works id · 2020. 10. 23. · /epartment of public works and highways contract id: 19ha00024...

6
./epartment of Public Works and llighways Contract ID: 19HA00024 Contract Name: Construction ofMulti-Purpose Building, Santa Cruz, Calape, Bohol Location of the Contract: Calape, Bohol Bohol First District Engineering Office Dao District, Tagbilaran City MINUTES OF PRE-BID COIYF'ERENCE Date: November 29. 2018 1. Attendance. Present were: Felipe S. Mosquera - BAC Chairman Lucio L. Bagol - BAC Vice Chairman Necesita M. Balili - BAC Member Leoncia R. Bagol - OIC, Procurement StaJf Alejandra Q. Clarete - BAC TWG Member Rogelio A. Obligado - BAC Secretariat Member Elvira B. Vencilao - BAC Secretariat Member Mary Noeline F. Racines - BAC Secretmiat Mernber 2. The BAC Chairman, Engr. Felipe S. Mosgera- called the Pre-Bid Conference for Confact ID 19HA0024 - Consfuction of Multi-Purpose Building" Santa Cruz Calaoe. Bohol to order at 10:00 AM on November 29. 2018. at the Procurernent Office. DPWH-BohoI lst District Engineering Office. Tagbilaran Citv. 3. Presentation/Explanation by BAC: a. Brief on Basic ConfractData: Iterrs of work as discussed by Engr. Lucio L. Bagol: PART A OTHER GENERAL REQUIREMENTS B.5 Project Billbomd / Signboard - 4' x 8' project billboards. The contractor will be required to install the 8'x 8' COA billboard to be charged to the OCM of the project B.7Q) Occupational Safety and Health Prograrn PART B REINFORCED CONCRETE WORK 900 (1) c4 Structural Concrete (Columns), Class A, 28 Days 900 (l) c6 Sfuctural Concrete (BeamVGirders), Class A, 28 Days 900 (7) Reinforced Concrete 902 (1) a Reinforcing Steel (Deformed), Grade 40 903 (2) Formworks and Falseworks PART C MASONRY WORKS 1046(2)al CHB Non Load Bearing (Including Reinforcing Steel), 100 mm 1046(2)aZ CHB Non Load Bearing (Including Reinforcing Steel), 150 mm PART D FINISHING WORKS 1018 (1) Glazed Tiles and Trims 1018 (2) Unglazed Tiles 1027 (l) Cement Plaster Finish PART E CARPENTRY WORKS 1003 (17) Carpentry and Joinery Works 1003 (2)b2 Wall, 10mm, Metal Frame, Fiber Cement Board PART F MISCELLANEOUS HARDWARES 1047 (1) Structural Steel 1047 (2) a Stuctural Steel, Trusses DPWH-INFR-26-2016 Page I of 6

Upload: others

Post on 27-Feb-2021

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Works ID · 2020. 10. 23. · /epartment of Public Works and Highways Contract ID: 19HA00024 contract Name: construction of Multi-Purpose Building, Santa cruz, calape, Bohol Location

./epartment of Public Works and llighwaysContract ID: 19HA00024Contract Name: Construction ofMulti-Purpose Building, Santa Cruz, Calape, BoholLocation of the Contract: Calape, Bohol

Bohol First District Engineering OfficeDao District, Tagbilaran City

MINUTES OF PRE-BID COIYF'ERENCEDate: November 29. 2018

1. Attendance. Present were:Felipe S. Mosquera - BAC ChairmanLucio L. Bagol - BAC Vice ChairmanNecesita M. Balili - BAC MemberLeoncia R. Bagol - OIC, Procurement StaJfAlejandra Q. Clarete - BAC TWG MemberRogelio A. Obligado - BAC Secretariat MemberElvira B. Vencilao - BAC Secretariat MemberMary Noeline F. Racines - BAC Secretmiat Mernber

2. The BAC Chairman, Engr. Felipe S. Mosgera- called the Pre-Bid Conference for Confact ID19HA0024 - Consfuction of Multi-Purpose Building" Santa Cruz Calaoe. Bohol to order at10:00 AM on November 29. 2018. at the Procurernent Office. DPWH-BohoI lst DistrictEngineering Office. Tagbilaran Citv.

