S.No. PP Status Package No. Description of Works Procurement For Procurement By Estimated Cost (Rs in lacs) Estimated Cost (Rs in USD Million) Method of Procurement Post/Prior Review Status Domestic preference Submission of Bid Document for Prior Review NOC from WB Original Bid Opening Date Revised Bid Opening Date Contract Signed Date Name & Address of the awarded bidder Contract Price (In Lakhs) Close date as per Contract Actual Close date Actual payment at close (INR in lacs) Remarks Remark 2 Remark 3 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 1 Completed ICZMP/W/CDA/ 1 Remodelling of Wetland Research & Training Centre,Chandraput CDA CDA 25.77 0.042 NCB Post No NA NA NA NA 15-Mar-11 M/s P.K. Das, Cuttack 25.77 15-Sep-11 12-Sep-11 25.77 Completed. 2 Completed ICZMP/W/CDA/03 Renovation and Upgradation of Wetland Research & Training Centre,Chandraput CDA SPMU 117.31 0.193 NCB Post No NA NA 04-Jul-12 04-Jul-12 10-Aug-12 M/s. Damodar Engineers Pvt. Ltd., Bhubaneswar 117.31 31-Oct-13 31-Oct-13 117.31 Completed. 3 Completed ICZMP/W/CDA/ 2 Balance Work of Remodelling of Wetland Research & Training Centre,Chandraput ( Several Contracts) CDA CDA 10.62 0.018 NS Post No NA NA 16-Jan-12 20-Oct-12 21.01.2013 to 10.03.2013 M/s P.K. Das, Cuttack 10.62 20.072013 to31.12.2013 31-Dec-13 10.62 Completed. 4 Completed ICZMP/W/CDA/ 4 Renovation and Remodelling (Addl. Work) of Wetland Research & Training Centre,Chandraput -(Several Contracts) CDA CDA 36.45 0.060 NS Post No NA NA NA 20-Dec-13 30-12-2013 to 15.01.2014 Several Bidders 36.45 30.03.2014 to 22.04.2014 22-Apr-14 36.45 Completed. Addition 5 Completed ICZM/W/DoC/10 Structural Conservation- British Cementry,Ganjam DoC DoC 9.81 0.016 Force Account Post No NA NA 15-May-12 30-Jan-13 22-Feb-13 PEA 9.81 31.03.2015 31.03.2015 9.78 Completed. 6 Completed ICZM/W/DoC/11 Structural Conservation- Jagannath Temple,Pentha DoC DoC 23.03 0.038 Force Account Post No NA NA 01-Jan-12 25-Apr-13 22-Apr-13 PEA 23.03 31.3.2015 31.03.2015 21.62 Completed. 7 Completed ICZM/W/DoC/01 Structural Conservation - Ganjam Fort Ganjam DoC DoC 66.40 0.109 Force Account Post No NA NA 16-Apr-12 14-Nov-12 01-Nov-12 PEA 66.40 31.03.2015 31.03.2015 66.04 Completed. 8 Completed ICZM/W/DoC/04 Structural Conservation - Hariharadev Temple,Nairi DoC DoC 43.80 0.072 Force Account Post No NA NA 15-Mar-12 30-Jan-13 22-Feb-13 PEA 43.80 31.03.2015 31.03.2015 43.78 Completed. 9 Completed ICZM/W/WL/34 Bio Diversity - Construction of Hatcery & Rearing Complex of Crocodiles and Laboratory at Dangamal ( Mangrove Forest Division) DWL SPMU 80.12 0.132 NCB Post No NA NA 12-Dec-11 24-Mar-12 20-Jun-12 M/s Shree Balaji Engicon Pvt. Ltd., Jharsuguda 80.12 30-Apr-13 30-Apr-13 79.18 Completed. Works

Upload: others

Post on 18-Jan-2022

2 views

Category:

Documents


0 download

TRANSCRIPT

S.N

o.

PP

Sta

tus

Pa

cka

ge

No

.

Description of Works

Pro

cure

men

t F

or

Pro

cure

men

t B

y

Est

ima

ted

Co

st

(Rs

in l

acs

)

Est

ima

ted

Co

st

(Rs

in U

SD

Mil

lio

n)

Met

ho

d o

f P

rocu

rem

ent

Po

st/P

rio

r R

evie

w S

tatu

s

Do

mes

tic

pre

fere

nce

Su

bm

issi

on

of

Bid

Do

cum

ent

for

Pri

or

Rev

iew

NO

C f

rom

WB

Ori

gin

al

Bid

Op

enin

g D

ate

Rev

ised

Bid

Op

enin

g D

ate

Co

ntr

act

Sig

ned

Da

te

Name & Address

of the awarded

bidder

Contract

Price

(In Lakhs)

Close date as per

Contract

Act

ua

l C

lose

da

te

Act

ua

l p

ay

men

t a

t cl

ose

(IN

R i

n l

acs

)

Remarks Remark 2 Remark 3

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22

1

Com

ple

ted

ICZM

P/W

/CD

A/

1

Remodelling of Wetland

Research & Training

Centre,Chandraput

CDA CDA 25.77 0.042 NCB Post No NA NA NA NA

15-M

ar-

11

M/s P.K. Das,

Cuttack25.77 15-Sep-11 12-Sep-11 25.77 Completed.

2

Com

ple

ted

ICZM

P/W

/CD

A/0

3

Renovation and Upgradation of

Wetland Research & Training

Centre,Chandraput

CDA SPMU 117.31 0.193 NCB Post No NA NA

04

-Ju

l-1

2

04

-Ju

l-1

2

10-A

ug-1

2 M/s. Damodar

Engineers Pvt.

Ltd.,

Bhubaneswar

117.31 31-Oct-13 31-Oct-13 117.31 Completed.

3

Com

ple

ted

ICZM

P/W

/CD

A/

2

Balance Work of Remodelling of

Wetland Research & Training

Centre,Chandraput

( Several Contracts)

CDA CDA 10.62 0.018 NS Post No NA NA

16

-Ja

n-1

2

20

-Oct-

12

21

.01

.20

13

to

10

.03

.20

13

M/s P.K. Das,

Cuttack10.62

20.072013

to31.12.201331-Dec-13 10.62 Completed.

4

Com

ple

ted

ICZM

P/W

/CD

A/

4

Renovation and Remodelling

(Addl. Work) of Wetland

Research & Training

Centre,Chandraput -(Several

Contracts)

CDA CDA 36.45 0.060 NS Post No NA NA NA

20

-De

c-1

3

30-1

2-2

013 t

o

15

.01

.20

14

Several Bidders 36.4530.03.2014 to

22.04.201422-Apr-14 36.45 Completed. Addition

5

Com

ple

ted

ICZM

/W/D

oC

/10

Structural Conservation- British

Cementry,GanjamDoC DoC 9.81 0.016

Force

AccountPost No NA NA

15

-Ma

y-1

2

30

-Ja

n-1

3

22

-Fe

b-1

3

PEA 9.81 31.03.2015 31.03.2015 9.78 Completed.

6

Com

ple

ted

ICZM

/W/D

oC

/11

Structural Conservation-

Jagannath Temple,PenthaDoC DoC 23.03 0.038

Force

AccountPost No NA NA

01

-Ja

n-1

2

25-A

pr-

13

22-A

pr-

13

PEA 23.03 31.3.2015 31.03.2015 21.62 Completed.

7

Com

ple

ted

ICZM

/W/D

oC

/01

Structural Conservation - Ganjam

Fort GanjamDoC DoC 66.40 0.109

Force

AccountPost No NA NA

16-A

pr-

12

14

-No

v-1

2

01

-No

v-1

2

PEA 66.40 31.03.2015 31.03.2015 66.04 Completed.

8

Com

ple

ted

ICZM

/W/D

oC

/04

Structural Conservation -

Hariharadev Temple,NairiDoC DoC 43.80 0.072

Force

AccountPost No NA NA

15

-Ma

r-1

2

30

-Ja

n-1

3

22

-Fe

b-1

3PEA 43.80 31.03.2015 31.03.2015 43.78 Completed.

