yard management system - newsletter road to recovery...

31
Yard Management System By Automation Division Tata Steel Ltd. At CII Steel summit, Delhi On 4 th November, 2009

Upload: docong

Post on 12-Mar-2018

229 views

Category:

Documents


3 download

TRANSCRIPT

Page 1: Yard Management System - Newsletter road to recovery …newsletters.cii.in/newsletters/steelsummit2009/pdf... ·  · 2013-05-20Yard Management System By Automation Division Tata

Yard Management SystemBy

Automation Division

Tata Steel Ltd.

At 

CII Steel summit, Delhi

On 4th November, 2009

Page 2: Yard Management System - Newsletter road to recovery …newsletters.cii.in/newsletters/steelsummit2009/pdf... ·  · 2013-05-20Yard Management System By Automation Division Tata

CONTENTSCONTENTSYMS FunctionYMS Function(Sachin Gupta)(Sachin Gupta)

Why ?FunctionsBenefits

Highlights

YMS Case Study YMS Case Study (Joshi Jacob)(Joshi Jacob)

Coil Tracking & Transport Systemat CRM

Page 3: Yard Management System - Newsletter road to recovery …newsletters.cii.in/newsletters/steelsummit2009/pdf... ·  · 2013-05-20Yard Management System By Automation Division Tata
Page 4: Yard Management System - Newsletter road to recovery …newsletters.cii.in/newsletters/steelsummit2009/pdf... ·  · 2013-05-20Yard Management System By Automation Division Tata

BEFORE YMS: Yard ScenarioBEFORE YMS: Yard Scenario

A Trailer ArrivesWith Some Material

Manual Reporting of Material Arrivals or At Berth

Manual Job Orders To TheTransporter & Operator

PLZ..PLZ…PLZ do this……

Page 5: Yard Management System - Newsletter road to recovery …newsletters.cii.in/newsletters/steelsummit2009/pdf... ·  · 2013-05-20Yard Management System By Automation Division Tata

YARDYARD YARD

YARDYARD

Crane Operation ByHand/Manual Signaling

BEFORE YMS: Yard ScenarioBEFORE YMS: Yard Scenario

Page 6: Yard Management System - Newsletter road to recovery …newsletters.cii.in/newsletters/steelsummit2009/pdf... ·  · 2013-05-20Yard Management System By Automation Division Tata

YARDYARD

YARDYARD

YARDYARD

YARDYARD

Continuing instructions for the material movement

Maintenance of ‘spread sheets’, ‘clip board’ or ‘tables’ to update the stock information

BEFORE YMS: Yard ScenarioBEFORE YMS: Yard Scenario

Page 7: Yard Management System - Newsletter road to recovery …newsletters.cii.in/newsletters/steelsummit2009/pdf... ·  · 2013-05-20Yard Management System By Automation Division Tata

Manual Search Of Materials In Yard

YARDYARD

YARDYARD

YARDYARD

YARDYARD

• Poor house keeping• Labor intensive jobs• Inconsistency of information• Poor planning at all stages• Poor compliances to the

order fulfillment

End ResultsEnd Results

Page 8: Yard Management System - Newsletter road to recovery …newsletters.cii.in/newsletters/steelsummit2009/pdf... ·  · 2013-05-20Yard Management System By Automation Division Tata

Problems Encountered Problems Encountered

• Everyone keeps different information.• Information never remains current.• Researching trailer status takes hours. • Locating materials is tedious.• Visualizing yard is even more complex.• Staff spent time on trailer shuffling on yard.• Phone, fax times takes up to hours a day.

Page 9: Yard Management System - Newsletter road to recovery …newsletters.cii.in/newsletters/steelsummit2009/pdf... ·  · 2013-05-20Yard Management System By Automation Division Tata

Effects on Plant Operation?Effects on Plant Operation?

• High labor cost due to manpower involvement at all stages.

• High operating & maintenance cost due to lack of process optimization and damages resulting from operator errors.

• Poor product tracking due to verbal data transfer, loss of time/material.

Generic Yard Management System (Yard Scope) Addresses Each of These Problems.

