Started in 2006, by Industrial Engineers with a will to make a difference to the field of Industrial Engineering, SNic India is today India’s leading firm in providing Industrial Engineering Solutions through consulting, IT and outsourcing services with Annual revenues of More than $ 1 Million in 2011 having today 100 plus clientele across India. SNic India has strong base in Industrial Engineering, Operations Management and Supply Chain Management with core expertise in Work Measurement, Simulation Modeling and Planning & Scheduling solutions. SNic India is the All India Representative for Arena Simulation Software by Rockwell Automation, Timer Pro Professional – Work Measurement software and a Solutions Partner to Preactor – Worlds No: 1 Scheduling Software. Consultants at SNic India have a strong background and practical experience in the application of Industrial Engineering tools and techniques, Lean Manufacturing concepts, Simulation Modeling and Operations Management across Manufacturing, IT, and Distribution Sectors. Specialties Work Mesurement Solutions, Ergonomic Design Solutions, Manufacturing Simulation Modeling and Analysis, Line / Flow Balancing, Valu Stream Mapping Simulation, Layout Simulation and Improvement, Preactor Implementation - Advanced Planning and Scheduling Software

TRANSCRIPT

Page 1: Work Measurement Solutions

Identify Analyze Execute

SN Industrial Consultants

Work Measurement Solutions

Page 2: Work Measurement Solutions

Contents

Company Profile

Accomplishments

Clientele

Solution Verticals

Case Studies

Plan of Action

www.snic.co.in

Page 3: Work Measurement Solutions

SNic India

Industrial Engineering, Operations consulting & Advanced Scheduling Solutions firm since 2006.

Experience Team of Consulting Engineers with diverse industry sectors integrated with a young pool for highly skilled Industrial Engineers.

Usage & Implementation of cutting edge IT tools and technology for analysis.

Knowledge transfer through a team based approach, equipping client organizations to sustain cost reductions, process improvements and increase in profitability.

Core Expertise in aiding client organizations in Cost Reduction.

YOU SAY IT, WE SOLVE IT

Quality

Cost

Delivery

Technology

Culture

www.snic.co.in

Page 4: Work Measurement Solutions

Work Measurement Accomplishments

Annual Cost Savings of Rs. 57 Lacs per annum Through Cycle Time Reductions, Lead Time Reduction and WIP Reduction.

Plant Capacity Estimation & Simulation leading to Savings of Rs. 2.5 Crore by deferring the new machine purchase

Standard Time Baseline formation correcting Capacity Estimation, Scheduling, Costing, Production Planning and Incentive Scheme.

Manufacturing Process Standardization – Cycle Times, Ergonomics, Work Station Design, Work Instructions for World Class Manufacturing Systems Audit

Waste Identification, Ergonomics, Cycle Time Generation, Line balancing leading to Man, Material and Machines Optimization

www.snic.co.in

Page 5: Work Measurement Solutions

All logos are trademarks of their respective owners

Extended Clientele

www.snic.co.in

Page 6: Work Measurement Solutions

Your Challenge

Identification and Waste Reduction is our Goal

Cost Reduction is the Outcome

Challenge AreasWork Measurement

& Standardization

Effective Capacity Planning

&Scheduling

Inventory Reduction

Increasing On-Time Delivery

Layout Improvement

www.snic.co.in

Page 7: Work Measurement Solutions

Work Measurement & Standardization

Video Time & Motion Study

Estimated Time Study

Work

Sampling

Flow Charts, Control Charts, SOP generation

Manpower Assessment /

Job Evaluation

Ergonomics

Resource Optimization

Assembly

Line Balancing

Supply Chain Alignment

Layout Improvement

Advanced Planning and Scheduling

Scheduling

Software Implementatio

n

Lean Planning

&

Scheduling

WIP

Reduction

ERP Integration

With

Scheduler

Lean Manufacturing

Aids

Value Stream Mapping

Simulation

5s, SMED, Kaizen

Analysis

Waste Identification

software

Cellular Layouts software

Simulation

Modeling

Business Process Re-Engineering

Capital Equipment

Justification

Manpower / Output

Justification

Bottleneck Analysis

SNic Solutions

www.snic.co.in

Page 8: Work Measurement Solutions

Our Assets

Core Expertise on Work Measurement and Lean Analysis Software’s and its usage in all assignments ensuring traceability and validation for the client.

SNic India elemental time database of Elemental times based on MTM standards especially for Indian industries like Automotive, Electrical and Electronics and

Engineering

Expertise on Simulation Modeling and Analysis using Process Simulator and ProModel

Expertise in Successfully Executing Scheduling software Implementations and Integrations.

