SELECTED WORK SAMPLES
“ARCHITECTURE A LIFE-LONG MARATHON. I CAN STOP TO TAKE A BREAK, BUT I CAN’T QUIT.
EACH MILESTONE HAS ITS OWN UNIQUENESS. EVERY ACCOMPLISHED MILSTONE IS A LESSON LEARNED.
I WILL GO WHEREVER THIS ARCHITECTURAL PATH TAKES ME!
MY GOAL IS ONLY TO RUN AN UNFORGETTABLE MARATHON.”
YuMin Liu
YOUNG WOMEN COLLEGE PREPATORY ACADEMY / 2015PROJECT MANAGER
This project is located downtown Houston. It’s an all-girls secondary school is slated to receive a $27.1 million makeover that will preserve its historic past while creating modern learning spaces to help prepare students for college and careers. The school is upgrading their classroom space to current Houston Independent school district standards as well as additional spaces for their STEM program, robotics and CTE classroom.
The design includes adding a circular drive to the front of the building with a covered pick-up/drop-off area complimenting its classical brick facade. The administrative offices, now on the second floor, will be relocated near the building’s main entrance, where a secure vestibule will be added. Much of the interior renovation will focus on modernizing the classroom spaces into larger learning centers with better natural light, integrated technology and flexible furniture. An addition is slated to be built adjacent to the current auditorium, and will feature an atrium and flexible spaces to create a college-like, collaborative atmosphere for the students to expand their creativities.
The challenge for this project is the site restriction due to project location and the need to preserve existing trees to achieve LEED status.
EXTERIOR FRONT VIEW
EXTERIOR EAST ADDTION
CLEBURNE ST.
CH
ENEV
ERT
ST.
CH
AR
TRES
ST.
WHEELER ST.
NEW ADDTION
FUTURE EXPANSION
DETENTION POND
TENNIS COURT
NEW PARKING
BUS DROP-OFF
SITE PLAN
N
34' - 0 1/2"
1' - 6" 22' - 4 1/2" 1' - 6" 7' - 2"
ENTRY GATE78' - 0"
36' -
0"
27' -
0"
39' - 0"
2" (TYP.)
4" (TYP.)21' - 0"
CENTRE SERVICELINE 2" (TYP.)
2" (T
YP.)
CEN
TRE
MA
RK
SER
VIC
E LI
NE
2" (T
YP.)
SINGLES SIDELINE 2" (TYP.)
BA
SE L
INE
2" (T
YP.)
NET
TENNIS COURT PLAN
18" DIAMETER
2'-6" SQUARE
MIN
.3'
- 6"
3' -
6"
NET POST SET IN SLEEVE
CONCRETE FOOTING BASEPOUR TO STABLE UNDISTURBED SOIL
COURT PAVEMENT
NET POST(LACING ROD OPTIONAL)NET
TIGHTENER
TENNIS NET POST FOOTING
CONCRETE LEVEL
BRICK PILASTER
7' -
4"2 1
/2"2"
4 1/2"
6"63
"12
1/2
"
1"
1 1/2"
1 1/2"
CASTONE BASE
FOUNDATION RE: STRUCTURE
CASTONE CAP
ELEVATION
6' -
3"
1 1/2" 23 1/2" 1 1/2"
26 1/2"
1 1/2"
23 1
/2"
1 1/2"
26 1
/2"
PLAN
REINFORCE CONCRETERE: STRUCTURE04 20 008" CMU04 20 00ECONO KING BRICK
CASTONE CAP
04 20 00BRICK TIES EVERY 6 ROWSALIGN WITH CMU ROWS
LEARNINGCENTER
LEARNINGCENTER
LEARNINGCENTER
LEARNINGCENTER
MECH RM
UNIFORM / GEN STG
FINE ARTS LEARNING CENTER / BLACK BOX
TEACHING THEATER STG
POOL FITNESS AREASHOWERS
GYMELEC
SCIENCE 6SCIENCE 7
LEARNINGCENTER
LEARNINGCENTER
LEARNINGCENTER
TEACHER WORK RM
EXTENDEDLEARNING AREA
EXTENDEDLEARNING AREA
FLEX LAB
ROBOTICS LAB
LEARNINGCOMMONS
AUDITORIUMUPPER LEVEL
AUDITORIUMUPPER LEVEL
AUDITORIUMLOWER LEVEL PREP RMSCIENCE 1
SCIENCE 3
GRAPHIC DESIGN
SCIENCE 2
CORRIDOR
CORRIDOR
CORRIDOR
PREP RMSCHLUMBERGERENGINEERINGLAB
CORRIDOR
CORRIDOR
CORRIDOR
MECH RM
SECTION A - A
SECTION B - B
MSSHOWERS
WOMEN
EXTENDEDLEARNING AREA
STGEXPLORINGCAREERS
GRAPHIC DESIGN
SCIENCE 3
SCIENCE 1
DEAN'S OFFICE
CONF. RM
TEACHER WORK RM
CONF. RM
CONF. RM
LEARNINGCENTER
DEAN OFINSTRUCTION
MAG. COORD.
