work samples from kasia wlusz
DESCRIPTION
An abbreviated portfolio.TRANSCRIPT
KASIA
N1
A-113.00
1
A-115.00
1
A-114.00
1/8" = 1'-0"1 EAST
GROUND FLOORPLAN
0' - 2 7/8"
1-A FLOOR PLAN12' - 2 7/8"
3rd FLOOR PLAN24' - 2 7/8"
4th FLOOR PLAN38' - 2 7/8"
5th FLOOR PLAN52' - 2 7/8"
6th FLOOR PLAN66' - 2 7/8"
7th FLOOR PLAN80' - 2 7/8"
8th FLOOR PLAN94' - 2 7/8"
9th FLOOR PLAN108' - 2 7/8"
10th FLOOR PLAN122' - 2 7/8"
11th FLOOR PLAN136' - 2 7/8"
12th FLOOR PLAN150' - 2 7/8"
Roof164' - 2 7/8"
1Y176' - 2 7/8"
NO. DATE COMMENT
CONSTRUCTION OF:The Eco-Life Center
501 WEST 17 STREETNEW YORK, NY 10011
DATE:
JOB #: 00101
DWN BY: CHKD BY:
SHEET:
1 10/07/2013 SCHEMATIC DESIGN SET
PROJEKT SUKA
2 11/07/2013 DESIGN DEVELOPMENT SET
3 12/10/2013 CONSTRUCTION DOCUMENT SET
CONSULTANTS:
CODE/ZONING BRIAN GILLEN
40 Worth Street Suite 800New York, NY [email protected]
LANDSCAPE/SHOPPING
TAEWOOK CHA
Supermass Studio12-16 Vestry Street 5th FloorNew York NY [email protected]
STRUCTURALENGINEERS
CIRO CUONO
Cuono Engineering PLLC16 King Street Suite 3-2Port Chester, NY 10573914-305-5679
DOMINIC PILLA
Dominick R. Pilla Associates PCCONSULTING ENGINEERING +ARCHITECTURE23 Depew AvenueNyack, New York 10960845.727.7793Email: [email protected]
RETAILCONSTRUCTION
MICHAEL RATNER
1025 Fifth AvenueNew York, NY 10028718-344-5000
MECHANICALENGINEER
AARON MARTIN
AltieriSeborWieber LLC31 Knight StreetNorwalk, CT [email protected]
LIGHTINGDESIGN
PEIHENG TSAI
PHT Lighting Design401 Broadway Suite 1402New York, NY 10013917-957-4180
SUSTAINABILITY JASON VOLLEN
RPI/CASE14 Wall Street 24th FloorNew York, NY [email protected]
BUILDINGENVELOPE
WALTER MARTINEZ
Israel Berger and Associates360 Park Avenue South,15th Floor212-689-5389
COSTESTIMATING
DAVE MILLER
Triton Construction303 Fifth Avenue, Suite1807New York, NY [email protected]
SPECIFICATIONS JEFF FEINGOLD
Adamson AssociatesArchitects401 Wellington Street West,3rd FloorToronto, Ontario M5V 1E7 [email protected]
JILL BUNYEA & KASIA WILUSZ
12/10/13
JB & KW -------
A-302.000' 4' 8' 16'
scale: 1/8" = 1'
N
01
A-502
01
A-504
01
A-501
RETACTABLE WALL
TOP PLAN +10’ 1/4” : 1’
WILUSZ
2015
Work
Samples
NO. DATE COMMENT
CONSTRUCTION OF:The Eco-Life Center
501 WEST 17 STREETNEW YORK, NY 10011
DATE:
JOB #: 00101
DWN BY: CHKD BY:
SHEET:
1 10/07/2013 SCHEMATIC DESIGN SET
PROJEKT SUKA
2 11/07/2013 DESIGN DEVELOPMENT SET
3 12/10/2013 CONSTRUCTION DOCUMENT SET
CONSULTANTS:
CODE/ZONING BRIAN GILLEN
40 Worth Street Suite 800New York, NY [email protected]
LANDSCAPE/SHOPPING
TAEWOOK CHA
Supermass Studio12-16 Vestry Street 5th FloorNew York NY [email protected]
STRUCTURALENGINEERS
CIRO CUONO
Cuono Engineering PLLC16 King Street Suite 3-2Port Chester, NY 10573914-305-5679
DOMINIC PILLA
Dominick R. Pilla Associates PCCONSULTING ENGINEERING +ARCHITECTURE23 Depew AvenueNyack, New York 10960845.727.7793Email: [email protected]
RETAILCONSTRUCTION
MICHAEL RATNER
1025 Fifth AvenueNew York, NY 10028718-344-5000
MECHANICALENGINEER
AARON MARTIN
AltieriSeborWieber LLC31 Knight StreetNorwalk, CT [email protected]
LIGHTINGDESIGN
PEIHENG TSAI
PHT Lighting Design401 Broadway Suite 1402New York, NY 10013917-957-4180
SUSTAINABILITY JASON VOLLEN
RPI/CASE14 Wall Street 24th FloorNew York, NY [email protected]
BUILDINGENVELOPE
WALTER MARTINEZ
Israel Berger and Associates360 Park Avenue South,15th Floor212-689-5389
COSTESTIMATING
DAVE MILLER
Triton Construction303 Fifth Avenue, Suite1807New York, NY [email protected]
SPECIFICATIONS JEFF FEINGOLD
Adamson AssociatesArchitects401 Wellington Street West,3rd FloorToronto, Ontario M5V 1E7 [email protected]
JILL BUNYEA & KASIA WILUSZ
12/10/13
JB & KW -------
A-101.00
UP
UNIT TYPE D
UNIT TYPE A
STAIR B
RESTROOM
UNIT TYPE A
UNIT TYPE B
STAIR A
RESTROOM UNIT TYPE A
UNIT TYPE C
CORRIDOR 6
1/8" = 1'-0"1 6th FLOOR PLAN
1/16" = 1'-0"2 6th FLOOR PLAN
UP
STAIR B
RESTROOM
STAIR A
RESTROOM
1/16" = 1'-0"2 6th FLOOR PLAN
UP
STAIR B
RESTROOM
STAIR A
RESTROOM
1/16" = 1'-0"2 6th FLOOR PLAN
UP
STAIR B
RESTROOM
STAIR A
RESTROOM
1/16" = 1'-0"2 6th FLOOR PLAN
UP
STAIR B
RESTROOM
STAIR A
RESTROOM
2000 sf
500 sf800 sf
1200 sf
1400 sf
VIEWS FROM FLOOR TO FLOOR
Vertical Mall Concept Fall 2013 Prof. Martin Stigsgaard Comprehensive StudioCollaborative Project
NO. DATE COMMENT
CONSTRUCTION OF:The Eco-Life Center
