SG 8 Seminar. WP 8F Workplan. Jim Ragsdale, USA. SG 8 Seminar. WP 8F Work Flows (1):. WP 8F deliverables for WRC 07 timeframe are grouped in three high level groups: Demand: IMT.MARKET, IMT.SRVC_View Supply: IMT.METH, IMT.ESTIMATE Where: IMT.CANDI Generically known as: - PowerPoint PPT Presentation

TRANSCRIPT

Jim Ragsdale, USA

WP 8F Workplan

SG 8 Seminar

Jim Ragsdale, USA

SG 8 Seminar WP 8F Work Flows (1):

• WP 8F deliverables for WRC 07 timeframe are grouped in three high level groups:

Demand: IMT.MARKET, IMT.SRVC_View

Supply: IMT.METH, IMT.ESTIMATE

Where: IMT.CANDI

• Generically known as:

What for?; How much?; Where?

Jim Ragsdale, USA

SG 8 Seminar WP 8F Work Flows (2):

Jim Ragsdale, USA

SG 8 Seminar Original WP 8F Structure:

WP 8F Plenary

WRCSPEC

Estmt Can Freq

SERVMkt Svcs

Meth

DEVTECH

Rad_asp

SAT Coord

Ad-Hoc Migrate

Ad-Hoc Workplan

Working Groups

Ad-Hoc and Coordination Groups

Coordination with external forums (research, standards, other ITU groups, etc.)

Jim Ragsdale, USA

SG 8 Seminar WP 8F Work Flows (3):

• WP 8F deliverables demand great interaction among Working Groups

ServicesSpectrumTechnologyWRC

• This was complicated in the original structure due to interactions among Sub-Working groups

Market, Services, MethodologyEstimate, Spectrum Bands, Frequency Arrangements, SharingRadio Aspects

Jim Ragsdale, USA

SG 8 Seminar WP8F Original Interactions

Jim Ragsdale, USA

Jim Ragsdale, USA

SG 8 Seminar WP 8F SWG Restructure

• WP 8F at 13th meeting in Berlin restructured Sub-Working Groups

Methodology and Estimate combined and renamed SpeCalc, home is Services WG until 16th meeting, then moved to Spectrum WG

Market and Services combined, renamed Market

• Restructure smooths interactions among Sub-Working groups

Market and Service aspects in same Sub-Working Group

Methodology and initial Estimate work in same Sub-Working Group; In same Working Group as Market

Final Estimate work in WG Spectrum along with CANDI

Jim Ragsdale, USA

SG 8 Seminar WP 8F Deliverable Plan: 2003 2004 2005 2006 2007 2008 2009 2010 >2010

CPM/WRC meeting <WRC CPM> WRC>

SG 8 meeting * * * * * * * *

WP 8F meeting No. 10 11 12 13 14 15 16 17 18 19 20 21 22

Service View Services Market

Methodology (to be moved to WG Spec in meeting #16)

Estimate (to be moved to WG

Spec in meeting #16)

Services/market aspects (SERV)

Naming Naming

WRC Preparations (WRC) CPM Text

Candidate Spectrum Mitigate

Comp Sharing UWB Survey

Spectrum (SPEC)

M.1036 Rev 2

Migrate (MIGRATE) Texts

Developing (DEV) Handbook update (if required)

SDR Radio aspects M.1079 Rev2 M.1580/1

Technology (TECH)

Trends Enhancements to IMT-2000 Annual revisions to M.1457 and, if necessary, revisions to other Recommendations on IMT -2000

IMT.RADIO and subsequent

revisions, if necessary New radio interface(s) for

systems beyond

IMT.GCS and subsequent revisions

IMT-2000 and enhancement

Development of detailed specifications for enhancements of IMT-2000

Radio interface development process

Complementary work to be performed outside ITU Systems

beyond IMT-2000

Research on new technologies Development of detailed specifications/standards

Key: WRC-07 related

deliverables

Recommendations Reports/Circulars etc.