3. Presentation/Explanation by BAC:a. Brief on Basic ConfractData:

Iterrs of work as discussed by Engr. Lucio L. Bagol:PART A OTHER GENERAL REQUIREMENTSB.5 Project Billbomd / Signboard - 4' x 8' project billboards. The

contractor will be required to install the 8'x 8' COA billboard to becharged to the OCM of the project

B.7Q) Occupational Safety and Health Prograrn

PART B REINFORCED CONCRETE WORK900 (1) c4 Structural Concrete (Columns), Class A, 28 Days900 (l) c6 Sfuctural Concrete (BeamVGirders), Class A, 28 Days900 (7) Reinforced Concrete902 (1) a Reinforcing Steel (Deformed), Grade 40903 (2) Formworks and Falseworks

PART C MASONRY WORKS1046(2)al CHB Non Load Bearing (Including Reinforcing Steel), 100 mm1046(2)aZ CHB Non Load Bearing (Including Reinforcing Steel), 150 mm

PART D FINISHING WORKS1018 (1) Glazed Tiles and Trims1018 (2) Unglazed Tiles1027 (l) Cement Plaster Finish

PART E CARPENTRY WORKS1003 (17) Carpentry and Joinery Works1003 (2)b2 Wall, 10mm, Metal Frame, Fiber Cement Board

PART F MISCELLANEOUS HARDWARES1047 (1) Structural Steel1047 (2) a Stuctural Steel, Trusses

DPWH-INFR-26-2016 Page I of 6

Page 2: Works ID · 2020. 10. 23. · /epartment of Public Works and Highways Contract ID: 19HA00024 contract Name: construction of Multi-Purpose Building, Santa cruz, calape, Bohol Location

^repartment of Public Worla and HighwaysContract ID: 19HA00024Contract Name: Construction of Multi-Purpose Building, Santa Cruz, Calape, BoholLocation of the Contract: Calape, Bohol

1047 Q)b Structural Steel, Purlins1047 (3) a Metal Structure Accessories, Bolts1047 (3) c Metal Stucture Accessories, Turnbuckle1047 (4) Metal Structure Accessories, Cross Bracingrc47 (6) Metal Structure Accessories, Steel Plates

1047 (7)b Metal Shucture Accessories, Sagrods

PART G ROOFING WORKSl0I3 (2) aZ Fabricated Metal Roofing Accessory, gauge 26, Flashings1013 (2) bl Fabricated Metal Roofing Accessory, gauge 24, Gutters1014 (1) bl PrepaintedMetal Sheet above 0.427nm., ComrgatedTlpe, Longspan

PART H DOORS AND WINDOWS1012 (6) Glass and Glazing1007 (1) a Aluminum Framed Glass Door, Sliding Type1007 (1) b Aluminum Framed Glass Door, Swing Type1010 (2) b Doors, Wood Panel

1008 (1) a Aluminum Glass Windows, Sliding Type1008 (1) d Aluminrun Glass Windows, Fixed Type1010 (1) Frames (Jarnbs, Sills, Head, Transoms & Mullions)1004 Q) Finishing Hardware

PART IELECTRICAL WORKS1101 (33) Wires and Wiring Devices1100 (10) Conduits, Boxes and Fittings(Conduit Works/Conduit Rough-in)I102 (1) Panelboard with Main & Branch Breakers1103 (1) Lighting Fixtures and Lamps

PART JPLUMBING WORKS INCLUDING WATERLINES1001 (8) Sewer Line Works1002 Q)a Water Close! Round Front Complete, Tank Type1002(21) Faucet1002 (24) Cold Water Lines

PART K PAINTING WORKSL032 (l) a Painting Works, Masonry/Concrete1032 (1) b Painting Works, Wood1032 (1) c Painting Works, Steel

ABC of the contract is P 1,980,00.00. Conffact duration is 85 calendar days.

Minimum equipment requirernent is One Baggq Mixer, Br Cttter, Bar Bender,

Welding Machine, Generator Set, Cutting Outfit, and Truck Mounted Crane'

b. Review ofRequirements of Bidding Documents:o The contractor shall use the prescribed/standard fonns Standmd/prescribed

forms posted in the PhiIGEPS and DPWH website and issued in the biddocurnents. Per Section 32.2.1of the IRR of RA 9184 "bids not addressing orproviding all of the required items in the Bidding Documents including, where

applicable, bill of quantities, shall be considered non-responsive and, thus,

automatically disqualifi ed.