RECEP.BOOK ROOMCORRIDOR
CORRIDOR
ADVANCEDCONCEPTS OF ENGINEERING
GYMMS LOCKERS
SCIENCE 5
SCIENCE 6
LEARNINGCENTER
LEARNINGCENTER
LEARNINGCENTER
CONF. RM
CORRIDOR
CORRIDOR
CORRIDOR
RECEP.LEARNINGCOMMONS
ROBOTICS LAB
EXTENDEDLEARNINGAREA
CORRIDOR
CORRIDOR
STAIR
STAIR
MECH RM
CUST. STG
FITNESSAREA
ATTENDANCE
CORRIDOR MECH RM
SECTION C - C
SECTION D - D
EXTENDED LEARNING AREA
CAFETERIA
LEVEL 3 CORRIDOR
LEVEL 2 CORRIDOR
ATRIUM
PEOPLES STATE BANK / 2013INTERN ARCHITECT
This is a complete interior renovation project for a Texas Bank. The existing bank was built in 1975 and an addition was added to the back of the building in 1983. The bank has a total of 9,232 s and is a type VB construction.
The vestibule is a transition space in between exterior and interior space. The Texas Star was used to give the bank that “Texan” welcome. The lobby is the hierarchical space of the building. In order to keep an open plan concept for the lobby, Tremain Planel System was used for the space. It’s different from the traditional cubicles, it has a nice black metal panel with window vision panel in between allowing people to feel less enclosed but yet they still have privacy from the public.
In this project, my focus was to ensure the phasing plan has clear graphics to convey to the contractors, ensure demolition plan has correctly noted with correct graphics, dimensioning all aspect of the project, coordinating with MEP on lighting and structural engineer on details for large span of above teller and waiting area, designed finish floor pattern for vestibule and lobby, designed and detailed teller and check stand millwork base on custom specifications, detailed interior elevations, layout furniture plan and generated 3D image for clients.
LOBBY VIEW FROM WATING AREA
LOBBY VIEW FROM ENTRANCE
BOOKKEEPINGTELLER AREA
OFFICE OFFICE OFFICEOFFICEOFFICEOFFICE
OFFICEOFFICE
TELLER
WAITINGROOM
SECURITYVAULT
SAFEDEPOSITVAULT
MOTOR BANKLOBBYBOOKKEEPING
TELLERS
RECORDS EMPLOYEES LOUNGE
HALL
HALL
STAIRSMACHINERM.
ELEVATOR
JANITORIAL
VESTIBULE
PHASE 5
PHASE 5
PHASE 2
PHASE 3
PHASE 4
VESTIBULE
SAFE DEPOSIT VAULT
LOBBY TELLERS
ELECTRICAL
RECORDS
OFFICE OFFICE OFFICE
ELEVATOR
MACHINE ROOMSTAIR 2
STORAGE
OFFICE OFFICE OFFICE OFFICE OFFICE ADMINISTRATOR
PRESIDENT
OFFICE
CORRIDOR 2
JANITORIAL
STAIR 1
CORRIDOR 1
EMPLOYEEPUBLIC
AREA N.I.C
NEW CONSTRUCTION PHASE 1
NEW CONSTRUCTION PHASE 2
NEW CONSTRUCTION PHASE 3
NEW CONSTRUCTION PHASE 4
NEW CONSTRUCTION PHASE 5
COUPON BOOTH
LOBBY
BOOKKEEPING
MOTOR BANK TELLERS
OFFICE
OFFICE
OFFICE
OFFICE
PHASE 5
PHASE 5
PHASE 2
PHASE 3
PHASE 4
1 FIRST FLOOR DEMOLITION - PHASE 2, 3, 4, 5 2 FIRST FLOOR NEW CONSTRUCTION - PHASE 2, 3, 4, 5
PROJECTNORTH
TRUE NORTH
AREA N.I.C
DEMOLITION PHASE 1
DEMOLITION PHASE 2
DEMOLITION PHASE 3
DEMOLITION PHASE 4
DEMOLITION PHASE 5
BOARD ROOM
COMPUTER ROOM
STORAGEMECHANICAL
ROOM
FURRED SPACE
FURRED SPACE
GENERAL STORAGE SPACE
CORRIDOR 1
COFFEE
AREA N.I.C
DEMOLITION PHASE 1
DEMOLITION PHASE 2
DEMOLITION PHASE 3
DEMOLITION PHASE 4
DEMOLITION PHASE 5
MEN WOMENELEVATOR
LOBBY
PHASE 1
PHASE 5BELOW
PHASE 5BELOW
FURRED SPACE
AREA N.I.C
NEW CONSTRUCTION PHASE 1
NEW CONSTRUCTION PHASE 2
NEW CONSTRUCTION PHASE 3
NEW CONSTRUCTION PHASE 4
NEW CONSTRUCTION PHASE 5
MECHANICAL ROOMCOMPUTER ROOM
GENERAL STORAGESPACE
CORRIDOR 1
STORAGE
MEN WOMENELEVATOR LOBBY
BOARDROOMPHASE 1
PHASE 5BELOW
PHASE 5BELOW
1 SECOND FLOOR DEMOLITION - PHASE 1, 5 2 SECOND FLOOR NEW CONSTRUCTION - PHASE 1, 5
PROJECTNORTH
TRUE NORTH
C
D
E
F
G
6
6
5
5
4
43
1
2
2
2.1
A
B
2A08.01
VESTIBULE100
LOBBY101
SAFE DEPOSIT
VAULT103
LOBBY TELLERS
105BOOKKEEPING106
111
RECORDS117
OFFICE114
OFFICE113
OFFICE112
ELEVATOR119
MECH. RM120
STAIR 2121
STG122
OFFICE123
OFFICE124
OFFICE125
OFFICE126
OFFICE127
ADMIN.128
PRESIDENT129
JANITORIAL108
110
CORRIDOR 1109
EMPLOYEE115
PUBLIC116
COUPON BOOTH
102
OFFICE130
OFFICE131
OFFICE132
OFFICE133
OFFICE134
1 -1
1.1
1-2
1.1
7
MOTOR BANK TELLERS
107
SECURITY VAULT104
FIRST FLOOR DRAWING CONVENTIONS
LEGEND
GENERAL NOTESA. ALL INTERIOR DIMENSIONS ARE MEASURED FROM FACE WALL. U.N.O.B. DIMENSIONS AT EXTERIOR ARE FROM EDGE OF SLAB.C. ALL INTERIOR LOAD BEARING PARTITIONS. RE: STRUCTURALD. VERIFY FINAL CLEARANCE DIMENSIONS FOR EQUIPMENT AND DEVICES PRIOR TO SETTING WALLS. E. NOTIFY HALTNER H.A.I. OF ANY DISCREPANCIES IN THE DIMENSIONS FOR RESOLUTION.
