Form TC 1 (7-28-10) Rev 1 7-29-2013 REB 1/06/2014
Tribal Council Workshop Information
Workshop Title: Ko-Kwel Wellness Center Project Update
Date of Workshop: 11/21/2019
Open Workshop Continued from previous Workshop – Date: Closed Executive Workshop
Presenter’s Name, Title and Department: KWCP Decision Team Members: Mark Johnston, Executive Director; Fauna Larkin, Operations Director; Eric Scott, Project Manager Guest Presenter(s), Title and Agency (anyone not associated with CIT): Note Taker for Workshop: Anna Chavez Brief Description (provide outline of discussion points as well as questions you need answered by this workshop):
• Review and discuss Major Milestones to Closing Calendar (see attached) • Review and discuss budget (see attached) • Review and discuss 80% Schematic Design (see attached) • Review and discuss Alta Survey (see attached) • Review work in progress
o FF&E o Recruitment o Environmental: Checklist and Phase 2 ESA o Land Use Permitting o Marketing o Business Operations Charter
Workshop Attendees (list everyone who attended workshop): Workshop Summary (provide outline of discussions that occurred): Reference Materials (provide for posting):
Next Steps:
Information Only
Schedule second workshop
Prepare item for Tribal Council Motion
Prepare item for Tribal Council Resolution
Prepare item for Administrative Approval process
Other: Executive Director Comments: Tribal Council Secretary/Treasurer Comments:
Executive Director Initials:
KWCP Draft Major Milestones to Closing Calendar: Last updated 11/20/19
*Budget includes Owner Costs, GMP & NMTC financing
Monday Tuesday Wednesday Thursday Friday Saturday Sunday 11/21 11/19 11/20 11/21 11/22 11/23 11/24
Design Documents Schematic Design (SD) drafts in Progress Council reviews 80% SD Schematic Design (SD) revisions in progress Budget* Drafts in Progress Council reviews updated
draft budget Drafts in Progress
Land Use Permit Proposed amendment 30 day comment period for Land Use and Zoning Ordinance changes Lease Environmental checklist, Phase 2 ESA in progress, lease agreement language draft in progress Council reviews draft ALTA
survey Alta survey completed. Environmental Checklist completed
11/25 11/26 11/27 11/28 11/29 11/30 12/1 Design Documents Schematic Documents (SD) revisions in progress KWCP DT Approves SD Set,
Design Draft Kick‐Off Mtg Design documents (DD) in progress
Budget* Drafts in Progress KWCP Team Reviews 75% draft of all owner costs
Drafts in Progress
Land Use Permit Proposed amendment 30 day comment period for Land Use and Zoning Ordinance changes Lease Environmental Impact Determination 30 day comment period, Phase 2 ESA in progress, lease agreement language draft in progress 12/2 12/3 12/4 12/5 12/6 12/7 12/8 Design Documents (DD) Design documents (DD) in progress KWCP DT Reviews 50% DD
drafts Design document (DD) revisions in progress
Budget* Drafts in Progress KWCP Team Reviews 75% draft of all owner costs and 90% SD budget
Drafts in Progress
Land Use Permit Proposed amendment 30 day comment period for Land Use and Zoning Ordinance changes Lease Environmental Impact Determination 30 day comment period, Phase 2 ESA in progress, lease agreement language draft in progress 12/9 12/10 12/11 12/12 12/13 12/14 12/15 Design Documents Design document (DD)
revisions in progress Council reviews 80% DDs Design document (DD) revisions in progress
Budget* KWCP DT approves SD budget
Council reviews 90% draft Owner Costs budget Council reviews approved SD budget
Drafts in Progress
Land Use Permit Comments incorporated into draft changes
Council reviews final suggested changes to Land Use and Zoning Ordinance
Council approves changes to Land Use and Zoning Ordinance
Permit Administrator Issues Land Use Permit.
Lease Environmental Impact Determination 30 day comment period, lease agreement language draft in progress
Tribal Council reviews environmental impact determination, and reviews draft QUALICB lease language
Environmental Impact Determination 30 day comment period, lease agreement language draft in progress. Phase 2 ESA in progress.
12/16 12/17 12/18 12/19 12/20 12/21 12/22 Design Documents Design document (DD) revisions in progress KWCP Team Reviews 90%
DD drafts Design document (DD) revisions in progress
Budget* Drafts in Progress KWCP Team Approves FF&E Budget (Contingent on Construction Budget)
Lease Environmental Impact Determination 30 day comment period, lease agreement language draft in progress, Phase 2 ESA in progress. 12/23 12/24 12/25 12/26 12/27 12/28 12/29 Design Documents KWCP team approves 90%
DD Design document (DD) revisions in progress
Budget* GMP based on DDs budget drafts in progress Lease
Environmental Impact Determination finalized.
Phase 2 ESA competed Lease agreement language draft in progress
KWCP Draft Major Milestones to Closing Calendar: Last updated 11/20/19
*Budget includes Owner Costs, GMP & NMTC financing
12/30 12/31 1/1 1/2 1/3 1/4 1/5 Design Documents KWCP DT Approves DD’s Budget* GMP budget based on DDs
drafts in progress KWCP DT Approves DD budget
GMP budget based on DDs drafts in progress
Lease Lease Approved by Tribal Council
1/6 1/7 1/8 1/9 1/10 1/11 1/12 Budget* GMP budget based on DDs
drafts in progress Council reviews draft resolutions for NMTC financing Council reviews approved DD’s
1/13 1/14 1/15 1/16 1/17 1/18 1/19 Budget* GMP budget based on DDs drafts in progress S&B James submits GMP
based on DD’s GMP Language Review GMP based on DDs Budget Review
1/20 1/21 1/22 1/23 1/24 1/25 1/26 Budget GMP based on DDs Budget Review
Negotiating and finalizing with lenders and S&B James GMP Language Review
Council reviews draft resolutions for NMTC financing
Resolutions for NMTC financing approved by Tribal Council
Deal Closes
1/27 1/28 1/29 1/30 1/31 Budget Tribal Council and senior staff unavailable
Ko-Kwel Wellness CenterPreliminary Construction Budget
13-Nov-19 USDA NMTC Grants Tribal Equity TotalSources of FundsLoan Proceeds 7,000,000 - - - 7,000,000 NMTC Benefit at Closing (less required reserves) - 2,996,670 - - 2,996,670 Oregon Community Foundation - - 35,000 - 35,000 Meyer Memorial Trust - - 85,000 - 85,000 Wildhorse Foundation - - 20,000 - 20,000 Shakopee Foundation - - 50,000 - 50,000 Spirit Mountain Community Fund - - 84,000 - 84,000 Collins Foundation - - 75,000 - 75,000 Craft3 Pre-development grant - - 175,000 - 175,000 Ford Foundation/Other (pending) - - 200,000 - 200,000 Indirect contract support - - 332,500 - 332,500 Tribal equity - - - 952,555 952,555
