xyn460001-a4492 ga rev f

2
C A B C D E A B C D E 2 1 3 4 5 6 7 8 2 1 3 4 5 6 7 8 Prepared Approved Revision Reg. No. Responsible department Take over department Document No. Page Total Based on We reserve all rights in this docume nt and in the in- formation contained therein. Reprodu ction, use or disclosure to third parties without express authority is strictly forbidden. ABB ItemQuantity Unit Part ID Description Dimension Title Material ID Mass Rem Mass Scale Order 1 en 0.024 2 TRAFO_ASSEMBLED E Inspection engineering review Design engineering review Production engineering review 6110#200 2402jacking Centre 1490jacking Centre 3034#200 12500#100 OVERALL LENGTH 7000 1460#25 4800 500 1059 1486 1486 933#15 1060#15 900 924 5000 7020 8800#100 OVERALL WIDTH 933#15 1060#15 1490jacking Centre 1740-Rail Centre 2402jacking Centre 1740-Rail Centre 1676 Rail Guages 1740-Rail Centre 1676 Rail Guages 1490jacking Centre 1490jacking Centre 1740-Rail Centre 4900#200 3682#15 HEIGHT OF HV BUSHING MOUNTING 3883#15 HEIGHT OF BUSDUCT MOUNTING 4933#15 HEIGHT OF HV BUSHING TOP 3182 3636 1670 2300 6000 OVERALL HEIGHT 1840#25 1250 *16 Holes 20 640 690 100 40 20 30 M *2 Holes 12 60 20 REFERENCE DRAWINGS LIST OF FITTINGS AND ACCESSORIES XYN460001 A4492, Sheet 2 FOUNDATION PLAN XYN460003 A4492 VALVE SCHEDULE PLATE XYN460031 A4492 LOADING GAUGE DRAWING (TRANSPORTATION DETAILS) XYN460011 A4492 APPROXIMATE WEIGHTS 1 CORE AND WINDINGS 65100 Kg 2 TANK AND FITTINGS 32800 Kg 3 TOTAL WEIGHT OF OIL IN TRANSFORMER 39900 Kg 4 TOTAL VOLUME OF OIL IN THE COMPLETE TRANSFORMER 44850 Litres 5 TOTAL WEIGHT OF TRANSFORMER WITH OIL 137800 Kg 6 TRANSPORT WEIGHT (DRY AIR FILLED) 84600 Kg 7 TOTAL WEIGHT OF REACTOR TANK WITH OIL EXCLUDING RADIATOR BANK 126800 Kg 8 TOTAL WEIGHT OF RADIATOR BANK WITH OIL 11000 Kg 15004 XYN468001-A4492 PPTR-PTD -- Shantanu D MJ/RG 10.03.09 ABB LIMITED Rev Ind Revision Appd Date B WEIGHTS TABLE MODIFIED PR/MJ 21.10.08 C CUST COMMENTS DT 21.10.08 INCORPORATED PR/MJ 12.12.08 D HV bushing mounting Ht changed, Dimensions added. MJ/RG 03.03.09 E STIFFENER ASSLY ADDED MJ/RG 06.08.09 F Overall Height Changed from 6500 to 6000 TKG/RG19.02.10 Rail/Transf. Rails/Reactor Rails/Reactor D D D D D General Arrangement 63 MVAR 420 kV, Shunt Reactor NOTE: 1. DIMENSIONS EXCEPT RAIL GUAGE AND MINIMUM AIR CLEARANCES SHOWN HAVE A TOLERANCE OF #5%. 2. WEIGHTS HAVE A TOLERANCE OF #5%. 3. PAINT SHADE : POLYURETHENE , SHADE : 697 OF IS5. 4. DUE TO PERMANENT DEFLECTION(17mm) DURING VT ADDITIONAL STIFFENER ARRANGEMENT IS PROVIDED ON NEUTRAL SIDE AS PER CUSTOMER REQUIREMENT. DEFLECTION ALLOWED = 19 mm (ACCORDING TO CBIP) Rails/Reactor PROJECT : 400/220 kV GIS(NEW) NAVI MUMBAI SUBSTATION UNDER WR SS-V TS EQUIPMENT : 63MVAR, 420Kv SHUNT REACTOR CUSTOMER : POWER GRID CORPORATION OF INDIA LIMITED. PGCIL P.O. NO. : C-33402-S119A-3/LOA-II/2472 dated 20.0 F D F F SCALE 0.250 TANK EARTHING PAD DETAILS MATERIAL: STAINLESS STEEL SCALE 0.100 HV BUSHING SF6 SIDE FLANGE

Upload: webambulist

Post on 26-Nov-2015

39 views

Category:

Documents


3 download

DESCRIPTION

fhjdd

TRANSCRIPT

  • CA

    B

    C

    D

    E

    A

    B

    C

    D

    E

    21 3 4 5 6 7 8

    21 3 4 5 6 7 8

    Prepared

    Approved

    Revision

    Reg. No.

