workshop and technical meeting 15,16th october 2014 - valenzano

33
Workshop and Technical Meeting 15,16th October 2014 - Workshop and Technical Meeting 15,16th October 2014 – Valenzano (Italy) Ing. Massimiliano Serafino InnovaPuglia

Upload: evangeline-shepard

Post on 31-Dec-2015

28 views

Category:

Documents


0 download

DESCRIPTION

Workshop and Technical Meeting 15,16th October 2014 – Valenzano (Italy). Ing. Massimiliano Serafino InnovaPuglia. Workshop and Technical Meeting 15,16th October 2014 - Valenzano. Welcome to Bari. Workshop and Technical Meeting 15,16th October 2014 - Valenzano. Agenda. 20:45. - PowerPoint PPT Presentation

TRANSCRIPT

Workshop and Technical Meeting 15,16th October 2014 - Valenzano

Workshop and Technical Meeting 15,16th October 2014 – Valenzano (Italy)

Ing. Massimiliano Serafino InnovaPuglia

Workshop and Technical Meeting 15,16th October 2014 - Valenzano

Welcome to Bari

Workshop and Technical Meeting 15,16th October 2014 - Valenzano

AgendaAgenda 15th October 2014

13:00-14:00 Lunch Break

14:00-14:05 Welcome and Logistics

14:05-14:15 Aim of the End User Workshop

14:15-14:45 Presentation of each invited (5min each one)

14:45-15:15 Presentation of C2SENSE main goals to invited

15:15-15:30 Questionnaire aims, analysis and results

15:30-16:30 Open Discussion on territorial emergency management

16:30-16:45 Coffee Break

16:45-18:30 Transfer and Visit to the Control Room of Civil Protection

20:00 Social Event

20:45

Workshop and Technical Meeting 15,16th October 2014 - Valenzano

Agenda 16th October 2014 (morning)

09:00-09:15 Status of the submitted deliverable (D2.2 and D7.1), next deadline, feedback from the Project Officer

09:15-10:15 Impact of workshop results on WP2 and WP7

10:15-10:30 WP2 status report

11:30-11:00 Task 2.2 status report

11:00-11:15 Task 2.3 status report

11:15-11:30 Coffee Break

11:30-12:00 Task 2.4 status report

12:00-12:30 Introduction to C2-SENSE Architecture Workshop

12:30-13:30 Lunch Break

Workshop and Technical Meeting 15,16th October 2014 - Valenzano

Agenda 16th October 2014 (afternoon)

13:30-16:00

C2-SENSE Architecture Workshop - Review of AIT Input- Review of SAGEM Input- Review of LUTECH Input- Review of PIAP Input

16:00-16:30 Summary of Action points / Next Meeting and Discussion

16:30-17:00 Networking

17:00 END of the Meeting

Workshop and Technical Meeting 15,16th October 2014 - Valenzano

Questionnaire aims, analysis and results

• Aim: collecting critical aspects from organizations belonging to different countries

• Issues raised by different organizations (Prefectures, Fire Department voluntary organizations…)

• First part of presentation: Data collected are showed

• Second part of presentation: Analisys of collected data

Workshop and Technical Meeting 15,16th October 2014 - Valenzano

Users and OrganizationsHEADQUARTER

C.B. Club Mattei Onlus Fano (PU) Italy

Associazione Radiantistica Cb Om Alessandria (AL) Italy

Associazione volontari Ser Ostuni (BR) Italy

Polizia Provinciale della Protezione Civile Bari (BA) Italy

Provincia di Foggia Foggia (FG) Italy

Prefettura di Foggia Foggia (FG) Italy

ANPAS Sociale Grugliasco (To) Italy

Prefettura di Bari Bari (BA) Italy

Direzione Regionale Vigili del Fuoco Bari (BA) Italy

Centro Funzionale Protezione Civile Bari (BA) Italy

Sala Operativa Integrata Regionale (SOIR) Bari (BA) Italy

Workshop and Technical Meeting 15,16th October 2014 - Valenzano

Users and Organizations

2.1 Type of the User / Organization involved

Workshop and Technical Meeting 15,16th October 2014 - Valenzano

Users and Organizations2.2 Are you a public organization? 2.3 Where is your headquarter?

YES

NO

Workshop and Technical Meeting 15,16th October 2014 - Valenzano

2.4 What kind of emergency do you manage?

Users and Organizations2.5 When did you have recents floods?

Workshop and Technical Meeting 15,16th October 2014 - Valenzano

2.7 With which organizations do you Cooperate during an emergency?

Users and Organizations2.8 What is the organization that is responsible for the coordination during the emergency phase?