501 WEST 17 STREETNEW YORK, NY 10011
DATE:
JOB #: 00101
DWN BY: CHKD BY:
SHEET:
1 10/07/2013 SCHEMATIC DESIGN SET
PROJEKT SUKA
2 11/07/2013 DESIGN DEVELOPMENT SET
3 12/10/2013 CONSTRUCTION DOCUMENT SET
CONSULTANTS:
CODE/ZONING BRIAN GILLEN
40 Worth Street Suite 800New York, NY [email protected]
LANDSCAPE/SHOPPING
TAEWOOK CHA
Supermass Studio12-16 Vestry Street 5th FloorNew York NY [email protected]
STRUCTURALENGINEERS
CIRO CUONO
Cuono Engineering PLLC16 King Street Suite 3-2Port Chester, NY 10573914-305-5679
DOMINIC PILLA
Dominick R. Pilla Associates PCCONSULTING ENGINEERING +ARCHITECTURE23 Depew AvenueNyack, New York 10960845.727.7793Email: [email protected]
RETAILCONSTRUCTION
MICHAEL RATNER
1025 Fifth AvenueNew York, NY 10028718-344-5000
MECHANICALENGINEER
AARON MARTIN
AltieriSeborWieber LLC31 Knight StreetNorwalk, CT [email protected]
LIGHTINGDESIGN
PEIHENG TSAI
PHT Lighting Design401 Broadway Suite 1402New York, NY 10013917-957-4180
SUSTAINABILITY JASON VOLLEN
RPI/CASE14 Wall Street 24th FloorNew York, NY [email protected]
BUILDINGENVELOPE
WALTER MARTINEZ
Israel Berger and Associates360 Park Avenue South,15th Floor212-689-5389
COSTESTIMATING
DAVE MILLER
Triton Construction303 Fifth Avenue, Suite1807New York, NY [email protected]
SPECIFICATIONS JEFF FEINGOLD
Adamson AssociatesArchitects401 Wellington Street West,3rd FloorToronto, Ontario M5V 1E7 [email protected]
JILL BUNYEA & KASIA WILUSZ
12/10/13
JB & KW -------
A-101.00
UP
UNIT TYPE D
UNIT TYPE A
STAIR B
RESTROOM
UNIT TYPE A
UNIT TYPE B
STAIR A
RESTROOM UNIT TYPE A
UNIT TYPE C
CORRIDOR 6
1/8" = 1'-0"1 6th FLOOR PLAN
1/16" = 1'-0"2 6th FLOOR PLAN
UP
STAIR B
RESTROOM
STAIR A
RESTROOM
1/16" = 1'-0"2 6th FLOOR PLAN
UP
STAIR B
RESTROOM
STAIR A
RESTROOM
1/16" = 1'-0"2 6th FLOOR PLAN
UP
STAIR B
RESTROOM
STAIR A
RESTROOM
1/16" = 1'-0"2 6th FLOOR PLAN
UP
STAIR B
RESTROOM
STAIR A
RESTROOM
2000 sf
500 sf800 sf
1200 sf
1400 sf
VIEWS FROM FLOOR TO FLOOR
NO. DATE COMMENT
CONSTRUCTION OF:The Eco-Life Center
501 WEST 17 STREETNEW YORK, NY 10011
DATE:
JOB #: 00101
DWN BY: CHKD BY:
SHEET:
1 10/07/2013 SCHEMATIC DESIGN SET
PROJEKT SUKA
2 11/07/2013 DESIGN DEVELOPMENT SET
3 12/10/2013 CONSTRUCTION DOCUMENT SET
CONSULTANTS:
CODE/ZONING BRIAN GILLEN
40 Worth Street Suite 800New York, NY [email protected]
LANDSCAPE/SHOPPING
TAEWOOK CHA
Supermass Studio12-16 Vestry Street 5th FloorNew York NY [email protected]
STRUCTURALENGINEERS
CIRO CUONO
Cuono Engineering PLLC16 King Street Suite 3-2Port Chester, NY 10573914-305-5679
DOMINIC PILLA
Dominick R. Pilla Associates PCCONSULTING ENGINEERING +ARCHITECTURE23 Depew AvenueNyack, New York 10960845.727.7793Email: [email protected]
RETAILCONSTRUCTION
MICHAEL RATNER
1025 Fifth AvenueNew York, NY 10028718-344-5000
MECHANICALENGINEER
AARON MARTIN
AltieriSeborWieber LLC31 Knight StreetNorwalk, CT [email protected]
LIGHTINGDESIGN
PEIHENG TSAI
PHT Lighting Design401 Broadway Suite 1402New York, NY 10013917-957-4180
SUSTAINABILITY JASON VOLLEN
RPI/CASE14 Wall Street 24th FloorNew York, NY [email protected]
BUILDINGENVELOPE
WALTER MARTINEZ
Israel Berger and Associates360 Park Avenue South,15th Floor212-689-5389
COSTESTIMATING
DAVE MILLER
Triton Construction303 Fifth Avenue, Suite1807New York, NY [email protected]
SPECIFICATIONS JEFF FEINGOLD
Adamson AssociatesArchitects401 Wellington Street West,3rd FloorToronto, Ontario M5V 1E7 [email protected]
JILL BUNYEA & KASIA WILUSZ
12/10/13
JB & KW -------
A-101.00
UP
UNIT TYPE D
UNIT TYPE A
STAIR B
RESTROOM
UNIT TYPE A
UNIT TYPE B
STAIR A
RESTROOM UNIT TYPE A
UNIT TYPE C
CORRIDOR 6
1/8" = 1'-0"1 6th FLOOR PLAN
1/16" = 1'-0"2 6th FLOOR PLAN
UP
STAIR B
RESTROOM
STAIR A
RESTROOM
1/16" = 1'-0"2 6th FLOOR PLAN
UP
STAIR B
RESTROOM
STAIR A
RESTROOM
1/16" = 1'-0"2 6th FLOOR PLAN
UP
STAIR B
RESTROOM
STAIR A
RESTROOM
1/16" = 1'-0"2 6th FLOOR PLAN
UP
STAIR B
RESTROOM
STAIR A
RESTROOM
2000 sf
500 sf800 sf
1200 sf
1400 sf
VIEWS FROM FLOOR TO FLOOR
C - Code explaining the need to have a set back of 25’ for 60% of the building
B - Diagram showing lines of sight to be viewed from interior spaces in the mall
A - The mall was organized around the concept that different sized stores could all fit within the same building or floor plates. There is also changeable walls so stores have the ability to customize their spaces.
