wwqrr, chapter 17, section 44 page 17-95 have not performed tank leak detection in 60 days did not...

7
DELIVERY PROHIBITION/RED TAG

Upload: johnathan-beasley

Post on 02-Jan-2016

213 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: WWQRR, Chapter 17, Section 44 Page 17-95  Have not performed tank leak detection in 60 days  Did not perform CP test within 90 days of due date

DELIVERY PROHIBITION/RED TAG

Page 2: WWQRR, Chapter 17, Section 44 Page 17-95  Have not performed tank leak detection in 60 days  Did not perform CP test within 90 days of due date

NO QUESTIONS ON RED TAGS ARE ON THE EXAMS

Page 3: WWQRR, Chapter 17, Section 44 Page 17-95  Have not performed tank leak detection in 60 days  Did not perform CP test within 90 days of due date

REASONS FOR DELIVERY PROHIBITION

WWQRR, Chapter 17, Section 44 Page 17-95 Have not performed tank leak detection in 60

days Did not perform CP test within 90 days of due

date A CP test failed and was not repaired and

retested within 90 days of the original fail date

Pressure test or line tightness test was not performed within 60 days of due date.

Page 4: WWQRR, Chapter 17, Section 44 Page 17-95  Have not performed tank leak detection in 60 days  Did not perform CP test within 90 days of due date

REASONS FOR DELIVERY PROHIBITION

Failure to function test line leak detectors within 60 days of due date

Failure to report and investigate a suspected release

Owner/operator (O/O) reported a release but failed to investigate within 7 Days

O/O reported a confirmed release but repairs were not made

Page 5: WWQRR, Chapter 17, Section 44 Page 17-95  Have not performed tank leak detection in 60 days  Did not perform CP test within 90 days of due date

REASONS FOR DELIVERY PROHIBITION

O/O has failed to pay the fees by September

O/O has failed to follow an Order issued by the department

If monitoring devices have been purposely tampered with or turned off

If any records have been falsified If tank does not have overfill or spill

prevention devices

Page 6: WWQRR, Chapter 17, Section 44 Page 17-95  Have not performed tank leak detection in 60 days  Did not perform CP test within 90 days of due date

REASONS FOR DELIVERY PROHIBITION

If a steel tank does not have CP system in place

If an AST has not been upgraded under Part I

If an OAI has not been performed within 90 days of due date

If there has been no class B operator for 90 days or more

If a CP rectifier has not been monitored every 60 days

Page 7: WWQRR, Chapter 17, Section 44 Page 17-95  Have not performed tank leak detection in 60 days  Did not perform CP test within 90 days of due date

NOV WITH ORDER IS ISSUED

A Notice of Violation (NOV) with Administrative order is issued

A copy is sent to the fuel delivery company

Anyone that intentionally delivers fuel to a red tagged tank is violating the order

A list of red tagged facilities are listed on our website