Page 10: Yard Management System - Newsletter road to recovery …newsletters.cii.in/newsletters/steelsummit2009/pdf... ·  · 2013-05-20Yard Management System By Automation Division Tata

STOCK IN MANAGEMENTMaterial receipt management in yards.Material feeding to various process lines.

YARD MANAGEMENTOptimized material storage in yards (location management)Material movement across different yards & process lines.Material re-arrangement as pre-dispatch arrangement.

STOCK OUT MANAGEMENTEvacuation of materials from different process lines.Dispatch planning.

YMS: Functional ModulesYMS: Functional Modules

Page 11: Yard Management System - Newsletter road to recovery …newsletters.cii.in/newsletters/steelsummit2009/pdf... ·  · 2013-05-20Yard Management System By Automation Division Tata

EQUIPMENTS MANAGEMENTCrane management.Coil conveyor management.Transfer car management.

PROCESS LINE TRACKINGMaterial tracking and history in its complete lifecycle across

process lines. System interfaces with Line L#1, Line L#2, SAP & MES for

capturing relevant information and process interlocking.DESPATCH MANAGEMENT.

Execution of dispatch plan in accordance for best fit.Wagon/trailer tracking (Thru Vehicle Tracking System).Reporting and documentation.

YMS: Functional ModulesYMS: Functional Modules

Page 12: Yard Management System - Newsletter road to recovery …newsletters.cii.in/newsletters/steelsummit2009/pdf... ·  · 2013-05-20Yard Management System By Automation Division Tata

YMS: HighlightsYMS: Highlights• Single window Logistics solution

• Inbound• In Process• Outbound

• Inter/Intra yard material flow scheduling• Yard optimization• Contingency handling

• Equipment Control, Tracking & Interlocking• Crane control• Transfer car tracking• Coil conveyor tracking

Page 13: Yard Management System - Newsletter road to recovery …newsletters.cii.in/newsletters/steelsummit2009/pdf... ·  · 2013-05-20Yard Management System By Automation Division Tata

YMS: HighlightsYMS: Highlights

• Smart information management– Transparent information flow and consistency– Seamless connectivity with lower (process) and

higher (SAP/MES) level systems– User defined reporting and visualization

• Scalable and Expandable – Bay extensions/additions– Yard re-configurations

Page 14: Yard Management System - Newsletter road to recovery …newsletters.cii.in/newsletters/steelsummit2009/pdf... ·  · 2013-05-20Yard Management System By Automation Division Tata

Principal ComponentsPrincipal ComponentsRemoteClients

RF Networking & Mobile Hand Held

TerminalsLoading/UnloadingYard Map Updating

Crane AutomationGuidance SystemAuto-Positioning

Process InterfacesLine L-1/2S.A.P.M.E.S.

Process InterlockingConveyorsTransfer CarsCranes

Yard Mgt. ServerStock InStock OutDispatchTrackingEquipment Mgt.Reporting

Man Machine Interfaces

Yard ManagementCrane Automation

Page 15: Yard Management System - Newsletter road to recovery …newsletters.cii.in/newsletters/steelsummit2009/pdf... ·  · 2013-05-20Yard Management System By Automation Division Tata

YMS: Hardware & Software PlatformsYMS: Hardware & Software Platforms

Operating systemOperating system

• Server – Win 2008 Server.

• Crane  – Win XP Embedded.

RF NetworkRF Network• On Ground – 2.4GHz DSSS

• On Crane – 2.4GHz DSSS

Application softwareApplication software

• Server – Sun Java

• Crane – C# 2.0

OthersOthers• PLC/Drives (Cranes)

• Laser Distance Meters

Data BaseData Base

• Server – Oracle 10G

• Crane – None

Computer HardwareComputer Hardware

• Server – HP Proliant

• Clients – Panel PC.

Page 16: Yard Management System - Newsletter road to recovery …newsletters.cii.in/newsletters/steelsummit2009/pdf... ·  · 2013-05-20Yard Management System By Automation Division Tata

CASE STUDYCTTS / SYMS

At 

Tata Steel Ltd.