A
B C
Plans & RCP’s
UP
GAS
WATER
ELECTRIC
RESTROOM
REST ROOM
STAIR A
1
A-401.00
1
A-400.00
1
A-402.00
6' - 5 1/2"
189'
- 8
"
64' -
11
1/2"
8' - 3 1/4"
5' -
1 1
/4"
5' -
0"
10' -
8 1
/4"
8' - 11"
34' -
10
3/4"
32' -
8 1
/2"
26' - 5"
48' -
1 1
/2"
24' - 5"
LOADING DOCK
MARKET
UTILITY CL
132'
- 4
"57
' - 6
"
93' - 0 3/4"
178' - 11 3/4"
A B C D E F G H
1
2
3
4
5
6
7
"3 - '12"4/3 6 - '91
"4/1 7 - '23"4/1 3 - '23
"2/1 3 - '23"4/3 1 - '72
"2/1 8 - '42
"4/3 2 - '51"2/1 5 - '23"4/3 4 - '61
"6 - '03"2/1 5 - '23"7 - '32"4/3 4 - '71
"4/1 01 - '12"2/1 0 - '82"6 - '03"2/1 5 - '23"7 - '32"4/1 11 - '71
"2/1 0 - '83"2/1 0 - '82"6 - '03"2/1 5 - '23"7 - '32"4/1 5 - '71
NO. DATE COMMENT
CONSTRUCTION OF:The Eco-Life Center
501 WEST 17 STREETNEW YORK, NY 10011
DATE:
JOB #: 00101
DWN BY: CHKD BY:
SHEET:
1 10/07/2013 SCHEMATIC DESIGN SET
PROJEKT SUKA
2 11/07/2013 DESIGN DEVELOPMENT SET
3 12/10/2013 CONSTRUCTION DOCUMENT SET
CONSULTANTS:
CODE/ZONING BRIAN GILLEN
40 Worth Street Suite 800New York, NY [email protected]
LANDSCAPE/SHOPPING
TAEWOOK CHA
Supermass Studio12-16 Vestry Street 5th FloorNew York NY [email protected]
STRUCTURALENGINEERS
CIRO CUONO
Cuono Engineering PLLC16 King Street Suite 3-2Port Chester, NY 10573914-305-5679
DOMINIC PILLA
Dominick R. Pilla Associates PCCONSULTING ENGINEERING +ARCHITECTURE23 Depew AvenueNyack, New York 10960845.727.7793Email: [email protected]
RETAILCONSTRUCTION
MICHAEL RATNER
1025 Fifth AvenueNew York, NY 10028718-344-5000
MECHANICALENGINEER
AARON MARTIN
AltieriSeborWieber LLC31 Knight StreetNorwalk, CT [email protected]
LIGHTINGDESIGN
PEIHENG TSAI
PHT Lighting Design401 Broadway Suite 1402New York, NY 10013917-957-4180
SUSTAINABILITY JASON VOLLEN
RPI/CASE14 Wall Street 24th FloorNew York, NY [email protected]
BUILDINGENVELOPE
WALTER MARTINEZ
Israel Berger and Associates360 Park Avenue South,15th Floor212-689-5389
COSTESTIMATING
DAVE MILLER
Triton Construction303 Fifth Avenue, Suite1807New York, NY [email protected]
SPECIFICATIONS JEFF FEINGOLD
Adamson AssociatesArchitects401 Wellington Street West,3rd FloorToronto, Ontario M5V 1E7 [email protected]
JILL BUNYEA & KASIA WILUSZ
12/10/13
JB & KW -------
A-101.000' 4' 8' 16'
scale: 1/8" = 1'
N
FINISHED CONCRETEFLOORING
POTENTIAL LAYOUTFOR MARKET SPA CES
FREIGHT ELEVATORS
EGRESS STAIRSTO MESININE LEVEL
MAIN ENTRANCE
The first floor is an open floor market with access from above and below the high-line.
Plans & RCP’s
UP
BUFFALOEXCHANGE
STAIR A
RESTROOM
STAIR B
RESTROOM
1
A-401.00
1
A-400.00
1
A-402.00
UTILITY CL
75' - 4 1/4"
39' -
1"
28' -
4"
53' -
6 1
/4"
28' -
0 1
/4"
34' -
4"
183'
- 3
1/2
"
12' - 8 3/4"
18' -
0 1
/2"
59' - 0"
A B C D E F G H
1
2
3
4
5
6
7
A-5042
UNIT TYPE B
UNIT TYPE B
CORRIDOR 4
STAIR A
RESTROOM
STAIR B
RESTROOM
1
A-401.00
1
A-400.00
1
A-402.00
UNIT TYPE C
UTILITY CL
UNIT TYPE B
UNIT TYPE C
UNIT TYPE A
UNIT TYPE E
UNIT TYPE D
25' - 2 1/4"
26' -
0 1
/4"
24' - 6 1/2"
"1 - '93"4/3 01 - '33
59' - 0"
24' - 8 1/4"
18' -
1 1
/4"
31' - 9 1/4"
22' -
8 1
/2"
20' -
10
1/2"
21' -
2 1
/2"
29' - 0 1/2"
"6 - '94"8 - '12
27' -
6 1
/2"
"2/1 11 - '4"4/3 01 - '6"0 - '95
"7 - '22"2/1 2 - '24
52' -
10
3/4"
"1 - '93"4/3 0 - '43
"6 - '94"8 - '12
71' - 1 3/4"
190'
- 1
0"
70' - 10 1/4"
12' - 9 3/4"
21' -
8"
A B C D E F
1
2
3
4
5
6
7
A-5034
NO. DATE COMMENT
CONSTRUCTION OF:The Eco-Life Center
501 WEST 17 STREETNEW YORK, NY 10011
DATE:
JOB #: 13001
DWN BY: CHKD BY:
SHEET:
1 10/07/2013 SCHEMATIC DESIGN SET
PROJEKT SUKA
2 11/07/2013 DESIGN DEVELOPMENT SET
3 12/10/2013 CONSTRUCTION DOCUMENT SET
CONSULTANTS:
CODE/ZONING BRIAN GILLEN
40 Worth Street Suite 800New York, NY [email protected]
LANDSCAPE/SHOPPING
TAEWOOK CHA
Supermass Studio12-16 Vestry Street 5th FloorNew York NY [email protected]
STRUCTURALENGINEERS
CIRO CUONO
Cuono Engineering PLLC16 King Street Suite 3-2Port Chester, NY 10573914-305-5679
DOMINIC PILLA
Dominick R. Pilla Associates PCCONSULTING ENGINEERING +ARCHITECTURE23 Depew AvenueNyack, New York 10960845.727.7793Email: [email protected]
RETAILCONSTRUCTION
MICHAEL RATNER
1025 Fifth AvenueNew York, NY 10028718-344-5000
MECHANICALENGINEER
AARON MARTIN
AltieriSeborWieber LLC31 Knight StreetNorwalk, CT [email protected]
LIGHTINGDESIGN
PEIHENG TSAI
PHT Lighting Design401 Broadway Suite 1402New York, NY 10013917-957-4180
SUSTAINABILITY JASON VOLLEN
RPI/CASE14 Wall Street 24th FloorNew York, NY [email protected]
BUILDINGENVELOPE
WALTER MARTINEZ
Israel Berger and Associates360 Park Avenue South,15th Floor212-689-5389
COSTESTIMATING
DAVE MILLER
Triton Construction303 Fifth Avenue, Suite1807New York, NY [email protected]
SPECIFICATIONS JEFF FEINGOLD
Adamson AssociatesArchitects401 Wellington Street West,3rd FloorToronto, Ontario M5V 1E7 [email protected]
JILL BUNYEA & KASIA WILUSZ
11/24/13
Author Checker
A-103.00 1/8" = 1'-0"1 3rd FLOOR PLAN
1/8" = 1'-0"2 4th FLOOR PLAN
0' 4' 8' 16'
scale: 1/8" = 1'
N
OUTDOOR PATIOACCESS TO THE HIGHLINE
END WOOD BLOCK MOHOGANY FLOORING
2’ X 2’ FLOOR LIGHTSSITS WITHIN WOOD BLOCK
6” X 6” FLOOR LIGHTSSITS WITHIN WOOD BLOCK
VERTICALGREEN WALL
FINISHED CONCRETEFLOORING
FINISHED CONCRETEFLOORING
FREIGHT ELEVATORSFREIGHT ELEVATORS
ENTRY FROM THE HIGHLINELEVEL
The third floor is a “typical” floor with spaces for stores to plug in of various sizes. All with access to the circulation hall and to the light from the exterior.
Detail
FLOOR FINISHING
VISION GLASS
VIBRO WIND PANELS
DROP CEILING
SHADOW BOX
2’ BEAM
1’ FLOOR PLATE
STACK JOINT11th FLOOR PLAN136' - 2 7/8"
12th FLOOR PLAN150' - 2 7/8"
10th FLOOR PLAN122' - 2 7/8"
CONCRETE WALL WITHSMOOTH SURFACE
3/8" DIA SS WEDGE ANCHOR
2"
1 1/
2"
6 1/
2" 5"
3"
4" 11 7/8" TYP.