9

Com

ple

ted

ICZM

/W/W

L/34 Bio Diversity - Construction of

Hatcery & Rearing Complex of

Crocodiles and Laboratory at

Dangamal ( Mangrove Forest

Division)

DWL SPMU 80.12 0.132 NCB Post No NA NA

12-D

ec-1

1

24-M

ar-

12

20-J

un-1

2 M/s Shree Balaji

Engicon Pvt. Ltd.,

Jharsuguda

80.12 30-Apr-13 30-Apr-13 79.18 Completed.

Works

S.N

o.

PP

Sta

tus

Pa

cka

ge

No

.

Description of Works

Pro

cure

men

t F

or

Pro

cure

men

t B

y

Est

ima

ted

Co

st

(Rs

in l

acs

)

Est

ima

ted

Co

st

(Rs

in U

SD

Mil

lio

n)

Met

ho

d o

f P

rocu

rem

ent

Po

st/P

rio

r R

evie

w S

tatu

s

Do

mes

tic

pre

fere

nce

Su

bm

issi

on

of

Bid

Do

cum

ent

for

Pri

or

Rev

iew

NO

C f

rom

WB

Ori

gin

al

Bid

Op

enin

g D

ate

Rev

ised

Bid

Op

enin

g D

ate

Co

ntr

act

Sig

ned

Da

te

Name & Address

of the awarded

bidder

Contract

Price

(In Lakhs)

Close date as per

Contract

Act

ua

l C

lose

da

te

Act

ua

l p

ay

men

t a

t cl

ose

(IN

R i

n l

acs

)

Remarks Remark 2 Remark 3

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22

Works

10

Com

ple

ted

ICZM

/W/W

L/24 Eco Tourism - Drinking Water

Facilities (Digging of deep tube

wells) and water supply

arrangements at Gahirmatha Marine

Sanctuary. (Chakrtadharpur - 1 and

Barunei - 1)

DWL DWL 3.32 0.005 NS Post No NA NA

31-J

an-1

2

20-A

pr-

13

26-S

ep-1

3

Sri Bibhuti

Bhusan

Biswal,Belatala,

Pattamundai,Di

st:Kendrapara,

Odisha-754215

3.32 10-Jan-14 10-Jan-14 3.30 Completed.

11

Com

ple

ted

ICZM

/W/W

L/25

Eco Tourism - Drinking Water

Facilities (Digging of deep tube

wells) and water supply

arrangements at Bhitarkanika

Sanctuary. ( Gupti - 1, Koilipur - 2,

Rajnagar - 1 No and Dangamal - 1

No.) Several Contracts

DWL DWL 8.90 0.015 NS Post No NA NA

15-F

eb-1

2

28-A

pr-

13

27

.06

.20

13

to

15

.07

.20

13

Several Bidders 8.9025.12.2013 to

14.01.2014

25.12.2013 to

14.01.20148.90 Completed.

12

Com

ple

ted

ICZM

/W/W

L/23

Eco Tourism - Construction of

Floating Jetty at Hukitola &

Babubali.(MFD)

DWL DWL 6.99 0.012 NS Post No NA NA

14

-Nov-1

1

14

-Nov-1

1

19

-Nov-1

1

M/s Mechem

Private Limited, S-

3/72, 1st Floor,

Mancheswae

Industrial Estate,

Bhubaneswae

6.99 18-Jan-12 18-Jan-12 6.99 Completed.

13

Com

ple

ted

ICZM

/W/W

L/35 Bio Diversity - Construction of

Permanent Campshed at Chinchiri

and Dobandhi inclusive of digging

deep tube well. (

Mangrove Forest Division)

DWL SPMU 47.77 0.079 NCB Post No NA NA

12-D

ec-1

1

24-M

ar-

12

20-J

un-1

2 M/s Shree Balaji

Engicon Pvt. Ltd.,

Jharsuguda

47.77 31-May-13 31-May-13 46.73 Completed.

14

Com

ple

ted

ICZM

/W/W

L/36

Bio Diversity - Campshed at 33

sites ( Rajnagar - 16, Chilika - 8,

Berhampur - 9)

( Several Contract)

DWL DWL 18.16 0.030 NS Post No NA NA

31-J

an-1

2

31-J

ul-12

02

.09

.20

12

to

11

.11

.20

12

Several Bidders 18.1601.03.2013 to

10.05.2013

01.03.2013 to

10.05.201318.16 Completed.

15

Com

ple

ted

ICZM

/W/W

L/34

Furnishing of PMU additional Annex

for establishment of PMU cell.

(Several Contract)

DWL DWL 12.26 0.020 NS Post No NA NA

12-D

ec-1

1

28-A

pr-

13

27

.05

.20

13

to

18

.08

.20

13 M/s Laxmi

Enterprisers,

Jharpada,

Bhubaneswar

12.2626.11.2013 to

17.02.2014

26.11.2013 to

17.02.201412.26 Completed.

16

Com

ple

ted

ICZM

/W/W

L/19 Eco Tourism - Construction of

raised platforms for pitching tents on

them ( 5 nos.) & construction of a

kitchen and Sit outs at Barunai

( Several Contracts)

DWL DWL 10.06 0.017 NS Post No NA NA15-F

eb-1

2

15-A

ug-1

2

20

.09

.20

12

to

20

.11

.20

12

M/s M. R.

Aquatech

B-63, Ashoka

Market,

Bhubabeswar

10.0619.12.2012 to

19.02.2013

19.12.2012 to

19.02.201310.01 Completed.

17

Com

ple

ted

ICZM

/W/W

L/05

Bio Diversity - Digging of tubewell

at 33 temporary shed.( Rajnagar -

16, Chilika - 8, Berhampur - 9)

( Several Contracts)

DWL DWL 62.96 0.104 NS Post No NA NA

01-J

an-1

2

01

-Ja

n-1

3

15

.03

.20

13

to

27

.09

.20

13

Several bidders. 62.9614.09.2013 to

26.03.2014

14.09.2013 to

26.03.201456.55 Completed.

18

Com

ple

ted

ICZM

/W/W

L/37 Bio Diversity - Works activities for

Plantation of mangroves/ Mangrove

associates and other species in 32

EDC Villages in 30.00 hctr. Land.

( Several Contracts )

DWL DWL 11.50 0.019 Com.Proc. Post No NA NA

31-J

an-1

2

31

-Oct-

12

05

.12

.20

12

to

27

.12

.20

12

Several

Community

Contracts.

11.5004.12.2014 to

26.12.2014

04.12.2014 to

26.12.20148.27 Completed.

S.N

o.

PP

Sta

tus

Pa

cka

ge

No

.

Description of Works

Pro

cure

men

t F

or

Pro

cure

men

t B

y

Est

ima

ted

Co

st

(Rs

in l

acs

)

Est

ima

ted

Co

st

(Rs

in U

SD

Mil

lio

n)

Met

ho

d o

f P

rocu

rem

ent

Po

st/P

rio

r R

evie

w S

tatu

s

Do

mes

tic

pre

fere

nce

Su

bm

issi

on

of

Bid

Do

cum

ent

for

Pri

or

Rev

iew

NO

C f

rom

WB

Ori

gin

al

Bid

Op

enin

g D

ate

Rev

ised

Bid

Op

enin

g D

ate

Co

ntr

act

Sig

ned

Da

te

Name & Address

of the awarded

bidder

Contract

Price

(In Lakhs)

Close date as per

Contract

Act

ua

l C

lose

da

te

Act

ua

l p

ay

men

t a

t cl

ose

(IN

R i

n l

acs

)

Remarks Remark 2 Remark 3

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22

Works

19

Com

ple

ted

ICZM

/W/W

L/31

Bio Diversity - Construction of

Monitoring Centre at

Chakradhara Pur, Rajnagar

Tahsil, Kendrapara

DWL SPMU 40.99 0.068 NCB Post No NA NA

12-D

ec-1

1

06

-De

c-1

3

12

-Fe

b-1

4 M/s Shree

Balaji Engicon

Pvt. Ltd.,

Jharsuguda

40.99 09-Nov-14 09-Nov-14 40.89 Completed.