Total Sources 7,000,000 2,996,670 1,056,500 952,555 12,005,725
Project CostsFinancing Costs
Loan fee 70,000 - - - 70,000 Craft 3Construction period interest - - 332,500 - 332,500 Craft 3
Subtotal 70,000 - 332,500 - 402,500 Site Preparation & Demolition
Site survey - - 13,900 - 13,900 Stuntzner EngineeringEarth Moving - 20,000 40,000 - 60,000 Wheeler ExcavatingExisting utility terminations - 1,500 - - 1,500 S&B JamesContingency (10%) - 7,540 - - 7,540
Subtotal - 29,040 53,900 - 82,940 Project Management/Surveys/Reports
Project Management - - 50,000 100,000 150,000 Eirc ScottConstruction Security - 50,000 - - 50,000 Plan Review, Permitting, MEP, FLS Inspections - 125,000 - - 125,000 NW Code ProfessionalsMaterials Testing Testing and Inspections - 30,000 - - 30,000 SHN Engineering
- 24,079 - - 24,079 - - - 25,500 25,500 SHN Engineering- - - 3,600 3,600 Creekside Environmental
Limited Phase II ESA - - - 14,500 14,500 Creekside EnvironmentalGeotechnical Engineering / Report - - - 8,966 8,966 Galli GroupPile Driving and Test Pile Program - - - 9,000 9,000 Galli GroupContingency (10%) - 44,065 - - 44,065
Subtotal - 273,144 50,000 161,566 484,710 Utility Infrastructure & Fees
- 120,000 - - 120,000 CIT- 60,000 - - 60,000 - 21,209 - - 21,209 Pacific Power
Backup Power Generator/ ATS - - 200,000 - 200,000 - 9,554 - - 9,554 - 33,860 - - 33,860 - 44,462 - - 44,462
Subtotal - 289,085 200,000 - 489,085 Building Construction
104,793 - 345,100 - 449,893 S&B JamesGeneral Conditions (Mgt Costs SBJ) 531,285 - - - 531,285 S&B James
5,523,781 672,932 75,000 - 6,271,713 S&B James770,141 - - - 770,141 S&B James
- 1,056,278 - - 1,056,278
Subtotal 6,930,000 1,729,210 420,100 - 9,079,310 Furniture Fixtures & Equipment
- 180,000 - - 180,000 IT Office Equipment - 104,000 - - 104,000 IT Network & Security Equipment - 17,000 - - 17,000 FF&E Dental - - - 360,350 360,350 ADEQFF&E Dental Imaging - - - 90,000 90,000 PlanmecaFF&E Medical/ Pharmacy - 201,311 - 248,689 450,000 FF&E Procurement Services - Medical - - - 76,950 76,950 MEQAFF&E Site Amenities - - - 15,000 15,000 Contingency (10%) - 129,330 - - 129,330
Subtotal - 631,641 - 790,989 1,422,630 Ingress/Egress & Signage
Ingress/Egress - 25,000 - - 25,000 Monument Sign - 15,000 - - 15,000 Wayfinding Signage - 500 - - 500 Contingency (10%) - 4,050 - - 4,050
Subtotal - 44,550 - - 44,550 Contingency - - - - - Total Costs 7,000,000 2,996,670 1,056,500 952,555 12,005,725
Sources Over (Under) Uses - - - - -
Facility Commissioning
Office Furniture/Equipment
FUNDING SOURCES
Architectural/Engineeirng Design Costs
Building Costs Site Construction CostsContingency (15% of bldg & site construction)
Storm Water/BPM/Reports/InspectionsTopo Survey/ALTA SurveyPhase 1 ESA
Building Permit Application Fee
Electric Utility Connection Fee
Water/Sewer Development Fee
Contingency (10%)
IT Cabling Network/Communications
24'-6"
EXISTINGCLINIC
BIO-SWALE
OUTDOOREXERCISE
AREA
FUTURE MEDICALEXPANSION
FUTUREPARKING
AREA
EXISTING RETENTION PONDEXISTING BERM PATH
NEW CONC STAIRS
COVEREDBICYCLEPARKING
FLAG POLETYP OF 3
121 STANDARD +7-HC = 128
TOTAL
VANVAN
W/CONLY
W/CONLY
M U L I K A V E N U E
BUS DROP-OFF
A1 SITE PLANSCALE: 1/32" = 1'-0"
NORTH
SRU
---09/30/2019
SITE PLAN
A-101
COVEREDENTRY
EXISTINGTRANS.
LANDSCAPEAREA
LOADINGAREA
DUMPSTERENCLOSURE
101
CENTRALCORRIDOR
100VESTIBULE
105
CENTRALCOURTYARD
202
WORKSPACE
200
WAITINGAREA
201
TALKINGROOM
203
SUPPLYSTORAGE
204
FOCUSROOM
205
PHARMACYDIRECTOR
206KITCHENETTE
300
WAITINGAREA
301CORRIDOR
302
PATIENTVITALS ROOM 1
303
PATIENTVITALS ROOM 2
304
EXAMROOM 3
305
EXAMROOM 2
306
EXAMROOM 1
307
ISOLATIONEXAM ROOM
308
PEDIATRICEXAM ROOM
309
EXAMROOM 4
310
MAALCOVE 1
311
EQUIPMENTSTERILIZATION
314
PROCEDUREROOM
313
EXAMROOM 5
312
MEDIMMUN315
MAALCOVE 1
317
EXAMROOM 6
318
DURABLE MEDEQUIPMENT
319
EXAMROOM 7
316CUSTODIAL
320
MED RECEPTSCHEDULING
321
TALKINGROOM 1
322
TALKINGROOM 2
342
PATIEND EDSTORAGE324
LABRESTROOM
901
SHAREDWORK SPACE
325LAB
326
MEDTREATMENT
327
STAFFRESTROOM
328
CONFERENCEROOM
329
TEAMROOM 1
330
TEAMROOM 2
331
TEAMROOM 3
332
TEAMROOM 4
333
STORAGESECURE
334
FOCUSROOM 1
335
FOCUSROOM 2
336
WORKCOUNTER337
ASSISTANTHHS OFFICE
338
MEDICALRECORDS
339KITCHENETTE340
MEDGAS
341CORRIDOR 2
502JANITOR
505
RECEIVINGBAY
504MECHANICAL
503
GEN SUPPLYSTORAGE
506
ELECTRICALROOM
908
OUTDOORGATHERING
102RECEPTION
507CORRIDOR
602RESTROOM 1
601
BREAKROOM
707PANO
715OPERTORY 3
716OPERTORY 4
717OPERTORY 5
710OFFICE
712
SHAREDWORK SPACE
702
PRIVATEOPERTORY
703
INSTRUMENTPROCESSING
711
FOCUSROOM
708
DENTALLAB
713OPERTORY 1
714OPERTORY 2
706
SUPPLYSTORAGE
604
MAIL/ COPYROOM
501
DATA/ TELEBLDG. INFO
701RECEPTION
700
DENTALWAITING AREA
718CORRIDOR
705
WORKCOUNTER
704KITCHENETTE
617
DENTALGAS
O
S
O
I C
H
A
I
R
OSOI
PROV.
STOOL
O
S
O
IC
H
A
I
R
O
S
O
IC
H
A
I
R
O
S
O
IC
H
A
I
R
OSOI
PROV.
STOOL
OSOI
MAYO
TRAY
902
TALKINGROOM 1
903
TALKINGROOM 2
110WC
109WC
107WC
108WC
908
RECORDSSTORAGE
904
TALKINGROOM 3
603RESTROOM 2
Room 901A453 SF Room 901B
340 SF104
COMMUNITYGATHERING
CHECKOUT
CHECKOUT
CHECKOUT
OS
OI
CH
AIR
OS
OI
CH
AIR
OS
OI
CH
AIR
OS
OI
CH
AIR
OS
OI
CH
AIR
OS
OI
CH
AIR
OS
OI
CH
AIR
OS
OI
CH
AIR
OS
OI
CH
AIR
OS
OI
CH
AIR
OS
OI
CH
AIR
OS
OI
CH
AIR
OS
OI
CH
AIR
OS
OI
CH
AIR
OS
OI
CH
AIR
OS
OI
CH
AIR
OS
OI
CH
AIR
OS
OI
CH
AIR
OS
OI
CH
AIR
OS
OI
CH
AIR
OS
OI
CH
AIR
OS
OI
CH
AIR
OS
OI
CH
AIR
OS
OI
CH
AIR
OS
OI
CH
AIR
OS
OI
CH
AIR
OS
OI
CH
AIR
OS
OI
CH
AIR
OS
OI
CH
AIR
OS
OI
CH
AIR
OS
OI
CH
AIR
OS
OI
CH
AIR
OS
OI
CH
AIR
OS
OI
CH
AIR
OS
OI
CH
AIR
OS
OI
CH
AIR
OS
OI
CH
AIR
OS
OI
CH
AIR
OS
OI
CH
AIR
OS
OI
CH
AIR
OS
OI
CH
AIR
OS
OI
CH
AIR
OS
OI
CH
AIR
OS
OI
CH
AIR
907OFFICE 1
RIVER ROCKW/ DRAINAGE
CRUSHEDSTONE
CONC.PATH
RAINWATERFROMROOF
STONE BENCH
906OFFICE 2
905OFFICE 3
PORTABLEDEMONSTRATIONKITCHEN
OS
OI
CH
AIR
OS
OI
CH
AIR
OS
OI
CH
AIR
OS
OI
CH
AIR
OS
OI
CH
AIR
OS
OI
CH
AIR
OS
OI
CH
AIR
OS
OI
CH
AIR
OSOI
CHAIR
OSOI
CHAIR
OSOI
CHAIR
OSOI
CHAIR
OSOI
CHAIR
OSOI
CHAIR
OSOI
CHAIR
OSOI
CHAIR
OSOI
CHAIR
103
CENTRALGATHERING
207VESTIBULE
105STORAGE
106CORRIDOR
D1A-201
C1A-201
B1A-201
A1A-201
D1A-202
A-301D1
909
WORKCOUNTER
801RECEPTION
815
THERAPYROOM
812OFFICE 3
807
SHARED WORKSPACE 3
809OFFICE 1
804
TALKINGCONFERENCE ROOM
814
CLOTHES & BABYEQUIP STORAGE
803
SUPPLYSTORAGE 2
806
SHARED WORKSPACE 2805
SHARED WORKSPACE 1
811OFFICE 2
808
FOCUSROOM
810
SUPPLYSTORAGE 1
802CORRIDOR
813KITCHENETTE
CHILDRENPLAYAREA
24'-6"
29'-6" 24'-7
"
28'-1
0"
26'-11"
26'-0"
OSOI
PROV.
