Yantra Harvest Energy Pvt Ltd
YANTRA HARVEST – ESCO EXPERIENCE & SUCCESS STORY
Started ESCO Business – MV Drive Based Solutions : 2007
2
Yantra Harvest Energy Pvt Ltd
VISION & MISSION STATEMENT
About Us
Yantra Harvest Energy Pvt Ltd is at the forefront of High Value Energy Saving Solutions since 2006 even before the current PAT scheme was in Place. We have proven track record to supply, install & commission turnkey basis
energy saving solutions with performance contracting with/without finance to major customers in core sector such as in Metal, Power, Cement, Oil & Gas. We have been rewarded with repeat orders from Majority of
Customers.
Vision
Yantra Harvest Energy intends to become India's Leading Energy Saving Solution provider company serving
energy intensive sectors & contributing to global mission of Co2 reduction & fossil fuel Conservation.
Mission
�To save 300MW power for country in Power/ Metal/Cement/Water/Oil & Gas industry in next 5 years
�Provide energy saving solutions packages using MV Drive & allied product�Apply innovative business modes like "Pay for performance / Performance base contracting", providing highest
value to the customers.�Provide lowest life cycle cost through innovative service models
Customer Partnership
We at Yantra understand that our customers influence every aspect of our business and are the foundation of our
30 years of successful enterprise. We believe in a shared journey by finding mutually satisfying solutions to
shared problems and a dedication to excellence in every sale or service opportunity. We are committed to forging long-term relationships that create synergies of knowledge, delivery, cost effectiveness and adaptability for our
customers.
2
3
Yantra Harvest Energy Pvt Ltd
Yantra Solution and Methodology-Performance Contracting
YANTRA- Methodology & Turn-Key Solution
4
Yantra Harvest Energy Pvt Ltd
YHEPL- CONCEPT
3
5
Yantra Harvest Energy Pvt Ltd
Yantra Harvest : Total Value Added Approach
a) MV VFD System
b) Bypass System
c) Air-conditioning System
d) Cable Laying /Cable Schedule
e) Civil Room – VFD Panel
f) Interfacing /Tuning with DCS –PLC
a) Post Warranty AMC
b) Service Spares at Plant Level during Warranty
Service Back up :
YHEPL- TURN KEY SOLUTION
6
Yantra Harvest Energy Pvt Ltd
ADVANTAGES OF ESCO MODEL
� ESCO takes on the risk of not achieving the prescribed saving.
� Turnkey Services- ESCO Provides all required services.
� Your business/institution requires less internal expertise as experts
with proven experience and track record carry on jobs. End user
may or may not have technical staff to make solution and achieve
targeted saving on procuring just product.
� Project financing can be “off Balance Sheet” and hence not affect
on debt load. On other hand- various tax incentive available and
proper documentation.
4
7
Yantra Harvest Energy Pvt Ltd
Performance Based Contracting !!-ESCO Model
Performance Contacting
� Energy Saving Guarantee Decided .
� Payback within agreed limits
� Price /KW Saved decided .
� Penalty for non achievement decided .
� Payments After Min Period of Performance
- Typically 60 days .
Pay-Out-of-Saving
� Energy Saving Guarantee Decided .
� Payback within agreed limits
� Finance Cost included
� EMI Decided within stipulated time or Shared Energy
Basis
� Penalty for non achievement decided .
8
Yantra Harvest Energy Pvt Ltd
PAY OUT OF SAVING
- PERFORMANCE CONTRACTS
Yantra Solution and Methodology-POS
5
9
Yantra Harvest Energy Pvt Ltd
RELIANCE ENERGY - DAHANU
Dahanu Thermal Power Station
APPLICATION RATING IN KW/KV PROJECTED SAVING IN KW
SAVING ACHIEVED IN
KW
CEP – 2A 880KW/6.6KV 150KW 175KW
PA FAN 1350KW/6.6KV X 2 250KW 280KW
CEP – 1A 880KW/6.6KV 150KW 175KW
� PAY OUT OF SAVING – PERFORMANCE CONTRACT
� TURN-KEY BASE PROJECT
� ALL INVESTMENT BY YANTRA HARVEST
� PAYMENT IN MONTHLY EMI FOR 30 MONTHS
� FIRST EMI START AFTER PROVING PROJECTED
SAVING AND ONE MONTH PERFORMANCE
OBSERVATION.
� PENALTY PER EVERY LESS KW SAVING IN PAYMENT.
� REWARDED WITH REPEAT ORDERS.
10
Yantra Harvest Energy Pvt Ltd
APPLICATION RATING IN KW/KV
PROJECTED SAVING IN KW
SAVING ACHIEVED IN
KW
HPBFP 1380KW/6.6KV 250KW AT BASE
LOAD
350KW AT PART
LOAD
300KW AT BASE
LOAD
450KW AT PART
LOAD
� PAY OUT OF SAVING – PERFORMANCE CONTRACT
� ALL INVESTMENT BY YANTRA HARVEST
� PAYMENT IN MONTHLY EMI FOR 30 MONTHS
� FIRST EMI START AFTER PROVING PROJECTED
SAVING AND ONE MONTH PERFORMANCE
OBSERVATION.
� PENALTY PER EVERY LESS KW SAVING IN PAYMENT.
