    Today’s 

    genda

    • Expert Review Panel

    • Settlement update, ongoing

    monitoring• SR 99 Tunnel Project

    update

    2

  • 8/9/2019 WSDOT Viaduct update

    3/37

    EXPERT REVIEW

    Panel  

    3

    2015 report key findings

    • Confident that the project can be successfully

    completed

    • The design-build contract is the right tool to get

    the job done

    • The seawall and tunnel project schedules are not

    adversely effected by the respective projects

  • 8/9/2019 WSDOT Viaduct update

    4/37

    Expanded

    4

     Jack Main

  • 8/9/2019 WSDOT Viaduct update

    5/37

    f requency5

    Instrument Type General Location Monitoring Frequency

    Utility SettlementPoint

    Near and south of access pit,including Western Avenue

    Daily or weekly, depending onlocation

    Satellite (ATLAS) Downtown corridor Biweekly

    MPBX Along tunnel alignment Every four hours along full route

    Daily within TBM zone of

    influence

    Inclinometer Access shaft vicinity Weekly

    Seismographs Alaskan Way – Jackson to

    Main, Tunnel portals

    Once per minute, reported

    weekly

    Liquid Levels Western, Polson and

    Commuter buildings

    Every four hours

    Limited Manual

    Building Survey

    Pioneer Square buildings near

    Viaduct (select locations)

    Daily, weekly or monthly,

    depending on location

  • 8/9/2019 WSDOT Viaduct update

    6/37

    f requency6

    Instrument Type General Location Monitoring Frequency

    Manual Viaduct

    Survey

    Full length of Viaduct Weekly or monthly, depending

    on location

    AMTS Pioneer Square buildings near

    Viaduct, Viaduct (select

    locations)

    Half-hourly or hourly, depending

    on location

    Tiltmeters Western, Polson and

    Commuter buildings, Viaduct

    (select locations)

    Every four hours

    Crack Gauges Viaduct (select locations) Every four hours to every three

    weeks, depending on location

    Piezometers Access shaft, tunnel

    alignment

    Every two minutes to every four

    hours, depending on location

    Secondary Survey

    Control

    SoDo, Pioneer Square,

    Downtown

    Weekly or monthly, depending

    on location

    LiDAR Pioneer Square Monthly

  • 8/9/2019 WSDOT Viaduct update

    7/37

    Settlement

    7

  • 8/9/2019 WSDOT Viaduct update

    8/37

    Settlement

    8

    •  All readings shown are based on WSDOT survey data.

    • The blue points represent the net change in elevation detected at a single reading as compared to original baseline elevation.

    • Three survey teams are collecting and analyzing data: WSDOT, STP and the City of Seattle.

    Columbia Street and Second Avenue

    (Primary Surface Survey Control Point –

     X35)

    -0.16 -0.16 -0.16 -0.16

    -1.5

    -1.25

    -1

    -0.75

    -0.5

    -0.25

    0

    0.25

       S   e   t   t    l   e   m   e   n   t    (   i   n .    )

    Survey Accuracy

  • 8/9/2019 WSDOT Viaduct update

    9/37

    Columbia Street and Second Avenue

    (Secondary Surface Survey Control Point –

     SMP405)

    Settlement

    9

    •  All readings shown are based on STP survey data.

    • The blue points represent the net change in elevation detected at a single reading as compared to original baseline elevation.

    • Three survey teams are collecting and analyzing data: WSDOT, STP and the City of Seattle.

    -0.34

    -0.41

    -0.32

    -0.32

    -0.34

    -0.31

    -0.30

    -0.34

    -0.31

    -0.35

    -0.32

    -0.32

    -0.31

    -0.19

    -0.25 -0.23 -0.32

    -0.29-0.29

    -0.32

    -1.500

    -1.250

    -1.000

    -0.750

    -0.500

    -0.250

    0.000

    0.250

       S   e   t   t    l   e   m   e   n   t    (   i   n .    )

    Survey Accuracy

  • 8/9/2019 WSDOT Viaduct update

    10/37

    Settlement

    10

    •  All readings shown are based on WSDOT survey data.

    • The blue points represent the net change in elevation detected at a single reading as compared to original baseline elevation.

    • Three survey teams are collecting and analyzing data: WSDOT, STP and the City of Seattle.

    James Street and Fifth Avenue

    (Primary Surface Survey Control Point –

     AWV011)

       S   e   t   t    l   e   m   e   n   t    (   i   n .    )

    -0.16 -0.16

    -1.5

    -1.25

    -1

    -0.75

    -0.5

    -0.25

    0

    0.25

    Survey Accuracy

  • 8/9/2019 WSDOT Viaduct update

    11/37

    Settlement

    11

  • 8/9/2019 WSDOT Viaduct update

    12/37

    South Main Street and First Avenue South

    (Primary Surface Survey Control Point –

     X05)

    Settlement

    12

    •  All readings shown are based on WSDOT survey data.