STOOL
A-301A1
A-302D1
A-302C1
A1A-302
A-303A-1
800
WAITINGAREA
64'-4"
SRU
SRU09/30/2019
OVERALL
FLOOR PLAN
A-102
A1 FLOOR PLANSCALE: 1/8" = 1'-0"
NORTH
OWNER:
NOTE: IF THIS SHEET IS LESS THAN 30" x 42" IT HAS BEEN REDUCED AND IS NOT TO SCALE.
Tel: (541)414-1325Fax: (541)826-5536E-mail: [email protected]
S+B James Construction Management
SAMUEL UCCELLOAIA, NCARB, LEED
STAMP:
CONSULTANT:
DESIGN-BUILDER:
ARCHITECT:
PROJECT:
S & B JAMES CONSTRUCTION MANAGEMENTCOPYRIGHT 2019
DRAWN BY:
CHECKED BY:
PROJECT DATE:
SBJ PROJECT NO.:
SHEET NO.:
SHEET TITLE:
- 00/00/00 -
- 00/00/00 -- 00/00/00 -
- 00/00/00 -- 00/00/00 -- 00/00/00 -
- 00/00/00 -
- 00/00/00 -
- 00/00/00 -
- 00/00/00 -- 00/00/00 -- 00/00/00 -
- 00/00/00 -
- 00/00/00 -
- 00/00/00 -
- 00/00/00 -
DESCRIPTIONDATEMARKER
M19-5118
KO-KWEL
WELLNESS CENTER
NEW MOBDESIGN
COQUILLE INDIAN TRIBE
3050 TREMONT STREETNORTH BEND, OREGON 97459CONTACT: PH: (800) 622-5869
REVISIONS
PROJECT ADDRESS:
641 MILUK DRIVENORTH BEND, OREGON 97420
SCHEMATIC
SUBMITTAL
I
s
s
u
e
d
:
1
1
-
1
9
-
2
0
1
9
C O N S T R U C T I O N M A N A G EM E N T
8425 Agate RoadWhite City, OR 97503
CCB #167945(541) 826-5668
OS
OI
CH
AIR
OS
OI
CH
AIR
OS
OI
CH
AIR
OS
OI
CH
AIR
OS
OI
CH
AIR
OS
OI
CH
AIR
OS
OI
CH
AIR
OS
OI
CH
AIR
OS
OI
CH
AIR
OS
OI
CH
AIR
OS
OI
CH
AIR
OS
OI
CH
AIR
OS
OI
CH
AIR
OS
OI
CH
AIR
OS
OI
CH
AIR
OS
OI
CH
AIR
OS
OI
CH
AIR
OS
OI
CH
AIR
OS
OI
CH
AIR
OS
OI
CH
AIR
OS
OI
CH
AIR
OS
OI
CH
AIR
OS
OI
CH
AIR
OS
OI
CH
AIR
OS
OI
CH
AIR
OS
OI
CH
AIR
OS
OI
CH
AIR
OS
OI
CH
AIR
OS
OI
CH
AIR
OS
OI
CH
AIR
OS
OI
CH
AIR
OS
OI
CH
AIR
OS
OI
CH
AIR
OS
OI
CH
AIR
OS
OI
CH
AIR
OS
OI
CH
AIR
OS
OI
CH
AIR
OS
OI
CH
AIR
OS
OI
CH
AIR
OS
OI
CH
AIR
OS
OI
CH
AIR
OS
OI
CH
AIR
OS
OI
CH
AIR
OS
OI
CH
AIR
OS
OI
CH
AIR
OS
OI
CH
AIR
OS
OI
CH
AIR
OS
OI
CH
AIR
OS
OI
CH
AIR
OS
OI
CH
AIR
OS
OI
CH
AIR
OS
OI
CH
AIR
OSOI
CHAIR
OSOI
CHAIR
OSOI
CHAIR
OSOI
CHAIR
OSOI
CHAIR
OSOI
CHAIR
OSOI
CHAIR
OSOI
CHAIR
OSOI
CHAIR
104
COMMUNITYGATHERING
34'-1158"
20'-8
1 2"
6'-0
78"
4'-834"
14'-3
58"
8'-0
"8'
-61 4"
6'-4" 6'-4"6'-4"8'-0"7'-9"7'-9"8'-1"
10'-2
"
9'-1
1"
14'-738"
10'-0
"10
'-0"
10'-0"
15'-4
78"
23'-814"
10'-0
"
10'-0"
5'-2"
103
CENTRALGATHERING
106CORRIDOR
105STORAGE
110WC
109WC
101
CENTRALCORRIDOR
108WC
107
FAMILYWC
904
TALKINGROOM 3
903
TALKINGROOM 2
902
TALKINGROOM 1
901
SHAREDWORK SPACE
908
RECORDSSTORAGE
907OFFICE 1
906OFFICE 2
905OFFICE 3
909
WORKCOUNTER
100VESTIBULE
908
OUTDOORGATHERING
8'-4
1 8"6'
-95
8"
WATER FOUNTAIN/BOTTLE FILLER
SRU / JCS
-09/16/19
ENLARGED
ADMINISTRATION &
COMMUNITY
GATHERING FLOOR
PLAN
A-103
A1 ADMINISTRATIVE AND COMMUNITY GATHERING ENLARGED FLOOR PLANSCALE: 1/4" = 1'-0"
NORTH
OWNER:
NOTE: IF THIS SHEET IS LESS THAN 30" x 42" IT HAS BEEN REDUCED AND IS NOT TO SCALE.
Tel: (541)414-1325Fax: (541)826-5536E-mail: [email protected]
S+B James Construction Management
SAMUEL UCCELLOAIA, NCARB, LEED
STAMP:
CONSULTANT:
DESIGN-BUILDER:
ARCHITECT:
PROJECT:
S & B JAMES CONSTRUCTION MANAGEMENTCOPYRIGHT 2019
DRAWN BY:
CHECKED BY:
PROJECT DATE:
SBJ PROJECT NO.:
SHEET NO.:
SHEET TITLE:
- 00/00/00 -
- 00/00/00 -- 00/00/00 -
- 00/00/00 -- 00/00/00 -- 00/00/00 -
- 00/00/00 -
- 00/00/00 -
- 00/00/00 -
- 00/00/00 -- 00/00/00 -- 00/00/00 -
- 00/00/00 -
- 00/00/00 -
- 00/00/00 -
- 00/00/00 -
DESCRIPTIONDATEMARKER
M19-5118
KO-KWEL
WELLNESS CENTER
NEW MOBDESIGN
COQUILLE INDIAN TRIBE
3050 TREMONT STREETNORTH BEND, OREGON 97459CONTACT: PH: (800) 622-5869
REVISIONS
PROJECT ADDRESS:
641 MILUK DRIVENORTH BEND, OREGON 97420
SCHEMATIC
SUBMITTAL
I
s
s
u
e
d
:
1
1
-
1
9
-
2
0
1
9
C O N S T R U C T I O N M A N A G EM E N T
8425 Agate RoadWhite City, OR 97503
CCB #167945(541) 826-5668
O
S
O
I
P
R
O
V
.
S
T
O
O
L
O
S
O
I
C
H
A
I
R
O
S
O
I
M
A
Y
O
O
S
O
I
P
R
O
V
.
S
T
O
O
L
202
WORKSPACE
19'-4"
8'-1"
203
SUPPLYSTORAGE
204
FOCUSROOM
205
PHARMACYDIRECTOR
206KITCHENETTE
207VESTIBULE
200
WAITINGAREA
201
TRAININGROOM
28'-1"
23'-1 12 "
10'-0"
8'-10"
10'-0" 9'-10 12 "
10'-0"
8'-0"
10'-0"
12'-0"
8'-91 2"
5'-8 12 "
8'-31 2"
102RECEPTION
7'-5 12 "
XXX
CENTRALCORRIDOR
100VESTIBULE
21'-6
"
C
H
A
I
R
O
S
O
I
P
R
O
V
.