Page 17: Yard Management System - Newsletter road to recovery …newsletters.cii.in/newsletters/steelsummit2009/pdf... ·  · 2013-05-20Yard Management System By Automation Division Tata

CONTENTSCONTENTS

Details of CRMLayout of CRMOperations in the yardCTTS system configurationInterfaces of CTTSVarious process times of coil handlingBenefits

Page 18: Yard Management System - Newsletter road to recovery …newsletters.cii.in/newsletters/steelsummit2009/pdf... ·  · 2013-05-20Yard Management System By Automation Division Tata

DETAILS OF CRM PLANT DETAILS OF CRM PLANT

• No of process lines – 11 (PLTCM -1, ECL -1, BAF-1, SPM-1,CGL -2, RCL -3, PL -1, CPL -1)

• No of cranes under CTTS control- 18• No of coil cars & conveyors – 10• No of storage bays – 7• Storage space – 3800 coils• Average coil movements per day – 1000 coils• Dispatch – Rated - 3500 T/day,

Page 19: Yard Management System - Newsletter road to recovery …newsletters.cii.in/newsletters/steelsummit2009/pdf... ·  · 2013-05-20Yard Management System By Automation Division Tata

LAYOUT OF CRM AT TATA STEELLAYOUT OF CRM AT TATA STEEL

Page 20: Yard Management System - Newsletter road to recovery …newsletters.cii.in/newsletters/steelsummit2009/pdf... ·  · 2013-05-20Yard Management System By Automation Division Tata

COMPLEXITY IN THE COMPLEXITY IN THE DIFFERENT YARD OPERATIONSDIFFERENT YARD OPERATIONS

Page 21: Yard Management System - Newsletter road to recovery …newsletters.cii.in/newsletters/steelsummit2009/pdf... ·  · 2013-05-20Yard Management System By Automation Division Tata

YARD MANAGEMENT SERVER

LAYER 3 SWITCH

SWITCH AT YARD1

SWITCH AT YARD2

SWITCH AT YARD3 SWITCH AT YARD4

RADIOACCESS

POINT

RADIOACCESS

POINT

RADIOACCESSPOINT

RADIOACCESS

POINT

CRANERF

CRANERF

CRANERF

CRANE RF

DEVELOPMENT PC’SNETWORKPRINTER

SYSTEM ARCHITECTURE

CTTS SYSTEM CONFIGURATIONCTTS SYSTEM CONFIGURATION

Page 22: Yard Management System - Newsletter road to recovery …newsletters.cii.in/newsletters/steelsummit2009/pdf... ·  · 2013-05-20Yard Management System By Automation Division Tata

CTTS SYSTEM INTERFACE STRUCTURECTTS SYSTEM INTERFACE STRUCTURE

CTTS Server

CRM-IS ServerProduction Scheduling & Recording

Crane ComputerGuidance, Data Communication

Level-I(Conveyor/Coil Car)Movement Control

Line Computer(PLTCM, SPM, RCL, CPL)Production, Mill Setup

HHTYard Verification, Trailer Arrival Events

PDICoil Supply Request

Weighing ResultTracking Information

Coil Supply CompletionLocation Result

Saddle StatusLock Result

Lock/Unlockrequest

Lock/Unlockrequest

Lock/Unlockresult

Crane Work Order Crane Work resultCrane Position

Work Information Trailer Arrival

Work Result

CYMS ServerHR Coil Transport

HR CoilTransportation

ReturningResult

SAPOrder Management

Picking List PickingResult

Page 23: Yard Management System - Newsletter road to recovery …newsletters.cii.in/newsletters/steelsummit2009/pdf... ·  · 2013-05-20Yard Management System By Automation Division Tata

Loading Time4%

Time of Coil on Saddle 62%

Rolling Time0%

Trailor Waiting Time15%

Stocking Time1%

Waiting for despatch18%

VARIOUS PROCESS TIMEVARIOUS PROCESS TIME

Page 24: Yard Management System - Newsletter road to recovery …newsletters.cii.in/newsletters/steelsummit2009/pdf... ·  · 2013-05-20Yard Management System By Automation Division Tata

Wrong Trailor Loading

17%

Coil Tracing time for Loading

31%

Manual Data and Doc. Handling

20%

Delay in Trailor arrival Inf.