20

Com

ple

ted

ICZM

/W/W

L/33

(A)

Bio Diversity - Construction of

Hostel building for

researchers/Seientist at Gupti with

canteen facilities.

DWL SPMU 136.15 0.225 NCB Post No NA NA

12-M

ar-

12

24-D

ec-1

2

30

-Ma

y-1

3

M/s Shree Balaji

Engicon Pvt. Ltd.,

Jharsuguda

136.15 09-Feb-15 09-Feb-15 135.50 Completed.

21

Com

ple

ted

ICZM

P/W

/OSD

MA

/05

Construction of Cyclone Shelter at

SamalanasiOSDMA SPMU 91.93 0.152 NCB Prior No NA NA

15

-Ju

n-1

1

15

-Ju

n-1

1

22

-No

v-1

1 M/s Shreenibas

Pradhan,

Bhubaneswar

91.93 30-Jun-14 30-Jun-14 91.93 Completed

22

Com

ple

ted

ICZM

P/W

/OSD

MA

/06

Construction of Cyclone Shelter at

MadhurchuanOSDMA SPMU 85.76 0.141 NCB Prior No NA NA

15

-Ju

n-1

1

17

-Ju

n-1

1

22

-No

v-1

1 M/s Shreenibas

Pradhan,

Bhubaneswar

85.76 30-Jun-14 30-Jun-14 85.76 Completed

23

Com

ple

ted

ICZM

/W/O

SDM

A/0

3

Construction of Cyclone Shelter at

KhatiakudiOSDMA SPMU 72.28 0.119 NCB Prior No NA NA

15

-Ju

n-1

1

17

-Ju

n-1

1

22

-No

v-1

1 Rabindra

Prasad Barik,

Bhadrak

72.28 10-Jan-14 10-Jan-14 72.28 Completed

24

Com

ple

ted

ICZM

/W/O

SDM

A/0

4

Construction of Cyclone Shelter at

GurubaiOSDMA SPMU 75.34 0.124 NCB Prior No NA NA

15

-Ju

n-1

1

17

-Ju

n-1

1

22

-No

v-1

1 Rabindra

Prasad Barik,

Bhadrak

75.34 10-Jan-14 10-Jan-14 75.34 Completed

25

Com

ple

ted

ICZM

/W/O

SDM

A/0

7

Construction of Cyclone Shelter Puri

at JamunaOSDMA SPMU 83.2 0.137 NCB Prior No NA NA

15

-Ju

n-1

1

17

-Ju

n-1

1

01

-No

v-1

1 Manoj Kumar

Pattnaik,

Cuttack

83.2 20-Dec-13 20-Dec-13 83.10 Completed

26

Com

ple

ted

ICZM

/W/O

SDM

A/1

0

Construction of Cyclone Shelter at

JharkotaOSDMA SPMU 81.38 0.134 NCB Prior No NA NA

15

-Ju

n-1

1

17

-Ju

n-1

1

01

-No

v-1

1 M/s R.P.

Construction ,

Bhubaneswar

81.38 20-Nov-14 20-Nov-14 81.38 Completed

S.N

o.

PP

Sta

tus

Pa

cka

ge

No

.

Description of Works

Pro

cure

men

t F

or

Pro

cure

men

t B

y

Est

ima

ted

Co

st

(Rs

in l

acs

)

Est

ima

ted

Co

st

(Rs

in U

SD

Mil

lio

n)

Met

ho

d o

f P

rocu

rem

ent

Po

st/P

rio

r R

evie

w S

tatu

s

Do

mes

tic

pre

fere

nce

Su

bm

issi

on

of

Bid

Do

cum

ent

for

Pri

or

Rev

iew

NO

C f

rom

WB

Ori

gin

al

Bid

Op

enin

g D

ate

Rev

ised

Bid

Op

enin

g D

ate

Co

ntr

act

Sig

ned

Da

te

Name & Address

of the awarded

bidder

Contract

Price

(In Lakhs)

Close date as per

Contract

Act

ua

l C

lose

da

te

Act

ua

l p

ay

men

t a

t cl

ose

(IN

R i

n l

acs

)

Remarks Remark 2 Remark 3

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22

Works

27

Com

ple

ted

ICZM

/W/O

SDM

A/1

2

Construction of Cyclone Shelter at

BaghamundaOSDMA SPMU 83.37 0.137 NCB Prior No NA NA

15

-Ju

n-1

1

17

-Ju

n-1

1

01

-No

v-1

1 Sri Tatwa

Prakash Rath,

Puri

83.37 07-Jul-14 07-Jul-14 83.37 Completed

28

Com

ple

ted

ICZM

/W/O

SDM

A/1

3 (I

)

Construction Cyclone Shelter at -

PenthaOSDMA SPMU 85.57 0.141 NCB Post No NA NA

16

-Ja

n-1

2

24-A

ug-1

1

08-D

ec-1

1 Sri Manoj

Kumar Pattnaik,

Cuttack

85.57 11-Dec-13 11-Dec-13 85.56 Completed

29

Com

ple

ted

ICZM

/W/O

SDM

A/0

8

Construction of Cyclone Shelter at

TitipaOSDMA SPMU 87.77 0.145 NCB Prior No NA NA

15

-Ju

n-1

1

17

-Ju

n-1

1

22

-No

v-1

1 Sri Tatwa

Prakash Rath,

Puri

87.77 31-Mar-15 31-Mar-15 82.46 Completed

30

Com

ple

ted

ICZM

/W/O

SDM

A/0

9

Construction of Cyclone Shelte at

Alanda OSDMA SPMU 85.44 0.141 NCB Prior No NA NA

15

-Ju

n-1

1

17

-Ju

n-1

1

01

-No

v-1

1 M/s R.P.

Construction ,

Bhubaneswar

85.44 07-Feb-15 07-Feb-15 85.44 Completed

31

Com

ple

ted

ICZM

/W/O

SDM

A/1

1

Construction of Cyclone shelter at

KhirisahiOSDMA SPMU 89.28 0.147 NCB Prior No NA NA

15

-Ju

n-1

1

01

-No

v-1

1

14

-Fe

b-1

2 M/s R.P.

Construction ,

Bhubaneswar

89.28 07-Feb-15 07-Feb-15 89.28 Completed

32

Com

ple

ted

ICZM

/W/O

SDM

A/1

3 (I

I)

Construction Cyclone Shelter at -

ManjuapalliOSDMA SPMU 91.24 0.150 NCB Post No NA NA

16

-Ja

n-1

2

24-A

ug-1

1

08-D

ec-1

1 Sri Manoranjan

Kar,

Bhubaneswar

91.24 31-Mar-15 31-Mar-15 91.23 Completed

33

Com

ple

ted

ICZM

/W/O

SDM

A/1

3 (I

II) Construction Cyclone Shelter at -

BadatubiOSDMA SPMU 91.61 0.151 NCB Post No NA NA

16

-Ja

n-1

2

24-A

ug-1

2

01-O

ct-

12 Sri Manoranjan

Kar,

Bhubaneswar

91.61 31-Mar-15 31-Mar-15 91.60 Completed

34

Com

ple

ted

ICZM

/W/O

SDM

A/1

4

Construction of Cyclone Shelter at

Petachhela OSDMA SPMU 134.37 0.222 NCB Post No NA NA

03

-Ma

r-1

2

31

-Ja

n-1

3

18

-Ma

y-1

3

M/s Tribhuban

Das,

Bhubaneswar

134.37 15-Nov-14 15-Nov-14 134.37 Completed

S.N

o.

PP

Sta

tus

Pa

cka

ge

No

.