SEE A09.01 FORPARTITION TYPE
GLASS PARTITION,RE: 06.02
MILLWORK UPPERCABINETS
PROVIDE MINIMUM DISTANCETO ADJACENT CONSTRUCTIONON STRIKE PULL SIDE OFDOOR TO FACILITATEACCESSIBILITY, U.N.O.
5'-0" ACCESSIBLETURNINGRADIUS.
30" X 48"ACCESSIBLE CLEARFLOOR SPACE.ACCESSIBLE APPROACHZONE, SLOPE NOT TOEXCEED 1:50
HALF RECESSEDFIRE EXTINGUISHER
EXTERIOR WINDOWDESIGNATION RE: AO6.02
DOOR DESIGNATIONRE: AO6.01
INTERIOR WINDOWDESIGNATION RE: AO6.02
SURFACE MOUNTEDFIRE EXTINGUISHER
PROJECTNORTH
TRUE NORTH
Level 1
0' - 0"
Level 212' - 0"
Level 322' - 8"
Lobby Ceiling18' - 0"
L3 X 3 X 1/4 Wall Support @ 32” O.C.
Bar Joist
EXISTING W14Wide Flange
EXISTING W16 WideFlange
EXISTING W16Wide Flange
5/8” GYP. BD. ON 3/4” APA RATE EXP.
1 PLYWOOD SHEATING
3 5/8"x 18 GAMTL STUDS @
32" O.C
3 5/8"x 18 GAMTL STUDS @
32" O.C
3 5/8"x 18 GACONT.
EXISTING 2x4
LIGHT COVE BEYOND
3 5/8"x 18 GAMTL STUDS @
16" O.C
10"
6"8'
- 6"
18' -
0"
11 3/4" 2' - 10 1/4" 5 1/2"
1' - 7 3/8"
9' -
0"
3"
4' - 0" 1' - 11" 1' - 0"
Level 10' - 0"
Level 212' - 0"
Level 322' - 8"
Lobby Ceiling18' - 0"
Bar JoistEXISTING W14Wide Flange
EXISTING W16Wide Flange
5/8" GYP. BD. ON3/4" APA RATE EXP. 1 PYWOOD SHEATHING
3 5/8"x 18 GA MTLSTUD BRACING
@ 32" O.C
3 5/8"x 18 GA MTL STUDS@ 32" O.C
3 5/8"x 18 GACONT.
EXISTING 2x4
LIGHT COVEBEYOND
3 5/8"x 18 GA MTL STUDS@ 16" O.C
8' -
0"3"
9' -
0"
VERIFY W/ ARCH9"
5' - 0" 2' - 0"
10"
1' -
0"8'
- 0"
C6X8.2 CONT.
AT DOOR 37 PROVIDE 4 6" X 18GAMETAL JOIST @ 16" O.C WITH3 1/4" X 4' X 6' PLYWOOD DECK
A/C DUCT VERIFY LOCATIONW/ ARCHITECT
1-2 SECTION - CORRIDOR 2 AND LOBBY FURRDOWN1-1 SECTION - TELLER FURRDOWN
LOBBYLOBBYTELLER COORIDOR 2
1' -
11"
7"4"
1' -
11"
11 1/4" 3' - 1 1/2" 1' - 10 1/2" 3' - 1 1/2" 5' - 0" 1' - 10 1/2" 3' - 1 1/2"
GR - 2
GR - 1
DEAL PLATE ANDPURSE RAIL, GR - 1
TYP.
PL - 2TYP.
GYPSUM BOARD FURR-DOWN PAINTED
PL - 2TYP.
4' -
9"2'
- 10
"
10"
2' - 11"
7"
GR - 2
1/2" RAISEDPANEL WITH
POLISHED EDGES,GR - 1
PL-2
DEALPLATE ANDPURSE RAIL, GR - 1
WIREMANAGEMENTCHASE
PL - 2
2' -
10"
1.1 LOBBY TELLER ENLARGED PLAN
LOBBY TELLER FRONT ELEVATION
SECTION @DEAL PLATE
6"4"
11 7/8"
3/4" TYP.