RELIANCE ENERGY - SAMALKOT
6
11
Yantra Harvest Energy Pvt Ltd
APPLICATION RATING IN KW/KV
PROJECTED SAVING IN KW
SAVING ACHIEVED IN
KW
HPBFP 400KW/6.6KV 70KW 85KW
� PAY OUT OF SAVING – PERFORMANCE CONTRACT
� ALL INVESTMENT BY YANTRA HARVEST
� PAYMENT IN MONTHLY EMI FOR 30 MONTHS
� FIRST EMI START AFTER PROVING PROJECTED
SAVING AND ONE MONTH PERFORMANCE
OBSERVATION.
� PENALTY PER EVERY LESS KW SAVING IN PAYMENT.
RELIANCE ENERGY - GOA
12
Yantra Harvest Energy Pvt Ltd
JSW STEEL - BELLARY
BELLARY STEEL PLANT
APPLICATION RATING IN KW/KV PROJECTED SAVING IN KW
SAVING ACHIEVED IN
KW
CONV ID FAN 1600KW/6.6KV X 3 250KW 300KW
HMPT ID FAN 1600KW/6.6KV X 2 250KW 300KW
� PAY OUT OF SAVING – PERFORMANCE CONTRACT
� TURN-KEY BASE PROJECT
� ALL INVESTMENT BY YANTRA HARVEST
� PAYMENT IN MONTHLY EMI FOR 36 MONTHS
� FIRST EMI START AFTER PROVING PROJECTED
SAVING AND ONE MONTH PERFORMANCE
OBSERVATION.
� PENALTY PER EVERY LESS KW SAVING IN PAYMENT.
� REWARDED WITH REPEAT ORDERS.
7
13
Yantra Harvest Energy Pvt Ltd
Yantra Solution and Methodology-Performance Contracting
PERFORMANCE
CONTRACTS
14
Yantra Harvest Energy Pvt Ltd
APGENCO – VTPS & RTPP
APPLICATION RATING IN KW/KV PROJECTED SAVING IN KW
SAVING ACHIEVED IN
KW
ID FAN-VTPS 1600KW/6.6KV X 250KW 350KW
ID FAN-RTPP 1600KW/6.6KV X 2 250KW 350KW
� PERFORMANCE CONTRACT
� TURN-KEY BASE PROJECT
� ENERGY SAVING AS PERFORMANCE PARAMETER
� PENALTY UP TO 30.0 LAC FOR LESS KW SAVING
� REWARDED WITH REPEAT ORDERS.
8
15
Yantra Harvest Energy Pvt Ltd
LANCO KONDAPALLI
APPLICATION RATING IN KW/KV PROJECTED SAVING IN KW
SAVING ACHIEVED IN
KW
HPBFP 1600KW/6.6KV X 2 200KW 220KW
� PERFORMANCE CONTRACT
� TURN-KEY BASE PROJECT
� ENERGY SAVING AS PERFORMANCE PARAMETER
�PENALTY PER EVERY LESS KW SAVING IN PAYMENT.
Lanco Kondapalli Power
16
Yantra Harvest Energy Pvt Ltd
CESC - KOLKATA
APPLICATION RATING IN KW/KV PROJECTED SAVING IN KW
SAVING ACHIEVED IN KW
ID FAN – SGS U2 450KW/6.6KV X 2 90KW 150KW
ID FAN – TGS 450KW/6.6KV X 2 90KW 150KW
ID FAN – SGS U1 450KW/6.6KV X 2 90KW UNDER
EXECUTION
FD FAN – SGS U1 450KW/6.6KV X 2 90KW UNDER
EXECUTION
� PERFORMANCE CONTRACT
� TURN-KEY BASE PROJECT
� ENERGY SAVING AS PERFORMANCE PARAMETER
� TROUBLE FREE OPERATION FOR 6 MONTHS FOR
PAYMENT.
� PENALTY FOR PER KW LESS SAVING
� REWARDED WITH MANY REPEAT ORDERS
9
17
Yantra Harvest Energy Pvt Ltd
PERFORMANCE RECORDS
18
Yantra Harvest Energy Pvt Ltd
PERFORMANCE RECORDS
10
19
Yantra Harvest Energy Pvt Ltd
OUR CUSTOMERS
20
Yantra Harvest Energy Pvt Ltd
CUSTOMER LIST
Customer List Customer List
11
21
Yantra Harvest Energy Pvt Ltd
AWARDS & RECOGNITION
BEE –GRADE-1 ESCO COMPANY
NEEMBA- NATIONAL ENERGY CONSERVATION AWARD
22
Yantra Harvest Energy Pvt Ltd
AWARDS & RECOGNITION
ASSOCHAM GREEN BUSINESS WINNER
12
23
Yantra Harvest Energy Pvt Ltd
AWARDS & RECOGNITION
CII- MOST INNOVATIVE ENERGY SAVING SERVICE PROVIDER
24
“ Energy Saving is Need of Hour and Action must be taken Today “
Yantra Harvest Energy India
THANK YOUYANTRA HARVEST ENERGY PVT. LTD.
Sr No 40 Plot No 84 Office No 501-506,
Near RTO Office Sangamwadi, Ambedkar Road,
Pune - 411001,
Maharashtra, INDIA
Mob: +91 96047 64696