DPWH-INFR-26-2016 Page2of 6

Page 3: Works ID · 2020. 10. 23. · /epartment of Public Works and Highways Contract ID: 19HA00024 contract Name: construction of Multi-Purpose Building, Santa cruz, calape, Bohol Location

/epartment of Public Works and HighwaysContract ID: 19HA00024contract Name: construction of Multi-Purpose Building, Santa cruz, calape, BoholLocation of the Contract: Calapg Bohol

o The Bidder shall submit to the Procuring Entity, as part of its Bid, a BidSecuring Declmation or any form of Bid security in an amount equal to a

of the ABC in accordance with the schedule:Form Minimum Amount

(1) Cash or cashier's/managor's check issued by aUniversal or Commercial Bank

2o/oof ABC

O Bank drafl/guarantee orirrevocableletter ofcredit issued by a Universal or CommercialBank

2%oof ABC

(3) Surety bond callable on demand issued by asurety or insurance company duly certified bythe Insurance Commission as authorized toissue such securitv

5% of ABC

The Bid Securing Declaration shall be notarwed and dry sealed otherwise thebid shall be declared as patently insufficient and ground for rejection.

Each bidder shall submit one original of the Technical Proposal and oneoriginal of the Financial Proposal and clearly malk each as "ORIGINAL -TECHNICAL PROPOSAL' and'ORIGINAL - FINANCIAL PROPOSAL".In addition, the bidders shall submit 2 copies of the Technical Proposal and theFinancial Proposal, and clearly mark them "COPY NO ....-TECHNICALPROPOSAL" and "COPY NO ... . - FINANCIAL PROPOSAL". In the eventof any discrepancy between the original and the copies, the original shallprevail.

Bid documents shall be ,A.4 sized paper, book-bound, properly pryinated witheach page signed by the confractor and with the appropriate markers/tags.

c. Review of Documents to be submitted by the Bidder - Bid Form, Technical andFinancial Proposals:

o The Technical Proposal shall contain:l. PCAB License and Regisfiation and WA if applicable2. the Organizational Chart for the Contract and not the firm's

organizational chart. The Organizational Chart shall reflect the keypersonnel assigned to the contact.List of contractor's personnel (e.g., Project M-ugo, ProjectEngineers, Materials Engineers, and Foremen), to be assigned to thecontract to be bi4 with their complete qualification and experiencedata (Use Form DPWHINFR-14). These personnel must meet therequired minimum years of experience shown in the BDS.List of Contractor's Major Construction and Laboratory EquipmentUnits to be assigned to the Conffact, Supported by Certificates ofAvailability using the prescribed format. To be attached are copies ofsales invoice / Registration Ce,rtificate from LTO for ownedequipment, certifications from the lessors that the equipment unitsunder Leased Equipment shall be available for this contact, andcertifications from the vendors that the equipment rmits underPurchase Agreements shall be available for this contract.

The conhactor shall include his laboratory equipment to be pledged tothe contract. The tist of laboratory apparatuVequiprnent should be

J.

4.

DPWH-INFR.26.2016 Page 3 of 6

Page 4: Works ID · 2020. 10. 23. · /epartment of Public Works and Highways Contract ID: 19HA00024 contract Name: construction of Multi-Purpose Building, Santa cruz, calape, Bohol Location

,repartment of Public Works and llighwaysContract ID: 19HA00024Contract Name: Construction of Multi-Purpose Building, Santa Cruz, Calape, BoholLocation of the Contract: Calape, Bohol

enumerated in detail. Engr. Mosquera reminded the contractors thatmost of the bidders got disqualified because of the non-compliance tothe prescribed fonn ofthe List of Contractor's Major Construction andLaboratory Equipment Units to be assigned to the Confiact as well asthe failwe to include the list of laboratory equipment.

5. Omnibus Sworn Statement in the prescribed form containing nine (9)items

o The Financial Documents shall contain the Bid Form, Bid Prices, DetailedEstimates, Surnnary Sheets indicating construction materials unit prices, laborrates and equipment rental rates and Cash Flow by Quarter.

d. Explanation of Criteria for Eligibility Screening, Preliminmy Exarnination of Bids,Evaluation of Bids, and Post-Qualification:

e To be eligible for the contract, a contractor must meet the following eligibilityrequirement: (a) Filipino citizen or 75% Filipino-ownedpartnership/corporation with license for Size Range Small B, (b) completionof similar contract costing at least 50%o of the ABC and (c) Net FinancialContracting Capacrty (NFCC) at least equal to the ABC.

o Eligibility screening will be conducted electonically by the Distict Office byProcurement Engineer. The office will just be retrieving the contractor's filefrom the CWA. In order to afford sulficient time to update the contractors'records in the CWA, participating contractors shall submit their Class "A"documents and Financial Statements to the DPWH Civil Works Registry atleast seven (7) calendar days and the Technical Docwnents (Completed/On-going projects) at least fifteen (15) days before the deadline for the submissionand/or opening of bids. A bidder may also submit his updated Class "A"doeuments and Financial Staternents together with his bid to be used by theBAC in case he fails in the electronic eligibility screening. The bidder is notrestrained to attach his legal documents in his technical proposal such as hisDTI, SEC registration, Mayor's Permit and Tax Clearance that might haveexpired or not yet updated in the CWA. hnprovement of bid proposal is notallowed.

