xp-300 maintenance log - nwprimarycare training info/analyzer...xp-300 maintenance log 1 2 3 4 5 6 7...

6
XP-300 MAINTENANCE LOG 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 Perform Shutdown Verify Background Verify Vacuum/Pressure Check Trap Chamber Perform Quality Control Initials Weekly Clean SRV Tray Monthly (or 1500 samples) Reagent Replacement Clean RBC/WBC Transducer Clean Waste Chamber Initial / check mark indicates value within instrument limits: maintenance procedure performed as required date / initials date / initials Serial Number date / initials date / initials date / initials date / initials A7652 Month Year Daily Maintenance __________________ Name Reviewed by Supervisor / Lab Director Date _______________ Clean Sample Rotor Valve (SRV) Cellpack Stromatolyser WH lot # / date Comments date / initials date / initials Quarterly (or every 4,500 samples) date / initials lot # / date lot # / date date / initials date / initials

Upload: others

Post on 25-Jan-2021

6 views

Category:

Documents


0 download

TRANSCRIPT

  • XP-300 MAINTENANCE LOG

    1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31

    Perform Shutdown

    Verify Background

    Verify Vacuum/Pressure

    Check Trap Chamber

    Perform Quality Control

    Initials

    Weekly

    Clean SRV Tray

    Monthly (or 1500 samples) Reagent Replacement

    Clean RBC/WBC Transducer

    Clean Waste Chamber

    Initial / check mark indicates value within instrument limits: maintenance procedure performed as required

    date / initials date / initials

    Serial Number

    date / initials date / initialsdate / initials date / initials

    A7652 Month YearDaily Maintenance __________________

    Name

    Reviewed by Supervisor / Lab Director

    Date

    _______________

    Clean Sample Rotor Valve (SRV)

    Cellpack

    Stromatolyser WH

    lot # / date

    Commentsdate / initials

    date / initialsQuarterly (or every 4,500 samples)

    date / initials lot # / date lot # / datedate / initials date / initials

  • YEAR: MONTH:Beckman Coulter Access 2 Maintenance Log

    Serial #: 511240 System ID: 22574280

    1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31

    *The

    substrate:Washed

    Ratio and the

    Unwashed Check RLU

    mean result are not

    system specifications.

    They are only

    reference guidelines.

    1.0 to -1.0

    0 to 1.25

    Unwashed RLU/%CV 4 to 10 million* / ≤ 2.00

    0 to 1.40

    Substrate RLU/%CV

    Washed RLU/%CV

    Expected Results

    5,000 to 20,000 / ≤ 12.00

    5,000 to 9,000 / ≤ 5.00

    Tech Initials

    Substrate: Washed Ratio

    Substrate Ratio

    Wash Efficiency PPM

    Week 5

    Date

    SYSTEM CHECK RESULTS Week 1 Week 2 Week 3 Week 4

    Enter the System Check Results in the boxes. Initial the Tech Initial box.

    Tech Initials

    (If Needed) Perform Special Clean

    Run Daily Clean System

    Tech Initials

    Run System Check (See below) (See below) (See below) (See below) (See below)

    Run Daily Maintenance

    Replace/Clean Aspiration Probe

    WEEKLY MAINTENANCE

    Clean Instrument Exterior

    Inspect Liquid Waste Bottle

    Check Waste Filter Bottle

    Inspect/Clean Primary Probe

    Date

    Week 1 Week 2 Week 3 Week 4 Week 5

    DAILY MAINTENANCE

    Perform the tasks on the left and draw a check (√) in the accompanying box on the right. Initial the Tech Initials box.

    Perform the tasks on the left and draw a check (√) in the accompanying box on the right. Initial the Tech Initials box.

    Clean Probe Exteriors

    Prime Substrate

    Inspect Fluidic Module

    System Backup Successful?

    Empty Liquid Waste Bottle

    Check System Supplies

    Check Zone Temperatures

    Lab Director Review: ____________________________________

  • YEAR: MONTH:Afinion Operation Log

    Afinion #: AS0035503

    AFINION #AS0035503 Year: Month:

    HbA1c QC 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31

    New lot

    New shipment

    New operator

    Unexpected result

    Software upgrade

    At least monthly

    ACR QC

    New lot

    New shipment

    New operator

    Unexpected result

    Software upgrade

    At least monthly

    DAILY MAINTENANCE

    Turn Analyzer On

    Turn Analyzer Off

    MONTHLY and PRN

    Clean Cartridge ChamberClean Exterior(water/mild soap)

    Reviewed: ________________________________________

  • YEAR: MONTH:Alfa Wasserman ACE Axcel Maintenance Log

    AXCEL #15040224CALIBRATION

    Reagent 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31

    Albumin

    Bilirubin, Tot

    BUN

    Calcium

    Cholesterol

    CO2-LC

    Creatinine

    Glucose

    HDL-C

    Total Protein

    Triglycerides

    1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31

    Inspect ISE Electrodes

    Tech Initials

    Clean Reference Housing

    Date

    Tech Initials

    Check Probe Alignment

    Remove sample cups-seglets

    DAILY MAINTENANCE

    Remove Condensation

    Check Fluid Levels

    DateReplace ISE Pump Tubing

    Perform the tasks on the left and draw a check ( √) in the accompanying box to the right when completed, then initial the "Tech Initials" box.

    7 days

    2 days

    30 days

    30 days

    30 days

    30 days

    Clean & Condition ISE (q40 pts)

    Calibration

    Frequency30 days

    30 days

    7 days

    30 days

    30 days

    Clean Exterior SurfacesClean ISE Sample PortTouch Plate cleaning Procedure

    Tech Initials

    Empty Cuvettes & liquid Waste

    Clean Exterior Probe

    Clean Touch Plate and Pathway

    Perform System Backup

    WEEKLY MAINTENANCE

    Inspect Air Filters and clean

    Load Reagents

    START UP

    SHUT DOWN

    Week 1 Week 2 Week 3 Week 4 Week 5

    Perform the tasks on the left and draw a check ( √) in the accompanying box to the right when completed, then initial the "Tech Initials" box.

    MONTHLY MAINTENANCE BI-ANNUAL/ANNUAL MAINTENANCE

    ANNUAL MAINTENANCEReplace All ISE Tubing

    Tech Initials

    Date

    Remove & Store Creat and CO2

    Fill Hopper

    Tech Initials

    Rinse Probe and Lines with 10% BleachClean Bottle Caps and Cap ConnectorsPerfom Sample Delay and Optics

    Other: Reviewed: ________________________________

  • Northwest Primary Care

    455 West McPherson Hwy

    Clyde, OH 43410

    Enviromental Log Year: ___________________Month: ___________________

    Temp Temp Temp Humidity

    F OK High F OK High F OK High % OK High

    1

    2

    3

    4

    5

    6

    7

    8

    9

    10

    11

    12

    13

    14

    15

    16

    17

    18

    19

    20

    21

    22

    23

    24

    25

    26

    27

    28

    29

    30

    31

    Notes:

    Freezer Refridgerator Lab Area

    Date< -4° F < 46° F < 90° F < 80 %

    Clean Initials

    Reviewed: ________________________________Date: ________________________________

  • Outside-Reference Lab LogSpecimen Rejection Log

    Month: ____________________

    Year: ____________________

    Urine Oral Y Reason

    RejectedPhysDate Last Name First Name ID # Quest Order

    Drug Screen