world bank document · 2016. 7. 13. · suljee llc, mongolia under implementation b2(a) prior 395...

5
ULAANBAATAR CLEAN AIR PROJECT IDA 5039-MN P122320 MUNICIPALITY OF ULAANBAATAR, MONGOLIA Guidelines Version: JANUARY 2011 GPN Date: 28-Nov-11 14-Jun-13 09-Oct-14 2014 THRESHOLDS Category Procurement method Thresholds for Procurement method Thresholds for Prior Review NCB: <USD 3,000,000 ● First 2 NCB works contracts by each PIU irrespective of value; ● All contracts >= USD 500,000 Shopping: <USD 200,000 In case unable to obtain at least 3 quotations NCB: <USD 300,000 ● First 2 NCB goods contracts by each PIU irrespective of value; ● All contracts >= USD 200,000 Shopping: <USD 100,000 In case unable to obtain at least 3 quotations QCBS: >=USD 200,000 CQS: <USD200,000 LCS: Contracts meeting the requirements of paragraph 3.6 of the Consultants Guidelines and all assignments for auditing PIU accounts, regardless of contract value IC: Assignments meeting the requirements of Articles 5.1-5.6 of the Consultants Guidelines. Only in Exceptional Cases SSS: Assignments meeting the requirements of paragraphs 3.8-3.11 of the Consultant Guidelines All SSS SSS (IC): Assignments meeting the requirements of paragraph 5.6 of Consultant Guidelines >=USD 20,000 Shortlist Comprising only National Consultants <USD100,000 Requirement of Advertising in National Neswpaper Category Works Goods Consultant Requirement of Advertising in UNDB online through Client Connection Category Works Goods Consultant Date of this updating of procurement plan: Period covered by this procurement plan: Civil Works Goods Consultancy Project: Credit No.: Project ID: Project Implementation Agency: Date of Bank no objection last time for procurement plan: For firm only: ● First contract for each selection method; ● All contracts >=USD 100,000 >=USD100,000 All ICB; All NCB All ICB; All NCB All firm consultant selection Requirement All ICB All ICB Requirement Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

Upload: others

Post on 27-Jan-2021

0 views

Category:

Documents


0 download

TRANSCRIPT

  • ULAANBAATAR CLEAN AIR PROJECT

    IDA 5039-MN

    P122320

    MUNICIPALITY OF ULAANBAATAR, MONGOLIA

    Guidelines Version: JANUARY 2011

    GPN Date: 28-Nov-11

    14-Jun-13

    09-Oct-14

    2014

    THRESHOLDS

    Category Procurement method Thresholds for Procurement method Thresholds for Prior Review

    NCB: = USD 500,000

    Shopping: =USD100,000

    All ICB; All NCB

    All ICB; All NCB

    All firm consultant selection

    Requirement

    All ICB

    All ICB

    Requirement

    Pub

    lic D

    iscl

    osur

    e A

    utho

    rized

    Pub

    lic D

    iscl

    osur

    e A

    utho

    rized

    Pub

    lic D

    iscl

    osur

    e A

    utho

    rized

    Pub

    lic D

    iscl

    osur

    e A

    utho

    rized

    Pub

    lic D

    iscl

    osur

    e A

    utho

    rized

    Pub

    lic D

    iscl

    osur

    e A

    utho

    rized

    Pub

    lic D

    iscl

    osur

    e A

    utho

    rized

    Pub

    lic D

    iscl

    osur

    e A

    utho

    rized

  • MONGOLIA

    ULAANBAATAR CLEAN AIR PROJECT

    IDA 5039-MN

    PROCUREMENT PLAN

    Prepared: 9/29/2011 Last Revised: 2/10/2014 Last Approved by WB: 6/14/2013 Last updated: 10/9/2014

    No Category Num Contract ID Contract Name Proc't method WB review Estimated

    total cost

    (000' USD)

    Actual cost (000'

    USD)

