Program of construction the high speed lines in Poland

Warsaw, 17.02.2010 r.

Page 2: Www.plk-sa.pl 1 Program of construction the high speed lines in Poland Warsaw, 17.02.2010 r

www.plk-sa.pl

2

Targets of the construction the high speed lines for Poland

Radical reducing the time of journey between the majority of the provincial capitals in Poland.

Increasing the share of the rail transport in passenger service in Poland.

Getting the unrivalled level of the safety in the transport.

Reduction in CO2 emission in the passenger transport.

Creation of image of the Polish railways as modern means of transport.

Page 3: Www.plk-sa.pl 1 Program of construction the high speed lines in Poland Warsaw, 17.02.2010 r

www.plk-sa.pl

3

Program of development of the high speed lines for Poland till 2020

Construction of a new line Warszawa – Łódź – Poznań/Wrocław with connection to the CMK line

Modernisation of line E 65 (CMK) from Warsaw to Cracow and Katowice (with option to extension to the border with the Czech Republic and Slovakia)

Page 4: Www.plk-sa.pl 1 Program of construction the high speed lines in Poland Warsaw, 17.02.2010 r

www.plk-sa.pl

4

HSL: Warszawa – Łódź – Poznań/Wrocław

New line of about 450 km Maximum speed 350 km/h System of traction supplying 25 kV AC Time of journey:

- Warsaw – Łódź: 35 minutes

- Warsaw – Poznań: 1h 35 min

- Warsaw – Wrocław: 1h 40 min

Page 5: Www.plk-sa.pl 1 Program of construction the high speed lines in Poland Warsaw, 17.02.2010 r

www.plk-sa.pl

Page 6: Www.plk-sa.pl 1 Program of construction the high speed lines in Poland Warsaw, 17.02.2010 r

www.plk-sa.pl

6

Calendar of the project

2005 – working out the the Feasibility Study of construction of the high speed line Poznań/Wrocław – Łódź – Warsaw

February 2008 - pointing the Inter-governmental Team for KDP construction

March - July 2008 – working out the Program of construction and start up high speed railways in Poland, counsel of the Program at Ministries and Regional Authorities

April – June 2008 – working of the Forecast of the influence on the environment for the HSL Program.

9 December 2008 – invitation to the tender for working the FeasibilityStudy for HSL

19 December 2008 – adopting a resolution of the government of the Republic of Poland of the strategic Program of construction and starting HSL in Poland

Warszawa, 29.09.09

Page 7: Www.plk-sa.pl 1 Program of construction the high speed lines in Poland Warsaw, 17.02.2010 r

www.plk-sa.pl

7

2008 – The resolution of Council of Ministers № 276/2008 - acceptance overregional strategy in terms of constructing and launching high speed rail in Poland

Page 8: Www.plk-sa.pl 1 Program of construction the high speed lines in Poland Warsaw, 17.02.2010 r

www.plk-sa.pl

8

Calendar of the HSL implementation

PREPARATION:• 2008 - Announcement the tender for preparing the

Feasibility Study,• 2011 - The finishing and the presentation of results of

the Study - choice of the route of the line• 2012-2013 Decisions for localisation the line and land

aquisition

REALISATION:• 2014-2019 Building works; putting into operation no

later than in 2019,

Page 9: Www.plk-sa.pl 1 Program of construction the high speed lines in Poland Warsaw, 17.02.2010 r

www.plk-sa.pl

9

Complementary action for the HSL realisation

Realisation of the accompanying infrastructure (the alteration of railway nodes, enabling the network of conventional lines to insert the HSL into the system, the construction/alteration of stations for the operation of travelling HS trains

Building of maintenance centres Modernisation investments on lines, making direct prolonging the HSL Connection HSL with an central airport Promotional action towards all actors of Program (on all stages of its

realisation) Training personnel for designing, construction and the supervision and the

HSL operation.

Page 10: Www.plk-sa.pl 1 Program of construction the high speed lines in Poland Warsaw, 17.02.2010 r

www.plk-sa.pl

10

Inwestmentsin Polandtill 2015

Page 11: Www.plk-sa.pl 1 Program of construction the high speed lines in Poland Warsaw, 17.02.2010 r

www.plk-sa.pl

Other tied projects and studies

1. The feasibility Study for Warsaw node - at present under the realisation.

2. The feasibility Study for modernisation line E 65 (CMK) – at present under the realisation.

3. The feasibility Study for construction of the tunnel of diametral railways in Łódź - at present under the realisation.