    • The blue points represent the net change in elevation detected at a single reading as compared to original baseline elevation.

    • Three survey teams are collecting and analyzing data: WSDOT, STP and the City of Seattle.

       S   e   t   t    l   e   m   e   n   t    (   i   n .    )

    -0.71

    -0.71

    -0.67

    -0.75

    -0.71

    -0.71

    -0.75-0.83

    -0.94

    -0.94 -0.94 -0.94 -0.98 -0.94 -0.94 -0.94 -0.98 -0.98 -0.94 -0.98 -0.98 -0.98

    -1.500

    -1.250

    -1.000

    -0.750

    -0.500

    -0.250

    0.000

    0.250

    Survey Accuracy

  • 8/9/2019 WSDOT Viaduct update

    13/37

    South Main Street and First Avenue South

    (Secondary Surface Survey Control Point –

     MAIN)

    Settlement

    13

    •  All readings shown are based on STP survey data.

    • The blue points represent the net change in elevation detected at a single reading as compared to original baseline elevation.

    • Three survey teams are collecting and analyzing data: WSDOT, STP and the City of Seattle.

    -1.04

    -1.08

    -1.15 -1.12

    -1.15

    -1.03

    -1.06

    -1.06

    -1.10

    -1.10

    -1.14

    -1.09

    -1.10

    -1.09 -1.10

    -0.95

    -1.00

    -0.98

    -1.01 -0.98

    -1.00

    -1.00

    -1.00

    -0.98-1.00

    -1.00

    -0.97

    -0.97

    -1.21

    -1.16-1.26

    -1.50

    -1.25

    -1.00

    -0.75

    -0.50

    -0.25

    0.00

    0.25

       S   e   t   t    l   e   m   e   n   t    (   i   n .    )

    Survey Accuracy

  • 8/9/2019 WSDOT Viaduct update

    14/37

    South Jackson Street and First Avenue South

    (Primary Surface Survey Control Point –

     Y04)

    Settlement

    14

    •  All readings shown are based on WSDOT survey data.

    • The blue points represent the net change in elevation detected at a single reading as compared to original baseline elevation.

    • Three survey teams are collecting and analyzing data: WSDOT, STP and the City of Seattle.

       S   e

       t   t    l   e   m   e   n   t    (   i   n .    )

    -0.87

    -0.87

    -0.87

    -0.87

    -0.87

    -0.87

    -0.91-0.98

    -1.10

    -1.10

    -1.10 -1.10 -1.10 -1.10 -1.10 -1.10 -1.14 -1.10 -1.10 -1.10 -1.14 -1.10

    -1.500

    -1.250

    -1.000

    -0.750

    -0.500

    -0.250

    0.000

    0.250

    Survey Accuracy

  • 8/9/2019 WSDOT Viaduct update

    15/37

    South Jackson Street and First Avenue South

    (Secondary surface survey control point –

     JACK) 

    Settlement

    15

    •  All readings shown are based on STP survey data.

    • The blue points represent the net change in elevation detected at a single reading as compared to original baseline elevation.

    • Three survey teams are collecting and analyzing data: WSDOT, STP and the City of Seattle.

    -1.16

    -1.16

    -1.18

    -1.24

    -1.18

    -1.15

    -1.14

    -1.16

    -1.22

    -1.18

    -1.24

    -1.18

    -1.21

    -1.22 -1.22

    -1.08

    -1.14

    -1.16

    -1.15

    -1.14

    -1.14

    -1.16

    -1.13

    -1.16-1.07

    -1.37

    -1.28-1.39

    -1.50

    -1.25

    -1.00

    -0.75

    -0.50

    -0.25

    0.00

    0.25

       S   e

       t   t    l   e   m   e   n   t    (   i   n .    )

    Survey Accuracy

  • 8/9/2019 WSDOT Viaduct update

    16/37

    South Jackson Street and Second Avenue Extension South

    (Primary Surface Survey Control Point –

     GP232)

    Settlement

    16

    •  All readings shown are based on WSDOT survey data.

    • The blue points represent the net change in elevation detected at a single reading as compared to original baseline elevation.

    • Three survey teams are collecting and analyzing data: WSDOT, STP and the City of Seattle.