1 1/
2" T
YP.
10"1/4"
1/4"
1"
TOP OF THE HOOD,PL - 2
VERTICAL SURFACES,PL - 2 PL - 2
1/4" REVEAL,PL - 1
DEALPLATE, GR - 1
PURSE RAIL,GR - 1
HOOD SECTION
PL - 2
PL - 2
3' - 2"
2' - 10"ACCESS.
TELLERLINE STONE DETAILS
1' - 8" 1' - 8" 3' - 4" 1' - 8" 3' - 4" 1' - 8" 3' - 4" 1' - 8" 1' - 8"
2' -
11"
3' -
4"6"
2"2'
- 0"
10"
6"
2' -
0"
DEAL PLATE ANDPURSE RAIL, GR - 1 TYP.
COUNTERTOPANDBACKSPLASH,PL - 1
PL-1HORIZONTALSURFACES.TYPICAL.
LOBBY TELLERS7 5/8"15' - 0"2' - 7 7/8"3' - 1 3/4"
PERUSE RAIL
DEAL PLATE
C
D
E
F
G
543
1 2
2.1
A
B
2A08.01
1A08.01
A.H
.U. #
2
A.H.U. #1H.W.H.
EXISTINGROOF HATCH
MECHANICAL ROOM206
BREAK ROOM209
COMPUTER ROOM205
GENERAL STORAGESPACE200
STORAGE208
MEN203
WOMEN204STORAGE
201
CORRIDOR 1207
30
2
2
BOARDROOM210
LOBBY101
ELEVATOR LOBBY202
A13.021
F.E.
28 27
3
7 7
3
3
29
31 33
EXISTINGKEY PADACCESS
EXISTINGKEY PADACCESS
CASED OPENING
1.1
7
SECOND FLOOR DRAWING CONVENTIONS
LEGEND
SEE A09.01 FORPARTITION TYPE
GLASS PARTITION,RE: 06.02
MILLWORK UPPERCABINETS
PROVIDE MINIMUM DISTANCETO ADJACENT CONSTRUCTIONON STRIKE PULL SIDE OFDOOR TO FACILITATEACCESSIBILITY, U.N.O.
5'-0" ACCESSIBLETURNINGRADIUS.
30" X 48"ACCESSIBLE CLEARFLOOR SPACE.ACCESSIBLE APPROACHZONE, SLOPE NOT TOEXCEED 1:50
HALF RECESSEDFIRE EXTINGUISHER
EXTERIOR WINDOWDESIGNATION RE: AO6.02
DOOR DESIGNATIONRE: AO6.01
INTERIOR WINDOWDESIGNATION RE: AO6.02
SURFACE MOUNTEDFIRE EXTINGUISHER
PROJECTNORTH
TRUE NORTH
D.W.
REF.
12 X 12 CERAMIC TILE
COUNTERTOP ANDBACKSPLASH, PL - 1
3' - 5 7/8" 20' - 11 5/8"
M.W.
COUNTERTOP ANDBACKSPLASH, PL - 1
4 1/4" 2' - 6" 11' - 6" 4 1/4"
BREAK ROOM209
BREAKROOM ENLARGE PLAN
3' - 0" 3' - 0" 3' - 0" 3' - 0" 3' - 0" 3' - 0" 3' - 0"
1' -
8"3'
- 6"
1' -
0"
GWB PAINT
6 X 12CERAMIC TILE
VERTICAL SURFACESPL - 3
COUNTERTOP ANDBACKSPLASH, PL - 1
M.W.
D.W.ACCESSIBLE
PANEL
1' -
5 3/
4"5"
3' - 0"2' - 11 7/8"1' - 0 1/8"2' - 0"3' - 0"3' - 0"3' - 0"3' - 0"
VERTICAL SURFACESPL - 3
EXSITINGCMU WALL
BREAKROOM - SOUTH
6 X 12 COVEBASE TILE
GWB PAINT
COUNTERTOP ANDBACKSPLASH, PL - 1
4 1/2"11' - 6"2' - 6"4 1/2"
4"2'
- 10
"4"
3' -
5 1/
2"
BREAKROOM - NORTH
BREAKROOM - EAST
6 X 12 COVEBASE TILE
GWB PAINTGWB PAINT
M.W.
3' -
4"1
1/2"
3' -
6"1'
- 8"
2' -
10"
COUNTERTOPANDBACKSPLASH,PL - 1
VERTICALSURFACES
PL - 3
COUNTERTOPAND
BACKSPLASH,PL - 1
VERTICALSURFACES,
PL - 3
8' -
0"
C
D
E
F
G
654
3
B
BOOKKEEPING106
RECORDS117
JANITORIAL108
PUBLIC116
EMPLOYEE115
CORRIDOR 2118
ELEVATOR119
MACH.ROOM
120
STAIR 2121
STG122
OFFICE123
OFFICE124
OFFICE125
OFFICE126
OFFICE127
ADMINISTRATOR128
PRESIDENT129
OFFICE114
OFFICE113
OFFICE112
LOBBY TELLERS105
ELECTRICAL111
STAIR 1110
SAFE DEPOSIT
VAULT103 VESTIBULE
100
LOBBY101
CORRIDOR 1109
COUPON BOOTH
102
OPEN ABOVE
1.1
7
SECURITY VAULT
104
MOTOR BANK TELLERS107
FIRST FLOOR REFLECTED CEILING PLAN
LEGEND
GYPSUM BOARD W/ PAINTED FINISH
2' X 2' GRID AND ACOUSTICAL TILE
EXHAUST FAN
2' X 2' RECESSED FLUORESCENT LIGHT FIXTURE,24 HR CIRCUIT UNSWITCHED WITH BATTERY BACK UP
SINGLE POLE SWITCH
EMERGENCY EXIT LIGHT
ACCESS PANEL
PENDANT LIGHTING
MOTOR BANK LANE LIGHT.RE: ELECTRICAL
RECESSED DOWN LIGHT
RETURN AIR
SUPPLY AIR
CEILING HEIGHT ABOVE FINISHED FLOOR (A.F.F.)AS NOTED
2' X 2' RECESSED FLUORESCENT LIGHT FIXTURE.