Description of Works

Pro

cure

men

t F

or

Pro

cure

men

t B

y

Est

ima

ted

Co

st

(Rs

in l

acs

)

Est

ima

ted

Co

st

(Rs

in U

SD

Mil

lio

n)

Met

ho

d o

f P

rocu

rem

ent

Po

st/P

rio

r R

evie

w S

tatu

s

Do

mes

tic

pre

fere

nce

Su

bm

issi

on

of

Bid

Do

cum

ent

for

Pri

or

Rev

iew

NO

C f

rom

WB

Ori

gin

al

Bid

Op

enin

g D

ate

Rev

ised

Bid

Op

enin

g D

ate

Co

ntr

act

Sig

ned

Da

te

Name & Address

of the awarded

bidder

Contract

Price

(In Lakhs)

Close date as per

Contract

Act

ua

l C

lose

da

te

Act

ua

l p

ay

men

t a

t cl

ose

(IN

R i

n l

acs

)

Remarks Remark 2 Remark 3

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22

Works

35

Com

ple

ted

ICZM

/W/O

TDC

/

58(I

I) Barkul - Development of the Existing

Water Sports Complex. OTDC SPMU 4.66 0.008 NCB Post No NA NA NA

22

-De

c-1

1

04-A

pr-

12

Sasanka

Sekhar

Samantasingha

r,At/Po-Kantia,

Jatni, Khurda.

4.66 03-Oct-12 03-Oct-12 4.66 Completed.

36

Com

ple

ted

ICZM

/W/O

TDC

/

58(I

)

Barkul - Construction of Touriest

Guide Centre , Handicraft Centre

and food Court with Public

Convinience.

( Several Contracts)

OTDC SPMU 180.60 0.298 NCB Post No NA NA

15

-Ma

y-1

1

22

-De

c-1

1

13

-Ma

r-1

2

M/s Native

Konbac

Bamboo

Products Pvt.

Ltd, Kudal-

416520,

180.60 31-Dec-14 30-Dec-14 177.38 Completed.

37

Com

ple

ted

ICZM

/W/O

TDC

/59

Barkul - Construction of Amusment

Park. OTDC SPMU 118.50 0.195 NCB Post No NA NA

31

-De

c-1

1

26

-Ma

r-1

2

29

-Ma

y-1

2

Sri Shreenibas

Pradhan,

Bhubaneswar

118.50 31-Dec-14 31-Dec-14 118.50 Completed.

38

Com

ple

ted

ICZM

/W/P

M/3

6

Furnishing & Fitting of new ICZMP

Cell.PM PM 5.88 0.010 NS Post No NA NA

20

-Ma

r-1

3

20

-Ma

r-1

3

21

-Ma

r-1

3

Sri Amerendra

Mallik,

Paradeep

5.88 07.11.2013 5.30 Completed. Addition

39

Com

ple

ted

ICZM

P/S

PM

U/W

/02 Furnishing work for

establishment of OCZMA SPMU SPMU 11.49 0.019 NS Post No. NA NA NA NA

05

-Se

p-1

2

M/s Lingaraj

Interior,

Bhubaneswar

11.49 20-Sep-12 30-Oct-12 11.49 Completed.

40

Com

ple

ted

ICZM

P/S

PM

U/W

/01

Furnishing of SPMU additional

Annex for establishment of GIS

cell.

SPMU SPMU 0.69 0.001 NS Post No NA NA

30-A

pr-

13

23

-Oct-

13

11

.11

.20

13

to

25

.12

.20

13

Several Bidders. 0.6910.02.2014 to

24.03.2014

10.02.2014 to

24.03.20140.69 Completed.

41

Com

ple

ted

ICZM

/W/W

R/0

2

Construction of Office cum Store

Room and approach road at

Pentha

WRD SPMU 323.13 0.533 NCB Prior No NA NA NA NA

05-S

ep-1

1

Sri Bijoy Kumar

Rout, 323.13 04-Sep-12 04-Sep-12 323.14 Completed.

42

Com

ple

ted

ICZM

/W/W

R/0

4

Improvement to approach Road

to pentha from PWD road at

Karunti Chhak to Lunia Chhak

under ICZMP at Rajnagar.

WRD SPMU 56.54 0.093 NS Post No NA NA

15

-Ma

y-1

3

15

-No

v-1

3

16

-De

c-1

3M/s M.P

Construction ,

Cuttack

56.54 15-Jun-14 15-Jun-14 56.54 Completed.

43

Com

ple

ted

ICZM

/W/O

TDC

/

63

Development of Jetty area at

RambhaOTDC SPMU 213.73 0.352 NCB Post No NA NA

25

-Ju

n-1

2

25

-Ma

y-1

3

08

-Oct-

13

M/s Shreenibas

Pradhan, BBSR213.73 07-Dec-14 07-Dec-14 213.12 Completed.

S.N

o.

PP

Sta

tus

Pa

cka

ge

No

.

Description of Works

Pro

cure

men

t F

or

Pro

cure

men

t B

y

Est

ima

ted

Co

st

(Rs

in l

acs

)

Est

ima

ted

Co

st

(Rs

in U

SD

Mil

lio

n)

Met

ho

d o

f P

rocu

rem

ent

Po

st/P

rio

r R

evie

w S

tatu

s

Do

mes

tic

pre

fere

nce

Su

bm

issi

on

of

Bid

Do

cum

ent

for

Pri

or

Rev

iew

NO

C f

rom

WB

Ori

gin

al

Bid

Op

enin

g D

ate

Rev

ised

Bid

Op

enin

g D

ate

Co

ntr

act

Sig

ned

Da

te

Name & Address

of the awarded

bidder

Contract

Price

(In Lakhs)

Close date as per

Contract

Act

ua

l C

lose

da

te

Act

ua

l p

ay

men

t a

t cl

ose

(IN

R i

n l

acs

)

Remarks Remark 2 Remark 3

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22

Works

44

Com

ple

ted

ICZM

/W/S

PC

B/5

6 External Eletrification (Supply of

electricity from PPT, Paradeep and

establishment of electrical sub

station, transformer etc.) , OSPCB OSPCB 43.80 0.072 DC Post No NA NA

12

-Ma

y-1

3

20

-De

c-1

3

13

-Ma

r-1

4

PPT, Paradeep 43.80 31-Mar-15 31-Mar-15 43.80 Completed

45

Com

ple

ted

ICZM

/W/S

PC

B/3

0

Construction and fabrication of Air

Emission Treatment (Scrubber)OSPCB OSPCB 4.10 0.007 NS Post No NA NA

01

-Ma

y-1

2

03

-De

c-1

3

16

-Ja

n-1

4

M/s Duttco

Instruments,

Howrah

4.10 07-Feb-15 07-Feb-15 3.08 Completed

46

Aw

ard

ed

ICZM

/W/D

oC

/02

Structural Conservation -

Bhabakundaleswar Temple

Manikapatna and civil work for stone

works.

DoC DoC 87.86 0.145Force

AccountPost No NA NA

16-A

pr-

12

14

-No

v-1

2

16

-Oct-

12

PEA 87.86 30.09.2015 30.09.2015 85.28 Completed

47

Aw

ard

ed

ICZM

/W/D

oC

/03

Structural Conservation-

Harichandi Temple,BaliharichandiDoC DoC 46.10 0.076

Force

AccountPost No NA NA

15

-Ma

y-1

2

15-A

pr-

13

11-A

pr-

13

PEA 46.10 30.09.2015 30.09.2015 46.09 Completed

ICZM

P/W

/Do

C/1

2

Old Building Jambu DoC DoC 35.00 0.058Force

AccountPost Deleted

48

Aw

ard

ed

ICZM

/W/D

oC

/09

Structural Conservation - Bateswar

Temple,KantiagadaDoC DoC 102.46 0.169

Force

AccountPost No NA NA

01-A

pr-

12

01

-Ma

y-1

3

04

-Ma

y-1

3

PEA 102.46 31-Dec-15 - 42.96 Awarded

49

Aw

ard

ed

ICZM

/W/D

oF/

14

Cost of Renovation & Excavation of

Fish Pond (

Several Contracts)

DoF DoF 477.50 0.787 Com.Proc. Post No NA NA

28-F

eb-1

2

28-F

eb-1

2

15.0

3.2

012 to

10.0

6.2

012

Several

Community

Contracts.

