Town of Georgina Committee of the Whole October 15, 2012 Upper York Sewage Solutions Individual Environmental Assessment Project Update Daniel Kostopoulos Director, Capital Planning and Delivery

Upload: others

Post on 17-Mar-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: YORK-#4436703-v2- Upper York Sewage Solutions Individual ... · 15-10-2012  · Town of Georgina Committee of the Whole October 15, 2012 Upper York Sewage Solutions Individual Environmental

Town of GeorginaCommittee of the Whole

October 15, 2012

Upper York Sewage Solutions Individual Environmental Assessment

Project Update

Daniel KostopoulosDirector, Capital Planning and Delivery

Page 2: YORK-#4436703-v2- Upper York Sewage Solutions Individual ... · 15-10-2012  · Town of Georgina Committee of the Whole October 15, 2012 Upper York Sewage Solutions Individual Environmental

Slide 2

Project Background Environmental Assessment Process Proposed Water Reclamation Centre

Rationale for Site Selection Recommended Site Recommended Outfall and Conveyance

Next Steps

Presentation Summary

Page 3: YORK-#4436703-v2- Upper York Sewage Solutions Individual ... · 15-10-2012  · Town of Georgina Committee of the Whole October 15, 2012 Upper York Sewage Solutions Individual Environmental

Slide 3

Project Timeline

Submission of Environmental

Assessment Report for review and approval by

Minister of the Environment

2009

York Region commences Upper York Sewage

Solutions (UYSS) Individual Environmental Assessment with Terms

of Reference

Jun

2009

Final Lake Simcoe Protection Plan

Mar 20

10

Minister of the Environment approves

Terms of Reference with addition of “Innovative Wastewater Treatment

Technologies” Alternative

Final Phosphorus Reduction Strategy

Lake Simcoe Water Reclamation Centre

identified as Preferred Alternative with

Modifications to the YDSS

Jun

2010 Oct

2011 2013Oct

2012

Lake Simcoe Water Reclamation Centre

Site and YDSS Modification Route

Recommended

Page 4: YORK-#4436703-v2- Upper York Sewage Solutions Individual ... · 15-10-2012  · Town of Georgina Committee of the Whole October 15, 2012 Upper York Sewage Solutions Individual Environmental

Slide 4

A Sustainable Servicing Solution

Wastewater from growth in East Gwillimbury and a portion of Newmarket will be conveyed to an innovative sewage treatment plant (Water Reclamation Centre)

Wastewater from growth in Aurora and a portion of Newmarket will be conveyed to the existing York Durham Sewage System (YDSS) for discharge to Lake Ontario

Modifications to existing YDSS include additional forcemainconnecting Newmarket, Aurora and Bogart Creek Pumping Stations

East Gwillimbury

28 MLD

Water Reclamation Centre- Advanced technology- Phosphorus off-sets- Potential use of Reclaimed Water

Aurora

11 MLD

Newmarket

5 MLD

3 MLD

Modifications to existing YDSS

Page 5: YORK-#4436703-v2- Upper York Sewage Solutions Individual ... · 15-10-2012  · Town of Georgina Committee of the Whole October 15, 2012 Upper York Sewage Solutions Individual Environmental

Slide 5

EA Process

We Are Here

Page 6: YORK-#4436703-v2- Upper York Sewage Solutions Individual ... · 15-10-2012  · Town of Georgina Committee of the Whole October 15, 2012 Upper York Sewage Solutions Individual Environmental

Slide 6

Proposed Water Reclamation CentreProposed Water Reclamation Centre

Rationale for Site SelectionRecommended Site, Outfall & Conveyance

Infrastructure

Page 7: YORK-#4436703-v2- Upper York Sewage Solutions Individual ... · 15-10-2012  · Town of Georgina Committee of the Whole October 15, 2012 Upper York Sewage Solutions Individual Environmental

Slide 7

Uses sustainable proven technologies –advanced wastewater purification systems and water reclamation technologies• Reverse osmosis membranes provide high quality phosphorus

reduced water to East Holland River• Nutrient rich water for irrigation and industrial processes

Provides unparalleled treatment levels in Ontario Provides a reliable water source that protects against changes in

rainfall intensity and frequency (climate change) Conserves our water resources Provides an opportunity for education, technology,

knowledge transfer and research within the Lake Simcoe watershed

Working together with the LSRCA, MOE & MNR to meet provincial growth plans while providing opportunities to benefit the Lake Simcoe watershed

Working together with the LSRCA, MOE & MNR to meet provincial growth plans while providing opportunities to benefit the Lake Simcoe watershed

Why a Water Reclamation Centre?Why a Water Reclamation Centre?

