Class of 1954 Chemistry Research Building Edwards Building Kline Biology Tower Kline Chemistry Laboratory Sloane Physics Laboratory Sterling Chemistry Laboratory Kline Geology Laboratory Wright Laboratory West Wright Laboratory Sage Hall Accessible Pedestrian Walkways Accessible Pedestrian Walkways Lay Down Area Loading Dock Bass Center Kline Biology Tower Library (Underground) Construction Fence & Scrim Temporary Construction Access as Required Kline Biology Tower Note: Dimeo to coordinate Peabody Museum tractor trailer deliveries with Peabody Museum Handicap Ramp Temporary Access Road Yale Science Building Footprint Tree Protection City Bus Stop Bike Racks Bike Racks Bike Racks Bike Racks Loading Zone Footprint Pavilion Footprint Manitowoc P602B or Similar Temp Wall for Curtainwall Removal Bike Racks Removable Fence to Accommodate Tractor Trailer Access to Peabody Yale Shuttle Stop Gate D 20’ Slide Truck Entry Into Site Delivery & Fire Truck Access to Peabody Museum Crane Swing Radius Excavate for MH-18. Bass loading dock to remain open YSB loading dock work within fence line Selective demo at Bass Bridge. 3rd floor ramp removal starting 7/2. No impact to Bass interior Demo retaining wall through late July Access SCL through east entry Temp wall in SCL historic corridor mid July Roofing work above CSSSI through July, followed by concrete pour early August Yale Science Building Logistics Plan Summer 2018 Updated 6/26/18 Intermittent sanitary work in driveway will be coordinated with Peabody deliveries

Upload: others

Post on 09-Jul-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Yale Science Building · 7/2. No impact to Bass interior Demo retaining wall through late July Access SCL through east entry Temp wall in SCL historic corridor mid July Roofing work

Class of 1954 Chemistry Research Building

Edwards Building

Kline

Biology

Tower

Kline Chemistry LaboratorySloane Physics

Laboratory

Sterling Chemistry Laboratory

Kline Geology

Laboratory

Wright Laboratory

West

Wright Laboratory

Sage Hall

Accessible Pedestrian Walkways

Accessible

Pedestrian

Walkways

Lay Down AreaLo

adin

g D

ock

Bass Center

Kline Biology Tower Library

(Underground)

Construction Fence & Scrim

Temporary Construction Access

as Required

Kline Biology Tower

Note:• Dimeo to coordinate Peabody Museum

tractor trailer deliveries with Peabody Museum

Handicap RampTemporary

Access Road

Yale Science Building

Footprint

Tree Protection

City Bus Stop

Bike Racks

Bike Racks

Bike Racks

Bike Racks

Loading Zone

Yale Science Building Physics

Footprint

PavilionFootprint

Manitowoc P602B or Similar

Temp Wall for

Curtainwall Removal

Bike Racks

Removable Fence to Accommodate Tractor

Trailer Access to Peabody

Yale Shuttle

Stop

Gate D20’ Slide

Truck Entry Into

Site

Delivery & Fire Truck Access to

Peabody Museum

Crane Swing Radius

Excavate for MH-18.Bass loading dock toremain open

YSB loading dockwork within fence line

Selective demo at Bass Bridge.3rd floor ramp removal starting7/2. No impact to Bass interior

Demo retaining wall through late July

Access SCL througheast entry

Temp wall in SCLhistoric corridor midJuly

Roofing work aboveCSSSI through July,followed by concretepour early August

Yale Science BuildingLogistics Plan Summer 2018

Updated 6/26/18

Intermittent sanitarywork in driveway willbe coordinated withPeabody deliveries