477.50 31.03.2016 419.20 Awarded

50

Aw

ard

ed

ICZM

/W/D

oF/

15

Cost of construction of Diary &

Poultry Shed.

( Several Contracts )

DoF DoF 328.90 0.542 Com.Proc. Post No NA NA NA

28-O

ct-

12

11.1

1.2

012 to

15.1

0.2

013

Several

Community

Contracts.

328.90 31.03.2016 - 296.74 Awarded

S.N

o.

PP

Sta

tus

Pa

cka

ge

No

.

Description of Works

Pro

cure

men

t F

or

Pro

cure

men

t B

y

Est

ima

ted

Co

st

(Rs

in l

acs

)

Est

ima

ted

Co

st

(Rs

in U

SD

Mil

lio

n)

Met

ho

d o

f P

rocu

rem

ent

Po

st/P

rio

r R

evie

w S

tatu

s

Do

mes

tic

pre

fere

nce

Su

bm

issi

on

of

Bid

Do

cum

ent

for

Pri

or

Rev

iew

NO

C f

rom

WB

Ori

gin

al

Bid

Op

enin

g D

ate

Rev

ised

Bid

Op

enin

g D

ate

Co

ntr

act

Sig

ned

Da

te

Name & Address

of the awarded

bidder

Contract

Price

(In Lakhs)

Close date as per

Contract

Act

ua

l C

lose

da

te

Act

ua

l p

ay

men

t a

t cl

ose

(IN

R i

n l

acs

)

Remarks Remark 2 Remark 3

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22

Works

51

Aw

ard

ed

ICZM

/W/D

oF/

16(I

)

Cost of construction of drying

platform & stores.

( Several Contracts)DoF DoF 111.00 0.183 Com.Proc. Post No NA NA

28-F

eb-1

2

28-F

eb-1

2

17.0

3.2

012 to

28.0

2.2

013

Several

Community

Contracts.

111.00 31.03.2016 - 107.50 Awarded

52

Aw

ard

ed

ICZM

/W/D

oF/

16(I

I)

Cost of Construction of Stores for

Cold Chain Marketing and other

allied activity.

( Several Contracts)

DoF DoF 144.00 0.237 Com.Proc. Post No NA NA NA

28-F

eb-1

2

17.0

3.2

012 to 2

8.0

2.2

013

Several

Community

Contracts.

144.00 31.03.2016 - 142.89 Awarded Addition

58

Aw

ard

ed

ICZM

/W/W

L/46

Bio Diversity - Survey and

demarcation, cost of inputs, fish

bone channel digging, Nursery

raising, collection of seeds and

seedling, replacement of seedling in

case of mortality for plantation of

mangroves 138 hcts. Land. (Several

Contracts)

DWL DWL 60.00 0.099 NS Post No NA NA

01

-Ma

y-1

3

01

-Ma

y-1

3

14

.07

.20

13

to

11

.09

.20

13 Sri Kabi Charan

Behera,

Kendrapara. for

Fish bone

channel Digging,

Nursery raising

and Mangrove

plantation. 3

years

60.0013.07.2016 to

30.11.2016- 59.66 Awarded

Completed in 46.6 Ha. 3rd

year maintenance is going

on.

59

Aw

ard

ed

ICZM

/W/W

L/16

Eco Tourism - Renovation of

Hukitola Building at HukitolaDWL SPMU 103.98 0.171 DC Prior No NA NA

31-M

ar-

12

30

-De

c-1

3

28

-Ju

n-1

4

M/s INTACH,

Bhubaneswar103.98 27-Dec-15 - 36.60 Awarded

Work started from 12th Jan

2015. Lime plaster, Iron joint

work & wood work is under

process

60

Aw

ard

ed

ICZM

/W/S

PC

B/5

3

Construction of Laboratory Building

(Includes Civil Works, Electrical,

Water Supply & Sanitation, Site

Development, Roads, Boundary

Wall, ), Rain Water Harvesting

OSPCB SPMU 326.84 0.539 NCB Post No NA NA1

6-N

ov-1

2

29

-Oct-

11

26

.11

.20

11

M/s Bhagaban

Mohapatra

Construction and

Engineering Pvt.

Ltd, Madhuban,

HIG-27, Gaurav

Vihar, Jagannath

326.84 31.12.2015 31.03.2016 265.84 Awarded Work in progress

61

Aw

ard

ed

ICZM

/W/S

PC

B/5

5

Package Sewage Treatment

Plant (PSTP) & Packaged

Reverse Osmosis System.

(Several Contracts)

OSPCB OSPCB 18.68 0.031 NS Post No NA NA

15-A

ug-1

3

03

-De

c-1

3

16

.01

.20

14

Several bidders. 18.68 30.11.2015 31.03.2016 6.15 Completed

62

Aw

ard

ed

ICZM

/W/S

PC

B/5

6(I

I)

Internal Illumination (Fixtures &

Fittings) as per recommendations of

Green Consultant.

OSPCB OSPCB 13.87 0.023 NS Post No NA NA

12

-Ma

y-1

3

20

-De

c-1

3

17

-Ja

n-1

4

G-one Energy

control, BBSR13.87 30.11.2015 29.02.2016 6.93 Awarded Addition Work in progress

S.N

o.

PP

Sta

tus

Pa

cka

ge

No

.

Description of Works

Pro

cure

men

t F

or

Pro

cure

men

t B

y

Est

ima

ted

Co

st

(Rs

in l

acs

)

Est

ima

ted

Co

st

(Rs

in U

SD

Mil

lio

n)

Met

ho

d o

f P

rocu

rem

ent

Po

st/P

rio

r R

evie

w S

tatu

s

Do

mes

tic

pre

fere

nce

Su

bm

issi

on

of

Bid

Do

cum

ent

for

Pri

or

Rev

iew

NO

C f

rom

WB

Ori

gin

al

Bid

Op

enin

g D

ate

Rev

ised

Bid

Op

enin

g D

ate

Co

ntr

act

Sig

ned

Da

te

Name & Address

of the awarded

bidder

Contract

Price

(In Lakhs)

Close date as per

Contract

Act

ua

l C

lose

da

te

Act

ua

l p

ay

men

t a

t cl

ose

(IN

R i

n l

acs

)

Remarks Remark 2 Remark 3

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22

Works

63

Aw

ard

ed

ICZM

/W/S

PC

B/5

9

Additional furnishing of

Building(Several Contracts)OSPCB OSPCB 22.17 0.037 NS Post No NA NA

25

-Ma

y-1

3

20

-De

c-1

3

22

.05

.20

14

M/s. Kanika

Furniture Pvt.Ltd22.17 30.11.2015 29.02.2016 0.00 Awarded Work in progress

64

Aw

ard

ed

ICZM

/W/S

PC

B/6

0

External Illumination (Fittings &

Fixtures) of CMCE building at

Paradeep.

OSPCB OSPCB 9.99 0.016 NS Post No NA NA

25-A

ug-1

3

20

-De

c-1

3

22

-Ja

n-1

4

M/s Wire house,

Bhubaneswar9.99 30.11.2015 30.11.2015 5.99 Awarded Work in progress

65

Aw

ard

ed

ICZM

/W/O

TDC

/64(

I)

Barkul - Development of the Water

Sports Complex.

(Electrification Work)

OTDC SPMU 38.06 0.063 NCB Post No NA NA

16

-Ju

n-1

2

03

-Fe

b-1

4

04

-Ma

r-1

4 M/s Jyotin

Kumar

Sahoo.,

Bhubaneswar

38.06 03.09.2015 30.09.2015 37.38 Completed.

66

Aw

ard

ed

ICZM

/W/O

TDC

/56

Sipakuda(Banamalipur) -

Construction of Food Courts, Public

Conveniance , Parking including

Waiting Hall, toilets, First Aid Facility.