2 X 2 RECESSED FLUORESCENT LIGHT FIXTURE.NIGHT LIGHT
SINGLE POLE OCCUPANCY SENSOR SWITCH
RECESSED DOWN LIGHT,24 HR CIRCUIT UNSWITCHED WITH BATTERY BACK UP
PROJECTNORTH
TRUE NORTH
20' - 0 1/2"
11"18' - 2 3/8"11"
9'-0"
8'-0"
9'-0"
9'-0"
LOBBY TELLERS105
LOBBY101
3' -
5 7/
8"6"
6' -
0 3/
8"
CO
RR
IDO
R 1
MAIN TEE SPLICE
FIRE EXPANSION NOTCHCROSS CHANNEL
SHEETROCK BRAND GYPSUM PANEL
MAIN TEE
12 GA. HANGER WIRE
SUSPENDED GYPSUM CEILING GRID
MAX
CONDITION AT WALL
FACE OF WALL
WALL TRIMOR ANGLE
CEILING PANELMAIN RUNNER
CROSS RUNNER
HANGER WIRESHANG FROMBEAMS & PERLINSONLY
PROVIDE #16 GA. TIES ORMETAL STRUTS SECURELYATTACHED TO PREVENTSPREADING OF RUNNERS
8"
LAY-IN CEILING DETAILS 2
#12 GA. VERT. HANGERWIRE @ 4'-0" O.C. BOTH
DIRECTIONS ALONGEACH MAIN RUNNER,
WRAPPED TIGHTLY ATLEAST 2 FULL TURNS
45 DEGREE SPLAY WIREBRACING IN PLANE OFRUNNER, ALL WIRESATTACHED TO THEMAIN RUNNER IN 4DIRECTIONS. LOCATEFOR LATERAL BRACING@ 12'-0" O.C.
CROSS RUNNER
SPLICE
MAIN RUNNER
SPLAY WIRE BRACE
LAY IN CEILING DETAIL
1' -
0"
1' - 0"
SUPPORT TO STRUCT. ABOVE
25 GA. 3 5/8" MTL. STUD @ 16" O.C.
SINGLE TUBE FLUORESCENT LIGHT FIXTURE
5/8" GYP BOARD PAINTED.
EGG CRATE LENS
5/8" TYPE "X" GWB OVER METAL STUDS
1" DIA. VENT HOLES AT 2'-0" O.C.
ROUNDED CORNER BEAD
FURR DOWN DETAIL @ RESTROOM
C
D
E
F
G
654
3
1 2
2.1
A
B
MECHANICAL ROOM206
MEN203
WOMEN204
COMPUTER ROOM205
CORRIDOR 1207
STG208
GENERAL STORAGESPACE
200
BREAK ROOM209
BOARDROOM210
ELEVATOR LOBBY
202
STG201
LOBBY101
R/A
R/A
VOID
NOTE:
EXISTING 2 X 4 CEILING GRID ANDLAY-IN TILE IN THIS AREA.
REPLACE EXISTING 2 X 4 LIGHTFIXTURES IN THIS AREA WITH (20)NEW 2 X 2 FIXTURES.
USE CROSS TEE AT CEILING GRIDAND CUT CEILING TILE TO FIT.
REFER TO ELECTRICAL.
1.1
7
SECOND FLOOR REFLECTED CEILING PLAN
LEGEND
GYPSUM BOARD W/ PAINTED FINISH
2' X 2' GRID AND ACOUSTICAL TILE
EXHAUST FAN
2' X 2' RECESSED FLUORESCENT LIGHT FIXTURE,24 HR CIRCUIT UNSWITCHED WITH BATTERY BACK UP
SINGLE POLE SWITCH
EMERGENCY EXIT LIGHT
ACCESS PANEL
PENDANT LIGHTING
MOTOR BANK LANE LIGHT.RE: ELECTRICAL
RECESSED DOWN LIGHT
RETURN AIR
SUPPLY AIR
CEILING HEIGHT ABOVE FINISHED FLOOR (A.F.F.)AS NOTED
2' X 2' RECESSED FLUORESCENT LIGHT FIXTURE.
