Background
Office: 626-458-4923Cell: [email protected]
Imelda Diaz, P.E., M.S.
• Unit Head of the Pavement Management Unit in the Geotechnical & Materials Engineering Division of the County of Los Angeles Department of Public Works
• 18 years of service with the County of Los Angeles
• Manages largest & most complex county road network in the state
• B.S. & M.S. in Civil Engineering with an emphasis on materials & geotechnical engineering from California State University, Long Beach
• Served as technical advisor for the Southern California Rubberized Asphalt Concrete Technology Center
![Page 3: Www.slurry.org A County of Los Angeles Case Study Fixing Faults With Limited Funds](https://reader036.vdocuments.mx/reader036/viewer/2022062404/551bd055550346b9588b5432/html5/thumbnails/3.jpg)
Background
Doug Ford
• A 21-year pavement preservation industry veteran
• President of Pavement Coatings Co.
• Active member of the California Chip Seal Association
• Current President of the International Slurry Surfacing Association (ISSA)
Office: 714-826-3011Cell: [email protected]
![Page 4: Www.slurry.org A County of Los Angeles Case Study Fixing Faults With Limited Funds](https://reader036.vdocuments.mx/reader036/viewer/2022062404/551bd055550346b9588b5432/html5/thumbnails/4.jpg)
Background
ISSA• ISSA is an international non-profit
trade association that promotes pavement preservation– Slurry & Micro Surfacing– Chip Sealing– Crack Treatment
• ISSA educates & promotes the highest standards of ethics & quality
• Members include contractors, equipment manufacturers, public officials, research personnel, consulting engineers & other industry professionals
ISSA Pavement Condition Index shows how proper pavement preservation timing reduces overall pavement lifecycle costs
www.slurry.org
![Page 5: Www.slurry.org A County of Los Angeles Case Study Fixing Faults With Limited Funds](https://reader036.vdocuments.mx/reader036/viewer/2022062404/551bd055550346b9588b5432/html5/thumbnails/5.jpg)
www.slurry.org
• Project Scope
• Budget Limitations
• Project Execution
• Project Results
• Questions & Answers
Agenda
![Page 6: Www.slurry.org A County of Los Angeles Case Study Fixing Faults With Limited Funds](https://reader036.vdocuments.mx/reader036/viewer/2022062404/551bd055550346b9588b5432/html5/thumbnails/6.jpg)
Project Scope
• 3.5 miles of roadway
• High volume, peak period connector between two major arterials
• 40 miles northwest of Los Angeles
• 12 miles from the San Gabriel Fault
• Geological activity have historically impacted the road
• Unsuitable subgrade material in several locations
• Project completed in 11 days
Vasquez Canyon Road
![Page 7: Www.slurry.org A County of Los Angeles Case Study Fixing Faults With Limited Funds](https://reader036.vdocuments.mx/reader036/viewer/2022062404/551bd055550346b9588b5432/html5/thumbnails/7.jpg)
Project Scope
ChallengesLarge Cracks throughout resulting from geologic activity and/or unsuitable subgrade from fault line land movement
![Page 8: Www.slurry.org A County of Los Angeles Case Study Fixing Faults With Limited Funds](https://reader036.vdocuments.mx/reader036/viewer/2022062404/551bd055550346b9588b5432/html5/thumbnails/8.jpg)
Project Scope
ChallengesLarge Cracks mean frequent patching and high maintenance needs
![Page 9: Www.slurry.org A County of Los Angeles Case Study Fixing Faults With Limited Funds](https://reader036.vdocuments.mx/reader036/viewer/2022062404/551bd055550346b9588b5432/html5/thumbnails/9.jpg)
Project Scope
ChallengesFrequent patching yields uneven roadways and rough ride for commuters
![Page 10: Www.slurry.org A County of Los Angeles Case Study Fixing Faults With Limited Funds](https://reader036.vdocuments.mx/reader036/viewer/2022062404/551bd055550346b9588b5432/html5/thumbnails/10.jpg)
Project Scope
Use the most cost-effective methods possible to eliminate ongoing high maintenance costs, improve the rideability of the road for commuters, and extend the life of the road by at least 5 years. until the county could redesign the geometrics of the road
Objective
![Page 11: Www.slurry.org A County of Los Angeles Case Study Fixing Faults With Limited Funds](https://reader036.vdocuments.mx/reader036/viewer/2022062404/551bd055550346b9588b5432/html5/thumbnails/11.jpg)
Project Scope
Budget Limitations
• NEED INFORMATION HERE– Was this a planned and budgeted project?– How did you fit it into the budget it not planned?– How and Why did you choose the methods of Pavement Preservation you
did?– What was the actual budget and did the project end up under or over
budget?
