yyc at yyc/land and...tank farm custom aviation buildings • large apron space • exclusive use...
TRANSCRIPT
YYC
MASTER PLAN
2nd
21,875 sq. ft.
Terminal 30,000 sq.ft.
6,000 sq. ft.
6,000 sq. ft.
Cov
ered
Bre
ezew
ay
Hangar52,500 sq. ft.
2nd
21,875 sq. ft.
Terminal 30,000 sq.ft.
6,000 sq. ft.
Cov
ered
Bre
ezew
ay
Hangar52,500 sq. ft.
Hangar
Aero Drive NE Aero Drive NE
Aero Landing NE
Tank Farm
Custom Aviation Buildings
• Large apron space
• Exclusive use facilities possible
• Capable of accommodating any use & size of aircraft
Elegance & Efficiency
• Designed to maximize passenger flow
• Segregated passenger areas
• Code “D” compliant hangar
Large format hangar configuration
• Apron can accommodate up to two 767s
• Built to Code “D” standards
• Customizable to meet user needs
LOT 1 LOT 2 LOT 3Industrial Terminal & Hangar Space
Cargo Hangar & Office Space
Build to Suit
This brochure is intended for information purposes only. The information contained herein is based on information EFC Developments deems reliable. The information contained herein is subject to change without notice.
InteriorSupply and install improvement components in accordance with the drawings, including the following:
• Metal doors and frames for all rated requirements
• Steel stud, drywall taped, sanded and painted for interior partition walls shall carry through to underside of floor or roof deck as per plan
• Fireproofing or fire stopping as per code
• Office concrete to be ground and polished for a smooth level for carpet or tile installation
• Suspended support grid with 2’ x 4’ acoustic inset panels in the office area
• Thermostat controlled air conditioning in the office with mounted diffusers and return air grills
• Washrooms and vanities commercial grade
• Solid core wood doors for offices and meeting rooms, c/w wood frame privacy or passage hardware as required
Building Shell - General• Concrete grade beam
and piles
• Hangars are pre-engineered buildings or pre-cast option
• Rigid frames, tapered columns in the hangar area
• Straight columns in the office area
• 24’ high pre-engineered structure for office areas two stories
• Galvalume standing seam roof c/w R20 insulation
• Exterior walls of pre-engineered building shall be metal clad c/w R:20 insulation
• Gutters and rain leaders
• Hangar doors to suit primary tenant height requirements
• 6” concrete slab in office areas, engineered concrete slab inside hangars
• Structural steel c/w engineered steel studs, insulated walls, exterior den shields, vapor barrier and either, glazing metal clad or composite panel exterior finish, as per plan and elevation - terminal building only
• Flat roof shall be EPDM or equal
FACILITY DETAILS
MechanicalSupply and install improvement components in accordance with the drawings, including the following:
• Unit heaters in warehouse area for heat recovery at overhead doors
• Radiant tube heaters to supply heat to hangars
• Gas line distribution and regulators
• 2 heat/cool rooftop units for office are complete with duct distribution
EnvironmentalSupply and install improvement components in accordance with the drawings, including the following:
• Solar panels on roof of terminal
• Low E windows
• Low flow bathroom toilets
• LED lighting
• Landscaping - naturally designed to retain water runoff in order to reduce water cost and consumption
• Solar thermal hot water tank & space heating
• Water conservation mandates through all facilities
• Collection of rain water and grey water for reuse
• Geo-thermal heating and cooling
Site WorkSupply and install improvement components in accordance with the drawings, including the following:
• Airside apron complies with Transport Canada requirements
• Asphalt paving, concrete pads, concrete walks, concrete curbs and retaining walls as required
• High efficiency parking lot lighting
• Shuttle bus enclosures
FACILITY DETAILS
Rental Rates:
Hangar: Based on exclusive occupancy of the hangar space for your business. Includes apron space.
$24.00 / sf / year
Office Space:New ‘A’ class office space
$24.00 / sf / year *in base building condition ready for your improvements
Additional Rates:
Operating Costs: Includes: utilities, taxes, land lease rents, property management and admin fees
$8.50 (estimated)
LEASING INFORMATIONSummaryKCL Landing is a multipurpose aviation facility designed to respond to the rapid growth at the Calgary International Airport. KCL Landing will be built for long-term use in order to meet the needs of the commercial, corporate and general aviation markets.
This project incorporates hangar, passenger handling facilities and modern office configurations with ample on-site parking. KCL Landing’s convenient location provides airside access that is only two minutes from Deerfoot Trail.
LEEDDesigned to be LEED Certified or equivalent.
ParkingPlenty of parking will be offered at the site in excess of 1300 stalls upon project completion. Market rates will be applied.
Lease TermTen (10) year term is offered with additional renewals.
LocationAirside location that is two minutes to Deerfoot Trail and neighbouring arteries.
LEASING CONTACT:Brent BerezowskiBusiness Development & Leasing Manager
587-229-6553
EFC Developments Ltd.
200, 660 Palmer Road NE Calgary, ABT2E 7R3
CALGARY INTERNATIONAL AIRPORT
The Calgary International Airport offers cargo companies, air carriers and charter operators an ideal location to work from. Calgary is highly integrated in transportation and the distribution of goods, allowing customers to be accessed by air in over 100 destinations from the Calgary International Airport. Calgary’s geographic position also connects ground transportation to a diverse group of customers both domestically and internationally.
A number of noteworthy points are:
• Canada’s 3rd largest Airport• Passenger growth 6.6% increase to over 15 million passengers
yearly• Air carrier movements growth 4.9% in 2014• New runway opened in 2014. Capable of handling any size and
capacity of airplanes with category III instrument • Canada’s largest runway• Over $2 billion capital investment from 2012 to 2016• New cargo handling facilities & warehouses in 2014 - 2016• Total economic impact of $8.28 billion and 48,000 jobs annually• Safe, secure and sustainable operations with progressive vision &
management• Calgary is recognized as Canada’s energy centre• Calgary has a labour force rich in competencies and skills that drive
success in the energy sector• Head office location of major oil and gas companies and the
industries major trade associations
The west side of the Calgary International Airport and future home to KCL Landing offers perspective tenants flexibility to grow. This key parcel of real estate will provide tenants access to newly developed infrastructure including:
• Direct access to Deerfoot Trail via 64th Avenue extension
• Direct airside connection to existing cargo facilities
• Potential new hangars to house next generation aircraft
• Modern office space that combines the operational functionality with outstanding views of the airport, mountains and downtown
STRATEGIC LOCATION
Beddington Trail NW
11StreetN
E
Aero Drive NE
Aero Drive NE
10St NE
19StN
E
BarlowTrail
8St
NE
9St
NE
72 Ave NE
68 Ave NE
65 Ave NE
64 Ave NE
Deerfo
ot Tr
ail
Deerfoot Trail
57 AveN E
11 S
t.N
E
11 S
t.N
E
96th Ave NE
Airport Trail NE
Aero Drive NEAero Crescent
AeroD
riveN
E
Airport Trail NE Airport Trail NE
Metis Trail NE
Metis Trail NE
100 Ave NE100 Ave NE
4 St
reet
NE
4 Street NE
64th Ave Extension
LOCATION DETAILS
Brent BerezowskiBusiness Development & Leasing Manager
587-229-6553
EFC Developments Ltd.200, 660 Palmer Road NE Calgary, ABT2E 7R3