2 X 2 RECESSED FLUORESCENT LIGHT FIXTURE.NIGHT LIGHT
SINGLE POLE OCCUPANCY SENSOR SWITCH
RECESSED DOWN LIGHT,24 HR CIRCUIT UNSWITCHED WITH BATTERY BACK UP
PROJECTNORTH
TRUE NORTH
18 GA. 3 5/8" MTL.STUD @ 16" O.C.
R-30 BATT INSULATION
ROUNDED CORNERREINFORCING, TYPICAL
LAY-IN CEILING TILE SYSTEMWITH ACOUSTICAL CEILING TILE.
REFER TO FINISH SCHEDULE,
SHT. A05.02
1' - 0" 2' - 10 1/4"
SUPPORT TOSTRUCTURE ABOVE
NARROW STAGGEREDFLUORESCENT LIGHT FIXTURE
5 3/
4"
9 3/
4"5
3/4"
9'-0"A.F.F.
8'-6"A.F.F.
CORRIDOR 2LOBBY
5" 7"
1X10 MAHAGONY STAINGRADE, 1/2" BEVEL TOP AND
BOTTOM EDGE
5/8" GWB OVER METAL STUDS
5/8" GWB OVER METAL STUDS
METAL TRACK SUPPORT TOSTRUCTURE
5/8" GWB OVER 3/4" PLYWOOD
18 GA. 3 5/8" MTL. STUD @ 16" O.C.
1/2"
CEILING DETAIL @ CORRIDOR 2
18 GA. 3 5/8" MTL. STUD@ 16" O.C.
R-30 BATT INSULATION
ROUNDED CORNERREINFORCING, TYPICAL
LAY-IN CEILING TILE SYSTEM WITHACOUSTICAL CEILING TILE. REFER TOFINISH SCHEDULE, SHT. A05.02
1' - 0"5' - 0"
SUPPORT TO STRUCT. ABOVE18 GA. 3 5/8" MTL. STUD.@ 16" O.C.
NARROW STAGGEREDFLUORESCENT LIGHT FIXTURE
1' -
0"
9'-0"A.F.F.
8'-0"A.F.F.
LOBBY TELLERS LOBBY
5 1/8"6 7/8"
1X10 MAHAGONY STAIN GRADE,1/2" BEVEL TOP AND BOTTOMEDGE
5/8" GWB OVER METAL STUDS
5/8" GWB OVER METAL STUDS
METAL TRACK SUPPORT TOSTRUCTURE
9'-0"A.F.F.
1' -
7 7/
8"
SUPPORT TO STRUCTUREABOVE
5/8" GWB OVER 3/4" PLYWOOD
18 GA. 3 5/8" MTL. STUD @ 16" O.C.
EXISTING STRUCTURAL COLUMN,MILLWORK CLAD.
NON STRUCTURAL COLUMNTO MATCH MILLWORK.
1/4"
8'-0"A.F.F.
1' -
0"10
"
WALL BEYOND
1' - 0"
CEILING DETAIL AT TELLERS
The intent of the project is to give extra gallery space and learning space for the Contemporary Arts Museum Houston. The project program includes Public Display, education space and an administrative space. One of the unique program in this is project is a Children’s Art studio. It allows artistes to teach the younger generations about art and different technique of creating art.
The concept of the project is utilize push and pull movement on series of boxes allowing the building to develop outdoor spaces the on the second level as well as natural skylights for spaces below.
The building program is divided into three main categories: galleries, education, and administrative. The building is recess below grade to allow more space for the gallery space and performance space. The public will be walking through a series of natural light in the space as they make their way to the performance art space at west end of the building. This “recess” movement allows the project to develop an amphitheater condition for the courtyard allowing outdoor mini performance for the community. This project seems like the internal connection to the CAMH is located on the second level but it’s actually connected through the basement, where the public are able to walk through different gallery spaces before arriving to CAMH. The upper eastside level houses workshops and studios for CAMH to host any community events promoting hands on art work programs for children. The café is located near the upper level of the auditorium where the public can enjoy the outdoor space after a performance over a cup of coffee.