Page 8: YORK-#4436703-v2- Upper York Sewage Solutions Individual ... · 15-10-2012  · Town of Georgina Committee of the Whole October 15, 2012 Upper York Sewage Solutions Individual Environmental

Slide 8

Improved aquatic habitat conditions from increased baseflow

Improved water quality in the East Holland River from the Water Reclamation Centre outfall

Lake Simcoe Watershed Benefits

Page 9: YORK-#4436703-v2- Upper York Sewage Solutions Individual ... · 15-10-2012  · Town of Georgina Committee of the Whole October 15, 2012 Upper York Sewage Solutions Individual Environmental

Slide 9

Advanced TreatmentDemonstration Facility

Uses secondary effluent from Mount Albert WPCP to demonstrate performance of: Tertiary treatment: Low pressure

membranes (microfiltration) Quaternary treatment: High

pressure membranes (reverse osmosis)

Consistent results following reverse osmosis show phosphorus reduced by 97% -below goal of 0.01 mg/L

Providing design optimization for Water Reclamation Centre

Reverse Osmosis Unit

Open for toursVisit www.uyssolutions.ca for full 

details and schedule

Open for toursVisit www.uyssolutions.ca for full 

details and schedule

Page 10: YORK-#4436703-v2- Upper York Sewage Solutions Individual ... · 15-10-2012  · Town of Georgina Committee of the Whole October 15, 2012 Upper York Sewage Solutions Individual Environmental

Slide 10

Preliminary long list of 98 potential alternative sites was identified based on mandatory site generation criteria:

• Within the Towns of East Gwillimbury and/or Newmarket

• Greater than 30 ha• Between 218 m and 253 m in

elevation• Less than 5 km away from a

permanent waterbodyLegend

Preliminary Long List of Potential Alternative Water Reclamation Centre SitesExisting Approved Holland Landing WPCP

Potential Water Reclamation Centre Sites – December 2011

Page 11: YORK-#4436703-v2- Upper York Sewage Solutions Individual ... · 15-10-2012  · Town of Georgina Committee of the Whole October 15, 2012 Upper York Sewage Solutions Individual Environmental

Slide 11

120 m buffer from sensitive environmental features

120 m buffer from the Greenbelt Natural Heritage System

Avoidance of Conservation Authority Regulated Floodplain Areas, the 5-25 Year Wellhead Protection Areas, and Oak Ridges Moraine

150 m buffer from sensitive land uses Minimum of 15 ha of useable area for the

proposed Water Reclamation Centre

Two sites added through Willing Property Owner Host Process –WH1 and WH2 (resulting in 22 sites)

LegendArea Suitable for Water Reclamation CentreArea Unsuitable for Water Reclamation CentreExisting Approved Holland Landing WPCP

Note: Site 42 included within WH2

Long List of Potential Water Reclamation Centre Sites – December 2011

Long list of 21 sites identified through Site Generation Process using the following criteria:

Page 12: YORK-#4436703-v2- Upper York Sewage Solutions Individual ... · 15-10-2012  · Town of Georgina Committee of the Whole October 15, 2012 Upper York Sewage Solutions Individual Environmental

Slide 12

Advantages of Sites 24, 30, WH1 and WH2:

Greater distance from locally significant wetlands

Greater distance from permanent watercourse/water body feature

Avoidance of existing agricultural operationsand/or structures

Suitability for constructionand operation of a Water Reclamation Centre

Access to regional roads Compatibility with future

land uses

Short List of Potential Water Reclamation Centre Sites – April 2012

Proposed Outfall

LegendArea Suitable for Water Reclamation CentreArea Unsuitable for Water Reclamation CentreProposed Route to OutfallProposed Route from QueensvilleWest Pumping StationExisting Approved Holland Landing WPCPUYSS Service Boundary

Page 13: YORK-#4436703-v2- Upper York Sewage Solutions Individual ... · 15-10-2012  · Town of Georgina Committee of the Whole October 15, 2012 Upper York Sewage Solutions Individual Environmental