GSKY SS FRAME WATERPROOFING
GSKY TRIM MOUNTING ANGLE
STAINLESS OR ALUMINUM GSKYSIDE TRIM SECURE INTO TRIMMOUNTING ANGLE
GSKY STANDARDGREEN WALL PANEL
SEE 10-p AND 11-p FORIRRIGATION DETAIL
GSKY TRIM MOUNTINGANGLE
STAINLESS OR ALUMINUMGSKY TOP TRIM SECURE
INTO TRIM MOUNTING ANGLE
CONCRETE WALLWITH SMOOTHSURFACE
WATERPROOFING
GSKY STANDARDGREEN WALL PANEL
3/8" DIA SS WEDGEANCHOR
GSKY SS FRAME
5"
6 1/2"
3"4"11
7/8
"
GSKY IRRIGATIONDRIP LINE
3/8" DIA SS WEDGEANCHOR
NEOPRENE WASHERBETWEEN WALL ANDGSKY FRAME
GSKY FRAME
MIN
2" E
MBE
D1
1/2"
2"
CONCRETE WALL
WATERPROOFING
DESIGN NOTE:*STRUCTURE MUST SUPPORT 30 LB/SQ.FT SATURATED GSKY GREEN WALL SYSTEM*WALL SURFACE MUST BE SMOOTH*WATERPROOFING IS REQUIRED TO BE APPLIED (LIQUID OR SELF ADHESIVE TYPE IS RECOMMENDED)*ADEQUATE LIGHTING MUST BE DESIGNED AND INSTALLED (FOR INTERIOR GREEN WALL)*WALL MUST BE ACCESSIBLE FOR MAINTENANCE (LIFT ACCESS MAY BE REQUIRED)*EMBEDDED PIPE OR CONDUIT LOCATIONS MUST BE INDICATED TO GSKY*TRIM WIDTH MAY INCREASE DEPENDING ON LOCATION OF ZONE VALVES; SEE 9-p, 10-p AND 11-p FOR DETAIL*GREEN WALL BELOW MUST TO BE CLEAR FOR MAINTENANCE LIFT ACCESS
2 PLAN DETAIL / CONCRETE WALLSCALE 3/4" - 1'-0" (FILE # 1-p-2)
1 ELEVATION DETAIL / WIND PANEL & CURTAIN WALLSCALE 3/4" - 1'-0" (FILE # 1-p-3)
4 FASTENER DETAIL / CONCRETE WALLSCALE 3" - 1'-0" (FILE # 1-p-4)
#704 - 318 HOMER STVANCOUVER, BC V6B 2V2604-708-0611 ph 604-357-1315 faxwww.gsky.com
11 x 17
CONCRETE WALL STRUCTURE / INTERIOR OR EXTERIOR
AS NOTED
SCALE 1-1/2”-1’0”
SCALE 1-1/2”-1’-0”
CONCRETE WALL WITHSMOOTH SURFACE
3/8" DIA SS WEDGE ANCHOR
2"
1 1/
2"
6 1/
2" 5"
3"
4" 11 7/8" TYP.
GSKY SS FRAME WATERPROOFING
GSKY TRIM MOUNTING ANGLE
STAINLESS OR ALUMINUM GSKYSIDE TRIM SECURE INTO TRIMMOUNTING ANGLE
GSKY STANDARDGREEN WALL PANEL
SEE 10-p AND 11-p FORIRRIGATION DETAIL
GSKY TRIM MOUNTINGANGLE
STAINLESS OR ALUMINUMGSKY TOP TRIM SECURE
INTO TRIM MOUNTING ANGLE
CONCRETE WALLWITH SMOOTHSURFACE
WATERPROOFING
GSKY STANDARDGREEN WALL PANEL
3/8" DIA SS WEDGEANCHOR
GSKY SS FRAME
5"
6 1/2"
3"4"11
7/8
"
GSKY IRRIGATIONDRIP LINE
3/8" DIA SS WEDGEANCHOR
NEOPRENE WASHERBETWEEN WALL ANDGSKY FRAME
GSKY FRAME
MIN
2" E
MBE
D1
1/2"
2"
CONCRETE WALL
WATERPROOFING
1 3D VIEW / CONCRETE WALL SCALE 3/8" - 1'-0" (FILE # 1-p-1)
DESIGN NOTE:*STRUCTURE MUST SUPPORT 30 LB/SQ.FT SATURATED GSKY GREEN WALL SYSTEM*WALL SURFACE MUST BE SMOOTH*WATERPROOFING IS REQUIRED TO BE APPLIED (LIQUID OR SELF ADHESIVE TYPE IS RECOMMENDED)*ADEQUATE LIGHTING MUST BE DESIGNED AND INSTALLED (FOR INTERIOR GREEN WALL)*WALL MUST BE ACCESSIBLE FOR MAINTENANCE (LIFT ACCESS MAY BE REQUIRED)*EMBEDDED PIPE OR CONDUIT LOCATIONS MUST BE INDICATED TO GSKY*TRIM WIDTH MAY INCREASE DEPENDING ON LOCATION OF ZONE VALVES; SEE 9-p, 10-p AND 11-p FOR DETAIL*GREEN WALL BELOW MUST TO BE CLEAR FOR MAINTENANCE LIFT ACCESS
2 PLAN DETAIL / CONCRETE WALLSCALE 3/4" - 1'-0" (FILE # 1-p-2)
2 SECTION DETAIL / WIND PANEL & CURTAIN WALLSCALE 3/4" - 1'-0" (FILE # 1-p-3)
4 FASTENER DETAIL / CONCRETE WALLSCALE 3" - 1'-0" (FILE # 1-p-4)
#704 - 318 HOMER STVANCOUVER, BC V6B 2V2604-708-0611 ph 604-357-1315 faxwww.gsky.com
DRAWING #
DRAWING TITLE:
GSKY GREEN WALL PANELS
DATE:
REV DATE:SCALE:AUG 18, 2010
N/A PAPER SIZE: 11 x 17
3D VIEWPLAN DETAIL
SECTION DETAILFASTENER DETAIL
CONCRETE WALL STRUCTURE / INTERIOR OR EXTERIOR
AS NOTED
1-p
SCALE 1”-1’0”
SCALE 1-1/2”-1’0”
SCALE 1-1/2”-1’-0”
CONCRETE WALL WITHSMOOTH SURFACE
3/8" DIA SS WEDGE ANCHOR
2"
1 1/
2"
6 1/
2" 5"
3"
4" 11 7/8" TYP.