    Plan vs. Actual BD preparation Submission to

    WB

    WB approval of

    BD2

    Advertisement of

    EOI2

    EOI submission Bid Invitation Bid Opening Evaluation

    Complete

    WB approval Contract Signing Contract

    Completion

    Contract Amt Consultant

    Name

    Contract implementation

    status

    A. Goods 455 256

    1 GLEQ-01 90 Plan 6/10/2013 6/21/2013 7/8/2013 7/17/2013 7/26/2013 9/9/2013

    Actual 6/10/2013 7/25/2013 8/12/2013 9/30/2013 10/21/2013 12/20/2013

    2 GLEQ-02 90 Plan 2/7/2014 2/10/2014 2/24/2014 3/5/2014 3/7/2014 6/9/2014

    Actual 2/8/2014 2/10/2014 2/24/2014 4/10/2014 4/24/2014 7/31/2014

    3 GLEQ-03 185 Plan 10/6/2014 10/8/2014 11/14/2014 12/3/2014 12/10/2014 2/13/2014

    Actual

    4 GLEQ-04 Plan 6/11/2014 6/13/2014 6/27/2014 7/28/2014 8/7/2014 11/18/2014

    Actual 6/2/2014 6/4/2014 7/2/2014 8/12/2014 8/25/2014 10/27/2014

    B. Works 380

    5 Plan 3/31/2014 4/7/2014 4/21/2014 4/23/2014 5/26/2014 6/9/2014 6/23/2014 6/25/2014 10/25/2014

    Actual 6/13/2014 6/30/2014

    8/21/2014

    9/4/2014 9/10/2014 10/13/2014

    153 Plan 3/31/2014 4/7/2014 4/21/2014 4/23/2014 5/26/2014 6/9/2014 6/23/2014 6/25/2014 10/25/2014

    Actual 6/13/2014 6/30/2014

    8/21/2014

    9/4/2014 9/10/2014 10/13/2014

    C. Consulting Service 3,295 3,160Contract

    ID

    Category Num Contract Name Proc't method WB review Estimated

    total cost

    (000' USD)

    Actual cost (000'

    USD)

    Plan vs. Actual TOR/BD

    preparation/review

    WB approval of

    TOR

    Advertisement of

    EOI

    EOI submission Subm of

    Shortlist/Ranking

    to WB

    RFP

    submission to

    Bidders

    Proposals

    submission

    WB approval of

    Tech Proposal

    WB approval of

    Negotiated

    Contract

    Contract Signing Contract

    Completion

    Contract Amt (USD) Consultant

    Name

    Contract implementation

    status

    6 CSVC-01 Plan 4/10/2013 6/14/2013 6/18/2013 7/19/2013 8/9/2013 8/19/2013 9/10/2013 9/30/2013 8/4/2013 8/4/2014

    Actual 4/10/2013 8/1/2013 8/26/2013 9/9/2013 9/25/2013 10/3/2013 10/25/2013 11/11/2013 11/13/2013

    7 CSVC-02 Plan

    Actual

    Plan 9/1/2014 9/10/2014 10/3/2014 Under implementation

    Actual 9/5/2014 9/08/204

    9 CLTA-01 Plan 10/15/2011 10/21/2011 10/26/2011 11/16/2011 1/10/20121 3/28/2012 5/9/2012 6/11/2012 1/15/2013 1/17/2013 1/16/2015

    Actual 10/27/2011 12/13/2011 3/12/2012 4/30/2012 6/11/2012 9/7/2012 1/11/2013 1/18/2013

    Plan 9/15/2011 11/2/2011 1/3/2012 1/17/2012 3/3/2012 4/6/2012 5/4/2012 5/18/2012 5/28/2012 10/29/2012

    Actual 1/4/2012 1/18/2012 3/12/2012 5/21/2012 6/21/2012 10/11/2012

    Plan 12/16/2013 12/30/2013 1/6/2014 1/22/2014 2/19/2014 2/20/2014 3/20/2014 4/18/2014 4/24/2014 9/25/2014

    Actual

    Plan 12/18/2013 1/13/2014 2/3/2014 2/17/2014 3/3/2014 3/31/2014 4/17/2014 4/23/2014 11/23/2014

    Actual 12/5/2013 1/9/2014 1/13/2014 2/3/2014 2/19/2014 2/27/2014 3/17/2014 3/25/2014 4/4/2014

    11 CPLG-01 406.39 Plan 10/5/2011 3/30/2012 4/2/2012 4/20/2012 5/15/2012 5/30/2012 6/11/2012 4/5/2013 4/30/2013 5/1/2013 5/13/2015

    Actual 10/5/2011 4/15/2012 4/2/2012 4/20/2012 5/22/2012 8/14/2012 9/24/2012 4/2/2013 5/8/2013 5/13/2013

    12 CPAP-01 482.97 Plan 10/29/2011 4/20/2012 1/30/2013 2/25/2013 4/17/2013 4/30/2013 6/12/2013 7/15/2013 8/16/2013 8/26/2013 2/26/2014

    Actual 10/17/2011 4/20/2012 1/30/2013 2/25/2013 4/17/2013 4/30/2013 6/12/2013 7/16/2013 9/11/2013 9/16/2013

    13 CDHS-01 796.99 Plan 11/6/2012 12/5/2012 1/11/2013 2/4/2013 3/18/2013 4/15/2013 5/13/2013 6/28/2013 7/26/2013 8/5/2013 8/5/2014 790,592.00$