ART EXPOLRATION CENTER OF HOUSTON / 2014Instructor: Matt Johnson
EDUCATION: PREFORMANCE
GALLERYCHILDRAN ART STUDIO
ROOF GARDENSKYLIGHTSEXTERIOR
PREFORMACE
TERRACESKYLIGHTS
EXISTING BUILIDNGCAMH
Site Location Transportation flow Parks / Recreation Education Facilities
Introducing outdoor space
Divide form into two levels
Placement of form
Marking entrane to the public
Existing Building Push and pull
SITE PLAN SITE PPLAN
BLACK BOX THEATER
DIGITAL EDITING
SUITEGALLERY
BASEMENT LEVEL
UP
UP
RAMP
UP
RAMP
DIGITAL EDITING
SUITE
DIGITAL EDITING
SUITE
DIGITAL LAB OFFICE GALLERY
BERTHEA ST
MO
NTR
OS
E B
LVD
BISSONNET ST
BAYA
RD
LN
MATERIALPRODUCTTRADENAMEMODELNUMBER
MATERIALPRODUCTTRADENAMEMODELNUMBER
ESTCODEMATERIALPRODUCTTRADENAMEMODELNUMBER
MATERIALPRODUCTTRADENAMEMODELNUMBER
ESTCODE
UPUP UP
UP
RAMP
UP
AB
AB
CC
LEVEL 1
STREETSIDEGALLERY
INFORMATIONCENTER
WORKROOMOFFICEOFFICE
OFFICEOFFICE
OFFICEOFFICE
CONTROLROOM
AUDITORIUM
STAGE
RESTROOMRESTROOM
STAGE
GREEN ROOM
LEVEL 2
WORKROOM
ROOF GARDEN
GALLERY
AUDITORIUMRESTROOM RESTROOM
CAFE
OPEN WORK-ROOM
CHILDERN ART STUDIO
UPUP
UP
BERTHEA ST
MO
NTR
OSE B
LVD
BISSONNET ST
BA
YAR
D LN
up
up
up
upup
B - 1
C
2 4 6 7
A
B
D
1 3 5
43' -
7"16
' - 7"
24' -
7"
84' -
9"
27' - 0" 26' - 0" 26' - 6" 26' - 6" 26' - 4" 35' - 2"
167' - 6"
STREETSIDE GALLERY
WORKROOM
INFORMATION CENTER
STAGE
SEATING
GREEN ROOM
RESTROOM
STAGE
AUDITORIUM
CONTROL ROOM
OFFICE
OFFICEOFFICE
OFFICE
OFFICE OFFICE
LEVEL 1
A
B
C
D
1 2 3 4 5 6 7
27' - 0" 26' - 0" 26' - 6" 26' - 6" 26' - 4" 35' - 2"
167' - 6"26
' - 0 1
/2"
34' -
1 1/2
"24
' - 7"
84' -
9"
DEGITAL LAB
OFFICE
DEGITAL EDITING
SUITE
DEGITAL EDITING
SUITE
DEGITAL EDITING
SUITE
GALLERY
EXISTING BUILDING
GALLERY
BLACK BOX THEATER
BASEMENT LEVEL
A - 0
A
A -1
B
B - 1
C
D
D -1
D - 2
1 2 3 4 5 6 7
7.1
W10
X49
W10
X49
W10
X49
W10
X49
W10X49
94X01
W94
X01W
W10X49
W10X49
W10X49
W10X49
94X01W94X01W
W10
X49
W10X49
W10
X49
W27
X94
W27
X94
W27
X94
49X72W49X72W
W27
X94
49X72
W49
X72W
W10
X49
W10
X49
W10X49
94X01
W94
X01W
94X01
W94
X01W
W10X49
W10
X49
W10
X49
W10
X49
W10
X49
W10
X49
W10
X49
W10X49
W10
X49
W10X49W10X49
W10X49
W10X49
W10X49W10X49
W10X49
W10X49
W10X49
W10X49W10X49
W10X49
W8X
28
W8X
28
W8X
28
W8X
28
W8X
28
W8X
28
W8X
28
W8X
28
W8X
28
W8X
28
W8X
28
W8X
28
W8X
28
W8X
28
W8X
28
W8X
28
W8X
28
W8X
28
W8X
28
W8X
2 8
W8X
28
W8X
28
W8X
28
W8X
28
W8X
28
W8X
28
W8X
28
W8X
28
W8X
28
W8X
28
W8X
28
W8X
28
W8X
28
W8X
28
W8X
28
W8X
28
W8X
28
W8X
28
W8X
28
W8X
28
W8X
28
W8X
28
W8X
28
W8X
28
W8X
28
W8X
28
W8X
28
W8X
28
W8X
28
W8X
28
W8X
28
W8X
28
W8X
28
W8X
28
W8X
28
W8X
28
W8X
28
W8X
28
W8X
28
W8X
28
W8X
28
W8X
28
W8X28
W8X28
W8X28
W8X28
W8X28
W8X28
W8X28
W8X28
W8X28
W8X28
W8X28
W8X28
W8X28
W8X28
W8X28
W8X28
W8X
28
W8X
28
W8X
28
W8X
28
W8X
28
W10X49
W10X49
W10X49
W8X
28
W8X
28
W8X
28
W8X
28
W8X
28
W8X
28
W8X
28
W8X
28
W8X
28
W8X
28
W8X
28
W8X
28
W8X
28
W8X
28
W8X
28
W8X
28
1
S-107
2
S-107
14' -
1"10
' - 10
"13
' - 9"
16' -
7"17
' - 6 1
/2"
26' -
0 1/2
"9'
- 1"
2' - 1
1/2"
129'
- 0 1/
2"
27' - 0" 26' - 0" 26' - 6" 26' - 6" 26' - 4" 35' - 2" 14' - 8"
182' - 2"
A
B
2 3 4 5 6
A - 0
A -1
B - 1
D -1
D - 2
7.1
71
D
C
1
2
S-107
S-107
W8X
28
W8X
28
W8X
28
W8X
28
W8X
28
W8X
28
W8X
28
W8X
28
W8X
28
W8X
28
W8X
28
W8X
28
W8X
28
W8X
28
W8X
28
W8X
28
W8X
28
W8X
28
W8X
28
W8X
28
W8X
28
W8X
28
W8X
28
W8X
28
W8X
28
W8X
28
W8X
28
W10X49W10X49
W8X
28
W8X
28
W8X
28
W8X
28
W8X
28
W8X
28
W8X
28
W8X
28
W8X
28
W8X
28
W8X
28
W8X
28
W8X
28
W8X
28
W8X
28
W8X
28
W8X
28
W8X
28
W8X
28
W8X
28
W8X
28
W8X
28
W8X
28
W8X
28
W8X
28
W8X
28
W8X
28
W8X
28
W8X
28