S
T
O
O
L
O
S
O
I
C
H
A
I
R
O
S
O
I
C
H
A
I
R
O
S
O
I
C
H
A
I
R
O
S
O
I
C
H
A
I
R
O
S
O
I
C
H
A
I
R
O
S
O
I
C
H
A
I
R
O
S
O
I
C
H
A
I
R
O
S
O
I
C
H
A
I
R
O
S
O
I
C
H
A
I
R
O
S
O
I
C
H
A
I
R
O
S
O
I
C
H
A
I
R
O
S
O
I
C
H
A
I
R
O
S
O
I
C
H
A
I
R
O
S
O
I
C
H
A
I
R
O
S
O
I
C
H
A
I
R
O
S
O
I
C
H
A
I
R
O
S
O
I
C
H
A
I
R
O
S
O
I
C
H
A
I
R
O
S
O
I
C
H
A
I
R
O
S
O
I
C
H
A
I
R
19'-4"
8'-1"
203
SUPPLYSTORAGE
204
FOCUSROOM
200
WAITINGAREA
201
TRAININGROOM
28'-1"
10'-0"
8'-10"
10'-0" 9'-10 12 "
10'-0"
8'-0"
103
CENTRALGATHERING
8'-31 2"
9'-11 12 "
101
CENTRALCORRIDOR
105
CENTRALCOURTYARD
102RECEPTION
7'-5 12 "
10'-0"
9'-6"
XXX
CENTRALCORRIDOR
XXX
CENTRALCORRIDOR
XXXCORRIDOR
10'-0"
20'-5
"
21'-4 12 "
8'-0"
106CORRIDOR
100VESTIBULE
21'-6
"
10'-0"
SRU / JCS
-10/02/19
ENLARGED
FLOOR PLANS:
PHARMACY &
CENTRAL COURTYARD
A-104
A1 ENLARGED PHARMACY FLOOR PLANSCALE: 1/4" = 1'-0"
NORTH
B3 ENLARGED CENTRAL COURTYARD FLOOR PLANSCALE: 1/4" = 1'-0"
NORTH
OWNER:
NOTE: IF THIS SHEET IS LESS THAN 30" x 42" IT HAS BEEN REDUCED AND IS NOT TO SCALE.
Tel: (541)414-1325Fax: (541)826-5536E-mail: [email protected]
S+B James Construction Management
SAMUEL UCCELLOAIA, NCARB, LEED
STAMP:
CONSULTANT:
DESIGN-BUILDER:
ARCHITECT:
PROJECT:
S & B JAMES CONSTRUCTION MANAGEMENTCOPYRIGHT 2019
DRAWN BY:
CHECKED BY:
PROJECT DATE:
SBJ PROJECT NO.:
SHEET NO.:
SHEET TITLE:
- 00/00/00 -
- 00/00/00 -- 00/00/00 -
- 00/00/00 -- 00/00/00 -- 00/00/00 -
- 00/00/00 -
- 00/00/00 -
- 00/00/00 -
- 00/00/00 -- 00/00/00 -- 00/00/00 -
- 00/00/00 -
- 00/00/00 -
- 00/00/00 -
- 00/00/00 -
DESCRIPTIONDATEMARKER
M19-5118
KO-KWEL
WELLNESS CENTER
NEW MOBDESIGN
COQUILLE INDIAN TRIBE
3050 TREMONT STREETNORTH BEND, OREGON 97459CONTACT: PH: (800) 622-5869
REVISIONS
PROJECT ADDRESS:
641 MILUK DRIVENORTH BEND, OREGON 97420
SCHEMATIC
SUBMITTAL
I
s
s
u
e
d
:
1
1
-
1
9
-
2
0
1
9
C O N S T R U C T I O N M A N A G EM E N T
8425 Agate RoadWhite City, OR 97503
CCB #167945(541) 826-5668
O
S
O
I C
H
A
I
R
OSOI
PROV.
STOOL
O
S
O
IC
H
A
I
R
O
S
O
IC
H
A
I
R
O
S
O
IC
H
A
I
R
OSOI
PROV.
STOOL
OSOI
MAYO
TRAY
D1A-201
A-301D1
24'-6"
29'-6" 24'-7
"
28'-1
0"
26'-11"
26'-0"
OSOI
PROV.
STOOLLOADINGAREA
300
WAITINGAREA
301CORRIDOR
302
PATIENTVITALS ROOM 1
303
PATIENTVITALS ROOM 2
304
EXAMROOM 3
305
EXAMROOM 2
306
EXAMROOM 1
307
ISOLATIONEXAM ROOM
308
PEDIATRICEXAM ROOM
309
EXAMROOM 4
310
MAALCOVE 1
311
EQUIPMENTSTERILIZATION
314
PROCEDUREROOM
313
EXAMROOM 5
312
MEDIMMUN
315
MAALCOVE 1
317
EXAMROOM 6
318
DURABLE MEDEQUIPMENT
319
EXAMROOM 7
316CUSTODIAL
320
MED RECEPTSCHEDULING
321
TALKINGROOM 1
322
TALKINGROOM 2
342
PATIEND EDSTORAGE
324
LABRESTROOM
325LAB
326
MEDTREATMENT
327
STAFFRESTROOM
328
CONFERENCEROOM
329
TEAMROOM 1
330
TEAMROOM 2
331
TEAMROOM 3
332
TEAMROOM 4
333
STORAGESECURE
334
FOCUSROOM 1
335
FOCUSROOM 2
336
WORKCOUNTER337
ASSISTANTHHS OFFICE
338
MEDICALRECORDS
339KITCHENETTE
340
MEDGAS
341CORRIDOR 2
502JANITOR
505
RECEIVINGBAY
504MECHANICAL
503
GEN SUPPLYSTORAGE
506
ELECTRICALROOM
507CORRIDOR
CHECKOUT
10'-0"
10'-0"
20'-4"
14'-0"
6'-0"
10'-4"
10'-0
1 8"
10'-5
7 8"
10'-0
1 8"
5'-27
8"
8'-0
"
16'-0
7 8"
13'-614"
10'-0
"
6'-11"5'-2
"
9'-5"6'-2"
9'-6
"
20'-8
1 2"
8'-112"
8'-512"
10'-2"
15'-3
3 8"
9'-6"
10'-0
"
10'-0
"
5'-0"
9'-10
"
6'-6"
6'-75
8"
8'-2"
6'-0"4'-91
8"
15'-6 78"
10'-0"
10'-0"
6'-4"
9'-53
4"
12'-2
"
13'-8"
10'-4
"
10'-1
0"
6'-8"
6'-0"
9'-5"
6'-0"
55'-10 34"
10'-1 78"
7'-8"
6'-338"
10'-0 18 "
6'-012"14'-91
2" 10'-0" 10'-0" 10'-1134"
2'-67
8 "6'-0"
8'-318"
7'-0"
2'-4"
9'-1"
10'-3
3 8"
11'-6
"
9'-4"
9'-07
8"
9'-2"
5'-9"
3'-81
4"
11'-8
"
15'-7"
14'-2
3 4"
2'-85
8"
20'-4"
3'-6
"
6'-0"
6'-0"
7'-6"
3'-10
3 8"
SRU / JCS
-09/16/19
ENLARGED
MEDICAL PLAN
A-105
A1 ENLARGED MEDICAL FLOOR PLANSCALE: 1/4" = 1'-0"
NORTH
OWNER:
NOTE: IF THIS SHEET IS LESS THAN 30" x 42" IT HAS BEEN REDUCED AND IS NOT TO SCALE.