    Actual 11/6/2012 12/5/2012 1/11/2013 2/4/2013 3/18/2013 4/12/2013 5/13/2013 7/16/2013 9/3/2013 9/23/2013 10,340,000.00₮

    593.02 Plan 11/1/2011 6/8/2012 6/11/2012 7/2/2012 7/16/2012 7/26/2012 9/6/2012 9/28/2012 10/19/2012 11/2/2012 4/19/2013

    Actual 10/26/2011 4/15/2012 5/25/2012 6/15/2012 9/4/2012 9/7/2012

    Plan Rebidding 9/17/2012 10/19/2012 1/21/2013 4/1/2013 4/30/2013 6/24/2013 7/24/2013 8/1/2013 4/1/2015

    Actual 9/17/2012 10/19/2012 2/6/2013 4/1/2013 4/30/2013 6/25/2013 9/2/2013 9/5/2013

    90

    Prior 600

    415 Rejected all EOIs due to lack of experience

    EEC LLC

    Under implementation

    SGS-SociétéGénérale de

    Surveillance S.A.,

    Switzerland

    482,971.00

    JV of SEURECA (Leading

    firm, France) and DESL

    (India)

    Affordable Housing Institute,

    USA

    593,023.00

    Under implementation

    186,627,576.00₮

    287,540.00

    TOR revised, hence

    rebidding required

    Under implementation

    Mon-Energy Consult LLC,

    Mongolia

    143,088,000.00₮

    Under implementation

    50.00

    A2(b2) Supply of equipment for stove development

    center

    NCB Post

    A2(b2) 2nd supply of additional equipment for

    sustainable operation of the Lab

    Shopping Post 84 83,633.00 NOAMC LLC

    406,392.00 ASCONIT Consultants (France); Sub-Consultants: ALMEC

    Corporation (Japan), VPI Inc.

    (Japan), DESO Architects

    (France), and Institute of Geo-

    Ecology (Mongolia)

    Under implementation

    Under implementation

    10 A2(b4) SWHB-01

    8 Verification and quality control (10 individual consultants to carry out the quality control of 1600

    stoves that were installed in heating season of 2013-

    2014)

    5.5SSS Post

    Prior 180Low Pressure Boiler Market Study (Assist

    MUB in design a program supporting rapid

    penetration of clean, affordable small water

    heating boilers and development of

    sustainable boiler market)

    CQS 80

    Completed A2(b2) TS to Stove Producers: Laboratory

    Equipment (Supply of additional equipment needed for sustainable operation of the Lab and equipment for

    testing of small water heating boiler)

    Shopping Post 50,000.00 Suljee LLC, Mongolia

    Suljee LLC, Mongolia Under implementation

    395PriorB2(a)

    B1(a)

    TA for Laboratory Testing and Stove

    Development Center (Increase technical capacity and sustainability of SEET, Support SDC for design

    and production of cleaner, affordable stoves & boilers)

    A1 (a3) CSVC-03

    2/10/2014

    Reason of rebidding: The

    selected firm proposed too

    high financial proposal

    A1(a3) Verification and quality control (2nd selection of NGO for verification and quality control of stoves to

    be delivered ger area households)

    CQS Post 88

    A2(b1) Under implementation

    Ireeduin Garts NGO,

    Mongolia

    Contract cancelled due to

    the Consultant's poor

    performance

    122A2(b2) Supply of equipment for testing of small

    water heating boiler

    Shopping Post

    CQS Prior

    122,400.00

    QCBS 600

    107.78

    NCB Prior

    Prior

    QCBS Prior 280

    287.54Prior

    Affordable Housing Study (Development of Affordable Housing Strategy)

    QCBS

    FS for Improved Emission Control and Ash

    Ponds (Review and assess all possible measures to reduce emissions including improved emission

    controls & improved ash pond management)

    Study for City Greening & Preparation of

    Pilot Project (Preparation of technical and economic feasibility of a city greening investment and

    development of pilot project)

    B3(a)

    QCBS

    FS for Rehabilitation & Expansion of DH

    system (Recommend investment and institutional capacity building program for UB district heating

    supply system - technically, environmentally,

    economically and financially feasible)

    QCBS

    It depends on quality of

    service CSVC-01, which is

    subject to extendable.

