xpswmmtutorial: processing 2d resultsxpsolutions.com/assets/dms/xpswmm tutorial processing 2d...
TRANSCRIPT
xpswmm Tutorial:Processing 2D Results
Presenter
Anthony Kuch, MScVice President Client Services, xpswmm Product Owner
XP Solutions
XP Solutions has a long history of …• Providing original, high-performing software solutions• Leading the industry in customer service and support• Educating our customers to be more successful in their work.
POLL
What is your experience with
xpswmm/xpstorm?
xptables Quick Data View Animations of HGL Dynamic Long Section and Dynamic Section Views Dynamic Plan View
Spatial Reports Graphical Encoding
Quick Look:1D Results Supporting 2D Models
XP
Analyze->2D Simulation Summary
2D Simulation Summary
Question: How can I review the hydrograph passed between the 2D and 1D portions of the model?
Solution: In the 2013 version (or later) of xpswmm or xpstorm, you can output the time series for flow which passes between the 2D and 1D portions of the model by specifying the following items in the 2D job control.
First - 2D Job Control->General->Produce Check files is selected.
Second - 2D Job Control->Advanced Settings,->Control File 'Write X1D Check Files' with a value of 'ON'.
Four output *.csv files called *_x1D_Q_to_2D.csv; *_x1D_Q_from_2D.csv; *_x1D_H_to_2D.csv; *_x1D_H_from_2D.csv. will contain the flow transferred between the 1D and 2D nodes.
Note:*_2D_Q_to_x1D.xsv - This file lists only NODES which are connected to 2D with INTERFACE LINES
*_2D_Q_from_x1D.xsv - This lists all NODES which are connected to 2D with EITHER link spillcrest or invert to 2D
1D/2D Flow Transfer Export Hydrograph
Write X1D Check Files
*_x1D_Q_to_2D.csv
XP
2D Map Output Choices and Time Interval Display Properties Maximums and Time Series Fill and Contour Colour Ramp, Transparency, Range, Result Labels
2D Flood Maps and Display Detail
2D Map Types
2D Maps Sample
XP
Direct from Layer CSV ASC Grid MID/MIF, SHP (Arcs)
xp2D Utility Interface ASC Grid MID/MIF, SHP (Points)
Map Export
XP
Flow Polylines + Left to Right D/S
Head and Velocity Points Velocity Velocity Direction
Time Series Outputs
XP
Apply Hazard Scheme Apply Hazard Value Inundation Time
2D Post Processing
XP
Questions? Comments?
Thank you for joining this presentation,
Processing 2D ResultsAnthony Kuch, VP Client Services
Contact XP SolutionsAmericas: +1 888 554 5022 [email protected] Pacific: +61 7 3310 2302 [email protected]: +44 0 1635 582555 [email protected]
www.xpsolutions.com