Jim Ragsdale, USA

SG 8 Seminar WP 8F Deliverables:

• Planned WP8F Deliverables (WRC-07 timeframe):

Methodology (IMT.METHEstimate (IMT.ESTIMATE)Candidate Spectrum (IMT.CANDI)Radio Aspects (IMT.RAD_ASPECTS)Market (IMT.MARKET)Service View (IMT.SRVC_VIEW)Services (IMT.SRVC)Naming (IMT.NAME)Sharing StudiesSurvey (IMT.SURVEY)Revision of M.1036-2 (2500-2690 MHz addition)Software Defined Radio (IMT.SDR)Revisions to M.1457Handbook Supplement

Jim Ragsdale, USA

SG 8 Seminar WP 8F Meeting Plan (1):

 

2005

Meeti ng Number Start End Year Location Status Comment

WP 8F 15 1 Feb 8 Feb 2005 Geneva Firm

WP 8F (selected WGs)

Working Group Meetings

6 Jun 7 Jun 2005 Canada Firm

WP 8F 16 8 Jun 15 Jun 2005 Canada Firm

WP 8F 17 12 Oct 19 Oct 2005 Finland Firm

SG 8 21 Nov 22 Nov 2005 Geneva Firm

Jim Ragsdale, USA

SG 8 Seminar WP 8F Meeting Plan (2):

2006

Meeting Number Start End Year Location Status Comments

WP 8F 18 25 Jan 1 Feb 2006 [Bangkok] moved forward

WP 8F 18 8 Feb 15 Feb 2006 [Bangkok] changed

WP 8F 19 3 May 10 May

2006 [France] moved forward

(date constrained by RRC-06 dates)

WP 8F 19 17 May

24 May

2006 [France] changed

RRC-06 15 May

16 Jun 2006 Geneva Firm RRC-06

WP 8F 20 23 Aug

30 Aug

2006 [USA] Replaces Nov 06 meeting

Deadline for CPM Chapter text

~5 Sept

2006 Approximately 6 months before CPM-07

WP 8F 20 15 Nov

22 Nov

2006 [USA] changed

SG 8 7 Dec 8 Dec 2006 Geneva Firm

Jim Ragsdale, USA

SG 8 Seminar WP 8F Meeting Plan (3):

2007

Meeting

Number Start End Year Location Status Comments

WP 8F 21 17 Jan 25 Jan 2007 [Geneva] Tentative

ITU CPM-07

5 Mar 16 Mar 2007 Geneva Firm

WP 8F 22 23 May

31 May 2007 [TBD] Tentative (date constrained by RA-07 & SG-8)

SG 8 25 Jun 26 Jun 2007 Geneva Tentative (date constrained by RA-07 approx 3 months prior to RA)

ITU RA-07

1 Oct 5 Oct 2007 Geneva Firm

ITU WRC-07

8 Oct 2 Nov 2007 Geneva Firm

Jim Ragsdale, USA

SG 8 Seminar WP 8F Micro Workplans(1)MICRO WORKPLAN FOR METHODOLOGY

Title Methodology

Identifier IMT.METH

Document Type Recommendation

ITU-R WP 8F Lead Group WG-SERV. Please note that this activity may be moved into WG-WRC as the WRC-07 preparations become more advanced. This should be considered later in 2004.

Sub-group chair Volker Reitz, Deutsche Telekom AG, Germany e-mail: [email protected]; Tel: +49 6151 9372468

Editor Thomas Welter, Bouygues Telecom, France e-mail: [email protected]; Tel:+33 1 39454136

Focus for scope and work This document describes the methodology used to calculate the spectrum requirements for the future development of IMT-2000 and systems beyond IMT-2000 from the year 2010 onwards to fulfil the vision for the future development of IMT-2000 and systems beyond IMT-2000. It needs to be determined if a new methodology recommendation or a revision of the existing methodology ITU-R M.1390 is required. However, it is obvious that clear guidelines and a comprehensive iterative process in the development of this modified/new recommendation will be required in conjunction with the other activities such as market/services, radio and spectrum aspects. The methodology will be developed in close cooperation with all relevant working groups. This recommendation will not include values for additional spectrum requirements; these will be developed within [IMT.ESTIMATE].

