work goals - 2015

Upload: ajay-bhaarath

Post on 09-Jan-2016

14 views

Category:

Documents


0 download

DESCRIPTION

Work goals

TRANSCRIPT

Sheet1Dec - 01 to 05-2014Goals Planning (Weekly )Work Done (Weekly

Day 1Day 2Day 3Day 4Day 5(Dec -05)Day 1Day 2Day 3Day 4Day 51. Bottom and top clamping blocks left and right side2. Design of L bracket3. Finding vernier depth gauge with digital display4. Designing of angular alignment positioning block5. Designing of top and bottom clamping blocks both end

1. Design of L bracketRequirements:1. Non metal2. 2 set of brackets left and right side to be use for guiding the target block,3. So the distance separated bet. 2 set of blocks are equal to the target block width4. No indexing holes5. Steps for std Nylon block6. The step height should be in plane with sensor blade top7. Counter bore hole to be provided for tap with tool clamping block top8. Length? (single block or multiple blocks)1. Bottom and top clamping blocks left and right sideRequirements:1. All L bracket seating faces should be Parallel with each other.2. Clamping with bottom block 3. Clamping with L bracket4. Whether two taps can be provided here?5. Exactly mate with tool OD6. How to maintain perpendicularity with sensor axis?7. Distance between blocks?8. Thickness of the blocks?9. Material availability10.

Top block stock (14 x 8 x 4 )Bottom block stock (14 x 8 x 4.5)http://www.mcmaster.com/#uhmw-polyethylene-sheets/=uvx09pUHMW block 5" thickhttp://www.mcmaster.com/#standard-nylon-sheets/=uvx5kznylon block 4" thickhttp://www.mcmaster.com/#95868a664/=uvx81q1/2" socket head nylon bolt0.8450.11.0450.21.0950.251.3450.5

2nd week

To Do This Week: 05 JAN 2015 to 09 JAN 2015

Goals12

MondayCompleted Assembly procedure of Geosharp electric sensor

TuesdayTuesday1Uploaded Assembly model in CWI2Weekly meeting

WednesdayMondayMonday1Update Assembly procedure of Geosharp electric sensor
Karuppusamy Viswanathan: Karuppusamy Viswanathan:Allen key size, to be review with Neela2Find plastics with permittivity bet 2 - 6 with ease of machiningDesign review meeting

ThursdayMondayUploaded all mfg spec (6 Nos) regarding Geosharp electric sensor in CWIModeled changed concept of Permittivity plasticTeam meeting for Variable pay

FridayMonday

SaturdaySunday

11th weekTo Do This Week:__________ to__________ _

Goals123456Monday123456TuesdayTuesday123456WednesdayMonday1
Karuppusamy Viswanathan: Karuppusamy Viswanathan:Allen key size, to be review with Neela23456ThursdayMonday123456FridayMonday123456SaturdaySunday

Sheet3

To Do This Week: 12 JAN 2015 to 16 JAN 2015

Goals12

Monday

TuesdayTuesday12

WednesdayMonday1
Karuppusamy Viswanathan: Karuppusamy Viswanathan:Allen key size, to be review with Neela2

ThursdayMonday

FridayMonday

SaturdaySunday