27%

Delay in Stocking due to Manual Coordination

5%

FACTORS INFLUENCINGFACTORS INFLUENCINGYARD OPERATIONYARD OPERATION

Page 25: Yard Management System - Newsletter road to recovery …newsletters.cii.in/newsletters/steelsummit2009/pdf... ·  · 2013-05-20Yard Management System By Automation Division Tata

Wrong Trailor Loading

17%

Delay in Stocking time, Information

to Crane5%

Delay in Trailor arrival

Information27%

Manual Data and Doc. Handling

20%Coil Tracing time

for Loading31%

AREAS WHERE WE CAN IMPROVE BY CTTSAREAS WHERE WE CAN IMPROVE BY CTTS

LOCATION BASED TRACKING SYSTEMWITH AUTOPOSITIONING

COMPUTERIZED YARDMANAGEMENT SYSTEMPROVIDES EFFECTIVE DOCUMENT HANDLING

TRAILOR TRACKING SYSTEMENABLES IDENTIFICATION OFRIGHT TRAILOR FOR RIGHTCOIL IN RIGHT TIME

WIRELESS DATACONNECTIVITY TO CRANE ENABLESINSTANT MESSAGING.

Page 26: Yard Management System - Newsletter road to recovery …newsletters.cii.in/newsletters/steelsummit2009/pdf... ·  · 2013-05-20Yard Management System By Automation Division Tata

BENEFITS OF YARD MANAGEMENT AT CRMBENEFITS OF YARD MANAGEMENT AT CRM

• CRM dispatch increased from 1.2 MT to 1.5 MT (increase of 25%, CTTS had a part to play).

Maximization of yard space utilization.

• Reduction of demurrage charges due to wagon turn around time

(documentation – Wagon builder software)due to reduction in trucks/trailer waiting time

& visibility (VTS)

• Reduction in inventory held- due to visibility of material,reduction in various process cycle times.

Page 27: Yard Management System - Newsletter road to recovery …newsletters.cii.in/newsletters/steelsummit2009/pdf... ·  · 2013-05-20Yard Management System By Automation Division Tata

SLAB CASTER YARD LAYOUTSLAB CASTER YARD LAYOUT

Page 28: Yard Management System - Newsletter road to recovery …newsletters.cii.in/newsletters/steelsummit2009/pdf... ·  · 2013-05-20Yard Management System By Automation Division Tata

SYMS SYSTEM CONFIGURATIONSYMS SYSTEM CONFIGURATION

Page 29: Yard Management System - Newsletter road to recovery …newsletters.cii.in/newsletters/steelsummit2009/pdf... ·  · 2013-05-20Yard Management System By Automation Division Tata

BENEFITS OF SYMS AT TATA STEELBENEFITS OF SYMS AT TATA STEEL

•Optimum utilisation of space – handling of 2 MT from 1MT in the same yard (investments in equipment handling also)

•Increase in use of direct hot slabs in rolling from nil to 54% (investments in equipments like CTRT also)

•Scheduling effectiveness from 60% to 67% ( compliance to schedule generated from FP planning system)

•Reduction of lost slabs – due to traceability – down from 20% to zero. (in conjunction with FP planning system)

Page 30: Yard Management System - Newsletter road to recovery …newsletters.cii.in/newsletters/steelsummit2009/pdf... ·  · 2013-05-20Yard Management System By Automation Division Tata

YMSYMS-- DRIVER FOR OPERATIONAL EXCELLENCEDRIVER FOR OPERATIONAL EXCELLENCE

• Achieving 100% visibility of vehicles/wagons (VTS) and inventoryAchieving 100% visibility of vehicles/wagons (VTS) and inventory, in , in the yard.the yard.

•• Leveraging a single point of yard command and controlLeveraging a single point of yard command and control

•• Achieving dispatch compliance to customers Achieving dispatch compliance to customers

•• Maximizing yard space utilisation ( 2high coils, traceability eMaximizing yard space utilisation ( 2high coils, traceability etc )tc )

•• Facilitating transport appointment scheduling (VTS) Facilitating transport appointment scheduling (VTS)

Page 31: Yard Management System - Newsletter road to recovery …newsletters.cii.in/newsletters/steelsummit2009/pdf... ·  · 2013-05-20Yard Management System By Automation Division Tata