Jim Ragsdale, USA

SG 8 Seminar WP 8F Micro Workplans(2)

Related documents

Recommendation ITU-R M.[IMT.SPEC] Recommendation ITU-R M.1645 Recommendation ITU-R M.1390 Recommendation ITU-R M.[IMT.RAD_ASPECTS] Recommendation ITU-R M.[IMT.ESTIMATE] Report ITU-R M.[IMT.MARKET] Comment: More details need to be added according to progress of work

MICRO WORKPLAN FOR METHODOLOGY (2)

Jim Ragsdale, USA

SG 8 Seminar WP 8F Micro Workplans(3)

Meeting #10 (concluded) · Review and produce initial scope · Produce initial document structure · Produce workplan / milestones Meeting #11 (concluded) · Modify plan in greater detail · Modify scope and document structure · Initial development of developing guidelines for the

methodology · Initial development of methodology flow charts · Consider interrelationship with other radio systems Meeting #12 (concluded) · Finalise developing guidelines for the methodology · Determine whether a new methodology Recommendation or a

revision to the Rec. ITU-R M.1390 is necessary · Completion of basic flow chart · Preliminary view on what information on services and radio

environments is required for methodology; submission to SWG Service

· Preliminary view on what technical parameters need to be considered for the spectrum calculation methodology; submission to SWG Radio Aspects

· Determine the technical approach for the methodology to estimate future spectrum requirements.

· Identify possible work items and their influences/interactions with other groups within WP 8F

Milestones

MICRO WORKPLAN FOR METHODOLOGY (3)

Jim Ragsdale, USA

SG 8 Seminar WP 8F Micro Workplans(4)

 

Milestones Meeting #13 · Identify what technical parameters need to be considered for

developing the spectrum calculation methodology · Submission of the technical parameter requirement to SWG

Radio Aspects ·Develop initi al calculation algorithm · Consider the relationship between the methodology developed

here and Rec. ITU-R M.1391, dealing with the satellite component of IMT-2000.

Meeting #14 · Use initial set of preliminary figures from Market Report

(IMT.MARKET), Service View and Radio Aspects (IMT.RADIO) to begin to test the methodology through an iterative process

· Determine calculation algorithm · Submission of the material available on the methodology to

SWG Estimate

MICRO WORKPLAN FOR METHODOLOGY (4)

Jim Ragsdale, USA

SG 8 Seminar WP 8F Micro Workplans(5)

Milestones Meeting #15 · Final adjustment of algorithm using a set of figures from

Service/Market (Service View, Report IMT.MARKET) and Radio Aspects (IMT.RADIO)

Meeting # 16 · Agreement of Methodology Recommendation · Submission of Methodology Recommendation to SWG

Estimate Meeting # 17 · Consideration of comments from application in SWG Estimate · Final approval of methodology Recommendation in WP8F and

submission to SG 8

MICRO WORKPLAN FOR METHODOLOGY (5)

Thank you

SG 8 Seminar

Jim Ragsdale, USA

2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012

WRC-03 WRC-07WRC

Future Services / Market Analysis• Draft text for WRC-07:

• Spectrum estimate

• Candidate freq ranges

• When

• What for / name

• Methods to satisfy agenda

• Footnote text

• Pooled / shared / paired / etc. ?

Future Spectrum Calculation Methodology

Future Spectrum Estimate

Spectrum Survey

Future Technology Assumptions

Sharing Studies

WP 8F WRC preparations

WP 8F other spectrum- related activities

2.5 GHz Spectrum Plan

Radio Aspects

SG 8 Seminar WP 8F Work Plan

Peter Scheele, Germany, for the Chairman of WP 8F