Page 1: WORK EXPERIENCE (Graphical report) · •Grupo Aluminios de Precisión GAP Urbanization and building of an industrial workshop for an aluminium processing company, Budget 12.100.000€

WORK EXPERIENCE (Graphical report)

David Manchón Frías Telephone: +34619935043

E-mail: [email protected]

Page 2: WORK EXPERIENCE (Graphical report) · •Grupo Aluminios de Precisión GAP Urbanization and building of an industrial workshop for an aluminium processing company, Budget 12.100.000€

1. WORK PROFILE HANDLED: “Site Manager”

PROJECTS WORKING ON

1. BUILDING PROJECTS:

– Urbanization and building of an industrial workshop for an aluminium processing company GAP (Grupo Aluminios de Precisión)

– Refurbish Works in two office buildings to update them according to the new company organization for ADISSEO International.

2. GENERAL CIVIL PROJECT:

– Works of Urbanization and updating in Quintanadueñas (Burgos)

– Works of Urbanization in Castrillo de Matajudios.

– Works of building of a new Water Regulation Tank in Escobados de Arriba.

– Works of Urbanization of “Bulevar Ferroviario de Burgos” Sectors 2-3 and 5 designed by Architect team Herzog & de Meuron.

– Urbanization Project of José Luís Talamillo Sports Center.

– Urbanization Project of Bulevar Ferroviario de Burgos in sector “2_accesos sector 27 ciudad del AVE” by Herzog & de Meuron.

– Study of Project and budget for the Urbanizations Works in streets LEÓN Y GLORIA FUERTES, city of Burgos. Planning of works, requirement of budgets, traffic access and regulation study, redaction of final report of Works

– Execution Project of " Marina San Vicente de la Barquera”

Page 3: WORK EXPERIENCE (Graphical report) · •Grupo Aluminios de Precisión GAP Urbanization and building of an industrial workshop for an aluminium processing company, Budget 12.100.000€

• Grupo Aluminios de Precisión GAP

Urbanization and building of an industrial workshop for an aluminium processing company, Budget 12.100.000€.

Aims:

Economic: Total benefit 23 % (of the invoiced)

Site Quality: 99%

Security: No accident at work

Execution Time: – Planned: 12 months (civil works)

– Used royal time: 8 months (civil works)

Number Subcontracted companies: 42 companies

Relation with Administrations: Private Site

Page 4: WORK EXPERIENCE (Graphical report) · •Grupo Aluminios de Precisión GAP Urbanization and building of an industrial workshop for an aluminium processing company, Budget 12.100.000€

• Grupo Aluminios de Precisión GAP

Air sight of foundations plant

Pits machinery and Bombs counter fires

Finished work

Page 5: WORK EXPERIENCE (Graphical report) · •Grupo Aluminios de Precisión GAP Urbanization and building of an industrial workshop for an aluminium processing company, Budget 12.100.000€

• Bulevar Ferroviario de Burgos” Sectors 2-3 and 5

Sectors 2-3: 60.849 m2

• Works of Urbanization (Study of initial budget and Project,

Planning of Civil Works)

• Designed by Architect team Herzog & de Meuron

• Budget sectors 2-3 and 5: 21.400.000 €

Page 6: WORK EXPERIENCE (Graphical report) · •Grupo Aluminios de Precisión GAP Urbanization and building of an industrial workshop for an aluminium processing company, Budget 12.100.000€

• Bulevar Ferroviario de Burgos” Sectors 2-3 and 5

Aims:

• Economic:

Adjudication Fall: 8 %

Estimated benefit: 6 % (after the adjudication Fall)

• Site in execution

• Relation with Administrations: Local administration

Sector 5: 182.348 m2

Page 7: WORK EXPERIENCE (Graphical report) · •Grupo Aluminios de Precisión GAP Urbanization and building of an industrial workshop for an aluminium processing company, Budget 12.100.000€

• Bulevar Ferroviario de Burgos ” ACCESOS sector 27 CIUDAD del AVE”

– Works of Urbanization

– Designed by Architect team: Herzog & de Meuron

– Budget: 5.900.000 €. €

Aims:

Economic: Total benefit 6 % (of the invoiced)

Site Quality: 90%

Security: No accident at work

Execution Time:

– Planned: 10 months

– Used royal time: 12 months

Number Subcontracted companies: 25 companies

Relation with Administrations: Local Administrations and Private Companies

Page 8: WORK EXPERIENCE (Graphical report) · •Grupo Aluminios de Precisión GAP Urbanization and building of an industrial workshop for an aluminium processing company, Budget 12.100.000€

• Bulevar Ferroviario de Burgos ” ACCESOS sector 27 CIUDAD del AVE”

Page 9: WORK EXPERIENCE (Graphical report) · •Grupo Aluminios de Precisión GAP Urbanization and building of an industrial workshop for an aluminium processing company, Budget 12.100.000€

• Urbanization Project: “CALLE LEÓN Y GLORIA FUERTES”

– Study of Project and budget for the Urbanizations Works (Planning of works, study and requirement of budgets, traffic access and regulation study, redaction of final report of Works, etc).