    Responsible department

    Take over department

    Document No.

    Page

    Total

    Based on

    We reserve all rights in this docume

    nt and in the in-

    formation contained therein. Reprodu

    ction, use or

    disclosure to third parties without

    express authority

    is strictly forbidden.

    ABB

    ItemQuantityUnit Part ID DescriptionDimension

    Title

    Material ID Mass Rem

    Mass

    Scale

    Order

    1

    en

    0.024

    2

    TRAFO_ASSEMBLED

    E

    Inspection engineering review

    Design engineering reviewProduction engineering review

    6110#200

    2402 jacking Centre1490 jacking Centre

    3034#200

    12500#100 OVERALL LENGTH

    7000

    1460#2548005001059

    1486 1486933#15

    1060#15

    900

    924

    50007020

    8800#100 OVERALL WIDTH

    933#151060#15

    1490 jacking Centre

    1740-Rail Centre

    2402 jacking Centre

    1740-Rail Centre1676 Rail Guages

    1740-Rail Centre1676 Rail Guages1490 jacking Centre1490 jacking Centre

    1740-Rail Centre

    4900#200

    3682#15 HEIGHT OF HV BUSHING MOUNTING

    3883#15 HEIGHT OF BUSDUCT MOUNTING

    4933#15 HEIGHT OF HV BUSHING TOP

    31823636

    1670

    2300

    6000 OVERALL HEIGHT

    1840#25

    1250

    *16 Holes20

    640

    690

    100

    40

    20

    30

    M *2 Holes12

    6020

    REFERENCE DRAWINGS

    LIST OF FITTINGS AND ACCESSORIES XYN460001 A4492, Sheet 2

    FOUNDATION PLAN XYN460003 A4492

    VALVE SCHEDULE PLATE XYN460031 A4492

    LOADING GAUGE DRAWING (TRANSPORTATION DETAILS)XYN460011 A4492

    APPROXIMATE WEIGHTS

    1 CORE AND WINDINGS 65100 Kg

    2 TANK AND FITTINGS 32800 Kg

    3 TOTAL WEIGHT OF OIL IN TRANSFORMER 39900 Kg

    4 TOTAL VOLUME OF OIL IN THE COMPLETE TRANSFORMER 44850 Litres

    5 TOTAL WEIGHT OF TRANSFORMER WITH OIL 137800 Kg

    6 TRANSPORT WEIGHT (DRY AIR FILLED) 84600 Kg

    7 TOTAL WEIGHT OF REACTOR TANK WITH OIL EXCLUDING RADIATOR BANK126800 Kg

    8 TOTAL WEIGHT OF RADIATOR BANK WITH OIL 11000 Kg

    15004

    XYN468001-A4492

    PPTR-PTD

    --

    Shantanu D

    MJ/RG 10.03.09

    ABB LIMITEDRev Ind Revision Appd DateB WEIGHTS TABLE MODIFIEDPR/MJ 21.10.08

    C CUST COMMENTS DT 21.10.08 INCORPORATEDPR/MJ 12.12.08

    D HV bushing mounting Ht changed, Dimensions added.MJ/RG 03.03.09

    E STIFFENER ASSLY ADDED MJ/RG 06.08.09

    F Overall Height Changed from 6500 to 6000

    TKG/RG19.02.10

    Rail/Transf.