GSKY SS FRAME WATERPROOFING
GSKY TRIM MOUNTING ANGLE
STAINLESS OR ALUMINUM GSKYSIDE TRIM SECURE INTO TRIMMOUNTING ANGLE
GSKY STANDARDGREEN WALL PANEL
SEE 10-p AND 11-p FORIRRIGATION DETAIL
GSKY TRIM MOUNTINGANGLE
STAINLESS OR ALUMINUMGSKY TOP TRIM SECURE
INTO TRIM MOUNTING ANGLE
CONCRETE WALLWITH SMOOTHSURFACE
WATERPROOFING
GSKY STANDARDGREEN WALL PANEL
3/8" DIA SS WEDGEANCHOR
GSKY SS FRAME
5"
6 1/2"
3"4"11
7/8
"
GSKY IRRIGATIONDRIP LINE
3/8" DIA SS WEDGEANCHOR
NEOPRENE WASHERBETWEEN WALL ANDGSKY FRAME
GSKY FRAME
MIN
2" E
MBE
D1
1/2"
2"
CONCRETE WALL
WATERPROOFING
1 3D VIEW / CONCRETE WALL SCALE 3/8" - 1'-0" (FILE # 1-p-1)
DESIGN NOTE:*STRUCTURE MUST SUPPORT 30 LB/SQ.FT SATURATED GSKY GREEN WALL SYSTEM*WALL SURFACE MUST BE SMOOTH*WATERPROOFING IS REQUIRED TO BE APPLIED (LIQUID OR SELF ADHESIVE TYPE IS RECOMMENDED)*ADEQUATE LIGHTING MUST BE DESIGNED AND INSTALLED (FOR INTERIOR GREEN WALL)*WALL MUST BE ACCESSIBLE FOR MAINTENANCE (LIFT ACCESS MAY BE REQUIRED)*EMBEDDED PIPE OR CONDUIT LOCATIONS MUST BE INDICATED TO GSKY*TRIM WIDTH MAY INCREASE DEPENDING ON LOCATION OF ZONE VALVES; SEE 9-p, 10-p AND 11-p FOR DETAIL*GREEN WALL BELOW MUST TO BE CLEAR FOR MAINTENANCE LIFT ACCESS
2 PLAN DETAIL / CONCRETE WALLSCALE 3/4" - 1'-0" (FILE # 1-p-2)
3 DETAIL / WIND PANEL & CURTAIN WALLSCALE 3/4" - 1'-0" (FILE # 1-p-3)
4 FASTENER DETAIL / CONCRETE WALLSCALE 3" - 1'-0" (FILE # 1-p-4)
#704 - 318 HOMER STVANCOUVER, BC V6B 2V2604-708-0611 ph 604-357-1315 faxwww.gsky.com
DRAWING #
DRAWING TITLE:
GSKY GREEN WALL PANELS
DATE:
REV DATE:SCALE:AUG 18, 2010
N/A PAPER SIZE: 11 x 17
3D VIEWPLAN DETAIL
SECTION DETAILFASTENER DETAIL
CONCRETE WALL STRUCTURE / INTERIOR OR EXTERIOR
AS NOTED
1-p
SCALE 1”-1’0”
SCALE 1-1/2”-1’0”
SCALE 1-1/2”-1’-0”
CONCRETE WALL WITHSMOOTH SURFACE
3/8" DIA SS WEDGE ANCHOR
2"
1 1/
2"
6 1/
2" 5"
3"
4" 11 7/8" TYP.
GSKY SS FRAME WATERPROOFING
GSKY TRIM MOUNTING ANGLE
STAINLESS OR ALUMINUM GSKYSIDE TRIM SECURE INTO TRIMMOUNTING ANGLE
GSKY STANDARDGREEN WALL PANEL
SEE 10-p AND 11-p FORIRRIGATION DETAIL
GSKY TRIM MOUNTINGANGLE
STAINLESS OR ALUMINUMGSKY TOP TRIM SECURE
INTO TRIM MOUNTING ANGLE
CONCRETE WALLWITH SMOOTHSURFACE
WATERPROOFING
GSKY STANDARDGREEN WALL PANEL
3/8" DIA SS WEDGEANCHOR
GSKY SS FRAME
5"
6 1/2"
3"4"11
7/8
"
GSKY IRRIGATIONDRIP LINE
3/8" DIA SS WEDGEANCHOR
NEOPRENE WASHERBETWEEN WALL ANDGSKY FRAME
GSKY FRAME
MIN
2" E
MBE
D1
1/2"
2"
CONCRETE WALL
WATERPROOFING
DESIGN NOTE:*STRUCTURE MUST SUPPORT 30 LB/SQ.FT SATURATED GSKY GREEN WALL SYSTEM*WALL SURFACE MUST BE SMOOTH*WATERPROOFING IS REQUIRED TO BE APPLIED (LIQUID OR SELF ADHESIVE TYPE IS RECOMMENDED)*ADEQUATE LIGHTING MUST BE DESIGNED AND INSTALLED (FOR INTERIOR GREEN WALL)*WALL MUST BE ACCESSIBLE FOR MAINTENANCE (LIFT ACCESS MAY BE REQUIRED)*EMBEDDED PIPE OR CONDUIT LOCATIONS MUST BE INDICATED TO GSKY*TRIM WIDTH MAY INCREASE DEPENDING ON LOCATION OF ZONE VALVES; SEE 9-p, 10-p AND 11-p FOR DETAIL*GREEN WALL BELOW MUST TO BE CLEAR FOR MAINTENANCE LIFT ACCESS
2 PLAN DETAIL / CONCRETE WALLSCALE 3/4" - 1'-0" (FILE # 1-p-2)
2 ELEVATION PLAN / WIND PANEL & CURTAIN WALLSCALE 3/4" - 1'-0" (FILE # 1-p-3)
4 FASTENER DETAIL / CONCRETE WALLSCALE 3" - 1'-0" (FILE # 1-p-4)
#704 - 318 HOMER STVANCOUVER, BC V6B 2V2604-708-0611 ph 604-357-1315 faxwww.gsky.com
11 x 17
CONCRETE WALL STRUCTURE / INTERIOR OR EXTERIOR
AS NOTED
SCALE 1-1/2”-1’0”
SCALE 1-1/2”-1’-0”
CONCRETE BEAM
1.5”IGU
VISION GLASS
PIEZOLECTRIC CELLS
TIE BACK
ALIMINUM FRAME MULLION
4X6X4 FIBER WIND PANELS
COPPER WIRE
CW ANCHOR
2 PANEL GLAZED WINDOW
BATT INSULATION
WIRE INSIDE VERTICAL
METAL PANEL
SHDOW BOX
6”4”
4”
6”
1 1/2”
2’ - 0”1’ - 0”
4”MECHANICAL SYSTEMS
0' 1’ 2' 4'
scale: 1/2" = 1'
0' 1’ 2' 4'
scale: 1/2" = 1'
0' 2” 4” 8”
scale: 3" = 1'
NO. DATE COMMENT
CONSTRUCTION OF:The Eco-Life Center
501 WEST 17 STREETNEW YORK, NY 10011
DATE:
JOB #: 00101
DWN BY: CHKD BY:
SHEET:
1 10/07/2013 SCHEMATIC DESIGN SET
PROJEKT SUKA
2 11/07/2013 DESIGN DEVELOPMENT SET
3 12/10/2013 CONSTRUCTION DOCUMENT SET
CONSULTANTS:
CODE/ZONING BRIAN GILLEN
40 Worth Street Suite 800New York, NY [email protected]
LANDSCAPE/SHOPPING
TAEWOOK CHA
Supermass Studio12-16 Vestry Street 5th FloorNew York NY [email protected]
STRUCTURALENGINEERS
CIRO CUONO
Cuono Engineering PLLC16 King Street Suite 3-2Port Chester, NY 10573914-305-5679
DOMINIC PILLA
Dominick R. Pilla Associates PCCONSULTING ENGINEERING +ARCHITECTURE23 Depew AvenueNyack, New York 10960845.727.7793Email: [email protected]
RETAILCONSTRUCTION
MICHAEL RATNER
1025 Fifth AvenueNew York, NY 10028718-344-5000
MECHANICALENGINEER
AARON MARTIN
AltieriSeborWieber LLC31 Knight StreetNorwalk, CT [email protected]
LIGHTINGDESIGN
PEIHENG TSAI
PHT Lighting Design401 Broadway Suite 1402New York, NY 10013917-957-4180
SUSTAINABILITY JASON VOLLEN
RPI/CASE14 Wall Street 24th FloorNew York, NY [email protected]
BUILDINGENVELOPE
WALTER MARTINEZ
Israel Berger and Associates360 Park Avenue South,15th Floor212-689-5389
