1/15
1 Client name2
3
4 Statutory code
Sr.
No.
Description CE Marking
re uirement1 PA, FD & ID fans
A List of Items which need CE
marking :-
1) Rotating assembly including
rotor, impeller, bearing,
coupling, cooling disc etc.
2) All instrumentation, electric
actuators for inlet & outlet
damper, fan oil lubrication
system etc.
Yes
B List of Items which does notneed CE marking :-
1) Static componenets like
casing, silencer, rainhood,
birdscreen, suction box,
suction cone, base frame,
No
2
A List of Items which need CE
marking :-
1) Rotary feeder with motor
and VFD, limestone feed
blowers with motors,
conveying system from blower
discharge upto furnace
including piping, fitting
,valves, intake tee etc.
2) All instrumentation,
actuators etc.
Yes
B List of Items which does not
need CE marking :-
1) Limestone silo, Limestone
gravity feeding upto rotary
feeder hardware etc.
No
3
Broad CE Marking requirements
Type of Boiler / Equipment
Installation country
Limestone Feeding system
Coal Feeding system
-
8/14/2019 Yildrim CE Marking Requirements.xls
2/15
A List of Items which need CE
marking :-
1) Gravimetric feeders with
motor and VFD, Distribution
conveyors with motor, rotary
air lock feeders with motor,
etc.2) All instrumentation, electric
/ pneumatic operated
actuators etc.
Yes
B List of Items which does not
need CE marking :-
1) Static componenets like
Coal silo, downspout / chute
from silo to feeder and feeder
to furnace, hardware etc.
No
4A List of Items which need CE
marking :-
1) All instrumentation, AC
drive motor, Air motor,
actuators for sealing system,
RAPH rotor, bearing and its
lubrication system etc.
Yes
B List of Items which does not
need CE marking :-1) Static componenets like
RAPH casing, heating
elements, ducts, hardware
No
5
A List of Items which need CE
marking :-
1) Bed ash system -
Conveying compressor with
motor, rotary feeder with
motor, Drag chain conveyors
with motor (06 nos), main ashconveyors with motor (02
nos), bucket elevator with
motor (01 nos), conveying
vessel / pump, piping, fitting
valve, instrumentation,
Ash Handling System
Regenerative Air Preheater
Yes
-
8/14/2019 Yildrim CE Marking Requirements.xls
3/15
B List of Items which need CE
marking :-
1) Air Preheater ash system -
Conveying compressor with
motor, Conveying vessel /
pump, piping, fitting valve,
instrumentation, dedusting
C List of Items which need CE
marking :-
1) MDC ash system -
Conveying compressor with
motor, MDC surge bin,
Conveying vessel / pump,
piping, fitting valve,
instrumentation,dedusting
D List of Items which does not
need CE marking :-
1) Crush bed ash surge bin,
inert bed silo, MDC surge bin,hardware etc.
No
6
A List of Items which need CE
marking :-
1) All instrumentation,
actuators etc.
List of Items which does not
need CE marking :-
1) frame. Blade. Seals etc.
Yes
B List of Items which does not
need CE marking :-
1) frame. Blade. Seals,
hardware etc.
No
Dampers in air and Flue Gas path
-
8/14/2019 Yildrim CE Marking Requirements.xls
4/15
Yildrim
1 x 300 MW TPH CFBC Boiler
Turkey
ASME With CE Marking
Applicable EC Directive
2006/42/EC - Machinery Directive
2006/95/EC - Low Voltage Directive
2004/108/EC- Electromagnetic Compatibility
-
2006/42/EC - Machinery Directive
2006/95/EC - Low Voltage Directive
97/23/EC - Pressure Equipment Directive
2004/108/EC - Electromagnetic Compatibility
-
-
8/14/2019 Yildrim CE Marking Requirements.xls
5/15
2006/42/EC - Machinery Directive
2006/95/EC - Low Voltage Directive
2004/108/EC - Electromagnetic Compatibility
-
2006/42/EC - Machinery Directive
2006/95/EC - Low Voltage Directive
2004/108/EC - Electromagnetic Compatibility
-
2006/42/EC - Machinery Directive
2006/95/EC - Low Voltage Directive
2004/108/EC - Electromagnetic Compatibility
2009/105/EC - Simple Pressure Vessels
97/23/EC - Pressure Equipment Directive
-
8/14/2019 Yildrim CE Marking Requirements.xls
6/15
-
2006/42/EC - Machinery Directive
-
-
8/14/2019 Yildrim CE Marking Requirements.xls
7/15
Applicable Documentation & Certification
Release of Engineering Specification
DOC- Declaration of Conformity by Manufacturer
alongwith Declaration of Incorporation for assembly,
Manufacturers Test Certificate as per BS EN 10204.
DOC- Declaration of Conformity by Assembler alongwith
Backup of DOC of Motor, Actuator & Valve.