W8X
28W
8X28
W8X
28
W8X
28
W8X
28
W8X
28
W8X
28
W8X
28
W8X
28
W8X
28
W8X
28
W8X
28
W8X
28
W8X
28
W8X
28
W8X
28
W8X
28
W8X
28
W8X
28
W8X
28
W8X
28
W8X
28
W8X
28
W8X28
W8X28
W8X28
W8X28
W8X28
W8X28
W8X28
W8X28
W8X28
W8X28
W8X28
W8X28
W8X28
W8X28
W8X28
W8X28
W8X
28
W8X
28
W8X
28
W8X
28
82X8
W82
X8W
W8X
28
W8X
28
W8X
28
W8X
28
W8X
28
W10
X49
W10
X49
W10
X49
W10
X49
W10X49
94X01
W94
X01W
W10X49
94X01W94X01W
94X01W94X01W
W10X49
W10
X49
W10
X49
W10
X49
W10
X49
W10
X49
W10X49
W10
X49
W10X49
W10
X49
W10
X49
W10X49
W10
X49
W10X49
W10X49
W10
X49
W10
X49
W10
X49
W10
X49
W10X49
W10X49
W10X49
W10X49
W10
X49
W10X49
94X01W94X01W
W10X49
W10
X49
94X01W94X01W
W10X49 W10X49
W27
X94
W27
X94
W27
X94
W27X94
49X72
W49
X72W
49X72
W
W27X94
W10
X49
W10
X49
W10X49
W10X49
W10X49
W10
X49
W10X49
W10
X49
W10X49
W10
X49
27' - 0" 26' - 0" 26' - 6" 26' - 4" 35' - 2"
26' -
0 1/
2"34
' - 1
1/2"
24' -
7"
24' -
11"
52' -
8"
182' - 2"
30' -
4"2'
- 1 1
/2"
128'
- 6 1
/2"
26' - 6"
Level 2
ROOF Level28' - 6"
LEVEL B-20' - 0"
LEVEL 1-6' - 0"
A - 0 A A -1 B B - 1 C D D -1 D - 2
14' - 1" 24' - 7" 16' - 7" 17' - 6 1/2" 26' - 0 1/2" 9' - 1"
107' - 10 1/2"
SECTION 1
Level 2
ROOF Level28' - 6"
LEVEL B-20' - 0"
LEVEL 1-6' - 0"
A - 0 A A -1 B B - 1 C D D -1 D - 2
14' - 1" 24' - 7" 16' - 7" 17' - 6 1/2" 26' - 0 1/2" 9' - 1"
107' - 10 1/2"
SECTION 2
NORTH ELEVATIONEAST ELEVATIONSECTION C - C
CAMH
SECTION B - B
CAMH
SECTION A - A
NOBEL CENTER: Transform / 2014Instructor: Matt Johson
The Nobel center situated on Blasieholmen peninsula in Stockholm. As an architectural representation of the Nobel Prize, the Nobel Center will serve as a space to promote creativity and innovative thinking in finding solutions for the world's major challenges of today and of the future.
This project is base on the idea of performance driven structure. It transfrom from landscape to hardscape to a ventilated facade system for the building. The Ventilated facade is made up of glass and perforated panels, it will allow the building to retain solar heat and allow the hot air raise through the building to keep the interior of the building warm.
The circulation of the site is to allow public to pass through the project with a direct connection to the water but also educate the public about the Noble Prize druing the process. The performance space and gallery usage is located on the ground floor. The cafe is located on the second floor. The third and fourth are more pivate usages such as library, workshop, conference rooms.
SITE EXISTING SITE CiRCULATION
MASSING FOOTPRINTPLAZA SPACECIRCULATION THROUGH THE SITE
PARKING
MASSING DIAGRAM
PLACED FORM BASE ON PROGRAMS LEVEL SEPERATION
VERTICAL CIRCULATION CLADDING FACADE
UPPER LEVEL CONNECTION MIMICK LANDSCAPE
TRANSFRORM DIAGRAM
SITE PLAN
OVERVIEW
WALL SECTION DETAIL + 3D RENDERING
up
up
RESTROOM
STAGEGREEN ROOM CONTROL
ROOM
AUDITORIUM
SHOP
CLOAK RM
INFORMATION CENTER
VISITOR AREA
VIDEO ROOM
SPECIAL GALLERY
BACK OFFICE
LOADING LOGISTICS
up
down
down
up
A
A’
B’
B
AA
up
RESTROOM
STAGE
CAFE
MEZZANINE
KITCHEN
STG
CATWALK
GROUND LEVEL LEVEL 2
NOTHEAST ELEVATION EAST ELEVATION
up
up
WORKSHOP
OFFICE
CONFERENCE RM
LIBRARY
down
CONFERENCE ROOM
OFFICE
OFFICE
OFFICE
RESTROOM
down
OFFICE
LEVEL 3 LEVEL 4
SOUTH ELEVATION SECTION A - A” SECTION B - B”SOUTH ELEVATION
stage
catwalk
office
visitor area
SESECTCCT OIOIONN AA - A”A”
stage
catwalk
office
visitorarea
conference room
office
auditorium
mezzanine
control room
shop
SESECTCTIOIONN BB - B”B”
visitor area
special gallery
back office
kitchencafe
library
office