NPCL NOIDA POWER COMPANY LIMITED
NPCL is a joint venture between RP-Sanjiv Goenka Group, a leading
business house in India and Greater Noida Industrial Development
Authority, an autonomous body of U.P. Government responsible for town
planning and infrastructure development.
Operational Area: 335 sq.km Customer Base: 85 K
MVA Peak Load: 180 MVA 10x Increase in
Customer Base & Peak
Load
33 kV Substation
33/11 kV Substation
Transformer
M3
M2
M6 M7
M8
M9
M1
M4
M5
33 kV Consumer Meter
33 kV Consumer Meter
LT Consumer
Meters
11 kV Consumer Meter
Outgoing Meter
Incoming Meter
Outgoing Meter
33/11 kV Substation
33 kV Substation
M1
M3
M2
M4
Loss = M1 – (M2 + M3 + M4)
33 kV Consumer Meter
33 kV Consumer Meter
Outgoing Meter
Incoming Meter
M1
M2 M3 M4
33/11 kV Substation
Transformer
M5
M6
M7
M8
M9
Loss= M5 – (M6 + M7 + M8 + M9)
LT Consumer
Meters
11 kV Consumer Meter
Outgoing Meter
M5
M6 M7 M8 M9
33/11 kV Substation
33 kV Substation
M1
M3
M2
M4
33/11 kV Substation
Transformer
M5
M6
M7
M8
M9
Loss= M1 – (M2 + M3 + …+ M9)
Pre-Requisite of Energy Audit = Meter Hierarchy
Tree.
M
M M M
Establish
Hierarchy AU IT D Micro-Manage
Audit
Capture
Network
Updates
Accurately capture all the
Metering Points present in
the network and place them
in a logical hierarchical tree.
Micro-Manage Audit by
introducing more Meter
Levels in the hierarchical
tree.
Capture and update the
hierarchical tree in case of any
Network changes such as
Network Extension, Switching,
etc.
33/11 kV Substation
33 kV Substation
M1
M3
M2
M4
Initiate Back Trace from Meter
Meter Encountered?
Consumer Meter?
Continue Back Tracing
Retrieve Meter Record from DB
Assign as Parent
Retrieve Next Meter Record from DB
No
Yes
Yes No
Problem Statement:
Accurately capture all the Metering Points present in the network and place them in a logical hierarchical tree.
Solution:
For each Meter present in the DB, use back-tracing to find its Parent Meter (Non-Consumer).
Establish Hierarchy
M
M M M
Substation Meter
DT Meter Consumer
Meter Auditing Error
Existing Hierarchy
Substation Meter
DT Meter Consumer
Meter Auditing Error
Boundary Meter
Division Meter
Newly Introduced Levels
Updated Hierarchy
Legends: Segment with excessive Energy Loss
Normal Segment
Large Area of Focus
Reduced Area of Focus
Substation Level
Feeder Level
DT Level
Substation Level
Feeder Level
DT Level
Division Level
Boundary Level
Nodal Level
Switching Level
Pre-GIS
Post-GIS
Problem Statement:
In the Existing levels of Hierarchy the “Inspection Area” (Area of Focus) is too big. This is resulting in higher rates of “Resolution Time”
Solution:
Introduce more layers (i.e. Meters) into the Hierarchical Tree in order increase the number of “Audit Sections” thereby reducing the Area of Focus.
Micro-Manage
Audit
AU IT D
Substation
M1
Substation
M2
M3 M4
M5 M6
M7
Transformer
M1
M5 M3
M6 M7
M4
M2 Meter Hierarchy
Switch Closed Switch Open
Substation
M1
Substation
M2
M3 M4
M5 M7
M8
Transformer
M1
M5 M3
M6 M7
M4
M2
Switch Open Switch Closed
Meter Hierarchy Updated
Project Created in SAP
Design Created in GIS
Network Proposed in GIS
Proposed Network Approved
Nw Augmentation Started
Field Verification Done
Design Approved in GIS
Design Data Posted Design Data Synced
with SAP
Project Created in SAP
Design Created in GIS
Network Proposed in GIS
Proposed Network Approved
Nw Augmentation Started
Field Verification Done
Design Approved in GIS
Design Data Posted Design Data Synced
with SAP
Energy Audit Extract Triggered
Existing Process Flow
Updated Process Flow
Problem Statement:
Update the Hierarchical Tree in case of any Network Changes such as Network Extensions, Network Switching, etc.
Solution:
Since all changes made to the network are routed via Business Process, update the Process Flow to trigger Energy Audit extract whenever Network Changes are captured.
Capture Network
Updates
Since the Data is extract only after going through multiple layers of QAQC, the reliability of Energy Audit Reports is greatly enhanced
Enhanced Reliability
Introduction of Additional layers have drastically reduced the Timelines associated with locating the issue
Reduced
Processing Time
The triggering, extraction and delivery hierarchical tree is completely automated thereby eliminating any chance of user-related error.
Completely Automated
Solution is designed in such a way that any augmentation to the network (big/small) can easily be captured and passed on to the hierarchical tree.