COSTESTIMATING
DAVE MILLER
Triton Construction303 Fifth Avenue, Suite1807New York, NY [email protected]
SPECIFICATIONS JEFF FEINGOLD
Adamson AssociatesArchitects401 Wellington Street West,3rd FloorToronto, Ontario M5V 1E7 [email protected]
JILL BUNYEA & KASIA WILUSZ
12/10/13
JB & KW -------
A-502.00
0' 1’ 2' 4'
scale: 1/2" = 1'
Wind panel curtain wall which vibrates with the wind and collects energy for the building
N1
A-113.00
1
A-115.00
1
A-114.00
1/8" = 1'-0"1 EAST
GROUND FLOORPLAN
0' - 2 7/8"
1-A FLOOR PLAN12' - 2 7/8"
3rd FLOOR PLAN24' - 2 7/8"
4th FLOOR PLAN38' - 2 7/8"
5th FLOOR PLAN52' - 2 7/8"
6th FLOOR PLAN66' - 2 7/8"
7th FLOOR PLAN80' - 2 7/8"
8th FLOOR PLAN94' - 2 7/8"
9th FLOOR PLAN108' - 2 7/8"
10th FLOOR PLAN122' - 2 7/8"
11th FLOOR PLAN136' - 2 7/8"
12th FLOOR PLAN150' - 2 7/8"
Roof164' - 2 7/8"
1Y176' - 2 7/8"
NO. DATE COMMENT
CONSTRUCTION OF:The Eco-Life Center
501 WEST 17 STREETNEW YORK, NY 10011
DATE:
JOB #: 00101
DWN BY: CHKD BY:
SHEET:
1 10/07/2013 SCHEMATIC DESIGN SET
PROJEKT SUKA
2 11/07/2013 DESIGN DEVELOPMENT SET
3 12/10/2013 CONSTRUCTION DOCUMENT SET
CONSULTANTS:
CODE/ZONING BRIAN GILLEN
40 Worth Street Suite 800New York, NY [email protected]
LANDSCAPE/SHOPPING
TAEWOOK CHA
Supermass Studio12-16 Vestry Street 5th FloorNew York NY [email protected]
STRUCTURALENGINEERS
CIRO CUONO
Cuono Engineering PLLC16 King Street Suite 3-2Port Chester, NY 10573914-305-5679
DOMINIC PILLA
Dominick R. Pilla Associates PCCONSULTING ENGINEERING +ARCHITECTURE23 Depew AvenueNyack, New York 10960845.727.7793Email: [email protected]
RETAILCONSTRUCTION
MICHAEL RATNER
1025 Fifth AvenueNew York, NY 10028718-344-5000
MECHANICALENGINEER
AARON MARTIN
AltieriSeborWieber LLC31 Knight StreetNorwalk, CT [email protected]
LIGHTINGDESIGN
PEIHENG TSAI
PHT Lighting Design401 Broadway Suite 1402New York, NY 10013917-957-4180
SUSTAINABILITY JASON VOLLEN
RPI/CASE14 Wall Street 24th FloorNew York, NY [email protected]
BUILDINGENVELOPE
WALTER MARTINEZ
Israel Berger and Associates360 Park Avenue South,15th Floor212-689-5389
COSTESTIMATING
DAVE MILLER
Triton Construction303 Fifth Avenue, Suite1807New York, NY [email protected]
SPECIFICATIONS JEFF FEINGOLD
Adamson AssociatesArchitects401 Wellington Street West,3rd FloorToronto, Ontario M5V 1E7 [email protected]
JILL BUNYEA & KASIA WILUSZ
12/10/13
JB & KW -------
A-302.000' 4' 8' 16'
scale: 1/8" = 1'
N
01
A-502
01
A-504
01
A-501
N1
A-113.00
1
A-115.00
1
A-114.00
1/8" = 1'-0"1 EAST
GROUND FLOORPLAN
0' - 2 7/8"
1-A FLOOR PLAN12' - 2 7/8"
3rd FLOOR PLAN24' - 2 7/8"
4th FLOOR PLAN38' - 2 7/8"
5th FLOOR PLAN52' - 2 7/8"
6th FLOOR PLAN66' - 2 7/8"
7th FLOOR PLAN80' - 2 7/8"
8th FLOOR PLAN94' - 2 7/8"
9th FLOOR PLAN108' - 2 7/8"
10th FLOOR PLAN122' - 2 7/8"
11th FLOOR PLAN136' - 2 7/8"
12th FLOOR PLAN150' - 2 7/8"
Roof164' - 2 7/8"
1Y176' - 2 7/8"
NO. DATE COMMENT
CONSTRUCTION OF:The Eco-Life Center
501 WEST 17 STREETNEW YORK, NY 10011
DATE:
JOB #: 00101
DWN BY: CHKD BY:
SHEET:
1 10/07/2013 SCHEMATIC DESIGN SET
PROJEKT SUKA
2 11/07/2013 DESIGN DEVELOPMENT SET
3 12/10/2013 CONSTRUCTION DOCUMENT SET
CONSULTANTS:
CODE/ZONING BRIAN GILLEN
40 Worth Street Suite 800New York, NY [email protected]
LANDSCAPE/SHOPPING
TAEWOOK CHA
Supermass Studio12-16 Vestry Street 5th FloorNew York NY [email protected]
STRUCTURALENGINEERS
CIRO CUONO
Cuono Engineering PLLC16 King Street Suite 3-2Port Chester, NY 10573914-305-5679
DOMINIC PILLA
Dominick R. Pilla Associates PCCONSULTING ENGINEERING +ARCHITECTURE23 Depew AvenueNyack, New York 10960845.727.7793Email: [email protected]
RETAILCONSTRUCTION
MICHAEL RATNER
1025 Fifth AvenueNew York, NY 10028718-344-5000
MECHANICALENGINEER
AARON MARTIN
AltieriSeborWieber LLC31 Knight StreetNorwalk, CT [email protected]
LIGHTINGDESIGN
PEIHENG TSAI
PHT Lighting Design401 Broadway Suite 1402New York, NY 10013917-957-4180
SUSTAINABILITY JASON VOLLEN
RPI/CASE14 Wall Street 24th FloorNew York, NY [email protected]
BUILDINGENVELOPE
WALTER MARTINEZ
Israel Berger and Associates360 Park Avenue South,15th Floor212-689-5389
COSTESTIMATING
DAVE MILLER
Triton Construction303 Fifth Avenue, Suite1807New York, NY [email protected]
SPECIFICATIONS JEFF FEINGOLD
Adamson AssociatesArchitects401 Wellington Street West,3rd FloorToronto, Ontario M5V 1E7 [email protected]
JILL BUNYEA & KASIA WILUSZ
12/10/13
JB & KW -------
A-302.000' 4' 8' 16'
scale: 1/8" = 1'
N
01
A-502
01
A-504
01
A-501
N1
A-113.00
1
A-115.00
1
A-114.00
1/8" = 1'-0"1 EAST
GROUND FLOORPLAN
0' - 2 7/8"
1-A FLOOR PLAN12' - 2 7/8"
3rd FLOOR PLAN24' - 2 7/8"
4th FLOOR PLAN38' - 2 7/8"
5th FLOOR PLAN52' - 2 7/8"
6th FLOOR PLAN66' - 2 7/8"
7th FLOOR PLAN80' - 2 7/8"
8th FLOOR PLAN94' - 2 7/8"
9th FLOOR PLAN108' - 2 7/8"
10th FLOOR PLAN122' - 2 7/8"
11th FLOOR PLAN136' - 2 7/8"
12th FLOOR PLAN150' - 2 7/8"
Roof164' - 2 7/8"
1Y176' - 2 7/8"
NO. DATE COMMENT
CONSTRUCTION OF:The Eco-Life Center