Tel: (541)414-1325Fax: (541)826-5536E-mail: [email protected]
S+B James Construction Management
SAMUEL UCCELLOAIA, NCARB, LEED
STAMP:
CONSULTANT:
DESIGN-BUILDER:
ARCHITECT:
PROJECT:
S & B JAMES CONSTRUCTION MANAGEMENTCOPYRIGHT 2019
DRAWN BY:
CHECKED BY:
PROJECT DATE:
SBJ PROJECT NO.:
SHEET NO.:
SHEET TITLE:
- 00/00/00 -
- 00/00/00 -- 00/00/00 -
- 00/00/00 -- 00/00/00 -- 00/00/00 -
- 00/00/00 -
- 00/00/00 -
- 00/00/00 -
- 00/00/00 -- 00/00/00 -- 00/00/00 -
- 00/00/00 -
- 00/00/00 -
- 00/00/00 -
- 00/00/00 -
DESCRIPTIONDATEMARKER
M19-5118
KO-KWEL
WELLNESS CENTER
NEW MOBDESIGN
COQUILLE INDIAN TRIBE
3050 TREMONT STREETNORTH BEND, OREGON 97459CONTACT: PH: (800) 622-5869
REVISIONS
PROJECT ADDRESS:
641 MILUK DRIVENORTH BEND, OREGON 97420
SCHEMATIC
SUBMITTAL
I
s
s
u
e
d
:
1
1
-
1
9
-
2
0
1
9
C O N S T R U C T I O N M A N A G EM E N T
8425 Agate RoadWhite City, OR 97503
CCB #167945(541) 826-5668
C
H
AIR
6'-0"
5'-11"
101
CENTRALCORRIDOR
707PANO
704KITCHENETTE
703
INSTRUMENTPROCESSING
706
SUPPLYSTORAGE
700
DENTALWAITING AREA
501
DATA/TELBLDG. INFO
701
DENTALRECEPTION
718CORRIDOR
705
WORKCOUNTER
708
DENTALLAB
710OFFICE
711
FOCUSROOM
712
SHAREDWORK SPACE
713OPERATORY 1
604
MAIL / COPYROOM
603RESTROOM 2
602RESTROOM 1
601
BREAKROOM
713OPERATORY 1
713OPERATORY 1
716OPERATORY 4
717OPERATORY 5
702
PRIVATEOPERATORY
300
WAITINGAREA
12'-5
"
6'-5"
4'-7"9'-11
"
9'-7 12 "
10'-1
1"
18'-2
1 2"
19'-0
1 2"
11'-0
"
9'-91 2"
12'-4"
9'-9"
9'-8"
9'-8"
10'-0
"
5'-9"
10'-0"
12'-0"
11'-2
"
9'-10"
11'-8"
9'-10"
10'-9 12 "
3'-61 2" 13
'-11 2"
10'-4 12 "
4'-2"
8'-6"
8'-0"10'-0"
7'-7"
7'-7"
10'-0 12 "
18'-0"
14'-0"
617
DENTALGAS
9'-10
"5'-10
" (FIN CLR
)
5'-4" (FIN C
LR)
10'-7"
14'-0"
10'-0 12 "
114.
35°
90°
SRU / JCS
-10/06/19
DENTAL
ENLARGED FLOOR
PLAN
A-106
A1 ENLARGED DENTAL FLOOR PLANSCALE: 1/4" = 1'-0"
NORTH
OWNER:
NOTE: IF THIS SHEET IS LESS THAN 30" x 42" IT HAS BEEN REDUCED AND IS NOT TO SCALE.
Tel: (541)414-1325Fax: (541)826-5536E-mail: [email protected]
S+B James Construction Management
SAMUEL UCCELLOAIA, NCARB, LEED
STAMP:
CONSULTANT:
DESIGN-BUILDER:
ARCHITECT:
PROJECT:
S & B JAMES CONSTRUCTION MANAGEMENTCOPYRIGHT 2019
DRAWN BY:
CHECKED BY:
PROJECT DATE:
SBJ PROJECT NO.:
SHEET NO.:
SHEET TITLE:
- 00/00/00 -
- 00/00/00 -- 00/00/00 -
- 00/00/00 -- 00/00/00 -- 00/00/00 -
- 00/00/00 -
- 00/00/00 -
- 00/00/00 -
- 00/00/00 -- 00/00/00 -- 00/00/00 -
- 00/00/00 -
- 00/00/00 -
- 00/00/00 -
- 00/00/00 -
DESCRIPTIONDATEMARKER
M19-5118
KO-KWEL
WELLNESS CENTER
NEW MOBDESIGN
COQUILLE INDIAN TRIBE
3050 TREMONT STREETNORTH BEND, OREGON 97459CONTACT: PH: (800) 622-5869
REVISIONS
PROJECT ADDRESS:
641 MILUK DRIVENORTH BEND, OREGON 97420
SCHEMATIC
SUBMITTAL
I
s
s
u
e
d
:
1
1
-
1
9
-
2
0
1
9
C O N S T R U C T I O N M A N A G EM E N T
8425 Agate RoadWhite City, OR 97503
CCB #167945(541) 826-5668
801RECEPTION
815
THERAPYROOM
812OFFICE 3
807
SHARED WORKSPACE 3
809OFFICE 1
804
TALKINGCONFERENCE ROOM
814
CLOTHES & BABYEQUIP STORAGE
803
SUPPLYSTORAGE 2
806
SHARED WORKSPACE 2
805
SHARED WORKSPACE 1
811OFFICE 2
808
FOCUSROOM
810
SUPPLYSTORAGE 1
802CORRIDOR
813KITCHENETTE
800
WAITINGAREA
12'-2" 14'-4" 14'-2" 14'-4" 8'-0"
10'-0
1 2"6'
-8"
2'-0
"14
'-8"
16'-4
1 2"10
'-8"
6'-4
"15
'-6"
12'-2" 6'-1" 10'-4" 10'-4" 10'-4" 5'-0" 8'-9"
15'-2
"
4'-0
"
10'-10"10'-4"16'-238"
3'-7" 8'-7"
16'-8
"12
'-7"
8'-5
1 2"
SRU / JCS
-09/16/19
ENLARGED
FAMILY SERVICES
FLOOR PLAN
A-107
A1 ENLARGED FAMILY SERVICES FLOOR PLANSCALE: 1/4" = 1'-0"
NORTH
OWNER:
NOTE: IF THIS SHEET IS LESS THAN 30" x 42" IT HAS BEEN REDUCED AND IS NOT TO SCALE.
Tel: (541)414-1325Fax: (541)826-5536E-mail: [email protected]
S+B James Construction Management
SAMUEL UCCELLOAIA, NCARB, LEED
STAMP:
CONSULTANT:
DESIGN-BUILDER:
ARCHITECT:
PROJECT:
S & B JAMES CONSTRUCTION MANAGEMENTCOPYRIGHT 2019
DRAWN BY:
CHECKED BY:
PROJECT DATE:
SBJ PROJECT NO.:
SHEET NO.:
SHEET TITLE:
- 00/00/00 -
- 00/00/00 -- 00/00/00 -
- 00/00/00 -- 00/00/00 -- 00/00/00 -
- 00/00/00 -
- 00/00/00 -
- 00/00/00 -
- 00/00/00 -- 00/00/00 -- 00/00/00 -
- 00/00/00 -
- 00/00/00 -
- 00/00/00 -
- 00/00/00 -
DESCRIPTIONDATEMARKER
M19-5118
KO-KWEL
WELLNESS CENTER
NEW MOBDESIGN
COQUILLE INDIAN TRIBE
3050 TREMONT STREETNORTH BEND, OREGON 97459CONTACT: PH: (800) 622-5869
REVISIONS
PROJECT ADDRESS:
641 MILUK DRIVENORTH BEND, OREGON 97420
SCHEMATIC
SUBMITTAL
I
s
s
u
e
d
:
1
1
-
1
9
-
2
0
1
9
C O N S T R U C T I O N M A N A G EM E N T
8425 Agate RoadWhite City, OR 97503
CCB #167945(541) 826-5668
TOP OF ROOF
FINISH FLOOR0'-0" (ASSUMED)
TOP OF ROOF+19'-8"
TOP OF PARAPET+19'-6"
14
09090909 10
1610
17TYP
03
05TYP
05TYP
05TYP
05TYP
05TYP
TOP OF ROOF+22'-3"
FINISH FLOOR0'-0" (ASSUMED)
TOP OF ROOF+20'-10"
TOP OF ROOF+13'-10"
TOP OF ROOF+13'-10"
ELEVATION DRAWN AT AN ANGLE
1010
10 10
04040404 090902 03 05TYP
05TYP
TOP OF ROOF+19'-8"
FINISH FLOOR0'-0" (ASSUMED)
TOP OF ROOF+22'-3"
TOP OF ROOF+16'-0"
0909 091010
10 17TYP
0404 05TYP
05TYP
05TYP
TOP OF ROOF+22'-3"
TOP OF ROOF+22'-3"
GENERAL NOTES1. PROVIDE (2) 12" X 12" MOCK-UP OF EACH EACH, PAINT
AND CEMENT PLASTER COLOR AND TEXTURE FOR THEPROJECT.
2. PROVIDE (3) SAMPLES OF EXTERIOR FINISH MATERIALS INCOLORS SELECTED BY ARCHITECT.
3. PREPARE COMPLETE SHOP DRAWINGS FOR ALL , SOFFITPANELS, GUTTERS, FLASHING AND SHOWING ALLNECESSARY COMPONENTS FOR A COMPLETEINSTALLATION.
4. COORDINATE SIGNAGE INSTALLATION REQUIREMENTS,INCLUDING ELECT POWER, STRUCTURAL SUPPORT ANDRELATED REQUIREMENTS W/ OWNER'S SIGNAGECONTRACTOR.
