Workshop on the Origin and Development of the Keeler Dunes Great Basin Unified Air Pollution Control District Governing Board Meeting March 7, 2013 Part 1: Background Presentation Oblique aerial photo with view to south across Keeler Dunes – Sept 2008

Upload: dominick-fleming

Post on 12-Jan-2016

214 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: Workshop on the Origin and Development of the Keeler Dunes Great Basin Unified Air Pollution Control District Governing Board Meeting March 7, 2013 Part

Workshop on the

Origin and Development of the Keeler Dunes

Great Basin Unified Air Pollution Control DistrictGoverning Board MeetingMarch 7, 2013

Part 1: Background Presentation

Oblique aerial photo with view to south across Keeler Dunes – Sept 2008

Page 2: Workshop on the Origin and Development of the Keeler Dunes Great Basin Unified Air Pollution Control District Governing Board Meeting March 7, 2013 Part

Location of Modern Keeler Dunes

Page 3: Workshop on the Origin and Development of the Keeler Dunes Great Basin Unified Air Pollution Control District Governing Board Meeting March 7, 2013 Part

Keeler PM10 Data

• Number of exceedances of Federal PM10 standard more than allowed by CAA• Dust emissions directly impact local residents and workers• Dust impacts public safety on State Highway 136

One allowed exceedance per year

First dust controls

More dust controls

Additional dust controls

NO dust controls

TOTAL = 256

Page 4: Workshop on the Origin and Development of the Keeler Dunes Great Basin Unified Air Pollution Control District Governing Board Meeting March 7, 2013 Part

Keeler Dunes Require Dust Controls

• PM10 emissions from Keeler Dunes cause an average of 6 violations

of health standard per year

One allowed exceedance per year

DUNES TOTAL = 120

Page 5: Workshop on the Origin and Development of the Keeler Dunes Great Basin Unified Air Pollution Control District Governing Board Meeting March 7, 2013 Part

Graph of the PM10 concentrations from the Keeler Dunes for exceedance days, measured at the Keeler Monitoring station from 1993 to 2012.

1/1/1

993

7/1/1

993

1/1/1

994

7/1/1

994

1/1/1

995

7/1/1

995

1/1/1

996

7/1/1

996

1/1/1

997

7/1/1

997

1/1/1

998

7/1/1

998

1/1/1

999

7/1/1

999

1/1/2

000

7/1/2

000

1/1/2

001

7/1/2

001

1/1/2

002

7/1/2

002

1/1/2

003

7/1/2

003

1/1/2

004

7/1/2

004

1/1/2

005

7/1/2

005

1/1/2

006

7/1/2

006

1/1/2

007

7/1/2

007

1/1/2

008

7/1/2

008

1/1/2

009

7/1/2

009

1/1/2

010

7/1/2

010

1/1/2

011

7/1/2

011

1/1/2

012

7/1/2

0120

500

1000

1500

2000

2500

3000

3500

12/28/20062097 mg/m3

PM10 Concentrations from the Keeler Dunes (1993-2012)(only values >150 mg/m3 24-hour standard)

PM10

Con

cent

ratio

n(m

g/m

3)

12/1/20112994 mg/m3

Page 6: Workshop on the Origin and Development of the Keeler Dunes Great Basin Unified Air Pollution Control District Governing Board Meeting March 7, 2013 Part

View from Keeler toward dunes – February 20, 2013

View from Keeler toward dunes – March 4, 2013

PM10 concentrationsHourly = 1,400 mg/m3

24-hour = 526 mg/m3

Health AlertsStage 1 > 400 mg/m3 per hour

Stage 2 > 800 mg/m3 per hour

Page 7: Workshop on the Origin and Development of the Keeler Dunes Great Basin Unified Air Pollution Control District Governing Board Meeting March 7, 2013 Part

Dust Control Requirements - 2008 SIP

• Attainment of the Federal PM10 standard in Owens Valley Planning Area (OVPA) required by 2017.

• The 2008 SIP orders control of 43 square miles of the lake bed sources plus requires additional controls should additional PM10 dust sources become identified.

• 2008 SIP attainment demonstration specifically deals with the control strategy for Owens Lake bed PM10 sources and also identifies the Keeler Dunes as requiring controls.

• Control of PM10 emission from the Keeler Dunes is required by 2014.

• 2006 Settlement Agreement between the GBUAPCD and the LADWP and the 2008 SIP both provide for cooperative study of the Keeler Dunes with LADWP.

Page 8: Workshop on the Origin and Development of the Keeler Dunes Great Basin Unified Air Pollution Control District Governing Board Meeting March 7, 2013 Part

Keeler Dunes Project Timeline 2000 - 2013

MAYContinued

Public Hearing

MarchPublic

Workshop

December – Public Hearing November – Final Staff Report

September – Preliminary Staff Report

2013

2012

2011

2010

2009

2008

2007

2006

2000

2006 Settlement Agreement Keeler Dunes Investigation Begins

First Public Meeting

Second Public MeetingLADWP begins independent work

(Board Discussi

on)

Public Workshop

MonitoringBegins

2008 State Implementation Plan (SIP) Approved

Page 9: Workshop on the Origin and Development of the Keeler Dunes Great Basin Unified Air Pollution Control District Governing Board Meeting March 7, 2013 Part

February and May 2012

Board Discussion

July 2012Board approved process, LADWP

approval

Sept 7, 2012Preliminary Staff Report

October 26, 2012Comment period

(7 weeks)

November 16, 2012Response to comments

Nov 16, 2012Final Staff

Report

November 28, 2012Second comment period (~2 weeks)

November 28, 2012Preparation of

materials for Board

December 10, 2012Response to additional comments

Dec 13, 2012Public Hearing

December 13, 2013LADWP submits

materials

March 7, 2013Public

Workshop

May 2013Continued

Public Hearing

4 Step Process Leading Up to May Public Hearing

1.

2.

3.

4.