501 WEST 17 STREETNEW YORK, NY 10011
DATE:
JOB #: 00101
DWN BY: CHKD BY:
SHEET:
1 10/07/2013 SCHEMATIC DESIGN SET
PROJEKT SUKA
2 11/07/2013 DESIGN DEVELOPMENT SET
3 12/10/2013 CONSTRUCTION DOCUMENT SET
CONSULTANTS:
CODE/ZONING BRIAN GILLEN
40 Worth Street Suite 800New York, NY [email protected]
LANDSCAPE/SHOPPING
TAEWOOK CHA
Supermass Studio12-16 Vestry Street 5th FloorNew York NY [email protected]
STRUCTURALENGINEERS
CIRO CUONO
Cuono Engineering PLLC16 King Street Suite 3-2Port Chester, NY 10573914-305-5679
DOMINIC PILLA
Dominick R. Pilla Associates PCCONSULTING ENGINEERING +ARCHITECTURE23 Depew AvenueNyack, New York 10960845.727.7793Email: [email protected]
RETAILCONSTRUCTION
MICHAEL RATNER
1025 Fifth AvenueNew York, NY 10028718-344-5000
MECHANICALENGINEER
AARON MARTIN
AltieriSeborWieber LLC31 Knight StreetNorwalk, CT [email protected]
LIGHTINGDESIGN
PEIHENG TSAI
PHT Lighting Design401 Broadway Suite 1402New York, NY 10013917-957-4180
SUSTAINABILITY JASON VOLLEN
RPI/CASE14 Wall Street 24th FloorNew York, NY [email protected]
BUILDINGENVELOPE
WALTER MARTINEZ
Israel Berger and Associates360 Park Avenue South,15th Floor212-689-5389
COSTESTIMATING
DAVE MILLER
Triton Construction303 Fifth Avenue, Suite1807New York, NY [email protected]
SPECIFICATIONS JEFF FEINGOLD
Adamson AssociatesArchitects401 Wellington Street West,3rd FloorToronto, Ontario M5V 1E7 [email protected]
JILL BUNYEA & KASIA WILUSZ
12/10/13
JB & KW -------
A-302.000' 4' 8' 16'
scale: 1/8" = 1'
N
01
A-502
01
A-504
01
A-501
East Elevation
I did a study with Visari to show where there was more wind intensity and put more wind panels in places where they would be more effective in creating electricity.
01
A-504
01
A-502
01
A-503
1
A-400.00
1
A-402.00
1234567
1/8" = 1'-0"1 Section B
NO. DATE COMMENT
CONSTRUCTION OF:The Eco-Life Center
501 WEST 17 STREETNEW YORK, NY 10011
DATE:
JOB #: 00101
DWN BY: CHKD BY:
SHEET:
1 10/07/2013 SCHEMATIC DESIGN SET
PROJEKT SUKA
2 11/07/2013 DESIGN DEVELOPMENT SET
3 12/10/2013 CONSTRUCTION DOCUMENT SET
CONSULTANTS:
CODE/ZONING BRIAN GILLEN
40 Worth Street Suite 800New York, NY [email protected]
LANDSCAPE/SHOPPING
TAEWOOK CHA
Supermass Studio12-16 Vestry Street 5th FloorNew York NY [email protected]
STRUCTURALENGINEERS
CIRO CUONO
Cuono Engineering PLLC16 King Street Suite 3-2Port Chester, NY 10573914-305-5679
DOMINIC PILLA
Dominick R. Pilla Associates PCCONSULTING ENGINEERING +ARCHITECTURE23 Depew AvenueNyack, New York 10960845.727.7793Email: [email protected]
RETAILCONSTRUCTION
MICHAEL RATNER
1025 Fifth AvenueNew York, NY 10028718-344-5000
MECHANICALENGINEER
AARON MARTIN
AltieriSeborWieber LLC31 Knight StreetNorwalk, CT [email protected]
LIGHTINGDESIGN
PEIHENG TSAI
PHT Lighting Design401 Broadway Suite 1402New York, NY 10013917-957-4180
SUSTAINABILITY JASON VOLLEN
RPI/CASE14 Wall Street 24th FloorNew York, NY [email protected]
BUILDINGENVELOPE
WALTER MARTINEZ
Israel Berger and Associates360 Park Avenue South,15th Floor212-689-5389
COSTESTIMATING
DAVE MILLER
Triton Construction303 Fifth Avenue, Suite1807New York, NY [email protected]
SPECIFICATIONS JEFF FEINGOLD
Adamson AssociatesArchitects401 Wellington Street West,3rd FloorToronto, Ontario M5V 1E7 [email protected]
JILL BUNYEA & KASIA WILUSZ
12/10/13
JB & KW -------
A-402.000' 4' 8' 16'
scale: 1/8" = 1'
N
GROUND FLOORPLAN
0' - 2 7/8"
1-A FLOOR PLAN12' - 2 7/8"
3rd FLOOR PLAN24' - 2 7/8"
4th FLOOR PLAN38' - 2 7/8"
5th FLOOR PLAN52' - 2 7/8"
6th FLOOR PLAN66' - 2 7/8"
7th FLOOR PLAN80' - 2 7/8"
8th FLOOR PLAN94' - 2 7/8"
9th FLOOR PLAN108' - 2 7/8"
10th FLOOR PLAN122' - 2 7/8"
11th FLOOR PLAN136' - 2 7/8"
12th FLOOR PLAN150' - 2 7/8"
Roof164' - 2 7/8"
1Y176' - 2 7/8"
GROUND FLOORPLAN
0' - 2 7/8"
1-A FLOOR PLAN12' - 2 7/8"
3rd FLOOR PLAN24' - 2 7/8"
4th FLOOR PLAN38' - 2 7/8"
5th FLOOR PLAN52' - 2 7/8"
6th FLOOR PLAN66' - 2 7/8"
7th FLOOR PLAN80' - 2 7/8"
8th FLOOR PLAN94' - 2 7/8"
9th FLOOR PLAN108' - 2 7/8"
10th FLOOR PLAN122' - 2 7/8"
11th FLOOR PLAN136' - 2 7/8"
12th FLOOR PLAN150' - 2 7/8"
Roof164' - 2 7/8"
1Y176' - 2 7/8"
01
A-504
01
A-502
01
A-503
1
A-400.00
1
A-402.00
1234567
1/8" = 1'-0"1 Section B
NO. DATE COMMENT
CONSTRUCTION OF:The Eco-Life Center
501 WEST 17 STREETNEW YORK, NY 10011
DATE:
JOB #: 00101
DWN BY: CHKD BY:
SHEET:
1 10/07/2013 SCHEMATIC DESIGN SET
PROJEKT SUKA
2 11/07/2013 DESIGN DEVELOPMENT SET
3 12/10/2013 CONSTRUCTION DOCUMENT SET
CONSULTANTS:
CODE/ZONING BRIAN GILLEN
40 Worth Street Suite 800New York, NY [email protected]
LANDSCAPE/SHOPPING
TAEWOOK CHA
Supermass Studio12-16 Vestry Street 5th FloorNew York NY [email protected]
STRUCTURALENGINEERS
CIRO CUONO
Cuono Engineering PLLC16 King Street Suite 3-2Port Chester, NY 10573914-305-5679
DOMINIC PILLA
Dominick R. Pilla Associates PCCONSULTING ENGINEERING +ARCHITECTURE23 Depew AvenueNyack, New York 10960845.727.7793Email: [email protected]
RETAILCONSTRUCTION
MICHAEL RATNER