Slide 13

WH1 West – Recommended Site

Approved QueensvilleWest Pumping Station

Proposed Outfall

Queensville

Holland Landing

Legend

Area Suitable for Water Reclamation CentreArea Unsuitable for Water Reclamation CentreProposed Route to OutfallProposed Route from Queensville West Pumping StationUYSS Service Area

Hydr

o Co

rrido

r

Page 14: YORK-#4436703-v2- Upper York Sewage Solutions Individual ... · 15-10-2012  · Town of Georgina Committee of the Whole October 15, 2012 Upper York Sewage Solutions Individual Environmental

Slide 14

WH1 West – Recommended Site(2nd Concession 1 km north of Queensville Sideroad)

Combination of natural features (existing ridge line and trees) and planned landscaping features will eliminate and/or minimize views of proposed Water Reclamation Centre – will not be visible from existing adjacent communities

No displacement of cultural heritage (i.e., heritage houses and farms)

Lower capital, operational and maintenance costs Minimal effects to terrestrial habitat and wildlife and no loss

of aquatic habitat Shorter conveyance infrastructure requires less energy

(measured by Carbon Dioxide (CO2) Footprint)

Page 15: YORK-#4436703-v2- Upper York Sewage Solutions Individual ... · 15-10-2012  · Town of Georgina Committee of the Whole October 15, 2012 Upper York Sewage Solutions Individual Environmental

Slide 15

WH1 West – Recommended Site Layout

Page 16: YORK-#4436703-v2- Upper York Sewage Solutions Individual ... · 15-10-2012  · Town of Georgina Committee of the Whole October 15, 2012 Upper York Sewage Solutions Individual Environmental

Slide 16

Water Reclamation CentreRecommended Outfall

Page 17: YORK-#4436703-v2- Upper York Sewage Solutions Individual ... · 15-10-2012  · Town of Georgina Committee of the Whole October 15, 2012 Upper York Sewage Solutions Individual Environmental

Slide 17

Modifications to ExistingYork Durham Sewage System (YDSS)

Rationale for modifications: Upgrades to infrastructure required to ensure

wastewater servicing remains reliable and secure to accommodate approved growth

Allow for operational flexibility with integration of existing YDSS with proposed Water Reclamation Centre

Provide backup to existing Newmarket and Bogart Creek Pumping Stations forcemainsduring periods of high flow (e.g. storm events) and during temporary shut down periods for routine maintenance

Required modifications: Modifications to existing Green Lane Trunk

Sewer to direct flows from northwest Newmarket to existing YDSS or Water Reclamation Centre

Additional wastewater conveyance forcemainbetween Newmarket & Aurora Pumping Stations and between Bogart Creek & Aurora Pumping Stations

17

Existing Trunk Sewer

Newmarket Pumping Station

Bogart Creek Pumping Station

Aurora Pumping Station

Existing Forcemain

Additional Forcemain or Gravity Sewer

Connection with QHLS Wastewater

Servicing

Page 18: YORK-#4436703-v2- Upper York Sewage Solutions Individual ... · 15-10-2012  · Town of Georgina Committee of the Whole October 15, 2012 Upper York Sewage Solutions Individual Environmental

Slide 18

Recommended Routefor YDSS Modifications

LegendRecommended RouteExisting Gravity SewerPumping StationStaging AreaAccess Route

Lower number of temporarily affected residences,businesses and roadways

Lower capital, operational & maintenance cost

Disruption to park areas is minimized through use of trenchless technology

Lowest pumping energy and shortest forcemain length (measured by Carbon Dioxide (CO2) Footprint)

Page 19: YORK-#4436703-v2- Upper York Sewage Solutions Individual ... · 15-10-2012  · Town of Georgina Committee of the Whole October 15, 2012 Upper York Sewage Solutions Individual Environmental

Slide 19

Next Steps Feedback on the recommended Water Reclamation

Centre Site and YDSS Modifications will be used in determining the preferred Site and Route Public meeting in Georgina scheduled for October 23rd

Initiate preliminary design: Water Reclamation Centre Site, Conveyance Infrastructure and

Outfall YDSS Modifications Conveyance Infrastructure

Initiate impact assessment stage of the UYSS EA on the preferred Water Reclamation Centre and YDSS Modifications Conveyance Infrastructure

Final round of consultation events planned forearly 2013