       S   e   t   t    l   e   m   e   n   t    (   i   n .    ) -0.43

    -0.43

    -0.63 -0.63 -0.63

    -1.5

    -1.25

    -1

    -0.75

    -0.5

    -0.25

    0

    0.25

    Survey Accuracy

  • 8/9/2019 WSDOT Viaduct update

    17/37

    South King Street and Second Avenue South

    (Primary Surface Survey Control Point –

     X39)

    Settlement

    17

    •  All readings shown are based on WSDOT survey data.

    The blue points represent the net change in elevation detected at a single reading as compared to original baseline elevation.

    • Three survey teams are collecting and analyzing data: WSDOT, STP and the City of Seattle.

       S   e   t   t    l   e

       m   e   n   t    (   i   n .    )

    Survey Accuracy

    -1.26 -1.26

    -1.5

    -1.25

    -1

    -0.75

    -0.5

    -0.25

    0

    0.25

  • 8/9/2019 WSDOT Viaduct update

    18/37

    Settlement

    18

  • 8/9/2019 WSDOT Viaduct update

    19/37

    First Avenue South between Railroad Way South

    and South Royal Brougham Way(Primary Surface Survey Control Point  – Y09)

    Settlement

    19

    •  All readings shown are based on WSDOT survey data.

    • The blue points represent the net change in elevation detected at a single reading as compared to original baseline elevation.

    • Three survey teams are collecting and analyzing data: WSDOT, STP and the City of Seattle.

    -0.71-0.75 -0.75

    -1.5

    -1.25

    -1

    -0.75

    -0.5

    -0.25

    0

    0.25

       S   e   t   t    l   e   m

       e   n   t    (   i   n .    ) Survey Accuracy

  • 8/9/2019 WSDOT Viaduct update

    20/37

    Viaduct

    20

    Crews assessing viaduct during semiannual inspection.

  • 8/9/2019 WSDOT Viaduct update

    21/37

    Western Avenue

    21

    = water line

  • 8/9/2019 WSDOT Viaduct update

    22/37

    Pioneer Square bui ld ing

    Completed 60 buildingassessments. No structural

    damage.

    • Coordinating with property

    owners on property condition

    surveys.

    22

  • 8/9/2019 WSDOT Viaduct update

    23/37

    Repairing

    Preparing the access pit wall

    Feb. 17, 2015

    23

  • 8/9/2019 WSDOT Viaduct update

    24/37

    Bertha’s breakthrough

    Feb. 19, 2015

    24

    BERTHAreaches dayl ight  

  • 8/9/2019 WSDOT Viaduct update

    25/37

    Repair ing

    Tidying up the access pit

    Feb. 24, 2015

    25

  • 8/9/2019 WSDOT Viaduct update

    26/37

    Repair ing

    26

    Bertha in the access pitMarch 4, 2015

  • 8/9/2019 WSDOT Viaduct update

    27/37

    UPDATE

    PHOTO

    Repair ing

    27

    Crews prepare Bertha’s outer

    shield for removal

    March 17, 2015

  • 8/9/2019 WSDOT Viaduct update

    28/37

    Repair ing

    28

    Bertha’s top shield isremoved

    March 19, 2015

  • 8/9/2019 WSDOT Viaduct update

    29/37

    Repair ing

    29

    Bertha’s first side shield isremoved

    March 21, 2015

  • 8/9/2019 WSDOT Viaduct update

    30/37

  • 8/9/2019 WSDOT Viaduct update

    31/37

    Repair ing

    31

    Crews prepare the cutterheadand drive unit for the big lift

    March 27, 2015

  • 8/9/2019 WSDOT Viaduct update

    32/37

    Repair ing

    The cutterhead and

    drive unit emerge

     from the pitMarch 30, 2015

    32

  • 8/9/2019 WSDOT Viaduct update

    33/37

    Repair ing

    The cutterhead and

    drive unit are placed on

    the repair platformMarch 31, 2015

    33

  • 8/9/2019 WSDOT Viaduct update

    34/37

    Repair ing

    34

    The drive unit is removed

     from the cutterhead

     April 3, 2015

  • 8/9/2019 WSDOT Viaduct update

    35/37

    Repair ing

    35

    The drive unit is removed

     from the cutterhead

     April 3, 2015

  • 8/9/2019 WSDOT Viaduct update

    36/37

    Repair ing

    36

    The cutter drive unit on itsrepair platform

     April 6, 2015

  • 8/9/2019 WSDOT Viaduct update

    37/37

    How toRE CH US

    Website:

    www.AlaskanWayViaduct.org

    Twitter:@BerthaDigsSR99

    Email:

    [email protected]

    Hotline:

    1-888-AWV-LINE

    Our information center,

    Milepost 31, is located

    at 211 First Ave. S. in

    Seattle’s Pioneer

    Square neighborhood