OTDC SPMU 257.89 0.425 NCB Post No NA NA

28

-Fe

b-1

2

08

-Ju

n-1

2

01

-Fe

b-1

3

Sri Shreenibas

Pradhan,

Bhubaneswar

257.89 30-Sep-15 30-Sep-15 257.87 Completed.

67

Aw

ard

ed

ICZM

/W/O

TDC

/64(

II)

Development of Ecotourism

Complex at Barkul.OTDC SPMU 950.90 1.568 NCB Post No NA NA

16

-Ju

n-1

2

15

-Ju

n-1

3

13

-Se

p-1

3

M/s Balajee

Engicon Pvt.

Ltd.,

Belpahar,

Jharsuguda

950.90 12.11.2015 12.01.2016 874.42 Awarded

Visitors Management

system work is in

progress

68

Aw

ard

ed

ICZM

/W/P

M/3

5

Construction of Boundry Wall around

the SWAM Project.PM SPMU 229.46 0.378 NCB Post No NA NA

30-A

pr-

13

05

-No

v-1

3

24

.06

.20

15

M/s Tribhuban

Das, Paradeep229.46 24.12.2015 24.12.2015 18.68 Awarded

69

Aw

ard

ed

ICZM

/W/W

R/0

1

Installation of Geo-textile tube

embankment with Toe mount at

Village Pentha for Protection

against Coastal erosion at

Pentha.

WRD SPMU 3295.93 5.435 NCB Prior No NA NA

15-A

pr-

12

30

-No

v-1

2

24

-Ju

l-1

3

M/s Garware

Wall Ropes

Ltd., Plot No.

11, Block No. D-

1, MIDC,

Chinchward,

3295.93 31-Dec-15 - 1637.92 AwardedEOT sanctioned up to

31.03.2016

70

Aw

ard

ed

ICZM

P/S

PM

U/W

/0

3

Plantation of mangroves, digging

of fishbone channel, fencing

through Community with input

cost - Post Phailin avtivity. (

Several Contracts )

F & E

Dept SPMU 100.00 0.165 Com.Proc. Post No NA NA NA N

A

15

-Ja

n-1

5 Several

Community

Contracts.

100.00 31-Dec-16 - 15.45 Awarded Addition

72

On

go

ing

ICZM

/W/D

oC

/08

Peripheral Development -

Harichandi Temple, BaliharichandiDoC SPMU 243.69 0.402 NCB Post No NA NA

01

-Ju

n-1

2

02

-Ja

n-1

4

15

.11

.20

15

243.69 15.10.2016 In Progress

Contract will be signed

after getting NOC from

Endorsement

Commissioner

S.N

o.

PP

Sta

tus

Pa

cka

ge

No

.

Description of Works

Pro

cure

men

t F

or

Pro

cure

men

t B

y

Est

ima

ted

Co

st

(Rs

in l

acs

)

Est

ima

ted

Co

st

(Rs

in U

SD

Mil

lio

n)

Met

ho

d o

f P

rocu

rem

ent

Po

st/P

rio

r R

evie

w S

tatu

s

Do

mes

tic

pre

fere

nce

Su

bm

issi

on

of

Bid

Do

cum

ent

for

Pri

or

Rev

iew

NO

C f

rom

WB

Ori

gin

al

Bid

Op

enin

g D

ate

Rev

ised

Bid

Op

enin

g D

ate

Co

ntr

act

Sig

ned

Da

te

Name & Address

of the awarded

bidder

Contract

Price

(In Lakhs)

Close date as per

Contract

Act

ua

l C

lose

da

te

Act

ua

l p

ay

men

t a

t cl

ose

(IN

R i

n l

acs

)

Remarks Remark 2 Remark 3

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22

Works

73

On

go

ing

ICZM

/W/D

oC

/06

Peripheral Development -

Bhabakundaleswar Temple

Manikapatna

DoC SPMU 81.01 0.134 NCB Post No NA NA

28

-Ma

y-1

3

02

-Ja

n-1

4

15

.11

.20

15

81.01 15.08.2016 In Progress

Contract will be signed

after getting NOC from

Endorsement

Commissioner

74

On

go

ing

ICZM

/W/D

oC

/21

Peripheral Development - Bateswar

Temple, KantiagadaDoC SPMU 60.00 0.099 NCB Post No NA NA

01

-Ma

y-1

2

15

.12

.20

15

15

.01

.20

16

60.00 15.12.2016 In ProgressTender process

completed

75

On

go

ing

ICZM

/W/D

oC

/23

Peripheral Development -

Jagannath Temple, PenthaDoC SPMU 117.29 0.193 NCB Post No NA NA

01

-Ma

y-1

2

02

-Ja

n-1

4

15

.11

.20

15

117.29 15.08.2016 In Progress

Contract will be signed

after getting NOC from

Endorsement

Commissioner

76

On

go

ing

ICZM

/W/D

oC

/07

Peripheral Development -

Hariharadev Temple, NairiDoC SPMU 107.55 0.177 NCB Post No NA NA

02-A

pr-

12

15

.12

.20

15

15

.01

.20

16

107.55 15.12.2016 In ProgressTender process

completed

ICZM

P/W

/Do

C/0

5

Peripheral Development - Ganjam

fort , GanjamDoC SPMU 49.65 0.082 NCB Post No Deleted

ICZM

P/W

/Do

C/2

2

Peripheral Development - British

Cementry , GanjamDoC SPMU 10.00 0.016 NS Post No Deleted

ICZM

P/W

/Do

C/2

4

Peripheral Development - Old

Building, JambuDoC SPMU 10.00 0.016 NS Post No Deleted

ICZM

P/W

/Do

C/2

5

Illumination work, Ganjam fort ,

GanjamDoC SPMU 7.90 0.013 NS Post No Deleted

ICZM

P/W

/Do

C/3

0

Illumination work, British

Cementry, GanjamDoC SPMU 5.00 0.008 NS Post No Deleted

S.N

o.

PP

Sta

tus

Pa

cka

ge

No

.

Description of Works

Pro

cure

men

t F

or

Pro

cure

men

t B

y

Est

ima

ted

Co

st

(Rs

in l

acs

)

Est

ima

ted

Co

st

(Rs

in U

SD

Mil

lio

n)

Met

ho

d o

f P

rocu

rem

ent

Po

st/P

rio

r R

evie

w S

tatu

s

Do

mes

tic

pre

fere

nce

Su

bm

issi

on

of

Bid

Do

cum

ent

for

Pri

or

Rev

iew

NO

C f

rom

WB

Ori

gin

al

Bid

Op

enin

g D

ate

Rev

ised

Bid

Op

enin

g D

ate

Co

ntr

act

Sig

ned

Da

te

Name & Address

of the awarded

bidder

Contract

Price

(In Lakhs)

Close date as per

Contract

Act

ua

l C

lose

da

te

Act

ua

l p

ay

men

t a

t cl

ose

(IN

R i

n l

acs

)

Remarks Remark 2 Remark 3

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22

Works

77

On

go

ing

ICZM

/W/D

oC

/13

Chemical Conservation - Ganjam

Fort GanjamDoC SPMU 85.61 0.141 DC Prior No

01-A

pr-

13

31-A

ug-1

5

15

.11

.20

15

85.61 15.05.2016 In ProgressA.A. is awaited from

SPMU

78

On

go

ing

ICZM

/W/D

oC

/14

Chemical Conservation -

Bhabakundaleswar Temple

Manikapatna

DoC DoC 7.58 0.013 DC Post No NA NA

01

-Ma

y-1

3

15-S

ep-1

4

15

.11

.20

15

7.58 15.05.2016 In ProgressContract will be signed

during the first week of

Jan'16

79

On

go

ing

ICZM

/W/D

oC

/15

Chemical Conservation -

Harichandi Temple, BaliharichandiDoC DoC 2.79 0.005 DC Post No NA NA

01-A

pr-

13

15-S

ep-1

4

15

.11

.20

15

2.79 15.05.2016 In ProgressContract will be signed

during the first week of

Jan'16

80

On

go

ing

ICZM

/W/D

oC

/16

Chemical Conservation - Bateswar

Temple, KantiagadaDoC DoC 2.40 0.004 DC Post No NA NA

01

-Ma

r-1

3

31-A

ug-1

5

15

.11

.20

15

2.40 15.05.2016 In ProgressA.A. is awaited from

SPMU

ICZM

/W/D

oC

/18

Chemical Conservation - British

Cementry, GanjamDoC DoC 10.00 0.016 DC Post No Deleted

ICZM

/W/D

oC

/20

Chemical Conservation - Old

building JambuDoC DoC 10.00 0.016 DC Post No Deleted

81

On

go

ing

ICZM

/W/D

oC

/17

Chemical Conservation -

Hariharadev Temple, NairiDoC DoC 9.98 0.016 DC Post No NA NA

01

-Ma

r-1

3

15-S

ep-1

4

15

.11

.20

15

9.98 15.05.2016 In ProgressContract will be signed

during the first week of

Jan'16

84

On

go

ing

ICZM

/W/W

L/46

(II)