5. SIGNAGE CONTRACTOR SHALL BE SOLELY RESPONSIBLEFOR PREPARATION OF SIGNAGE PERMIT SUBMITTALDOCUMENTS FOR COUNTY APPROVAL AND SHALL OBTAINALL REQUIRED PERMITS, APPROVALS AND INSPECTIONSFOR SIGNAGE INSTALLATION.
WALL MOUNTED LIGHT FIXTURE (SED)
ROLL-UP SECTIONAL MET DOOR @ STORAGE(SEE DOOR SCHEDULE)
PTD HM DOOR
ALUM SF DOOR (SEE DOOR SCHED)
ALUM WINDOW SYSTEM (SEE WINDOW SCHED)
WD BENCH @ COVERED ENTRY (SLD)
WALL-MTD POWDER-COATED, RECESSED"KNOX BOX" AT ENTRY, 6'-0" AFF (SEE FLOORPLAN)
CONTIN PTD BENT PLATE STL CHANNEL (SSD)
FIBER CEMENT (FC) PANEL CLADDING WALLSYSTEM
FIBER CEMENT (FC) VERTICAL PLANKCLADDING WALL SYSTEM
ASSUMED PROPERTY LINE (SEE PLANS)
EXTERIOR VERTICAL SEISMIC JOINT COVER
ROOF OVERFLOW COWS TONGUE (TYP OF 4)(SPD)BY: ZURN / Z199 - 5 12" / NICKEL FINISH / SSSCREEN
GSM COLLECTOR BOX & DOWNSPOUT,MATCH GUTTERS (TYP OF 3)
COVERED WALKWAY TO EXISTING CLINIC
ENTRY CANOPY
VENT LOUVER
TPO ROOFING
MATERIALS LEGEND
03
02
01
04
SHEET KEYNOTE LEGEND
05
06
07
08
09
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
COMMERCIAL GRADE PTD FIBER CEMENT"HARDIE REVEAL PANEL SYSTEM" W/ CHEM FILM(PRIMED) HORIZONTAL AND VERTICAL REVEALTRIM, ALL COMPONENTS & FASTENERS SUPPLIEDBY: JAMES HARDIE CORPORATIONWARRANTY: MFR STANDARD 25 YEAR
COMMERCIAL GRADE PTD FIBER CEMENT"HARDIE REVEAL PLANK SYSTEM" W/ CHEM FILM(PRIMED) HORIZONTAL AND VERTICAL REVEALTRIM, ALL COMPONENTS & FASTENERS SUPPLIEDBY: JAMES HARDIE CORPORATIONWARRANTY: MFR STANDARD 25 YEAR
PAINT: EXTERIORHARDIE REVEAL PANEL SYSTEM PRIMER(PRIME OVER SHOP PRIMING)"LOXON-XP" ACRYLIC PRIMER FINISH COATSFINISH COATS"DURATION EXTERIOR ACRYLIC LATEX"COLOR: AS SELECTED BY ARCHITECTASSUME STANDARD COLORSBASIS: ALL SHERWIN WILLIAMS PAINT
PAINT: EXTERIORHARDIE REVEAL PANEL SYSTEM PRIMER(PRIME OVER SHOP PRIMING)"LOXON-XP" ACRYLIC PRIMER FINISH COATSFINISH COATS"DURATION EXTERIOR ACRYLIC LATEX"COLOR: AS SELECTED BY ARCHITECTASSUME STANDARD COLORSBASIS: ALL SHERWIN WILLIAMS PAINT
SRU / JCS
-09/16/2019
EXTERIOR BUILDING
ELEVATIONS
A-201
EAST ELEVATIONB1 SCALE: 1/8" = 1' - 0"
SOUTHWEST ELEVATIOND1 SCALE: 1/8" = 1' - 0"
SOUTH ELEVATIONA1 SCALE: 1/8" = 1' - 0"
SOUTH ELEVATIONC1 SCALE: 1/8" = 1' - 0"
OWNER:
NOTE: IF THIS SHEET IS LESS THAN 30" x 42" IT HAS BEEN REDUCED AND IS NOT TO SCALE.
Tel: (541)414-1325Fax: (541)826-5536E-mail: [email protected]
S+B James Construction Management
SAMUEL UCCELLOAIA, NCARB, LEED
STAMP:
CONSULTANT:
DESIGN-BUILDER:
ARCHITECT:
PROJECT:
S & B JAMES CONSTRUCTION MANAGEMENTCOPYRIGHT 2019
DRAWN BY:
CHECKED BY:
PROJECT DATE:
SBJ PROJECT NO.:
SHEET NO.:
SHEET TITLE:
- 00/00/00 -
- 00/00/00 -- 00/00/00 -
- 00/00/00 -- 00/00/00 -- 00/00/00 -
- 00/00/00 -
- 00/00/00 -
- 00/00/00 -
- 00/00/00 -- 00/00/00 -- 00/00/00 -
- 00/00/00 -
- 00/00/00 -
- 00/00/00 -
- 00/00/00 -
DESCRIPTIONDATEMARKER
M19-5118
KO-KWEL
WELLNESS CENTER
NEW MOBDESIGN
COQUILLE INDIAN TRIBE
3050 TREMONT STREETNORTH BEND, OREGON 97459CONTACT: PH: (800) 622-5869
REVISIONS
PROJECT ADDRESS:
641 MILUK DRIVENORTH BEND, OREGON 97420
SCHEMATIC
SUBMITTAL
I
s
s
u
e
d
:
1
1
-
1
9
-
2
0
1
9
C O N S T R U C T I O N M A N A G EM E N T
8425 Agate RoadWhite City, OR 97503
CCB #167945(541) 826-5668
15
01TYP OF 7
1617
TYP
02 0909100909
ELEVATION DRAWN AT AN ANGLEELEVATION DRAWN AT AN ANGLE
17TYP
04040403 05TYP
05TYP
05TYP
05TYP
GENERAL NOTES1. PROVIDE (2) 12" X 12" MOCK-UP OF EACH EACH, PAINT
AND CEMENT PLASTER COLOR AND TEXTURE FOR THEPROJECT.
2. PROVIDE (3) SAMPLES OF EXTERIOR FINISH MATERIALS INCOLORS SELECTED BY ARCHITECT.
3. PREPARE COMPLETE SHOP DRAWINGS FOR ALL , SOFFITPANELS, GUTTERS, FLASHING AND SHOWING ALLNECESSARY COMPONENTS FOR A COMPLETEINSTALLATION.
4. COORDINATE SIGNAGE INSTALLATION REQUIREMENTS,INCLUDING ELECT POWER, STRUCTURAL SUPPORT ANDRELATED REQUIREMENTS W/ OWNER'S SIGNAGECONTRACTOR.
5. SIGNAGE CONTRACTOR SHALL BE SOLELY RESPONSIBLEFOR PREPARATION OF SIGNAGE PERMIT SUBMITTALDOCUMENTS FOR COUNTY APPROVAL AND SHALL OBTAINALL REQUIRED PERMITS, APPROVALS AND INSPECTIONSFOR SIGNAGE INSTALLATION.
