT PAINT 2x2 ACT116 CLASSROOM VCT RUBBER PAINT PAINT PAINT PAINT 2x2 ACT117 STORAGE VCT RUBBER PAINT PAINT PAINT PAINT ETR.118 CORRIDOR VCT RUBBER PAINT PAINT PAINT PAINT 2x2 ACT119 MEN LOCKER ETR. RUBBER PAINT PAINT PAINT PAINT PAINT

STRUCTURE

120 MAINTENANCE ETR. RUBBER -- -- -- -- ETR.121 TOILET VCT RUBBER PAINT PAINT PAINT PAINT 2x2 ACT122 MEN ETR. ETR. PAINT PAINT PAINT PAINT PAINT

GYP. BD.PAINT ABOVE TILE

123 WOMEN ETR. ETR. PAINT PAINT PAINT PAINT PAINTGYP. BD.

PAINT ABOVE TILE

124 SHOWER EPOXY 6"EPOXY

EPOXY EPOXY/PAINT

PAINT EPOXY/PAINT

PAINTGYP. BD.

EPOXY FLOOR TO CEILING SHOWERSONLY

125 WOMEN LOCKER ETR. RUBBER PAINT PAINT PAINT PAINT PAINTGYP. BD.

126 ASSEMBLY HALL ETR. ETR. PAINT PAINT PAINT PAINT ETR.127 MECH ETR. ETR. -- -- -- -- ETR.128 FOOD STORAGE ETR. ETR. -- -- -- -- ETR.129 FOOD PREP ETR. ETR. -- -- -- -- ETR.130 SCULLERY ETR. ETR. -- -- -- -- ETR.131 SUPPLY ETR. ETR. -- -- -- -- ETR.132 STORAGE ETR. ETR. -- -- -- -- ETR.133 CORRIDOR VCT RUBBER PAINT PAINT PAINT PAINT 2x2 ACT134 STORAGE ETR. ETR. -- -- -- -- ETR.135 CORRIDOR VCT RUBBER PAINT PAINT PAINT PAINT 2x2 ACT136 LOCKER ETR. ETR. PAINT PAINT PAINT PAINT ETR.137 WEIGHT ROOM ETR. ETR. -- -- -- -- ETR.138 SUPPLY ETR. ETR. -- -- -- -- ETR.139 MECH. EQUIP. ETR. ETR. -- -- -- -- ETR.140 VAULT ETR. ETR. ETR. ETR. ETR. ETR. ETR.141 VAULT ETR. ETR. ETR. ETR. ETR. ETR. ETR.

HARDWARE NOTES:

1. BY ALUMINUM STOREFRONT CONTRACTOR. COORDINATE WITH ALL OTHER TRADES FOR A COMPLETE AND FULLY FUNCTIONING INSTALLATION.2. PROVIDE KICK PLATES AT ALL DOORS.

HARDWARE SETS:

SET 1: "OFFICE" PROVIDE LOCKSET, HINGES AND STOPSET 2: "CLASSROOM" PROVIDE LOCKSET, HINGES, STOP AND CLOSERSET 3: "EXIT" PROVIDE EXIT DEVICE, EXTERIOR TRIM, HINGES, STOP, CLOSER, THRESHOLD, WEATHER STRIP, REMOVABLE MULL AND BOLTS AT PAIRSSET 4: "STORE ROOM" PROVIDE LOCKSET, HINGES, STOPS, CLOSER AND FLUSHBOLTS AT PAIRSSET 5: "PRIVACY" PROVIDE LOCKSET, HINGES AND STOPSSET 6: "LATRINE" PROVIDE PUSH/PULL, HINGES, CLOSER AND STOPSSET 7: "PASSAGE" PROVIDE LOCKSET, HINGES AND STOPS

Page 6: Z:GovernmentSt Joesph Readiness Center 2019Construction ... Final... · alt alternate alum aluminum anch anchor bolt anno anodized appd approved approx approximate arch architectural

6 7

6 7

6 7

6 7

6 7

6 7

6 7

6 7

7

8

3A-201

6 7

6 7

VESTIBULE100

RECRUITER101

LOBBY102

OFFICE103OFFICE

104

OFFICE105

CORRIDOR106

OFFICE107

OFFICE108

OFFICE109

OFFICE110

OFFICE111

OFFICE112

LIBRARY113

LEARNING114

CLASSROOM115

CLASSROOM116

STORAGE117

CORRIDOR118

MEN LOCKER119

MAINTENANCE120

TOILET121

MEN122 WOMEN

123

SHOWER124

WOMEN LOCKER125

ASSEMBLY HALL126

MECH127

FOOD STORAGE128

FOOD PREP129

SCULLERY130

SUPPLY131

STORAGE132

CORRIDOR133

STORAGE134

CORRIDOR135

LOCKER136

WEIGHT ROOM137

MECH. EQUIP.139

VAULT140

VAULT141

SUPPLY138

7

A.F.F.9' - 4"