Operation & Maintanance Instruction Manual Machinery
Directive is applicable to Partly Supplied or assembled
parts or components, at least one of which moves, with
the appropriate actuators, control and power circuit etc.,
joined together for specific application.
Release of Engineering Specification
DOC- Declaration of Conformity by Manufacturer
alongwith Declaration of Incorporation for assembly,
Manufacturers Test Certificate as per BS EN 10204.
DOC- Declaration of Conformity by Assembler alongwith
Backup of DOC of Motor, Actuator & Valve.
Operation & Maintanance Instruction Manual Machinery
Directive is applicable to Partly Supplied or assembled
parts or components, at least one of which moves, with
the appropriate actuators, control and power circuit etc.,
joined together for specific application.
-
8/14/2019 Yildrim CE Marking Requirements.xls
8/15
Release of Engineering Specification
DOC- Declaration of Conformity by Manufacturer
alongwith Declaration of Incorporation for assembly,
Manufacturers Test Certificate as per BS EN 10204.
DOC- Declaration of Conformity by Assembler alongwith
Backup of DOC of Motor, Actuator & Valve.
Operation & Maintanance Instruction Manual MachineryDirective is applicable to Partly Supplied or assembled
parts or components, at least one of which moves, with
the appropriate actuators, control and power circuit etc.,
joined together for specific application.
Release of Engineering Specification
DOC- Declaration of Conformity by Manufacturer
alongwith Declaration of Incorporation for assembly,
Manufacturers Test Certificate as per BS EN 10204.
DOC- Declaration of Conformity by Assembler alongwith
Backup of DOC of Motor, Actuator & Valve.
Operation & Maintanance Instruction Manual Machinery
Directive is applicable to Partly Supplied or assembled
parts or components, at least one of which moves, with
the appropriate actuators, control and power circuit etc.,
joined together for specific application.
Release of Engineering Specification
DOC- Declaration of Conformity by Manufacturer
alongwith Declaration of Incorporation for assembly,
Manufacturers Test Certificate as per BS EN 10204.
DOC- Declaration of Conformity by Assembler alongwith
Backup of DOC of Motor, Actuator & Valve.
Operation & Maintanance Instruction Manual MachineryDirective is applicable to Partly Supplied or assembled
parts or components, at least one of which moves, with
the appropriate actuators, control and power circuit etc.,
joined together for specific application.
-
8/14/2019 Yildrim CE Marking Requirements.xls
9/15
Release of Engineering Specification
DOC- Declaration of Conformity by Manufacturer
alongwith Declaration of Incorporation for assembly,
Manufacturers Test Certificate as per BS EN 10204.
DOC- Declaration of Conformity by Assembler alongwith
Backup of DOC of Motor, Actuator & Valve.
Operation & Maintanance Instruction Manual Machinery
Directive is applicable to Partly Supplied or assembled
parts or components, at least one of which moves, with
the appropriate actuators, control and power circuit etc.,joined together for specific application.
-
8/14/2019 Yildrim CE Marking Requirements.xls
10/15
Vendors Responsibility for CE Marking
Individual sub assemblies of the total asssembly will have
CE marking as supplied by vendor.
For assembly at site, vendor shall provide technical
advisory services during erection.
The responsibility of assembling entire system conforming
to CE requirement and obtaining CE certification including
documentation if any is not considered in vendor scope.
Individual sub assemblies of the total asssembly will have
CE marking as supplied by vendor.
For assembly at site, vendor shall provide technical
advisory services during erection.
The responsibility of assembling entire system conforming
to CE requirement and obtaining CE certification including
documentation if any is not considered in vendor scope.
-
8/14/2019 Yildrim CE Marking Requirements.xls
11/15
Individual sub assemblies of the total asssembly will have
CE marking as supplied by vendor.
For assembly at site, vendor shall provide technical
advisory services during erection.
The responsibility of assembling entire system conformingto CE requirement and obtaining CE certification including
documentation if any is not considered in vendor scope.
Individual sub assemblies of the total asssembly will have
CE marking as supplied by vendor.
For assembly at site, vendor shall provide technical
advisory services during erection.
The responsibility of assembling entire system conforming
to CE requirement and obtaining CE certification including
documentation if any is not considered in vendor scope.
Individual sub assemblies of the total asssembly will have
CE marking as supplied by vendor.
For assembly at site, vendor shall provide technical
advisory services during erection.
The responsibility of assembling entire system conformingto CE requirement and obtaining CE certification including
documentation if any is not considered in vendor scope.
-
8/14/2019 Yildrim CE Marking Requirements.xls
12/15
-
8/14/2019 Yildrim CE Marking Requirements.xls
13/15
B & W Reply / Comment dt.
-
8/14/2019 Yildrim CE Marking Requirements.xls
14/15
-
8/14/2019 Yildrim CE Marking Requirements.xls
15/15