Bio Diversity - 2nd Phase for

digging of fish bone channel,

and creation and maintainance of

fishbone channel , Fencing and

plantation of Mangrove in 138

hcts. Land. (Several Contracts)

DWL DWL 70.00 0.115 NS Post No NA NA

15

-No

v-1

4

15

-No

v-1

4

15

.12

.20

14

to

11

.01

.20

15

Several Contracts 70.00

14

.12

.20

15

to

10

.01

.20

17

- 13.96 Awarded Addition

Plantation work

completed & maintenance

under progress.

87

On

go

ing

ICZM

/W/P

M/3

4

Establishment of Solid Waste

Management Project at Paradeep.PM SPMU 3700.00 6.102 NCB Prior No NA NA

31

-Ma

y-1

3

30

.11

.20

15

30

.01

.20

16

3700.00 30.01.2017 - In Progress

S.N

o.

PP

Sta

tus

Pa

cka

ge

No

.

Description of Works

Pro

cure

men

t F

or

Pro

cure

men

t B

y

Est

ima

ted

Co

st

(Rs

in l

acs

)

Est

ima

ted

Co

st

(Rs

in U

SD

Mil

lio

n)

Met

ho

d o

f P

rocu

rem

ent

Po

st/P

rio

r R

evie

w S

tatu

s

Do

mes

tic

pre

fere

nce

Su

bm

issi

on

of

Bid

Do

cum

ent

for

Pri

or

Rev

iew

NO

C f

rom

WB

Ori

gin

al

Bid

Op

enin

g D

ate

Rev

ised

Bid

Op

enin

g D

ate

Co

ntr

act

Sig

ned

Da

te

Name & Address

of the awarded

bidder

Contract

Price

(In Lakhs)

Close date as per

Contract

Act

ua

l C

lose

da

te

Act

ua

l p

ay

men

t a

t cl

ose

(IN

R i

n l

acs

)

Remarks Remark 2 Remark 3

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22

Works

88

Ye

t to

Sta

rt

ICZM

/W/C

DA

/05

Construction of New Scientist

hostel for Researcher's in WRTC

Barkul

CDA SPMU 200.00 0.330 NCB Post No NA NA

30

.12

.20

15

30

.12

.20

15

15

.03

.20

16

200.00 15.06.2017 _ In Progress Addition

89

Ye

t to

Sta

rt

ICZM

P/W

/Do

F/17

Construction of Infrastructure for

hygienic dryfish including central

processing, packaging and Storage

units.

(Several Packages)

DoF DoF 251.00 0.414 NS Post NA NA NA

15

.12

.20

15

15

.01

.20

16

251.00 15.07.2017 - Pending Addition

90

Ye

t to

Sta

rt

ICZM

/W/W

L/20

Eco Tourism - Construction of

Interpretation Centre, Museum and

barrack for staff for interpretation

centre, Tourist Complex at Koilipur

with provision of drinking water, solar

lights, etc.

( Several Contracts)

DWL SPMU 500.00 0.825 NCB Post No NA NA

01-M

ar-

12

10

.01

.20

16

25

.02

.20

16

500.00 25.08.2017 - In ProgressEstimate has been sent

for technical sanction.

91

Ye

t to

Sta

rt

ICZM

/W/W

L/48

Additional work of Hatchery and

rearing complex of crocodile and

Laboratory at Dangamal

DWL DWL 12.00 0.020 NS Post No NA NA

15

-No

v-1

4

10

.01

.20

16

25

.02

.20

16

12.00 25.08.2016 - Pending Addition

Administrative approval

accorded from SPMU

93

Ye

t to

Sta

rt

ICZM

P/F

&E

Dep

t./W

/01

Mangrove Plantation on identified

area along the Coast by F & E Dept. -

Post Phailin activity.

F & E

Dept

F & E

Dept.310.00 0.511 Com.Proc. Post No NA NA N

A

15

.12

.20

15

15

.01

.20

16

Several bidders 310.00 15.10.2017 - Pending Addition

ICZM

/W/D

oI/

54(1

)

Construction of Boundary wall/

Fencing around the land for

establishment of TPC

MSME MSME 4.00 0.007 NS Post No Deleted

ICZM

/W/D

oI/

54

Construction of building for

establishment of TPC at 2 locationMSME MSME 120.00 0.198 NCB Post No Deleted

ICZM

/W/W

L/28

Eco Tourism - Construction of

Floating Jetty at PurunabandhaDWL DWL 5.00 0.008 NS Post No Deleted

S.N

o.

PP

Sta

tus

Pa

cka

ge

No

.

Description of Works

Pro

cure

men

t F

or

Pro

cure

men

t B

y

Est

ima

ted

Co

st

(Rs

in l

acs

)

Est

ima

ted

Co

st

(Rs

in U

SD

Mil

lio

n)

Met

ho

d o

f P

rocu

rem

ent

Po

st/P

rio

r R

evie

w S

tatu

s

Do

mes

tic

pre

fere

nce

Su

bm

issi

on

of

Bid

Do

cum

ent

for

Pri

or

Rev

iew

NO

C f

rom

WB

Ori

gin

al

Bid

Op

enin

g D

ate

Rev

ised

Bid

Op

enin

g D

ate

Co

ntr

act

Sig

ned

Da

te

Name & Address

of the awarded

bidder

Contract

Price

(In Lakhs)

Close date as per

Contract

Act

ua

l C

lose

da

te

Act

ua

l p

ay

men

t a

t cl

ose

(IN

R i

n l

acs

)

Remarks Remark 2 Remark 3

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22

Works

ICZM

/W/W

L/17

Eco Tourism - Construction of a

Jetty cement concrete at Hokitota

(several contracts)

DWL DWL 20.00 0.033 NS Post No Deleted

ICZM

/W/W

L/26

Eco Tourism - Construction of

building for museum of local fauna at

Koilipur, Kanika Tahasil, Kendrapara

DWL SPMU 70.00 0.115 NCB Post No Deleted

ICZM

/W/W

L/29 Eco Tourism - Construction of

monitoring & interpretetion centre

and Barracks for staff and visiting

Officials of Interpretation centre at

New Baxipalli

DWL SPMU 213.00 0.351 NCB Post No Deleted

ICZM

/W/W

L/40

Eco Tourism - Digging of channels

for easy approach for landing of

boats for ecotourism purpose at

Nalanana

DWL DWL 10.00 0.016 NS Post No Deleted

ICZM

/W/W

L/33

(B)

Bio Diversity - Furnishing and fittings

(works) of Interpretation Centre at

koilipur, Rajnagar, (several

Contracts)

DWL DWL 10.00 0.016 NS Post No Deleted

ICZM

/W/O

TDC

/55

New mouth Chilika - Construction of

food court, kiosks, public

conveyance & sit outs.

