EIE EffCoBuild
WP6 Implementation of WP6 Implementation of pilot/demonstration projectspilot/demonstration projects
IntroductionIntroduction
WP leader BCEI ZRMK
Marjana Šijanec ZavrlBuilding and Civil Engineering Institute ZRMK
Meeting in Sala, February 22-23, 2007
EffCoBuild
WP6 Implementation of pilot/demonstration projects
WP 2: Analyses of framework in the pilot community
WP 3: Energy saving potentials in building sector and virtual “power saving plant”
WP 1: projec
t manageme
nt
WP 4: Development of a concept for measures towards enhancing the energy saving in buildings
WP 5: Compilation of “10 best of” examples for a brochure
WP 6: Implementation of pilot/demonstration projects
Brochure with 10 examples for each country
Initiated pilotproject in each pilot community
Saving potential in GWh/a for each community
Concept of measures/actions for pilot community
Analyses of the status quo;Suggestions for improvement
WP 7: dissemination of result
s
Work packages Output
EffCoBuild
WP6 Tasks – national workshops
In national workshops in each community, the project partner selects, together with the stakeholders, one measure, instrument or action contained in the concept (worked out in work package 4), which is considered as most prior and should be implemented first.
Considering the experience from the “best of” examples from other communities, the criteria for the selection of the pilot project will be:
- innovative approach: the measure should be new in the community
- the measure should be clearly perceived by the citizens and media
- the measure should overcome existing barriers for energy efficiency measures at buildings in the community
- the measure should be applicable for many other communities in the country and in the EU (multiplication)
EffCoBuild
WP6 Tasks – joint transnational workshop & adopted pilot project
In a joint transnational workshop, all country partners present their planned pilot projects to the other communities.
Every community will receive feedback and will thus profit from the experience of the other countries in similar actions.
The feedback will be adopted in the pilot projects, and the results of each pilot project will be documented in a report, which will be published at the project homepage.
EffCoBuild
EffCoBuild
WP6 - Outcome
- Organising national workshops with the stakeholders to determine and draft the pilot project in the pilot communities
- Organising the transnational workshop
- Adoption of the pilot projects regarding the feedback from the workshop
- Implementation of the pilot projects
EffCoBuild
WP6 – Timetable & Deliverables
Project phase / Duration of the project (in months) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
Work package 1: Project management Work package 2: analyses framework Work package 3: saving potentials Work package 4: concept measures Work package 5: brochure 10 best of Work package 6: pilot/demonstration project Work package 7: Dissemination Work package 8: Common Dissemination Activities
Project meetings X X X X Project deliverables* P
R P
R IR
Project phase / Duration of the project (in months) 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
Work package 1: Project management Work package 2: analyses framework Work package 3: saving potentials Work package 4: concept measures Work package 5: brochure 10 best of Work package 6: pilot/demonstration project Work package 7: Dissemination Work package 8: Common Dissemination Activities
Project meetings X X Project deliverables* P
R P
R F
R
x
x xx
IRIRDeliverable(s) of WP6- D20 4 national workshops to evaluate final concept for measures and selection of pilot project- D23 draft plan for the pilot projects 10 pages per country- D24 transnational workshop in Jesenice 23-24 October 2007- D25 report on transnational workshop 15 pages - 3 introduction ZRMK and 3 p from each partner about pilot project- D26 final plan for the implementation of pilot projects 20 pages per country-D28 4 pilot pilot project implemented just report
-Move project meeting from 7 2007 to 10 2007 and from 10 2007 to 3 2007-Jesnice meeting 23-24 October 2007
D20 D23D24
D25D26
D28
Jan
2007
July
2007
Jan
2008
PRPRPRPRPRPR
EffCoBuild
Performance indicators
Work package 6
Performance indicator Quantification
Implementation of a pilot/demonstration project
Workshop national: with at least 20 stakeholders of the community, at least one representative from the local administration entities, regional or national administration entities, building (refurbishing) companies, architects, financing institutes, building owners.
Workshop transnational: participation of all country lead partners. Detailed presentation of each planned pilot project
The pilot project must fulfil the following criteria:
Its effect must address a significant part of the community buildings
More than 50% of the citizens will be informed by the pilot measure/action and the results
Web site, lectures, leaflet encl. to energy bill, article, posters …
Thank you for your attention!Thank you for your attention!