WALL MOUNTED LIGHT FIXTURE (SED)
ROLL-UP SECTIONAL MET DOOR @ STORAGE(SEE DOOR SCHEDULE)
PTD HM DOOR
ALUM SF DOOR (SEE DOOR SCHED)
ALUM WINDOW SYSTEM (SEE WINDOW SCHED)
WD BENCH @ COVERED ENTRY (SLD)
WALL-MTD POWDER-COATED, RECESSED"KNOX BOX" AT ENTRY, 6'-0" AFF (SEE FLOORPLAN)
CONTIN PTD BENT PLATE STL CHANNEL (SSD)
FIBER CEMENT (FC) PANEL CLADDING WALLSYSTEM
FIBER CEMENT (FC) VERTICAL PLANKCLADDING WALL SYSTEM
ASSUMED PROPERTY LINE (SEE PLANS)
EXTERIOR VERTICAL SEISMIC JOINT COVER
ROOF OVERFLOW COWS TONGUE (TYP OF 4)(SPD)BY: ZURN / Z199 - 5 12" / NICKEL FINISH / SSSCREEN
GSM COLLECTOR BOX & DOWNSPOUT,MATCH GUTTERS (TYP OF 3)
COVERED WALKWAY TO EXISTING CLINIC
ENTRY CANOPY
VENT LOUVER
TPO ROOFING
MATERIALS LEGEND
03
02
01
04
SHEET KEYNOTE LEGEND
05
06
07
08
09
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
COMMERCIAL GRADE PTD FIBER CEMENT"HARDIE REVEAL PANEL SYSTEM" W/ CHEM FILM(PRIMED) HORIZONTAL AND VERTICAL REVEALTRIM, ALL COMPONENTS & FASTENERS SUPPLIEDBY: JAMES HARDIE CORPORATIONWARRANTY: MFR STANDARD 25 YEAR
COMMERCIAL GRADE PTD FIBER CEMENT"HARDIE REVEAL PLANK SYSTEM" W/ CHEM FILM(PRIMED) HORIZONTAL AND VERTICAL REVEALTRIM, ALL COMPONENTS & FASTENERS SUPPLIEDBY: JAMES HARDIE CORPORATIONWARRANTY: MFR STANDARD 25 YEAR
PAINT: EXTERIORHARDIE REVEAL PANEL SYSTEM PRIMER(PRIME OVER SHOP PRIMING)"LOXON-XP" ACRYLIC PRIMER FINISH COATSFINISH COATS"DURATION EXTERIOR ACRYLIC LATEX"COLOR: AS SELECTED BY ARCHITECTASSUME STANDARD COLORSBASIS: ALL SHERWIN WILLIAMS PAINT
PAINT: EXTERIORHARDIE REVEAL PANEL SYSTEM PRIMER(PRIME OVER SHOP PRIMING)"LOXON-XP" ACRYLIC PRIMER FINISH COATSFINISH COATS"DURATION EXTERIOR ACRYLIC LATEX"COLOR: AS SELECTED BY ARCHITECTASSUME STANDARD COLORSBASIS: ALL SHERWIN WILLIAMS PAINT
SRU / JCS
-10/06/19
EXTERIOR BUILDING
ELEVATIONS
A-202
WEST ELEVATIOND1 SCALE: 1/8" = 1' - 0"
OWNER:
NOTE: IF THIS SHEET IS LESS THAN 30" x 42" IT HAS BEEN REDUCED AND IS NOT TO SCALE.
Tel: (541)414-1325Fax: (541)826-5536E-mail: [email protected]
S+B James Construction Management
SAMUEL UCCELLOAIA, NCARB, LEED
STAMP:
CONSULTANT:
DESIGN-BUILDER:
ARCHITECT:
PROJECT:
S & B JAMES CONSTRUCTION MANAGEMENTCOPYRIGHT 2019
DRAWN BY:
CHECKED BY:
PROJECT DATE:
SBJ PROJECT NO.:
SHEET NO.:
SHEET TITLE:
- 00/00/00 -
- 00/00/00 -- 00/00/00 -
- 00/00/00 -- 00/00/00 -- 00/00/00 -
- 00/00/00 -
- 00/00/00 -
- 00/00/00 -
- 00/00/00 -- 00/00/00 -- 00/00/00 -
- 00/00/00 -
- 00/00/00 -
- 00/00/00 -
- 00/00/00 -
DESCRIPTIONDATEMARKER
M19-5118
KO-KWEL
WELLNESS CENTER
NEW MOBDESIGN
COQUILLE INDIAN TRIBE
3050 TREMONT STREETNORTH BEND, OREGON 97459CONTACT: PH: (800) 622-5869
REVISIONS
PROJECT ADDRESS:
641 MILUK DRIVENORTH BEND, OREGON 97420
SCHEMATIC
SUBMITTAL
I
s
s
u
e
d
:
1
1
-
1
9
-
2
0
1
9
C O N S T R U C T I O N M A N A G EM E N T
8425 Agate RoadWhite City, OR 97503
CCB #167945(541) 826-5668
301CORRIDOR
306
EXAMROOM 1
311
TREATMENTSTERILIZATION
318
DURABLE MEDEQUIPMENT
326
MEDTREATMENT
301CORRIDOR
301CORRIDOR
TRUSSBEARING+14'-0"
FINISH FLOOR0'-0" (ASSUMED)
TRUSSBEARING+20'-8"
8'-0
" 10'-0
"
8'-0
"
TRUSSBEARING+14'-0"
CRICKET - SEEROOF PLAN
505
RECEIVINGBAY
504MECHANICAL
501CORRIDOR
BEYOND
101
CENTRALCORRIDOR
105
CENTRALCOURTYARD
901
SHAREDWORK SPACE908
RECORDSSTORAGE
TOP OFPARAPET+19'-6"
MAT
CH
LIN
E
A1/A
-301
MAT
CH
LIN
E
A1/A
-301
101
CENTRALCORRIDOR
MEDICAL WAITINGROOM BEYOND
MEDICALRECEPTIONDESK
FILM APPLIED TOGLAZING AT MEDICALRECEPTION DESK
TOP OFPARAPET+19'-6"
C1/A
-301
MAT
CH
LIN
E
C1/A
-301
MAT
CH
LIN
E
COVERED ENTRY
MAIN ENTRY STOREFRONT DOORS
METAL TRUSSES (SSD)
CONT PREFINISHED GSM FLASHING TOMATCH ROOF
CONC. SLAB ON GRADE (SSD)
CONC. FOOTING (SSD)
BATT INSULATION @ EXTERIOR WALLS (R-21TYP)
SUSPENDED ACT CEILING (SEE REFLECTEDCEILING PLAN)
PTD CEILING BD
6" CONT BASE (SEE FINISH SCH)
CORNER GUARD
1x8 T & G (SSD)
DOUGLAS FIR #1 WD BEAM (SSD)
4" x 4" WOOD POST (SSD)
CULTURED STONE VENEER BASE
PRECAST SMOOTH SLOPED CULTUREDSTONE CAP
"HARDIE" PLANK LAP SIDING
PRE-FINISHED GSM GUTTER TO MATCHROOF
CONT PERIMETER DRAIN PIPE W/ DRAINROCK & FILTER FABRIC WRAP. CONNECTTO STORM (SSD, SCD)
PRE-FINISHED STANDING SEAM MET ROOF
OVER FRAMING TRUSS ABOVE MAIN ROOFSHEATHING (SSD)
MULTIPLE PLY GIRDER TRUSS (SSD)
TRUSS BEARING DROP DOWN (SSD)
BUILT-UP WALL CORNER COLUMN IN WALLBEYOND (SSD)
FIBERGLASS THERMAL BATT INSULATIONR-38
05
06
07
03
04
01
02
SHEET KEYNOTE LEGEND
08
09
10
11
SHEET KEYNOTE LEGEND1. SEE ENLARGED PLANS FOR ADDITIONAL
INFORMATION2. SEE STRUCTURAL, MECHANICAL, ELECTRICAL AND
PLUMBING DRAWINGS FOR RELATED INFORMATION.
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
- - -
SRU00/00/12
BUILDING SECTIONS
-
-
-
-
A-301
D1 BUILDING SECTIONSCALE: 1/4" = 1'-0"
A1 BUILDING SECTIONSCALE: 1/4" = 1'-0"
OWNER:
NOTE: IF THIS SHEET IS LESS THAN 30" x 42" IT HAS BEEN REDUCED AND IS NOT TO SCALE.
