To:
From:
CITY OF WOODINVILLE, WA
REPORT TO THE CITY COUNCIL 17301 133rd Avenue NE, Woodinville, WA 98072 WWW.Cl.WOODINVILLE.WA.US
Honorable City Council i. A /
Richard A. Leahy, City Manager \~v
Date: 01/21/2014
By: Thomas E. Hansen, P.E., Public Works Director/£;?:?-
Subject: WSDOT Presentation about Impacts of Little Bear Creek Culvert Replacement FINANCIAL ACTION SUMMARY
Expenditure Required Amount Budgeted/Approved Additional Amount Required
$0 $0
ISSUE: Shall the City Council receive a presentation from the Washington State Department of Transportation (WSDOT) concerning the construction options and the traffic control impacts for the Little Bear Creek Culvert Replacement Project?
RECOMMENDATION: To receive the presentation and provide comments and feed back to WSDOT staff.
BACKGROUND/DISCUSSION: WSDOT is designing a project to replace the existing box culvert under SR 202 ( 131 st Avenue NE) for Little Bear Creek. The existing culvert does not meet current installation guidelines for culverts on fish migratory streams. It restricts the free passage of salmon and other species that try to reach the upper sections of Little Bear Creek. They are under federal court order to replace this culvert and 800 others throughout the state. On Tuesday night, WSDOT staff will give a presentation on the options considered in replacing this box culvert and the traffic impacts of each option. WSDOT is planning to start construction of this project in 2015.
ALTERNATIVES: 1. To receive the presentation and provide comments to WSDOT about proposed traffic
control and detours for the Little bear Creek Culvert Replacement Project.
2. Request additional information.
RECOMMENDED MOTION: NO MOTION REQUIRED.
----r 1:
I
1
This page left intentionally blank.
2
SR 202 Little Bear CreekFish Barrier Removal
Hung HuynhProject Engineer
City Council BriefingWoodinville City Hall
January 21st, 2014
Lynn PetersonSecretary of Transportation
Cathy GeorgeEngineering Manager
SR 202 Little Bear CreekFish Barrier Removal
2___.
• RCW 77.57.030 requires unrestricted fish passage at all stream crossings
• U.S. District Court permanent injunction No. C70-9213 requires WSDOT to restore fish passage at more than 800 culverts (this location included) in western Washington by 2030
• Rank #3 statewide for fish passage restoration
• Flow exceeds maximum design velocity for trout
• Replace existing 10’ wide opening with a 30’ wide opening
SR 202 Little Bear CreekFish Barrier Removal
3Picture from Bing.com.
Culvert
Dairy Queen
McLendon
Dream Auto
• Main Access to City
• 38,000 vehicles each day
• 3,500 vehicles during PM peak hour
• Emergency responders
• Underground utilities
SR 202 Little Bear CreekFish Barrier Removal
4___
Downstream of culvert looking at SR 202 Upstream of culvert looking at SR 202
Little Bear Creek is approximately 30’ below SR 202
SR 202 SR 202
SR 202 Little Bear CreekFish Barrier Removal
5___
Constraints
• Minimize impact to the community during construction
• All work in the creek must occur between July 1st and September 30th
• Keep costs within budget
SR 202 Little Bear CreekFish Barrier Removal
6___
Options
1. Culvert - replace existing culvert with a larger culvert
2. Bridge - replace existing culvert with a bridge
3. Tunnel - replace existing culvert with a tunnel
SR 202 Little Bear CreekFish Barrier Removal
7___
Culvert Option Culvert
Dream Auto
10,300 CY hole = 1,015 truck & pup
Dairy Queen
SR 202 Little Bear CreekFish Barrier Removal
8___
Downstream of culvert looking at SR 202 Upstream of culvert looking at SR 202
Little Bear Creek is approximately 30’ below SR 202
SR 202 SR 202
SR 202 Little Bear CreekFish Barrier Removal
9___
Culvert Option Culvert
Dairy QueenDream
Auto
10,300 CY hole = 1,015 truck & pup
Close SR 202 for a month
Not Desirable
SR 202 Little Bear CreekFish Barrier Removal
10___
Bridge Option
Existing Culvert
Edge of Dairy Queen Parking Lot/Driveway
Culvert
Dream Auto
Dairy Queen
SR 202 Little Bear CreekFish Barrier Removal
11___
Bridge OptionClose SR 202 for 2 weekends
Secant walls to be installed at night
Shaft caps to be installed at night
Precast deck slabs to be installed during weekend closure
Roadway to be constructed during weekend closure
Better
SR 202 Little Bear CreekFish Barrier Removal
12___
Tunnel Option
• Existing sandy soils present unacceptable risks
• Not enough space at either end to perform the installation without significant environmental impacts
• Twice the cost of the bridge option
Not Recommended
Not suitable for site conditions
SR 202 Little Bear CreekFish Barrier Removal
13___
Culvert Bridge Tunnel
Road Closure 1 month 2 weekends None
Night time Lane Closure Intermittent 10 months intermittent
Cost $6M $8M $15M
Constructability risks Acceptable Acceptable Not
Acceptable
Options Comparison
SR 202 Little Bear CreekFish Barrier Removal
14___
Selected Option
• Replace existing culvert with a bridge in order to minimize impact to the community during construction
• Construction from Summer 2015 through Fall 2016
• Night time work from Summer 2015 to Summer 2016
• Two (2) weekend closures in May or June 2016
• Daytime off road work Summer and Fall 2016
SR 202 Little Bear CreekFish Barrier Removal
15___
Moving Forward
• Brief City Council
• Meet with the business community
• Meet with the affected property owners and businesses
• Public information campaign leading up to the weekend closures
• Continue to work with city staff to minimize construction impacts
SR 202 Little Bear CreekFish Barrier Removal
16Picture from Bing.com.
Culvert
Dairy Queen
McLendon
Dream Auto