Sheet1Dec - 01 to 05-2014Goals Planning (Weekly )Work Done (Weekly
Day 1Day 2Day 3Day 4Day 5(Dec -05)Day 1Day 2Day 3Day 4Day 51. Bottom and top clamping blocks left and right side2. Design of L bracket3. Finding vernier depth gauge with digital display4. Designing of angular alignment positioning block5. Designing of top and bottom clamping blocks both end
1. Design of L bracketRequirements:1. Non metal2. 2 set of brackets left and right side to be use for guiding the target block,3. So the distance separated bet. 2 set of blocks are equal to the target block width4. No indexing holes5. Steps for std Nylon block6. The step height should be in plane with sensor blade top7. Counter bore hole to be provided for tap with tool clamping block top8. Length? (single block or multiple blocks)1. Bottom and top clamping blocks left and right sideRequirements:1. All L bracket seating faces should be Parallel with each other.2. Clamping with bottom block 3. Clamping with L bracket4. Whether two taps can be provided here?5. Exactly mate with tool OD6. How to maintain perpendicularity with sensor axis?7. Distance between blocks?8. Thickness of the blocks?9. Material availability10.
Top block stock (14 x 8 x 4 )Bottom block stock (14 x 8 x 4.5)http://www.mcmaster.com/#uhmw-polyethylene-sheets/=uvx09pUHMW block 5" thickhttp://www.mcmaster.com/#standard-nylon-sheets/=uvx5kznylon block 4" thickhttp://www.mcmaster.com/#95868a664/=uvx81q1/2" socket head nylon bolt0.8450.11.0450.21.0950.251.3450.5
2nd week
To Do This Week: 05 JAN 2015 to 09 JAN 2015
Goals12
MondayCompleted Assembly procedure of Geosharp electric sensor
TuesdayTuesday1Uploaded Assembly model in CWI2Weekly meeting
WednesdayMondayMonday1Update Assembly procedure of Geosharp
electric sensor
Karuppusamy Viswanathan: Karuppusamy Viswanathan:Allen key size, to
be review with Neela2Find plastics with permittivity bet 2 - 6 with
ease of machiningDesign review meeting
ThursdayMondayUploaded all mfg spec (6 Nos) regarding Geosharp electric sensor in CWIModeled changed concept of Permittivity plasticTeam meeting for Variable pay
FridayMonday
SaturdaySunday
11th weekTo Do This Week:__________ to__________ _
Goals123456Monday123456TuesdayTuesday123456WednesdayMonday1
Karuppusamy Viswanathan: Karuppusamy Viswanathan:Allen key size, to
be review with
Neela23456ThursdayMonday123456FridayMonday123456SaturdaySunday
Sheet3
To Do This Week: 12 JAN 2015 to 16 JAN 2015
Goals12
Monday
TuesdayTuesday12
WednesdayMonday1
Karuppusamy Viswanathan: Karuppusamy Viswanathan:Allen key size, to
be review with Neela2
ThursdayMonday
FridayMonday
SaturdaySunday