Tel: (541)414-1325Fax: (541)826-5536E-mail: [email protected]
S+B James Construction Management
SAMUEL UCCELLOAIA, NCARB, LEED
STAMP:
CONSULTANT:
DESIGN-BUILDER:
ARCHITECT:
PROJECT:
S & B JAMES CONSTRUCTION MANAGEMENTCOPYRIGHT 2019
DRAWN BY:
CHECKED BY:
PROJECT DATE:
SBJ PROJECT NO.:
SHEET NO.:
SHEET TITLE:
- 00/00/00 -
- 00/00/00 -- 00/00/00 -
- 00/00/00 -- 00/00/00 -- 00/00/00 -
- 00/00/00 -
- 00/00/00 -
- 00/00/00 -
- 00/00/00 -- 00/00/00 -- 00/00/00 -
- 00/00/00 -
- 00/00/00 -
- 00/00/00 -
- 00/00/00 -
DESCRIPTIONDATEMARKER
M19-5118
KO-KWEL
WELLNESS CENTER
NEW MOBDESIGN
COQUILLE INDIAN TRIBE
3050 TREMONT STREETNORTH BEND, OREGON 97459CONTACT: PH: (800) 622-5869
REVISIONS
PROJECT ADDRESS:
641 MILUK DRIVENORTH BEND, OREGON 97420
SCHEMATIC
SUBMITTAL
I
s
s
u
e
d
:
1
1
-
1
9
-
2
0
1
9
C O N S T R U C T I O N M A N A G EM E N T
8425 Agate RoadWhite City, OR 97503
CCB #167945(541) 826-5668
COVERED ENTRY
MAIN ENTRY STOREFRONT DOORS
METAL TRUSSES (SSD)
CONT PREFINISHED GSM FLASHING TOMATCH ROOF
CONC. SLAB ON GRADE (SSD)
CONC. FOOTING (SSD)
BATT INSULATION @ EXTERIOR WALLS (R-21TYP)
SUSPENDED ACT CEILING (SEE REFLECTEDCEILING PLAN)
PTD CEILING BD
6" CONT BASE (SEE FINISH SCH)
CORNER GUARD
1x8 T & G (SSD)
DOUGLAS FIR #1 WD BEAM (SSD)
4" x 4" WOOD POST (SSD)
CULTURED STONE VENEER BASE
PRECAST SMOOTH SLOPED CULTUREDSTONE CAP
"HARDIE" PLANK LAP SIDING
PRE-FINISHED GSM GUTTER TO MATCHROOF
CONT PERIMETER DRAIN PIPE W/ DRAINROCK & FILTER FABRIC WRAP. CONNECTTO STORM (SSD, SCD)
PRE-FINISHED STANDING SEAM MET ROOF
OVER FRAMING TRUSS ABOVE MAIN ROOFSHEATHING (SSD)
MULTIPLE PLY GIRDER TRUSS (SSD)
TRUSS BEARING DROP DOWN (SSD)
BUILT-UP WALL CORNER COLUMN IN WALLBEYOND (SSD)
FIBERGLASS THERMAL BATT INSULATIONR-38
05
06
07
03
04
01
02
SHEET KEYNOTE LEGEND
08
09
10
11
SHEET KEYNOTE LEGEND1. SEE ENLARGED PLANS FOR ADDITIONAL
INFORMATION2. SEE STRUCTURAL, MECHANICAL, ELECTRICAL AND
PLUMBING DRAWINGS FOR RELATED INFORMATION.
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
122
121
OVERSIZEBARN DOOR
807
SHARED WORKSPACE 3
804
TALKINGCONFERENCE ROOM
806
SHARED WORKSPACE 2
805
SHARED WORKSPACE 1
808
FOCUSROOM
8'-0
" 10'-0
"
9'-0
"
TRUSS BEARING+19'-3"
715OPERTORY 3
716OPERTORY 4
717OPERTORY 5
712
SHAREDWORK SPACE
713OPERTORY 1
714OPERTORY 2
TRUSSBEARING+14'-0"
FINISHFLOOR+0'-0"
TRUSS BEARING+19'-6"
10'-0
"
- - -
SRU00/00/12
BUILDING SECTIONS
A-302
D1 BUILDING SECTIONSCALE: 1/4" = 1'-0"
A1 BUILDING SECTIONSCALE: 1/4" = 1'-0"
C1 BUILDING SECTIONSCALE: 1/4" = 1'-0"
OWNER:
NOTE: IF THIS SHEET IS LESS THAN 30" x 42" IT HAS BEEN REDUCED AND IS NOT TO SCALE.
Tel: (541)414-1325Fax: (541)826-5536E-mail: [email protected]
S+B James Construction Management
SAMUEL UCCELLOAIA, NCARB, LEED
STAMP:
CONSULTANT:
DESIGN-BUILDER:
ARCHITECT:
PROJECT:
S & B JAMES CONSTRUCTION MANAGEMENTCOPYRIGHT 2019
DRAWN BY:
CHECKED BY:
PROJECT DATE:
SBJ PROJECT NO.:
SHEET NO.:
SHEET TITLE:
- 00/00/00 -
- 00/00/00 -- 00/00/00 -
- 00/00/00 -- 00/00/00 -- 00/00/00 -
- 00/00/00 -
- 00/00/00 -
- 00/00/00 -
- 00/00/00 -- 00/00/00 -- 00/00/00 -
- 00/00/00 -
- 00/00/00 -
- 00/00/00 -
- 00/00/00 -
DESCRIPTIONDATEMARKER
M19-5118
KO-KWEL
WELLNESS CENTER
NEW MOBDESIGN
COQUILLE INDIAN TRIBE
3050 TREMONT STREETNORTH BEND, OREGON 97459CONTACT: PH: (800) 622-5869
REVISIONS
PROJECT ADDRESS:
641 MILUK DRIVENORTH BEND, OREGON 97420
SCHEMATIC
SUBMITTAL
I
s
s
u
e
d
:
1
1
-
1
9
-
2
0
1
9
C O N S T R U C T I O N M A N A G EM E N T
8425 Agate RoadWhite City, OR 97503
CCB #167945(541) 826-5668
805
SHARED WORKSPACE 1
802CORRIDOR
802CORRIDOR
TOP OF ROOF @ENTRY CANOPY+16'-0"
101
CENTRALCORRIDOR
100VESTIBULE
106CORRIDOR
103
CENTRALGATHERING
800WAITING
TOP OF PARAPET+19'-6"
COVERED ENTRY
MAIN ENTRY STOREFRONT DOORS
METAL TRUSSES (SSD)
CONT PREFINISHED GSM FLASHING TOMATCH ROOF
CONC. SLAB ON GRADE (SSD)
CONC. FOOTING (SSD)
BATT INSULATION @ EXTERIOR WALLS (R-21TYP)
SUSPENDED ACT CEILING (SEE REFLECTEDCEILING PLAN)
PTD CEILING BD
6" CONT BASE (SEE FINISH SCH)
CORNER GUARD
1x8 T & G (SSD)
DOUGLAS FIR #1 WD BEAM (SSD)
4" x 4" WOOD POST (SSD)
CULTURED STONE VENEER BASE
PRECAST SMOOTH SLOPED CULTUREDSTONE CAP
"HARDIE" PLANK LAP SIDING
PRE-FINISHED GSM GUTTER TO MATCHROOF
CONT PERIMETER DRAIN PIPE W/ DRAINROCK & FILTER FABRIC WRAP. CONNECTTO STORM (SSD, SCD)
PRE-FINISHED STANDING SEAM MET ROOF
OVER FRAMING TRUSS ABOVE MAIN ROOFSHEATHING (SSD)
MULTIPLE PLY GIRDER TRUSS (SSD)
TRUSS BEARING DROP DOWN (SSD)
BUILT-UP WALL CORNER COLUMN IN WALLBEYOND (SSD)
FIBERGLASS THERMAL BATT INSULATIONR-38
05
06
07
03
04
01
02
SHEET KEYNOTE LEGEND
08
09
10
11
SHEET KEYNOTE LEGEND1. SEE ENLARGED PLANS FOR ADDITIONAL
INFORMATION2. SEE STRUCTURAL, MECHANICAL, ELECTRICAL AND
PLUMBING DRAWINGS FOR RELATED INFORMATION.
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
- - -
SRU00/00/12
BUILDING SECTIONS
A-303
A1 BUILDING SECTIONSCALE: 1/4" = 1'-0"
OWNER:
NOTE: IF THIS SHEET IS LESS THAN 30" x 42" IT HAS BEEN REDUCED AND IS NOT TO SCALE.
Tel: (541)414-1325Fax: (541)826-5536E-mail: [email protected]
S+B James Construction Management
SAMUEL UCCELLOAIA, NCARB, LEED
STAMP:
CONSULTANT:
DESIGN-BUILDER:
ARCHITECT:
PROJECT:
S & B JAMES CONSTRUCTION MANAGEMENTCOPYRIGHT 2019
DRAWN BY:
CHECKED BY:
PROJECT DATE:
SBJ PROJECT NO.:
SHEET NO.:
SHEET TITLE:
- 00/00/00 -
- 00/00/00 -- 00/00/00 -
- 00/00/00 -- 00/00/00 -- 00/00/00 -
- 00/00/00 -
- 00/00/00 -
- 00/00/00 -
- 00/00/00 -- 00/00/00 -- 00/00/00 -
- 00/00/00 -
- 00/00/00 -
- 00/00/00 -
- 00/00/00 -
DESCRIPTIONDATEMARKER
M19-5118
KO-KWEL
WELLNESS CENTER
NEW MOBDESIGN
COQUILLE INDIAN TRIBE
3050 TREMONT STREETNORTH BEND, OREGON 97459CONTACT: PH: (800) 622-5869
REVISIONS
PROJECT ADDRESS:
641 MILUK DRIVENORTH BEND, OREGON 97420
SCHEMATIC
SUBMITTAL
I
s
s
u
e
d
:
1
1
-
1
9
-
2
0
1
9
C O N S T R U C T I O N M A N A G EM E N T
8425 Agate RoadWhite City, OR 97503
CCB #167945(541) 826-5668
∆
∆