Ability to execute assignments as KPO/offshore assignments.

www.snic.co.in

Page 9: Work Measurement Solutions

Area of Expertise

• Advanced Planning and Scheduling

• Work Measurement & Lean Analysis

• Lean Concepts Implementation

• Simulation Modelling & Analysis

• Contract Industrial Engineering

www.snic.co.in

Process Transformation

Optimized Inventory

Optimized Resource Utilization

Reduced Rework / Scrap

Scientific &

StandardizedOperations

Page 10: Work Measurement Solutions

MANUFACTURING CASE STUDIES

Page 11: Work Measurement Solutions

Work Measurement Case Study - 1

www.snic.co.in

Business

Case

•The Company was using roughly estimated cycle times for costing, planning, scheduling, and man power calculation and found estimates leading to inefficiencies and tangible losses.

Solution

•Work Sampling, Methods study, Time Study, Ergonomics Study and Lean Analysis.

Outcome

•1/1000th of a second accuracy to establish time standards on a 95% confidence level.

•Increase in manpower efficiency by 7%

•Overall Throughput Increase by 15%

•Reduction in throughput time by 10%

Page 12: Work Measurement Solutions

Work Measurement Case Study - 2

www.snic.co.in

Business

Case

•Standardization, cycle time reduction, resource optimization and Lead time reduction for a Plant having Assembly lines for a UPS Manufacturer who wanted to drastically optimize resources to reduce Input Cost.

Solution

•Work Measurement, Lean Analysis, Bottleneck Analysis, Line Balancing and Value Stream Mapping.

Outcome

•Low Cost Automation to reduce cycle times by 22% of bottleneck areas leading to increase in throughput by 8%.

•Standard times data library for costing, scheduling and efficiency calculations.

•Average Man power reduction of 10% across 41 lines.

•Lead time reduction through Value stream mapping from 60 days to 53 days

Page 13: Work Measurement Solutions

Work Measurement Case Study - 3

www.snic.co.in

Business

Case

• A Leader in the Power Automation Industry, the client providing custom products to its clients was facing a challenge in estimating the completion time, time for rework, manpower planning, lead time, capacity justification, and Testing Capacity Utilization.

Solution

•Work Measurement, Manpower Assessment, Lean Analysis and Bottleneck Analysis.

Outcome

•Estimation of Completion time and rework time at the design stage

•Standardized Working methods eliminating the possibility of operator based rework (about 5% of the total throughput time)

•Increased testing capacity Utilization by 48%

•Reduced throughput time by 13% through reduction of man movement for material procurement

Page 14: Work Measurement Solutions

Work Measurement Case Study - 4

www.snic.co.in

Business

Case

•A Pharmaceutical Client was facing the difficulty in realizing the planned capacity from all it Machines in a particular section of it manufacturing facility. The Challenge was high input costs for the current productivity levels leading to identifying ways of increasing the output and thereby increase productivity.

Solution

•Motion and Time Study, Man Machine Charts, Lean Analysis, Simulation Modeling for bottleneck and throughput analysis

Outcome

•Establishment of Facts governing Production from Each Machine

•Product wise Production Norms for each machine.

•Lean Analysis leading to Improvements in Machine Design leading to an estimated average cycle time reduction across all processes by 11%.

•Identification of bottlenecks through Simulation Modeling representing current scenario and scenario after cycle time reductions giving key inputs to top management on expansion plans.

Page 15: Work Measurement Solutions

Work Measurement Case Study - 5

www.snic.co.in

Business

Case

•Estimated Time study vs. Actual Time study comparison for Vendors of a large automotive unit to revise the financial understandings.

Solution

•Onsite (Vendor) – Video Motion and time study, Quick Time (MTM based) estimations, gap analysis, waste identification, revised costing.

Outcome

• Identification of Gaps between estimated times and actual times at vendor sites.

•Fair assessment and revision of sub-contract rates.

•Increase in Vendor On-Time-delivery from 73% - 92% leading to overall increase in OTD for the client from 60% - 78% .

Page 16: Work Measurement Solutions

Work Measurement Case Study - 6

www.snic.co.in

Business

Case

•Estimated Time study for Greenfield Assembly lines

Solution

•MTM based Motion and time Study using Timer Pro Professional Software & ProModel Simulation for validation of throughput.

Outcome

• 95% accurate Estimated times validated through Assembly line simulation using Pro Model.