![Page 12: Www.slurry.org A County of Los Angeles Case Study Fixing Faults With Limited Funds](https://reader036.vdocuments.mx/reader036/viewer/2022062404/551bd055550346b9588b5432/html5/thumbnails/12.jpg)
Project Scope
Breakdown Of Processes Used
• Leveling of the most seveir areas was accomplished by milling of high areas and filling of low areas with Hot Mix Asphalt
• Project mainly consisted of cold-in-place recycling with a micro surfacing overlay
– Cold-In-Place-Recycling (CIR) 52,716 square yards
– Type II Micro Surfacing 52,716 sq.yds @ 18 lbs/sq.yd and 14% emulsion
• We also did a cement treated base as a test area
– Cement Treated Base (CTB) 4,500 square yards
![Page 13: Www.slurry.org A County of Los Angeles Case Study Fixing Faults With Limited Funds](https://reader036.vdocuments.mx/reader036/viewer/2022062404/551bd055550346b9588b5432/html5/thumbnails/13.jpg)
Project Execution
1. Digouts and milling were performed to level the road (fill low spots or remove high spots)
2. Cement Treated Base Test Section: Removed 3” of AC from 1,350 lane feet & stockpile grindings on sitePulverized & cement treated with 5% cement to a depth of 12”Moved AC grindings back into place, grade & roll
3. Recycled to a depth of 3” using Cold-In Place Recycling Method
4. Fog sealed with a SS1h, lightly sanded & cured for 4 days
5. Applied Type II Micro Surfacing
Steps
* Test section where cement treated base was used
![Page 14: Www.slurry.org A County of Los Angeles Case Study Fixing Faults With Limited Funds](https://reader036.vdocuments.mx/reader036/viewer/2022062404/551bd055550346b9588b5432/html5/thumbnails/14.jpg)
Project Execution
1. Step one was to return save ride to the areas affected by severe land movement
2. Where the Cement Treated Base would be utilized:
✔Removed 3” of AC from 1,350 lane feet & stockpile grindings on site
✔Pulverized & cement treated with 5% cement to a depth of 12”, graded and compacted
✔Moved AC grindings back into place, grade & roll
3. Recycled to a depth of 3” using Cold-In-Place Recycling Method
4. Fog sealed with a SS1h, lightly sanded & cured for 4 days
5. Applied Type II Micro Surfacing
Steps
![Page 15: Www.slurry.org A County of Los Angeles Case Study Fixing Faults With Limited Funds](https://reader036.vdocuments.mx/reader036/viewer/2022062404/551bd055550346b9588b5432/html5/thumbnails/15.jpg)
Project Execution – Reusing The Puzzle Pieces
Leveling ProcessAreas of land movement had to be returned to a smooth and safe condition
• Extensive milling of high areas
• 200 tons of hot mix asphalt used to fill low and depressed areas
![Page 16: Www.slurry.org A County of Los Angeles Case Study Fixing Faults With Limited Funds](https://reader036.vdocuments.mx/reader036/viewer/2022062404/551bd055550346b9588b5432/html5/thumbnails/16.jpg)
Project Execution – Reusing The Puzzle Pieces
Leveling ProcessAreas of land movement had to be returned to a smooth and safe condition
• Extensive milling of high areas
• 200 tons of hot mix asphalt used to fill low and depressed areas
![Page 17: Www.slurry.org A County of Los Angeles Case Study Fixing Faults With Limited Funds](https://reader036.vdocuments.mx/reader036/viewer/2022062404/551bd055550346b9588b5432/html5/thumbnails/17.jpg)
Project Execution – Reusing The Puzzle Pieces
Cement Treated BaseTest Areas of CTB was completed at the beginning of the roadway
Heaviest traffic loads utilize this section of road
![Page 18: Www.slurry.org A County of Los Angeles Case Study Fixing Faults With Limited Funds](https://reader036.vdocuments.mx/reader036/viewer/2022062404/551bd055550346b9588b5432/html5/thumbnails/18.jpg)
Project Execution – Reusing The Puzzle Pieces
Cold-In-Place RecyclingEnvironmentally & Budget Friendly
• Cost-efficient labor & transportation
• Uses existing materials & no heat
• Using existing materials = no need to purchase or transport fresh aggregate
• No heat = reduced noxious fume emissions
![Page 19: Www.slurry.org A County of Los Angeles Case Study Fixing Faults With Limited Funds](https://reader036.vdocuments.mx/reader036/viewer/2022062404/551bd055550346b9588b5432/html5/thumbnails/19.jpg)