1025 Fifth AvenueNew York, NY 10028718-344-5000
MECHANICALENGINEER
AARON MARTIN
AltieriSeborWieber LLC31 Knight StreetNorwalk, CT [email protected]
LIGHTINGDESIGN
PEIHENG TSAI
PHT Lighting Design401 Broadway Suite 1402New York, NY 10013917-957-4180
SUSTAINABILITY JASON VOLLEN
RPI/CASE14 Wall Street 24th FloorNew York, NY [email protected]
BUILDINGENVELOPE
WALTER MARTINEZ
Israel Berger and Associates360 Park Avenue South,15th Floor212-689-5389
COSTESTIMATING
DAVE MILLER
Triton Construction303 Fifth Avenue, Suite1807New York, NY [email protected]
SPECIFICATIONS JEFF FEINGOLD
Adamson AssociatesArchitects401 Wellington Street West,3rd FloorToronto, Ontario M5V 1E7 [email protected]
JILL BUNYEA & KASIA WILUSZ
12/10/13
JB & KW -------
A-402.000' 4' 8' 16'
scale: 1/8" = 1'
N
GROUND FLOORPLAN
0' - 2 7/8"
1-A FLOOR PLAN12' - 2 7/8"
3rd FLOOR PLAN24' - 2 7/8"
4th FLOOR PLAN38' - 2 7/8"
5th FLOOR PLAN52' - 2 7/8"
6th FLOOR PLAN66' - 2 7/8"
7th FLOOR PLAN80' - 2 7/8"
8th FLOOR PLAN94' - 2 7/8"
9th FLOOR PLAN108' - 2 7/8"
10th FLOOR PLAN122' - 2 7/8"
11th FLOOR PLAN136' - 2 7/8"
12th FLOOR PLAN150' - 2 7/8"
Roof164' - 2 7/8"
1Y176' - 2 7/8"
GROUND FLOORPLAN
0' - 2 7/8"
1-A FLOOR PLAN12' - 2 7/8"
3rd FLOOR PLAN24' - 2 7/8"
4th FLOOR PLAN38' - 2 7/8"
5th FLOOR PLAN52' - 2 7/8"
6th FLOOR PLAN66' - 2 7/8"
7th FLOOR PLAN80' - 2 7/8"
8th FLOOR PLAN94' - 2 7/8"
9th FLOOR PLAN108' - 2 7/8"
10th FLOOR PLAN122' - 2 7/8"
11th FLOOR PLAN136' - 2 7/8"
12th FLOOR PLAN150' - 2 7/8"
Roof164' - 2 7/8"
1Y176' - 2 7/8"
Section
This section shows a green wall and the center circulation space, This space helps clean the air throughout the building and creating a chimney effect.
Model Photos
Model Photos
NO. DATE COMMENT
CONSTRUCTION OF:The Eco-Life Center
501 WEST 17 STREETNEW YORK, NY 10011
DATE:
JOB #: 00101
DWN BY: CHKD BY:
SHEET:
1 10/07/2013 SCHEMATIC DESIGN SET
PROJEKT SUKA
2 11/07/2013 DESIGN DEVELOPMENT SET
3 12/10/2013 CONSTRUCTION DOCUMENT SET
CONSULTANTS:
CODE/ZONING BRIAN GILLEN
40 Worth Street Suite 800New York, NY [email protected]
LANDSCAPE/SHOPPING
TAEWOOK CHA
Supermass Studio12-16 Vestry Street 5th FloorNew York NY [email protected]
STRUCTURALENGINEERS
CIRO CUONO
Cuono Engineering PLLC16 King Street Suite 3-2Port Chester, NY 10573914-305-5679
DOMINIC PILLA
Dominick R. Pilla Associates PCCONSULTING ENGINEERING +ARCHITECTURE23 Depew AvenueNyack, New York 10960845.727.7793Email: [email protected]
RETAILCONSTRUCTION
MICHAEL RATNER
1025 Fifth AvenueNew York, NY 10028718-344-5000
MECHANICALENGINEER
AARON MARTIN
AltieriSeborWieber LLC31 Knight StreetNorwalk, CT [email protected]
LIGHTINGDESIGN
PEIHENG TSAI
PHT Lighting Design401 Broadway Suite 1402New York, NY 10013917-957-4180
SUSTAINABILITY JASON VOLLEN
RPI/CASE14 Wall Street 24th FloorNew York, NY [email protected]
BUILDINGENVELOPE
WALTER MARTINEZ
Israel Berger and Associates360 Park Avenue South,15th Floor212-689-5389
COSTESTIMATING
DAVE MILLER
Triton Construction303 Fifth Avenue, Suite1807New York, NY [email protected]
SPECIFICATIONS JEFF FEINGOLD
Adamson AssociatesArchitects401 Wellington Street West,3rd FloorToronto, Ontario M5V 1E7 [email protected]
JILL BUNYEA & KASIA WILUSZ
12/10/13
JB & KW -------
X-103.00
Rendering Using 3DS Max
Rendering using Vray in 3ds Max as well as Photoshop to edit into photo. Shows the facade system as well as the interior green wall.
Yarvis Renderings with 3DS MAXRendering Class with Vray Spring 2013 Prof. Chang
Rendering made of an unbuilt project . Using speculative materials.
Return
Supply
Boiler chimney
Fan exhaust
Fireplace
HVAC
- Coordination
BuildG
ENER
AL C
ON
TRAC
TOR
132 Kane & 6-8 Cheever
TOW
NHOUSE
REHABILITATION
Brooklyn NY11231
Dixon Advisory USA
Inc.O
WN
ERK&C
41 Union Square W
Suite#806N
YC10003
T: 212. 255. 4157F: 718. 395. 5117
MRTA
PRO
JECT
MAN
AGER
K 701
M.ARCH
ARCHITECTSAR
CH
ITECT
OF R
ECO
RD
SANTORA
ENIGEERING
LLCEN
GIN
EER132 KANE
ST
PRELIM
ANR
Y 7.25.14
Kane- HVAC Diagram - Cellar & L-1R-1
Return
Supply
Boiler chimney
Fan exhaust
Fireplace
HVAC
- Coordination
BuildG
ENER
AL C
ON
TRAC
TOR
132 Kane & 6-8 Cheever
TOW
NHOUSE
REHABILITATION
Brooklyn NY11231
Dixon Advisory USA
Inc.O
WN
ERK&C
41 Union Square W
Suite#806N
YC10003
T: 212. 255. 4157F: 718. 395. 5117
MRTA
PRO
JECT
MAN
AGER
K 701
M.ARCH
ARCHITECTSAR
CH
ITECT
OF R
ECO
RD
SANTORA
ENIGEERING
LLCEN
GIN
EER132 KANE
ST
PRELIM
ANR
Y 7.25.14
Kane- HVAC Diagram - Cellar & L-1R-1
HVAC ModelingRhino & Illustrator Diagram - MRTA Design
HVAC ModelingRhino & Illustrator Diagram - MRTA Design
Stair DesignModels - MRTA Design
A - Rhino model of 90 degree U - stair to make sure the stairs and stringers work together and the stairs depths and angles could be done to code.
B - Mock up model done out of foam core and paper spray panted to show client what the dimension of the blackened steel stair case would look like.
Stringer needs to be 12” here
Cheever Level 1