A bidder may modifii its bid, provided that this is done before the deadline forthe submission and receipt of bids.

The DPWH will use non-discretionary "pass/fail" criteria in the eligibilitycheck, preliminary examination of bids, evaluation of bids, post-qualificationand award.

o The Procuring Entity shall conduct a Post-Qualification of the Bidder ilrat isevaluated to have the Lowest Calculated Bid (LCB). Within frve (5) calendardays from receipt by the Bidder of the notice from the BAC that it submittedthe LCB, the Bidder shall submit the following post qualification documentaryrequirements:(1) Latest income and business tax returns.(2) Other appropriate licenses and permits required by law and stated in theBDs.

DPWH-INFR-26-20I6 Page 4 of 6

Page 5: Works ID · 2020. 10. 23. · /epartment of Public Works and Highways Contract ID: 19HA00024 contract Name: construction of Multi-Purpose Building, Santa cruz, calape, Bohol Location

,repartment of Public Works and IlighwaysContract ID: 19HA00024Contract Name: Construction of Multi-Purpose Building, Santa Cruz, Calape, BoholLocation of the Contract: Calape, Bohol

Failure of the Bidder declared as LCB to duly submit the requirements shall beground for forfeiture of the bid security and disqualification of the Bidder foraward.

If the BAC detennines that the Bidder with the LCB passes all the criteria forPost-Qualification, it shall declare the said bid as the Lowest CalculatedResponsive Bi{ GCRB) and recommend to the HoPE the award of contractto the said Bidder.

The bidder with the Lowest Calculated Responsive Bid will be required tosubmit to the Procuring Entity, within ten (10) calendar days from his receiptof the Notice of Award, the following documents:

Certificate.

JV Agreement

Precedence Diagram and Bar Chart with S-Curve and Cash Flow

Contractor is free and clean of all tax liabilities

of2013

In the case of the failure, refusal or inability of the bidder with the LowestCalculated Responsive Bid, to submit the required documents within theprescribed period, through its own fault, the BAC will be constrained to post-disqualify the said bidder and shall initiate and complete the post-qualificationprocess on flre bidder with the second Lowest Calculated Responsive Bid.

4. Questions and Comments from Bidders and Responses of BAC and Other DPWH Officials:None. There were no interested bidders who came to attend.

5. Other Matters Discussed:The paragraph inserted in the lnvitation to Bid per DO 127 series 2018 wasemphasized. The said paragraph states that "if at the time of the post-qualification procedure, the BAC verifies that any of the deficiencies is due tothe contractor's fault or negligence pursuant to 3a.3@)(ii)(c) of the 2016Revised Implementing Rules and Regulations of Republic Act No. 9184 Q0l6RIRR of RA 9L84), the Procuring Entity shall disqualify the contractor fromthe award without any right to reimburse fees and incidental oost paid for theprocurement of infrasffuctwe contact subject of the Bid".

DPWH-INFR.25-2016 Page 5 of 6

Page 6: Works ID · 2020. 10. 23. · /epartment of Public Works and Highways Contract ID: 19HA00024 contract Name: construction of Multi-Purpose Building, Santa cruz, calape, Bohol Location

-\repartment of Public Works and Highways

Contract ID: 19HA00024Contract Name: Construction of Multi-Purpose Building, Santa Cruz, Calape, BoholLocation of the Contract: Calape, Bohol

6. Summry by BAC Chairmm of Procecdings, including SupplementayBid Bulletins to be

issued.

Issuance of Bid Docunents November 22. 2018 - December 1 1, 20 18

.Deadline of buvins of bid documents December 11.2018.2018. 10:00 AMDeadline of Receint of Bids December l1- 2018. 12:00 NoonOoenins of Bids Decerrber 11. 2018- 1:00 PM

7. Adjournment. There being no other remaining topics for discussion, the Conference adjourned

at l1:00 AM.

On LeaveILUMINTEOFE C. ECHAYIA

Member

O,B,ESTER L. CATACAT

Member

)

4--ttL(TIECESITA M. BALILI

Member

Prepared By:

- LEONCilA RfAGOI{orffi"rtsm

Vice Chairman

DPWH-INFR.26-2016 Page 6 of 6