Workshop and Technical Meeting 15,16th October 2014 - Valenzano

2.11 What are the functions carried out during emergency management?

2.12 In which facilities are performedfunctions during emergency management?

Users and Organizations

Workshop and Technical Meeting 15,16th October 2014 - Valenzano

3 Description of the main problems

3.1 What criticities do you have during emergency management ?

Workshop and Technical Meeting 15,16th October 2014 - Valenzano

4 Infrastructural/Technical data4.1 Which type of information are Acquired during emergency management?

4.2 How are acquired data?

Workshop and Technical Meeting 15,16th October 2014 - Valenzano

4.3 Which databases are used? 4.4 Does/Do your system(s) support cryptographic protocols? ?

Infrastructural/Technical data

Workshop and Technical Meeting 15,16th October 2014 - Valenzano

4.5 Are data encrypted? 4.6 Do you use Role-Based Access Control (RBAC) system?

Infrastructural/Technical data

Workshop and Technical Meeting 15,16th October 2014 - Valenzano

4.7 Do you use Decision Support System (DSS)?

4.9 How does occur communications?

Infrastructural/Technical data

Workshop and Technical Meeting 15,16th October 2014 - Valenzano

4.12 Do you use an IT system in order to share data?

Infrastructural/Technical data

NAS, DropBox, GoogleDrive, File Servers, WebGIS geographic

information systems, Content Management System (CMS)….

Workshop and Technical Meeting 15,16th October 2014 - Valenzano

4.14 What protocols are used in order to transfer data? Select all that apply?

Infrastructural/Technical data

Workshop and Technical Meeting 15,16th October 2014 - Valenzano

4.16 How frequently would your system(s) send data automatically?

4.17 What would be the amount of data sent by your system(s)?

Infrastructural/Technical data

Workshop and Technical Meeting 15,16th October 2014 - Valenzano

4.18 What is the level of CONFIDENTIALITY of your system(s) / data ?

4.19 What is the level of INTEGRITY of your system(s) / data

Infrastructural/Technical data

Workshop and Technical Meeting 15,16th October 2014 - Valenzano

4.20 What is the level of AVAILABILITY of your system(s) / data?

4.21 Are your system(s) able to send data in real-time (or near real-time)?

Infrastructural/Technical data

Workshop and Technical Meeting 15,16th October 2014 - Valenzano

4.22 Are your system able to send data with different priorities?

4.23 Does the data sent from your system need to be prioritized?

Infrastructural/Technical data

Workshop and Technical Meeting 15,16th October 2014 - Valenzano

4.24 Does your system need to receivea feedback after having sent data?

4.25 Is your system able to send back a feedback ?

Infrastructural/Technical data

Workshop and Technical Meeting 15,16th October 2014 - Valenzano

4.31 How soon can your system(s) guarantee response to a data request?

Infrastructural/Technical data4.32 How soon do your system(s) need to receive the data request?

Workshop and Technical Meeting 15,16th October 2014 - Valenzano

4.33 Does/Do your system(s) need to exchange data outside C2-SENSE perimeter?

Infrastructural/Technical data

Presidency of the Council of Ministers, Department of Civil Protection, Ministry of the Interior, Region, Province, Municipalities, Private Entities

Workshop and Technical Meeting 15,16th October 2014 - Valenzano

4.35 Are your data extracted from a database/repository or gathered by the system(s) always updated? Or are they cached?

4.36 How can you guarantee continuous communication with other systems?

Infrastructural/Technical data

Workshop and Technical Meeting 15,16th October 2014 - Valenzano

Observations and comments

Predominant use of outdated means of communication such as telephone

and fax

Possible dysfunction in communications during emergencies

andnot always avalaible!!

Workshop and Technical Meeting 15,16th October 2014 - Valenzano

Observations and comments

One of the most common problems is incomplete information

Need a better organization of the data that will be easily accessible if

processed electronically in a systematic way.

Workshop and Technical Meeting 15,16th October 2014 - Valenzano

Observations and comments

As expected, the processed data are extremely heterogeneous

The system must be able to correlate very different information.

Workshop and Technical Meeting 15,16th October 2014 - Valenzano

Observations and comments

Data management tools are not homogeneus

Need to make the system independent by type of technology used

Workshop and Technical Meeting 15,16th October 2014 - Valenzano

Conclusions

• The key points are incomplete or missing informations; the result is a wrong decision

• Timely information avalaibility

• Need of a better interoperability between actors

• Shared and not reliable communication infrastructures during emergency management

Workshop and Technical Meeting 15,16th October 2014 - Valenzano

Thank you for your attention!!!