•Identification of material and movement constraints leading to effective allowances over and above the estimated studies

Page 17: Work Measurement Solutions

NON-MANUFACTURING CASE STUDIES

Page 18: Work Measurement Solutions

Work Measurement Case Study - 7

www.snic.co.in

Business

Case

•A Warehouse of an online retail internet portal was looking to improve its warehouse capacity by identifying improvement opportunities. Using Industrial engineering techniques SNic India was given the task to achieve at least 25% capacity improvement.

Solution

•Identified non-value-added process steps and manually intense materials handling methods that were the cause of bottlenecks and increased product cycle times. A number of process steps were eliminated and/or modified to allow for the design and implementation of an improved WMS and materials handling system. Areas evaluated included: computer systems, warehouse methodology, receiving, quality control, replenishment/put-away, ticketing, put system, pick system, shipping, and returns.

Outcome

•Improve facility capacity 40% by increasing the number of pallet positions and replacing existing racking with new, more space efficient Narrow Aisle (NA) pallet racking.

•Implement pick-to-belt and pick-to-carton for additional sets of case flow racking needed to support picking of all SKUs.

Page 19: Work Measurement Solutions

Work Measurement Case Study - 8

www.snic.co.in

Business

Case

•An Embedded IT Services Development company wanted to reduce the overall lead time of the project which was currently 6 months. SNic India was given the task to study the current system and provide recommendations for lead time reduction.

Solution

•Time and Motion study and Value Stream Mapping were used to Map the existing processes and asses the time for the each process.

•Process Simulator was used to simulate the maps with the cycle times to identify bottlenecks.

Outcome

•Out of 4 Bottlenecks the most critical bottleneck was analyzed using statistical distributions for the bottleneck stations.

•Many process taking less time were clubbed to align to the bottleneck which eventually decreased input cost on the project by 12%.

•Over Lead Time was reduced from 6 months to 3 months by reducing the bottleneck cycle time.

Page 20: Work Measurement Solutions

Work Measurement Methodology

Note:

Pilots can be carried out for first time clients, where in a pilot area is identified to carry out the study achieving the required objective during the preliminary visit.

Client bears all the expenses for the pilot except the consulting fees which is to be paid only on satisfactory completion of the pilot as an inculcation into the commercial proposal.

Phase 1• Video Capture –

Methods Study• Methods

Correction

Phase 2• Analyses using

Time study Software

Phase 3• Waste

Identification• Standardization• Recommendation

s

Phase 4 (as per Objective)• Capacity

Estimation• Costing• Scheduling• Manpower

Planning

Phase 5• Coordinating

Implementation• Operator Training• Audits

Page 21: Work Measurement Solutions

Video Time Study- Timer Pro Software

• Sampling is done to arrive at the number of cycles for observation after method study.

• Videos of the observed method are imported in timer pro for analysis.

• Operations are broken down into elements.

• Basic elements are classified into Lean categories(VA,RNVA,NVA).

• Necessary Allowances are added to the basic work content.

• Standard Time for the operation is arrived.

Page 22: Work Measurement Solutions

Video Time Study- Timer Pro Software

Select video

VA RNVA &NVA Break up

Break up of activities into elements

Cycle time for corresponding element

Screen Shot from Timer Pro Software.

Page 23: Work Measurement Solutions

Video Time Study- Timer Pro Software

Report Summary from Timer Pro Software.

Page 24: Work Measurement Solutions

Video Time Study- Timer Pro Software

Standard Time report from Timer Pro Software.

Page 25: Work Measurement Solutions

Man Machine Charts- Timer Pro Software

Man Machine Chart Screen ShotGantt Chart for Man Machine Activitiesfrom Timer Pro Software

Page 26: Work Measurement Solutions

Android Based Time Study – Using PDA’s

• Time Study can be done by installing Timer Pro Software on Mobile Devices (Android & Windows mobiles).

• Screen Shot from the Android mobile is as shown.

• By clicking the Timer Pro icon on screen the application is opened.

• Last used study is selected to open a dynamic Timer Pro Screen to start time study.

Page 27: Work Measurement Solutions

Android Based Time Study- Using PDA’s

Page 28: Work Measurement Solutions

PDA Time Study- Using PDA’s

• Click on the Start tab to run the predefined sequence of elements and start stopwatch.

• By clicking on the Sub tab the element is stopped and next element is started.

• Results from the PDA based Time Study can be downloaded to the PC is Excel Format as Standard Time Report.

Page 29: Work Measurement Solutions

Identify Analyze Execute

SNic India#831/60, 1st floor,

4th Main, Vijay Nagar,Bangalore 560 040

Ph: +91 80 4127 5612 / 98459 09492Email: [email protected]

Business Hours: 9.30 am – 05.30 pm (Mon-Fri)

For Business Inquiries, References and Testimonials visit www.snic.co.in