A.F.F.9' - 4"

A.F.F.8' - 0"

A.F.F.8' - 0"A.F.F.8' - 0"

A.F.F.8' - 0"

A.F.F.8' - 0"

A.F.F.8' - 0"

A.F.F.8' - 0"

A.F.F.8' - 0"

A.F.F.8' - 0"

A.F.F.8' - 0"

A.F.F.8' - 0"

A.F.F.8' - 0"

A.F.F.8' - 0"

A.F.F.8' - 0"

A.F.F.8' - 0"

A.F.F.8' - 0"

A.F.F.8' - 0"

A.F.F.8' - 0"

A.F.F.8' - 0"

A.F.F.8' - 0"

EXISTING WALL

NEW WALL

2x2 ACOUST CEILING TILE AND GRID

NEW LIGHT, RE: ELEC.

STATE OF MISSOURIMICHAEL L. PARSONGOVERNOR

PROFESSIONAL SEAL

OFFICE OF ADMINISTRATIONDIVISION OF FACILITIESMANAGEMENT,DESIGN AND CONSTRUCTION

REVISION:

SITE #:ASSET#:

DATE:REVISION:

DATE:REVISION:

DATE:ISSUE DATE:

CAD DWG FILE:DRAWN BY:CHECKED BY:DESIGNED BY:

SHEET TITLE:

SHEET NUMBER:

PROJECT #:

MISSOURI NATIONAL GUARD

E L L I S O N - A U X I E RA R C H I T E C T S

924 FRANCIS ST.ST. JOSEPH, MO 64501

P: 816-233-8003 F: 816-233-7793www.ellison-auxier.com

T1905-0162558136264001

RENOVATE INTERIORSAINT JOSEPHREADINESS CENTER

301 N. WOODBINESAINT JOSEPH, MISSOURI64501

NEW REFLECTEDCEILING PLAN

A-701

DEC. 9 2019

JKEAML

JKE

T1905-01-6255-A-701

SCALE: 1/8" = 1'-0"1 NEW REFLECTED CEILING PLAN6 of 21 SHEETS

PLAN NOTES

NUMBER NOTE

1 NEW 1/4" SOLID SURFACE WINDOW SILL, RE: DTL. 5/A-2012 NEW PORCELAIN TILE ON FLOOR AND BASE TO MATCH EXISTING @ WALL DEMO3 NEW CONC. STOOP4 NEW HDPE PARTITIONS, INTALL TO MATCH EXIST. LAYOUT5 INSTALL EPOXY ON FLOOR AND WALLS6 CLEAN ALL DIFFUSERS AND REPAINT IF ANY SIGNS OF RUST.7 NEW CEILING TILE AND GRID8 NEW METAL SOFFIT PANEL ON EXIST. FRAMING9 INSTALL CEMENT BD. ON EXISTING FRAMING

#

TRUE PLAN

REFLECTED CEILING PLAN LEGEND

Page 7: Z:GovernmentSt Joesph Readiness Center 2019Construction ... Final... · alt alternate alum aluminum anch anchor bolt anno anodized appd approved approx approximate arch architectural

1

10

7

2 3

2 3

2 3

2 3

2 3

2 3

2 3

2 3

2 3

2 3

2 3

2 3

2 3

2 32 3

2 3

2

4

5

4

5

8

9

9

6

2 3

11

11

11

11

11

11

11

11

11

11

11

11

11

11

11

11

3A-201

12

2 3 11 2 3 11

11VESTIBULE

100

RECRUITER101

LOBBY102

OFFICE103OFFICE

104OFFICE

105

CORRIDOR106

OFFICE107

OFFICE108

OFFICE109

OFFICE110

OFFICE111

OFFICE112

LIBRARY113

LEARNING114

CLASSROOM115

CLASSROOM116

STORAGE117

CORRIDOR118

MEN LOCKER119

MAINTENANCE120

TOILET121

MEN122

WOMEN123

SHOWER124

WOMEN LOCKER125

ASSEMBLY HALL126

MECH127

FOOD STORAGE128

FOOD PREP129

SCULLERY130

SUPPLY131

STORAGE132

CORRIDOR133

STORAGE134

CORRIDOR135

LOCKER136

WEIGHT ROOM137

MECH. EQUIP.139

SUPPLY138

VAULT140

VAULT141

STATE OF MISSOURIMICHAEL L. PARSONGOVERNOR

PROFESSIONAL SEAL

OFFICE OF ADMINISTRATIONDIVISION OF FACILITIESMANAGEMENT,DESIGN AND CONSTRUCTION

REVISION:

