A
REPORT
ON
“INDUSTRIAL VISIT AT WANAKBORI (W.T.P.S)”
Submitted in accordance with the INDUSTRIAL VI SI T requir ements for 5 th semester of the
DME course I n the branch of
MECHANICAL ENGINEERING
Of
GUJARAT TECHNOLOGICAL UNIVERSITY
YEAR 2015/16
Submitted By:-
Mr. VISHAL PATEL
Mr. YOGESH PATEL
8/15/2019 Wtps Report (1)
http://slidepdf.com/reader/full/wtps-report-1 2/11
ACKNOWLEDGEMENT
We are gladly thankful to our Principal Dr. V.M PATEL , And our H.O.D
Mr. Rajesh Lavingia and our staff members who give us a great guidance
regarding training and instruct us the importance of training in Mechanical
field. So we decided to take visit in thermal power plant which is situated at
Wanakbori.
We are especially thankful to respected chief engineer,Thermal powerstation, Wanakbori and Janakkumar Gadhavi because we granted us
permission for taking visit in wonderful campus.
8/15/2019 Wtps Report (1)
http://slidepdf.com/reader/full/wtps-report-1 3/11
GENERAL DETAILS
Industry Name WTPS WANAKBORI
Detailed Address Kheda dist ,Gujarat
Day & Date of Visit Friday, 17th July 2015Name of faculty
supervisors
1. Lect. Vishal patel
2. Lect. Yogesh Patel
3. Prof . Maulik Patel
Duration Time of entry : 10.00 a.m. / Time of Exit: 02.10 p.m.
Duration : 4hr & 10 mins
Semester 5t
DME Class
No. of Participants Faculties 03 Nos.
Non Teaching Staff 00 Nos.
Students 31 Nos.
Total 34 Nos.
8/15/2019 Wtps Report (1)
http://slidepdf.com/reader/full/wtps-report-1 4/11
INTRODUCTION:-
1.
W.T.P.S is the biggest power plant in GUJARAT.
2.
Wanakbori Thermal Power Station is a coal-fired power station in Gujarat, India. It is located on
the bank of Mahi river in Kheda district.
3.
There are 7 Turbo Generator sets each of 210MW out of which first 3 units are equipped with
Russian Turbines and other 4 Units are equipped with German Turbines.
4.
Unit no 7 is entirely Computerized and well advanced. All the above units are of BHEL make.
Unit NumberInstalled Capacity
(MW)Date of Commissioning Status
Stage I 1 210 March 1982 Running
Stage I 2 210 January, 1983 Running
Stage I 3 210 March, 1984 Running
Stage I 4 210 March, 1986 Running
Stage I 5 210 September 1986 Running
Stage I 6 210 November 1987 Running
Stage II 7 210 December 1998 Running
8/15/2019 Wtps Report (1)
http://slidepdf.com/reader/full/wtps-report-1 5/11
PURPOSE OF VISIT:-
Mechanical Engineering Dept. of SVBIT College, VASAN decided to arrange one day
industrial visit for 5th Diploma Mechanical Engineering students to improve practical knowledge and get
benefited their theoretical knowledge In W.T.P.S, Students will get benefit regarding their theoretical
subject of conventional power engineering, thermal engineering and many more.
8/15/2019 Wtps Report (1)
http://slidepdf.com/reader/full/wtps-report-1 6/11
BLOCK DIAGRAM OF POWER PLANT:-
Coal to Electricity Process
8/15/2019 Wtps Report (1)
http://slidepdf.com/reader/full/wtps-report-1 7/11
WORKING POWER PLANT MODELS @ WTPS:-
Generator, Generator Transformer
Turbine
Boiler, Boiler Drum
Boiler Burners, Dampers arrangement
Boiler Feed Pump
Air Pre-heater
ID Fan, FD Fan, PA Fan
Coal Mill
FW Pump
8/15/2019 Wtps Report (1)
http://slidepdf.com/reader/full/wtps-report-1 8/11
FEATURES:-
1.
Installed Capacity : 7× 210 = 1470 MW
2.
Total Area of Project : 1571 Acres
3.
PLF % : Between 84.64 to 91.24%
4.
Plant Area : 626.2 ha
5.
Ash Dump Area : 215.7 ha
6.
Cooling Water Quantity Required : From
7.
Canal of Mahi River Reservoir 60 to 70 Cusecs / month
8.
Cooling Tower Heights :
9.
Stage I & II – 112 Mtrs, Stage III – 118 Mtrs.
8/15/2019 Wtps Report (1)
http://slidepdf.com/reader/full/wtps-report-1 9/11
EQUIPMENT DETAILS:-
Fuel Details :-
1.
Fuel: Bituminous Coal
2.
Linked Coal Mines : Coal India
3.
From Bihar, Orissa, M.P., West Bengal, Andhra Pradesh
4.
Generally 400 Wagons [ 07 Racks ] received per day
5.
Record of Unloading Wagons : 650 Wagons / Day
6.
Gross Calorific Value of Coal : 4400 Kcal/Kg
7.
Nos of Wagon Tipplers: 05 NOS.
8.
Coal Quantity Required :
9.
With Design Coal : 16000 MT / Day
10.
With Actual Coal: 18000 MT / Day
11.
Stock Yard: Storage Capacity: 02 Lacks MT (Approx.)
12.
Area : 48000 m2
8/15/2019 Wtps Report (1)
http://slidepdf.com/reader/full/wtps-report-1 10/11
PHOTOGRAPHS SECTION :