    Rails/Reactor

    Rails/Reactor

    D

    D

    DD

    D

    General Arrangement63 MVAR 420 kV, Shunt Reactor

    NOTE:1. DIMENSIONS EXCEPT RAIL GUAGE AND MINIMUM AIR CLEARANCES SHOWN HAVE A TOLERANCE OF #5%.2. WEIGHTS HAVE A TOLERANCE OF #5%.3. PAINT SHADE : POLYURETHENE , SHADE : 697 OF IS5.4. DUE TO PERMANENT DEFLECTION(17mm) DURING VT ADDITIONAL STIFFENER ARRANGEMENT IS PROVIDED ON NEUTRAL SIDE AS PER CUSTOMER REQUIREMENT. DEFLECTION ALLOWED = 19 mm (ACCORDING TO CBIP)

    Rails/Reactor

    PROJECT : 400/220 kV GIS(NEW) NAVI MUMBAI SUBSTATION UNDER WR SS-V TSEQUIPMENT : 63MVAR, 420Kv SHUNT REACTORCUSTOMER : POWER GRID CORPORATION OF INDIA LIMITED.PGCIL P.O. NO. : C-33402-S119A-3/LOA-II/2472 dated 20.03.2008

    F

    D

    F

    F

    SCALE 0.250

    TANK EARTHING PAD DETAILS

    MATERIAL: STAINLESS STEEL

    SCALE 0.100

    HV BUSHING SF6 SIDE FLANGE

  • CA

    B

    C

    D

    E

    A

    B

    C

    D

    E

    21 3 4 5 6 7 8

    21 3 4 5 6 7 8

    Prepared

    Approved

    Revision

    Reg. No.

    Responsible department

    Take over department

    Document No.

    Page

    Total

    Based on

    We reserve all rights in this docume

    nt and in the in-

    formation contained therein. Reprodu

    ction, use or

    disclosure to third parties without

    express authority

    is strictly forbidden.

    ABB

    ItemQuantityUnit Part ID DescriptionDimension

    Title

    Material ID Mass Rem

    Mass

    Scale

    Order

    2

    en

    0.034

    2

    TRAFO_ASSEMBLED

    E

    Inspection engineering review

    Design engineering reviewProduction engineering review

    5733#25 HEIGHT OF HVN BUSHING TOP

    835

    1800

    710

    DESCRIPTION OF FITTINGSPART NO. PART NO.

