Working Group 4B: Network Timing Single Source Risk Reduction Status Update September 21, 2015 Jennifer A. Manner, Chair

Upload: nathan-carpenter

Post on 18-Jan-2016

212 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Working Group 4B: Network Timing Single Source Risk Reduction Status Update September 21, 2015 Jennifer A. Manner, Chair

Working Group 4B: Network Timing Single Source Risk Reduction

Status Update

September 21, 2015

Jennifer A. Manner, Chair

Page 2: Working Group 4B: Network Timing Single Source Risk Reduction Status Update September 21, 2015 Jennifer A. Manner, Chair

2

WG4B Objectives Working Group Description:

• Synchronized network timing (time of day, standard time intervals, standard frequencies, and corrections) is a crucial element of a communications network management. However, given the high dependence of the communications sector on GNSS, the Commission is interested in identifying ways to increase the resilience of communications networks by exploring complementary or backup solutions that could be employed to offer similar time precision as GNSS in the event that GNSS signals are lost. These solutions need to be independent of GNSS to reduce risk and solutions need to be employed across the sector.

Deliverables:

• The Working Group will make recommendations on acquiring and implementing back-up precision timing solutions that are independent of GPS.– Define the problem, including vulnerability of the GNSS systems, and what is the impact of the result of any failure

– Define required characteristics for back-up solution

– Identify what technologies are possible to solve the problem and the pros and cons of each

Page 3: Working Group 4B: Network Timing Single Source Risk Reduction Status Update September 21, 2015 Jennifer A. Manner, Chair

3

WGX MembersAhmad Armand, T-MobileDennis Coleman, CenturyLinkLee Cosart, Microsemi (ATIS)Bill Coward, CoxAlexander Gerdenitsch, EchoStarEthan Lucarelli, Iridium (Wiley Rein)Jennifer A. Manner, EchoStar (Chairman)Chris Oberg, VerizonBill Ryan, DHSRob Seastrom, TWCGeorge Turetsky, Intel (ATIS)Joan Vaughn, T-MobileSameer Vuyyuru, TCS

Page 4: Working Group 4B: Network Timing Single Source Risk Reduction Status Update September 21, 2015 Jennifer A. Manner, Chair

4

• WG4B draws on a wide range of expertise on the issue of timing– Technical, operational, legal, process expertise– Across all technologies – wireline, terrestrial, space-based

• We have defined our deliverables and beginning work right away on our first deliverable:– Defining the problem

• This work will ensure we are all in sync on what we are seeking to solve

• Next we move to defining the requirements for the solutions we are evaluating

WG4B Status

Page 5: Working Group 4B: Network Timing Single Source Risk Reduction Status Update September 21, 2015 Jennifer A. Manner, Chair

5

• Bi-weekly conference calls with members• Date February 2016: Submission of Draft WG4B

Report 1 • June 2016: Submission of Draft WG4B Report 2• Date December 2016: Submission of Final WG4B 1

Report • March 2017: Submission of Final WG4B Report 2

WG4B Schedule

Page 6: Working Group 4B: Network Timing Single Source Risk Reduction Status Update September 21, 2015 Jennifer A. Manner, Chair

6

Next Steps

• Begin bi-weekly calls• We are identifying experts for each deliverable• Research issues and solutions for analysis by WG4B• Provide periodic status updates to Steering

Committee and Council