Project Score
Planning Factors
Project Readiness
Cost/Benefit Analysis
Roadway ITS-Operations Transit
Active Transportation Other
Project Score
Planning Factors
Project Readiness
Cost/Benefit Analysis
•
•
•
•
•
•
•
•
•
•
•
•
Project Score
Planning Factors
Project Readiness
Cost/Benefit Analysis
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
Project Score
Planning Factors
Project Readiness
Cost/Benefit Analysis
•
•
•
•
o
o
o
o
o
o
Source: CBA spreadsheet
•
Inverse Rank
Total # of EntriesX 25 (total points possible)
•
•
•
•
Crash Rate per VMT Bastrop Burnet Caldwell Hays Travis Williamson
Rural
Interstate/Freeway N/A N/A 0.0009 N/A N/A N/A
Principal Arterial 0.0010 0.0007 0.0008 0.0012 0.0006 0.0008
Min. Arterial, Maj. Collector 0.0014 0.0010 0.0022 0.0017 0.0020 0.0015
Urban
Interstate/Freeway 0.0013 N/A N/A 0.0003 0.0009 0.0008
Principal Arterial 0.0019 0.0037 0.0021 0.0018 0.0021 0.0018
Min. Arterial, Maj. Collector 0.0032 0.0025 0.0054 0.0034 0.0029 0.0024
Source: CRIS data, TxDOT published VMT 2016
Examples
High $10M < X Medium $1M < X < $10MLow X < $1M
Value123
Tool for Operations Benefit Cost Analysis (TOPS-BC)
•
•
FHWA Tool for Operations Benefit Cost Analysis (TOPS-BC)
Inverse Rank
Total # of EntriesX 50 (total points possible)
•
•
Source: WalkArlington
Project Score
Planning Factors
Project Readiness
Cost/Benefit Analysis
•
•
•