    DETATCHEDFIXED DESCRIPTION MAKE QUANTITY

    1 ABB MONOGRAM PLATE ABB 3

    2 RATING AND DIAGRAM PLATE ABB 1

    3 VALVE POSITION INDICATING PLATE ABB 1

    4 LIFTING HOOKS ABB 4

    5 JACKING PADS ABB 4

    6 HAULAGE LUGS ABB 4

    7 LATCHING LUGS ABB 4

    8 TURNING EYES ABB 4

    9 TANK EARTHING PADS ABB 2

    10 AIR RELEASE PLUGS ON TOP COVER ABB 2

    11 THERMOMETER POCKET ON COVER ABB 1

    12 EARTHING LINK TOP TANK TO BOTTOM TANK ABB 2

    13 HV LINE BUSHINGS 420 kV, 800 Amps, RIP Condenser type ABB 3

    14 ***** *** *

    15 HV NEUTRAL BUSHING 145 kV, 800 Amps, OIP Condensor type. CGL/BHEL/ABB 1

    16 ACCESS FOR CORE EARTHING TO TANK EARTHING ABB 1

    17 VALVE FOR GAS MONITORING SYSTEM 40 NB GLOBE AUDCO/LEADER/GG 1

    18 DRAIN VALVE 100 BORE CI TAPER PLUG VALVE AUDCO/LEADER/GG 1

    19 BOTTOM FILTER VALVE 50 BORE CI TAPER PLUG VALVE AUDCO/LEADER/GG 1

    20 TOP FILTER VALVE 50 BORE CI TAPER PLUG VALVE AUDCO/LEADER/GG 1

    21 TOP SAMPLING VALVE 15 BORE GUNMETAL GLOBE LEADER 2

    22 BOTTOM SAMPLING VALVE 15 BORE GUNMETAL GLOBE LEADER 1

    23 SLUDGE REMOVAL VALVE 32 BORE BALL TYPE F.S. ENGINEERS 1

    24 MAIN CONSERVATOR WITH AIRCELL ABB/PRONAL 1

    25 ***** *** *

    26 BUCHHOLZ RELAY ISOLATING VALVE 80 BORE C.I TAPER PLUG AUDCO/LEADER/GG 2

    27 MAIN CONSERVATOR DRAIN VALVE 50 BORE CI TAPER PLUG VALVE AUDCO/LEADER/GG 1

    28 RADIATORS WITH LIFT, TIE FLATS, AIR RELEASE AND DRAIN PLUGS TTP/CTR/HI-TECH 12

    29 RADIATORS ISOLATING BUTTERFLY VALVES 100 BORE PETSON 24

    30 ***** *** *

    31 MARSHALLING BOX WITH 1 NO.OIL AND WINDING TEMPERATURE INDICATORS-150mm DIAL WITH ANTIVIBRATION PADSABB 1

    32 250MM DIAL SIZE MOLG WITH LOLA CONTACT FOR MAIN CONSERVATOR SUKRUT 1

    33 PRISMATIC OIL LEVEL GAUGE FOR MAIN CONSERVATOR FITTED WITH ISOLATING VALVE, VENT PIPE ABB 1-SET

    34 SILICAGEL BREATHER FOR MAIN CONSERVATOR WITH 8 Kg GEL YOGYA 1

    35 **** ** *

    36 C.T TERMINAL BOXES IN "1U, 1V, 1W, 1U-N, 1V-N AND 1W-N" ABB 12

    37 PRESSURE RELIEF DEVICE SUKRUT 2

    38 DETATCHABLE LADDER ABB 1

    39 BUCHHOLZ RELAY DOUBLE FLOAT, 80 BORE WITH GAS SAMPLING PETCOCKATVUS/PRAYOG 1

    40 FLANGED SINGLE ROLLERS WITH ANTI-EARTH QUAKE LOCKING DEVICES ABB/CHAMPION ENGINEERS6-SETS

    41 BATH FOR OIL TEMPERATURE INDICATOR ABB 1

    42 BATH FOR WINDING TEMPERATURE INDICATOR ABB 1

    43 BATH FOR RTD FOR WINDINGS ABB 1

    44 INSPECTION COVER FOR HV BUSHINGS ABB 3

    45 INSPECTION COVER FOR HVN & DISMANTLING OF CURRENT TRANSFORMERS ABB 3

    46 TOP & BOTTOM HEADER ISLOATING BUTTERFLY VALVES - 250mm PETSON/ASHISH 4

    47 RTD SENSOR FOR WINDING (NOT SHOWN) PERFECT CONTROL/PRECIMEASURE2

    48 ***** *** *

    49 HV NEUTRAL ARRANGEMENT - 12THK X 75WIDE GI FLAT ABB 1-SET

    50 AIRCELL INSTRUCTION PLATE ABB 1

    51 AIRCELL TO MAIN CONSERVATOR EQUALISING VALVE 25 BORE GLOBE LEADER/GG 1

    52 TOP RADIATOR HEADER WITH AIR RELEASE PLUG, LIFTER, FILTERATION CUM DRAIN CUM SAMPLING VALVE 50NB, THERMOMETER POCKETABB 1 SET

    53 BOTTOM RADIATOR HEADER WITH AIR RELEASE PLUG, LIFTER, FILTERATION CUM DRAIN CUM SAMPLING VALVE 50NB, THERMOMETER POCKETABB 1 SET

    54 STIFFENER ASSEMBLY NEUTRAL SIDE Size- 400*140 ABB 1 SET

    15004

    XYN468001-A4492

    PPTR-PTD

    --

    Shantanu D

    MJ/RG 10.03.09

    ABB LIMITEDRev Ind Revision Appd DateB WEIGHTS TABLE MODIFIEDPR/MJ 21.10.08

    C CUST COMMENTS DT 21.10.08 INCORPORATEDPR/MJ 12.12.08

    D HV bushing mounting Ht changed, Dimensions added.MJ/RG 03.03.09

    E STIFFENER ASSLY ADDED MJ/RG 06.08.09

    F Overall Height Changed from 6500 to 6000

    TKG/RG19.02.10

    1

    27

    40

    D

    54

    General Arrangement63 MVAR 420 kV, Shunt Reactor

    F

    PROJECT : 400/220 kV GIS(NEW) NAVI MUMBAI SUBSTATION UNDER WR SS-V TSEQUIPMENT : 63MVAR, 420Kv SHUNT REACTORCUSTOMER : POWER GRID CORPORATION OF INDIA LIMITED.PGCIL P.O. NO. : C-33402-S119A-3/LOA-II/2472 dated 20.03.2008

    E

    SCALE 0.022

    2

    3

    4

    5

    10111315

    17

    16

    2021 22 23

    24

    26

    28

    32

    37

    38

    3944

    52

    SCALE 0.02218

    19

    29

    31

    33

    34

    36

    41

    40

    43

    45

    46

    47

    49

    50

    51

    53

    Sheet 1Viewsnew_view_1bottom_3left_5main_viewleft_19right_64new_view_67

    Sheet 2Viewsnew_view_10new_view_65new_view_66