    14 B4(a) CAHS-01

    10 Individual Consultants

    Verification and quality control (Selection of NGO for verification and quality control of stoves to be

    delivered ger area households)

    WPLT-01B1(b)Upgrading work LOT2 (WPLT-01-B): Pilot

    project for City Greening (Implementation of pilot project for a good example of establishment or

    upgrading of green space in UB)

    NCB Prior

    Greening work, LOT1 (WPLT-01A): Pilot

    project for City Greening (Implementation of pilot project for a good example of establishment or

    upgrading of green space in UB)

    227

    A1(a3) 197

    10/20/2014 2/5

  • Contract

    ID

    Category Num Contract Name Proc't method WB review Estimated

    total cost

    (000' USD)

    Actual cost (000'

    USD)

    Plan vs. Actual TOR/BD

    preparation/review

    WB approval of

    TOR

    Advertisement of

    EOI

    EOI submission Subm of

    Shortlist/Ranking

    to WB

    RFP

    submission to

    Bidders

    Proposals

    submission

    WB approval of

    Tech Proposal

    WB approval of

    Negotiated

    Contract

    Contract Signing Contract

    Completion

    Contract Amt (USD) Consultant

    Name

    Contract implementation

    status

    Plan 3/1/2012 3/28/2012 1/17/2013 2/7/2013 3/18/2013 3/27/2013 3/27/2014

    Actual 3/1/2012 4/15/2012 1/17/2013 2/7/2013 3/18/2013 3/27/2013 4/1/2014Actual 5/8/2014 4/3/2015 25,020,000.00₮ Under implementation

    Plan 3/1/2012 3/28/2012 1/17/2013 2/7/2013 3/18/2013 3/20/2013 3/27/2014

    Actual 3/1/2012 4/15/2012 3/18/2013 3/27/2013 4/1/2014

    Actual 5/8/2014 4/3/2015 25,020,000.00₮ Under implementation

    17 CPAS-01 199.00 Plan 4/1/2012 4/13/2012 5/22/2012 6/11/2012 9/4/2012 3/29/2013 4/19/2013 6/6/2013 6/10/2013 6/10/2014

    Actual 4/1/2012 4/13/2012 5/22/2012 6/11/2012 9/4/2012 3/29/2013 4/19/2013 6/6/2013 6/10/2013 4/31/2014

    M&E (Evaluation of Current status of clean air activities in UB )

    Plan Removed

    Actual

    19 CLTA-02 153.83 Plan 3/27/2013 4/5/2013 5/21/2013 5/22/2013 1/22/2014 74,015.53

    Actual 3/27/2013 4/2/2013 5/21/2013 5/22/2013 6/15/2015 79,818.00

    20 CHWS-01 IC Post 14.5 14.09 Plan 5/13/2013 5/14/2013 5/24/2013 6/3/2013 6/14/2013 9/1/2013 14,091.66

    Actual 5/13/2013 5/14/2013 5/24/2013 6/3/2013 8/21/2013 9/30/2013 20,203,641 MNT

    TOTAL 4,130 3,416

    Description:

    CQS - Consultant Qualification Selection1 - New contract, added due to causing requirement.

    QCBS - Quality and Cost Based Selection

    QBS - Quality Based Selection

    IC - Individual Consultant Revised

    SSS - Single Source Selection

    NCB - National Competitive Bidding Contracts for 2014

    Updated by: Yu.Purevsuren, Procurement Specialist, PMU

    C3(c) CPMT-0118

    19.22 Ts.Ariuntuya

    16 C2(a) CPC-01B Support Operational Work of Coordination (Assistance to Vice Mayor in charge of Ecology and

    Green Development of UB to continuously coordinate

    air pollution reduction activities in UB, communication

    coordinator)

    IC Prior 125 19.22 D.Munkhzul

    15 C2(a) CPC-01A Support Operational Work of Coordination (Assistance to Vice Mayor in charge of Ecology and

    Green Development of UB to continuously coordinate

    air pollution reduction activities in UB, research

    coordinator)

    IC Prior 125

    JV of BREAKTHROUGH PR

    CO., LTD (Mongolia) and

    OGILVY PUBLIC

    RELATIONS WORLDWIDE

    COMPANY (Canada)

    19,224.77

    199,000.00

    Completed

    Completed

    19,224.77 Completed

    Completed

    P.Sharavnyamba

    Mr. Crispin Pemberton-Pigott Contract exteneded,

    under implementation

    2 - In order to have list of potential suppliers/manufacturers for the supply of goods (in case of shopping) we are planning to organize at the 1st the advertisement of request for EOI then

    based on the collected list the request for quotation will be submitted to the potential bidders .

    A2(b5)1 Heating Wall Consultant (Study of heating walls

    in use, determination of requirements for safe

    connection of new clean low-emission)

    A2(b1) Supervision of Lab equipment installation (Verify lab equipment reassembling and ensure new

    operators to be able to operate and maintain SEET lab

    independently)

    SS Prior 75.00

    Prior

    CQS Prior

    C2(c) Support for PR campaign (Develop and implement a package of consistent public awareness

    campaigns and assist MUB in supporting effective air

    pollution reduction program in UB city)

    195CQS

    10/20/2014 3/5

  • 143,088,000 1,785

  • 80,161