Zero Waste to Landfill Initiatives Tammy Giroux June 12, 2012

Upload: others

Post on 14-Jun-2020

30 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Zero Waste to Landfill Initiatives Landfill Free Status S… · Zero Waste to Landfill Initiatives Tammy Giroux June 12, 2012 . Environmental Services Worldwide Facilities Group Our

Zero Waste to Landfill

Initiatives

Tammy Giroux

June 12, 2012

Page 2: Zero Waste to Landfill Initiatives Landfill Free Status S… · Zero Waste to Landfill Initiatives Tammy Giroux June 12, 2012 . Environmental Services Worldwide Facilities Group Our

Environmental Services Worldwide Facilities Group

Our Business & Sustainability

Models

Maximizing the

benefits of operating

our facilities in an

environmentally and

socially responsible

manner 2

Page 3: Zero Waste to Landfill Initiatives Landfill Free Status S… · Zero Waste to Landfill Initiatives Tammy Giroux June 12, 2012 . Environmental Services Worldwide Facilities Group Our

Environmental Services Worldwide Facilities Group

2020 Manufacturing Commitments

1. Reduce energy intensity by 20%

2. Use 125 MW of renewable energy

3. Reduce carbon intensity by 20%

4. Reduce VOC emissions by 10%

5. Reduce water consumption intensity by 15%

6. Reduce total waste by 10%

7. 100 mfg & 25 non-mfg landfill free sites

8. One outreach activity per plant annually

9. Wildlife Habitat Council at each mfg site

Base year is 2010

3

Page 4: Zero Waste to Landfill Initiatives Landfill Free Status S… · Zero Waste to Landfill Initiatives Tammy Giroux June 12, 2012 . Environmental Services Worldwide Facilities Group Our

Defining Landfill Free • All non productive materials (hazardous and non

hazardous) from ongoing, day-to-day operations

• Includes regular maintenance activities like pit

cleanouts

• Excludes wastewater and event waste (e.g.

construction)

• Non productive materials are managed using

waste hierarchy of elimination, reuse, recycling,

energy recovery

• At manufacturing sites, on average 96% of waste

can be recycled/reused and less than 4% remains

to be managed through energy recovery

facilities

Page 5: Zero Waste to Landfill Initiatives Landfill Free Status S… · Zero Waste to Landfill Initiatives Tammy Giroux June 12, 2012 . Environmental Services Worldwide Facilities Group Our

Environmental Services Worldwide Facilities Group

Landfill Free Facilities

GM Landfill Free Definition

• Includes all waste from day-to-day operations

• Facilities must handle waste by any other method except landfill

• Materials sent to a recycling center and subsequently landfilled by the recycling center must not exceed 1% by weight of the facility’s total

• Ash generated from waste to energy recovery systems is exempt

5

Page 6: Zero Waste to Landfill Initiatives Landfill Free Status S… · Zero Waste to Landfill Initiatives Tammy Giroux June 12, 2012 . Environmental Services Worldwide Facilities Group Our

Environmental Services Worldwide Facilities Group

Reduce Total Waste by 10%

6

Page 7: Zero Waste to Landfill Initiatives Landfill Free Status S… · Zero Waste to Landfill Initiatives Tammy Giroux June 12, 2012 . Environmental Services Worldwide Facilities Group Our

Environmental Services Worldwide Facilities Group

Reduce Total Waste, Cont’d

Example Distribution: Focus on:

• Paint Related (solvents,

paint sludges, and wwtp

sludges)

• Packaging (wood,

cardboard & plastic foil)

• Foundry sand

• Metal scrap

7

Page 8: Zero Waste to Landfill Initiatives Landfill Free Status S… · Zero Waste to Landfill Initiatives Tammy Giroux June 12, 2012 . Environmental Services Worldwide Facilities Group Our

Environmental Services Worldwide Facilities Group

General Motors of Canada Limited

Results

• St. Catharines Facility – Landfill free since 2008

• CAMI and Oshawa Automotive Assembly Plants

currently divert more than 95% of the total non

productive material

•Key waste challenges:

wastewater treatment plant sludge,

paint sludge; and

plant trash

Page 9: Zero Waste to Landfill Initiatives Landfill Free Status S… · Zero Waste to Landfill Initiatives Tammy Giroux June 12, 2012 . Environmental Services Worldwide Facilities Group Our