Project Execution – Reusing The Puzzle Pieces
Cold-In-Place RecyclingType I Cold-In-Place Recycling Process
1. Reclaim top 3-4 inches using milling machine
2. Crush reclaimed material & screen for proper sizing
3. Add reclaimed material to paver
4. Pave into place
5. Compact with steel drum & rubber tire pneumatic rollers
This process is completed with a combination of machinery referred to as a “train”
![Page 20: Www.slurry.org A County of Los Angeles Case Study Fixing Faults With Limited Funds](https://reader036.vdocuments.mx/reader036/viewer/2022062404/551bd055550346b9588b5432/html5/thumbnails/20.jpg)
Project Execution – Reusing The Puzzle Pieces
Cold-In-Place Recycling
Paving Recycled asphalt with conventional equipment
The use of electronic “skies” improves the finished ride
![Page 21: Www.slurry.org A County of Los Angeles Case Study Fixing Faults With Limited Funds](https://reader036.vdocuments.mx/reader036/viewer/2022062404/551bd055550346b9588b5432/html5/thumbnails/21.jpg)
Project Execution – Reusing The Puzzle Pieces
Cold-In-Place Recycling
Quality Control requires a field set rolling pattern
The pattern must be continually monitored for changes
Final re- roll will occur one to two days after placement, warm temperatures help obtain maximum densities
![Page 22: Www.slurry.org A County of Los Angeles Case Study Fixing Faults With Limited Funds](https://reader036.vdocuments.mx/reader036/viewer/2022062404/551bd055550346b9588b5432/html5/thumbnails/22.jpg)
Project Execution – Filling The Voids
Fog Seal“A light spray application of dilute asphalt emulsion used primarily to seal an existing asphalt surface to reduce raveling and enrich dry, weathered surfaces”
Asphalt Emulsion Manufacturers Association
![Page 23: Www.slurry.org A County of Los Angeles Case Study Fixing Faults With Limited Funds](https://reader036.vdocuments.mx/reader036/viewer/2022062404/551bd055550346b9588b5432/html5/thumbnails/23.jpg)
Project Execution – Icing On The Cake
Why Micro Surfacing?
• Improves skid resistance
• Extends service life by up to 7 years
• Quick-drying aspects shorten traffic delays–drivable after 1 hour
• Does not alter drainage/curb reveal
• Helps eliminate hydroplaning
• Cost-effective surfacing
• Rutting, shoving & cracking resistant
• Applied at ambient temperatures, which lowers energy requirements & eliminates pollutants
![Page 24: Www.slurry.org A County of Los Angeles Case Study Fixing Faults With Limited Funds](https://reader036.vdocuments.mx/reader036/viewer/2022062404/551bd055550346b9588b5432/html5/thumbnails/24.jpg)
Project Execution – Icing On The Cake
Micro Surfacing
1. Begins as a mixture of dense-graded aggregate, asphalt emulsion, water & mineral fillers
2. Added capabilities from use of high-quality advanced polymers & other modern additives
3. Applied with special paver that carries all components , mixes them on-site & spreads to roadway
4. Mixture is continuously fed into a full-width spreader box
5. Spreads the width of a traffic lane in one pass
Surface is initially dark brown, but finishes black once water is chemically ejected & the surface cures
![Page 25: Www.slurry.org A County of Los Angeles Case Study Fixing Faults With Limited Funds](https://reader036.vdocuments.mx/reader036/viewer/2022062404/551bd055550346b9588b5432/html5/thumbnails/25.jpg)
Project Results
• Existing asphalt reclaimed & repurposed
• Water & air permeability lowered
• Even driving surface with good traction created
• BUDGET STATEMENT TO BE ADDED
![Page 26: Www.slurry.org A County of Los Angeles Case Study Fixing Faults With Limited Funds](https://reader036.vdocuments.mx/reader036/viewer/2022062404/551bd055550346b9588b5432/html5/thumbnails/26.jpg)
Questions & Answers
![Page 27: Www.slurry.org A County of Los Angeles Case Study Fixing Faults With Limited Funds](https://reader036.vdocuments.mx/reader036/viewer/2022062404/551bd055550346b9588b5432/html5/thumbnails/27.jpg)
www.slurry.org
Fixing Faults With Limited Funds
Thank You