SITE #:ASSET#:

DATE:REVISION:

DATE:REVISION:

DATE:ISSUE DATE:

CAD DWG FILE:DRAWN BY:CHECKED BY:DESIGNED BY:

SHEET TITLE:

SHEET NUMBER:

PROJECT #:

MISSOURI NATIONAL GUARD

E L L I S O N - A U X I E RA R C H I T E C T S

924 FRANCIS ST.ST. JOSEPH, MO 64501

P: 816-233-8003 F: 816-233-7793www.ellison-auxier.com

T1905-0162558136264001

RENOVATE INTERIORSAINT JOSEPHREADINESS CENTER

301 N. WOODBINESAINT JOSEPH, MISSOURI64501

FIRST FLOORDEMOLITION PLAN

D-101

DEC. 9 2019

JKEAML

JKE

T1905-01-6255-D-101

SCALE: 1/8" = 1'-0"1 DEMO PLAN7 of 21 SHEETS

DEMOLITION NOTES

NUMBER NOTE

1 REMOVE ALL CARPET ON FLOOR AND WALLS2 REMOVE BASE3 REMOVE FLOORING. CLEAN FLOOR OF ALL GLUE RESIDUE, PATCH AND REPAIR FOR

NEW VCT4 REMOVE TOILET PARTITIONS & PATCH WALL5 SALVAGE TOILET ACCESSORIES FOR RE INSTALL6 REMOVE EXISTING GYB. BD.@ SOFFIT7 REMOVE SINK AND COUNTER, PATCH FLOOR AND WALLS8 REMOVE EXISTING STOREFRONT DOORS ONLY FOR REPLACEMENT DOORS9 CUT OPENING FOR NEW DOOR10 REMOVE SHOWER INSERTS AND GYP. BD.; FRAMING TO REMAIN11 REMOVE EXISTING CEILING TILE AND GRID12 REMOVE MIRRORS

TRUE PLAN

#

Page 8: Z:GovernmentSt Joesph Readiness Center 2019Construction ... Final... · alt alternate alum aluminum anch anchor bolt anno anodized appd approved approx approximate arch architectural
Page 9: Z:GovernmentSt Joesph Readiness Center 2019Construction ... Final... · alt alternate alum aluminum anch anchor bolt anno anodized appd approved approx approximate arch architectural
Page 10: Z:GovernmentSt Joesph Readiness Center 2019Construction ... Final... · alt alternate alum aluminum anch anchor bolt anno anodized appd approved approx approximate arch architectural
Page 11: Z:GovernmentSt Joesph Readiness Center 2019Construction ... Final... · alt alternate alum aluminum anch anchor bolt anno anodized appd approved approx approximate arch architectural
Page 12: Z:GovernmentSt Joesph Readiness Center 2019Construction ... Final... · alt alternate alum aluminum anch anchor bolt anno anodized appd approved approx approximate arch architectural
Page 13: Z:GovernmentSt Joesph Readiness Center 2019Construction ... Final... · alt alternate alum aluminum anch anchor bolt anno anodized appd approved approx approximate arch architectural
Page 14: Z:GovernmentSt Joesph Readiness Center 2019Construction ... Final... · alt alternate alum aluminum anch anchor bolt anno anodized appd approved approx approximate arch architectural
Page 15: Z:GovernmentSt Joesph Readiness Center 2019Construction ... Final... · alt alternate alum aluminum anch anchor bolt anno anodized appd approved approx approximate arch architectural
Page 16: Z:GovernmentSt Joesph Readiness Center 2019Construction ... Final... · alt alternate alum aluminum anch anchor bolt anno anodized appd approved approx approximate arch architectural
Page 17: Z:GovernmentSt Joesph Readiness Center 2019Construction ... Final... · alt alternate alum aluminum anch anchor bolt anno anodized appd approved approx approximate arch architectural
Page 18: Z:GovernmentSt Joesph Readiness Center 2019Construction ... Final... · alt alternate alum aluminum anch anchor bolt anno anodized appd approved approx approximate arch architectural
Page 19: Z:GovernmentSt Joesph Readiness Center 2019Construction ... Final... · alt alternate alum aluminum anch anchor bolt anno anodized appd approved approx approximate arch architectural
Page 20: Z:GovernmentSt Joesph Readiness Center 2019Construction ... Final... · alt alternate alum aluminum anch anchor bolt anno anodized appd approved approx approximate arch architectural
Page 21: Z:GovernmentSt Joesph Readiness Center 2019Construction ... Final... · alt alternate alum aluminum anch anchor bolt anno anodized appd approved approx approximate arch architectural