Environmental Services Worldwide Facilities Group

St. Catharines: Landfill Free Activities

• Actual landfill waste volumes (production-related waste only):

o 2005 landfill total = 1089 MT (11% reduction from 2004)

o 2006 landfill total = 982 MT (9.8% reduction from 2005)

o 2007 landfill total = 525 MT (46.5% reduction from 2006)

o 2008 landfill total = 69.7 MT (pre-ZWTL for January to April)

o April 2008 – Present = LANDFILL FREE

• Since zero waste to landfill was achieved the goal is continuous

improvement and cost reduction

o to improve recyclable waste volumes by 1% for mixed paper

and mixed beverage containers or 1.5 tonnes for each waste

stream

Page 10: Zero Waste to Landfill Initiatives Landfill Free Status S… · Zero Waste to Landfill Initiatives Tammy Giroux June 12, 2012 . Environmental Services Worldwide Facilities Group Our

Environmental Services Worldwide Facilities Group

Key to Success: Tracking Waste

Quantities • Each month waste quantities for each waste type were entered into a tracking

database.

• In 2007 the facility started plotting a glide path to be Landfill Free with annual

reductions which generated a monthly graph to present to plant management.

10

Page 11: Zero Waste to Landfill Initiatives Landfill Free Status S… · Zero Waste to Landfill Initiatives Tammy Giroux June 12, 2012 . Environmental Services Worldwide Facilities Group Our

Environmental Services Worldwide Facilities Group 11

Environmental Scorecard

No

Waste to

landfill

for one

year

0.2

1

0.0

0

0.1

4

0.0

8

0.0

1

0.0

0

0.0

0

0.0

0

0.0

0

0.0

0

0.0

0

0.0

0

0.0

0

0.0

0

0.0

0

0.0

0

0.0

0

0.0

0

0.0

0

0.0

0

0.0

0

0.0

0

0.2

9

0.00 0.00 0.00

0.05

0.10

0.15

0.20

0.25

0.30

0.35

Kilo

gra

ms p

er

Un

it

St. Catharine's Powertrain 2009 Non-Recycled Waste Kilograms per Unit of Production

Color-Coded = YTD (12 Months) One Month 2009 Glidepath

Page 12: Zero Waste to Landfill Initiatives Landfill Free Status S… · Zero Waste to Landfill Initiatives Tammy Giroux June 12, 2012 . Environmental Services Worldwide Facilities Group Our

Environmental Services Worldwide Facilities Group

In 2012 the

plant still

issues

Environmental

Alerts

monthly to try

and improve

Recycling and

reduce cross

contamination

12

Page 13: Zero Waste to Landfill Initiatives Landfill Free Status S… · Zero Waste to Landfill Initiatives Tammy Giroux June 12, 2012 . Environmental Services Worldwide Facilities Group Our

Environmental Services Worldwide Facilities Group

CAMI: Key to Waste Diversion Success

• Internal Lineside Waste Audit Program

Key component of program is being persistent

Allowed ENV to quickly fix source separation problems

Created a history of each station and associated issues

Results communicated to appropriate departments

Station # Material Collected

# of

Container Container Type Audit Result

1E metal jig 2 drum Good!

1E brown coated backing 1 slim jim needs a blue bag

1E Paper recycling 1 wire stand need one here by water container!!

1E recycle station 4 bins slim jim missing need 4 stream rack + lids

1W brown coated backing 1 slim jim needs blue bag

3E gloves recycling 1 slim jim good!

3E Paper recycling 1 slim jim good!

4W recycle station 4 bins slim jim missing? Still needed?

5E foam sheets 1 wire stand missing? Still needed?

5W brown kraft paper 1 bag holder missing? Still needed?

7E recycle station 4 bins slim jim missing gloves + waste lids!

8W plastic bags 1 wire stand needs blue bag

Page 14: Zero Waste to Landfill Initiatives Landfill Free Status S… · Zero Waste to Landfill Initiatives Tammy Giroux June 12, 2012 . Environmental Services Worldwide Facilities Group Our

Environmental Services Worldwide Facilities Group

CAMI: Key to Waste Diversion Success

• Communication

Signage on all waste/recycle bins

Waste accumulation areas identified by floor signage and

communication board

Internal audit results emailed to A/M and A/L

Waste Anomaly sheet program for WM operators

Page 15: Zero Waste to Landfill Initiatives Landfill Free Status S… · Zero Waste to Landfill Initiatives Tammy Giroux June 12, 2012 . Environmental Services Worldwide Facilities Group Our

Environmental Services Worldwide Facilities Group

Lessons Learned on Path to Zero

Waste to Landfill

• Communication is the largest hurdle

• Need to be persistent

• Waste Management contractor has to stay actively

involved with planning

• Executive Team’s/Plant management support is

critical

Page 16: Zero Waste to Landfill Initiatives Landfill Free Status S… · Zero Waste to Landfill Initiatives Tammy Giroux June 12, 2012 . Environmental Services Worldwide Facilities Group Our

Any Questions???