OTDC SPMU 230.00 0.379 NCB Post No Deleted

ICZM

/W/O

TDC

/57

Satapada - Construction of

Handicraft center & public

conveyance

OTDC SPMU 150.00 0.247 NCB Post No Deleted

ICZM

/W/O

TDC

/66

Islands - Construction of nature trail,

water

supply,plantation,pathway,public

conveyance centre, food court etc. at

Kalijai & Chheliakuda

OTDC SPMU 100.00 0.165 NCB Post No Deleted

ICZM

/W/O

TDC

/62

Tampara lake - Construction of Eco

Park, upgradation and construction

of jetty, public conveyance, cottage,

resturant, landscaping

OTDC SPMU 310.00 0.511 NCB Post No Deleted

S.N

o.

PP

Sta

tus

Pa

cka

ge

No

.

Description of Works

Pro

cure

men

t F

or

Pro

cure

men

t B

y

Est

ima

ted

Co

st

(Rs

in l

acs

)

Est

ima

ted

Co

st

(Rs

in U

SD

Mil

lio

n)

Met

ho

d o

f P

rocu

rem

ent

Po

st/P

rio

r R

evie

w S

tatu

s

Do

mes

tic

pre

fere

nce

Su

bm

issi

on

of

Bid

Do

cum

ent

for

Pri

or

Rev

iew

NO

C f

rom

WB

Ori

gin

al

Bid

Op

enin

g D

ate

Rev

ised

Bid

Op

enin

g D

ate

Co

ntr

act

Sig

ned

Da

te

Name & Address

of the awarded

bidder

Contract

Price

(In Lakhs)

Close date as per

Contract

Act

ua

l C

lose

da

te

Act

ua

l p

ay

men

t a

t cl

ose

(IN

R i

n l

acs

)

Remarks Remark 2 Remark 3

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22

Works

ICZM

P/S

PM

U/W

/0

3

Bio Diversity - Cost of work

components of plantation of

mangrove through NGO for 500

hctr land (several contracts)

SPMU SPMU 100.00 0.165Com.

Proc.Post No Deleted

94

ICZM

/W/W

R/0

3

Plantation (involving Community

at Field level)WRD WRD 3.84 0.006

Com.

Proc.Post No NA NA

01

.10

.20

15

01

.01

.20

16

28

.02

.20

16

3.84 30.06.2017 Pending

ICZM

/W/D

oC

/19

Chemical Conservation -

Jagannath Temple PenthaDoC DoC 10.00 0.016 DC Post No Deleted

On

go

ing

ICZM

/W/D

oI/

31(a

)

Construction of Common Facility

Centre at GolaMSME MSME 35.05 0.058 NS Post No NA NA

16

-Ma

y-1

2

28

-No

v-1

3

07

-Fe

b-1

4 Sri Manoj

Kumar Patra,

Bhubaneswar

35.05 15.11.2015 31.01.2016 23.37 Awarded Work in progress

On

go

ing

ICZM

/W/D

oI/

31(b

)

Construction of Common Facility

Centre at ParbatipurMSME MSME 42.80 0.071 NS Post No NA NA

16

-Ma

y-1

2

30-S

ep-1

5

15

-Oct-

15

Ranjit ku Swain 42.80 15.04.2016 29.03.2016 AwardedContract Awarded & work

in progress

On

go

ing

ICZM

/W/D

oI/

31(c

)

Construction of Common Facility

Centre at GangadharpurMSME MSME 43.24 0.071 NS Post No NA NA

16

-Ma

y-1

2

30-S

ep-1

5

15

.11

.20

15

Ranjit ku Swain 43.24 15.05.2016 26.05.2016 AwardedContract Awarded & work

in progress

Aw

ard

ed

ICZM

/W/W

L/43

(a)

Eco Tourism - Construction of

departmental Camp(building) at

Rambharatia at Chilika Coast.

DWL DWL 31.56 0.052 NS Post No NA NA

28-F

eb-1

2

15

-Oct-

13

04

-De

c-1

3

M/s Manoj

Kumar Patra,

Bhubaneswar

31.56 30.04.2015 30.04.2015 28.73 Completed

Aw

ard

ed

ICZM

/W/W

L/43

(b)

Eco Tourism - Construction of

departmental Camp(building) at

Berhampura at Chilika Coast.

DWL DWL 31.56 0.052 NS Post No NA NA

28-F

eb-1

2

15

-Oct-

13

04

-De

c-1

3

M/s Manoj

Kumar Patra,

Bhubaneswar

31.56 31.03.2016 - 22.98 Awarded

Aw

ard

ed

ICZM

/W/W

L/43

( c)

Eco Tourism - Construction of

departmental Camp(building) at

Khirsahi at Chilika Coast

DWL DWL 31.56 0.052 NS Post No NA NA

28-F

eb-1

2

15

-Oct-

13

04

-De

c-1

3

M/s Manoj

Kumar Patra,

Bhubaneswar

31.56 31.03.2016 - 27.83 Awarded

S.N

o.

PP

Sta

tus

Pa

cka

ge

No

.

Description of Works

Pro

cure

men

t F

or

Pro

cure

men

t B

y

Est

ima

ted

Co

st

(Rs

in l

acs

)

Est

ima

ted

Co

st

(Rs

in U

SD

Mil

lio

n)

Met

ho

d o

f P

rocu

rem

ent

Po

st/P

rio

r R

evie

w S

tatu

s

Do

mes

tic

pre

fere

nce

Su

bm

issi

on

of

Bid

Do

cum

ent

for

Pri

or

Rev

iew

NO

C f

rom

WB

Ori

gin

al

Bid

Op

enin

g D

ate

Rev

ised

Bid

Op

enin

g D

ate

Co

ntr

act

Sig

ned

Da

te

Name & Address

of the awarded

bidder

Contract

Price

(In Lakhs)

Close date as per

Contract

Act

ua

l C

lose

da

te

Act

ua

l p

ay

men

t a

t cl

ose

(IN

R i

n l

acs

)

Remarks Remark 2 Remark 3

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22

Works

Aw

ard

ed

ICZM

/W/W

L/43

(d)

Eco Tourism - Construction of

departmental Camp(building) at

Balianta at Chilika Coast

DWL DWL 31.56 0.052 NS Post No NA NA

28-F

eb-1

2

15

-Oct-

13

04

-De

c-1

3

M/s Manoj

Kumar Patra,

Bhubaneswar

31.56 31.03.2016 - 12.62 Awarded1.ground Floor roof

casting

completed.Internal

plastering work in

progress.

Aw

ard

ed

ICZM

/W/W

L/43

(e)

Eco Tourism - Construction of

departmental Camp(building) at

Pokhrikuda at Chilika Coast

DWL DWL 31.56 0.052 NS Post No NA NA

28-F

eb-1

2

15

-Oct-

13

04

-De

c-1

3

M/s Manoj

Kumar Patra,

Bhubaneswar

31.56 28.02.2016 - 12.62 Awarded

1.ground Floor roof

casting

completed.Internal

plastering work in

progress.

On

go

ing

ICZM

/W/O

TDC

/60(

a)

Construction of Public Convenience ,

Food Court , Pathway & Parking at

Gabakunda

OTDC SPMU 367.95 0.607 NCB Post No NA NA

01

-Ma

y-1

2

03

-Fe

b-1

4

10

.09

.20

15

Srinibas

Pradhan367.95 09.08.2016 09.08.2016 Awarded work started

On

go

ing

ICZM

/W/O

TDC

/60(

c )

Construction of Public Convenience ,

Food Court , Pathway & Parking at

Mirjapur.

OTDC SPMU 271.86 0.448 NCB Post No NA NA

01

-Ma

y-1

2

21

-Ma

r-1

4

28

.09

.20

15

GC Das 271.86 27.08.2016 27.08.2016 Awarded work started

Ye

t to

Sta

rt

ICZM

/W/O

TDC

/61

Construction of Public Convenience ,

Food Court , Pathway & Parking at

Gangadharpur.

OTDC SPMU 150.00 0.247 NCB Post No NA NA NA

15

.12

.20

15

15

.02

.20

16

150.00 15.02.2017 - In ProgressTechnical santioned estimate has

been sent to SPMU for bidding