4. The feasibility Study for Łódź, Poznań,and Wrocław nodes.

5. Construction of the new central station in Łódź with the multimodal centre and modernisation stations in Wrocław, Poznań and Warsaw .

Page 12: Www.plk-sa.pl 1 Program of construction the high speed lines in Poland Warsaw, 17.02.2010 r

www.plk-sa.pl

12

HSL Warszawa – Katowice (Zebrzydowice) – Kraków

PREPARATION:

• July 2009 – starting the of the feasibility study for the modernisation (construction of new sections) of line

• 2012 – finishing the Study.

REALISATION :

• Adapting the CMK line to 200 km/h in the first stage (at present under the realisation)

• 2014-2020 Modernisation up to parameters of the HSL line

Page 13: Www.plk-sa.pl 1 Program of construction the high speed lines in Poland Warsaw, 17.02.2010 r

www.plk-sa.pl

13

Options of the modernisation of the CMK line analysed at the study

Option 1: 220 - 230 km/h, electrification 3 kV DC Option 2: 250 km/h, electrification 25 kV AC Option 3: 300 km/h, electrification 25 kV AC The modernisation or construction of new sections to

Katowice and farther to the border with the Czech Republic and Slovakia

The modernization or construction of new sections to Cracow

Page 14: Www.plk-sa.pl 1 Program of construction the high speed lines in Poland Warsaw, 17.02.2010 r

www.plk-sa.pl

14

Optimal network of high speed lines till 2020

Page 15: Www.plk-sa.pl 1 Program of construction the high speed lines in Poland Warsaw, 17.02.2010 r

www.plk-sa.pl

15

High Speed Railways – Key element of Polish rail network which lets to discount existing and planned investment projects

Page 16: Www.plk-sa.pl 1 Program of construction the high speed lines in Poland Warsaw, 17.02.2010 r

www.plk-sa.pl

16

System of the HSL in Europe according to of planned investments till 2025Source: UIC

Page 17: Www.plk-sa.pl 1 Program of construction the high speed lines in Poland Warsaw, 17.02.2010 r

www.plk-sa.pl

17

List of activities in terms of realising Program of development of the high speed lines for Poland

Activity Level of implementation Comments"Constructing Wrocław / Poznań - Łódź - Warszawa high speed line" feasibility

study

Contractors ,chosen on the first step of procedure, have been invited to submit

of tender.

A contractor will be chosen in February 2010.

Results of destination route and methods of realization - 2011.

Realization of the accompanying infrastructure (the alteration of railway

nodes, enabling the network of conventional lines to insert the HSL into the system, the construction/alteration

of stations for the operation of travelling HS trains

Preparing auctions for Poznań, Wrocław and Łódź railway nodes. Warsaw node

is in the course of action. Diametral tunnel – award.

The project will be put out to tender in march 2010

TSI analysis for high speed lines in Poland and to assure interoperability

with rail network in Poland

A contractor has been chosen Work commencement in February 2010

Guidance feasibility study for development of polish high speed lines

in Poland till 2040

In the course of action Results will be put to consultation in April 2010

Promotional activities In the course of actionPreparing call for tender procedures

The project will be put out to tender in May 2010

Page 18: Www.plk-sa.pl 1 Program of construction the high speed lines in Poland Warsaw, 17.02.2010 r

www.plk-sa.pl

Schedule – activities connected with the project POIiŚ 7.1-26

Page 19: Www.plk-sa.pl 1 Program of construction the high speed lines in Poland Warsaw, 17.02.2010 r

www.plk-sa.pl

Next task for European Community

How to connect HSL in Poland with EU HS Newtork?

Page 20: Www.plk-sa.pl 1 Program of construction the high speed lines in Poland Warsaw, 17.02.2010 r

www.plk-sa.pl

Thank you for your attention

Projekt współfinansowany przez Unię Europejską ze środków Funduszu Spójności w ramach Programu Infrastruktura i Środowisko