– Designed by PROINTEC (Consulting Company)

– Budget: 4.100.000 €

Aims:

Economic: Total benefit 5,5 % (Adjudication Fall: 9% and Estimated benefit: 4 % after the adjudication Fall)

Site Quality: 93%

Security: No accident at work

Execution Time:

– Planned: 9 months

– Used royal time: 10 months

Number Subcontracted companies: 5 companies

Relation with Administrations: Local Administrations

Page 10: WORK EXPERIENCE (Graphical report) · •Grupo Aluminios de Precisión GAP Urbanization and building of an industrial workshop for an aluminium processing company, Budget 12.100.000€

• Urbanization Project: “CALLE LEÓN Y GLORIA FUERTES”

Page 11: WORK EXPERIENCE (Graphical report) · •Grupo Aluminios de Precisión GAP Urbanization and building of an industrial workshop for an aluminium processing company, Budget 12.100.000€

• Different Sites:

– ADISSEO International: Refurbish Works in two office

buildings to update them according to the new

company organization (Budget: 134.500 €).

Administration Building Technical building

Page 12: WORK EXPERIENCE (Graphical report) · •Grupo Aluminios de Precisión GAP Urbanization and building of an industrial workshop for an aluminium processing company, Budget 12.100.000€

• Different Sites:

– Works of Urbanization and updating in Quintanadueñas (Burgos) (Budget: 280.000 €)

–Works of Urbanization

Castrillo de Matajudios.

(Budget: 260.000€)

Page 13: WORK EXPERIENCE (Graphical report) · •Grupo Aluminios de Precisión GAP Urbanization and building of an industrial workshop for an aluminium processing company, Budget 12.100.000€

• Different Sites:

– Works of building of a new Water

Regulation Tank in Escobados de

Arriba (Budget: 50.000€).

– Urbanization Project of José Luís

Talamillo Sports Center (Budget:

365.000€).

Page 14: WORK EXPERIENCE (Graphical report) · •Grupo Aluminios de Precisión GAP Urbanization and building of an industrial workshop for an aluminium processing company, Budget 12.100.000€

2. WORK PROFILE HANDLED: “Project Manager”

PROJECTS WORKING ON

1. BUILDING PROJECTS:

– Since 11/2009 till 03/2010 Cooperation, supervision and assessment on the

design of work reform on a flat located in downtown of Bilbao, another one in Av. America (Madrid), another one in Sector S3 in Burgos.

– Execution Project of " Regional Center of musical Creation and Production" Former Hangars RENFE's station of Burgos. City hall of Burgos.

2. GENERAL CIVIL PROJECT:

– Urbanization Project on the” U.A.29.01.1 y la U.A.29.01.2 del Plan Especial de la

Estación de Burgos”

– Urbanization Project on the “ SECTOR SAUI-1 de Villagonzalo de Pedernales (Burgos)

Page 15: WORK EXPERIENCE (Graphical report) · •Grupo Aluminios de Precisión GAP Urbanization and building of an industrial workshop for an aluminium processing company, Budget 12.100.000€

• U.A.29.01.1 y U.A.29.01.2 del Plan Especial de la Estación Brugos

Study, Design and Project direction in phase of project execution.

Project Manager in phase of site execution.

Budget: 9.500.000 €

Aims:

Economic: 0% Difference between initial budget of bidding and final certification delivered by the construction

company

Site Quality: 100%

Security: No accident at work

Execution Time: 2 years

Number Subcontracted companies: 2 companies

Relation with Administrations: Local administrations and the Private Companies

Page 16: WORK EXPERIENCE (Graphical report) · •Grupo Aluminios de Precisión GAP Urbanization and building of an industrial workshop for an aluminium processing company, Budget 12.100.000€

• U.A.29.01.1 y U.A.29.01.2 del Plan Especial de la Estación Brugos

Page 17: WORK EXPERIENCE (Graphical report) · •Grupo Aluminios de Precisión GAP Urbanization and building of an industrial workshop for an aluminium processing company, Budget 12.100.000€

Urbanization Project on the “ SECTOR SAUI-1 de Villagonzalo de Pedernales (Burgos)

Aims:

• Economic: 5 % Difference between initial budget of

biddingand final certification delivered by

the construction company

•Site Quality: 100%

• Security: No accident at work

• Execution Time: 1,5 years

• Relation with Administrations: Local

administrations and the Private Companies

• Study, Design and Project direction in phase of project execution.

Page 18: WORK EXPERIENCE (Graphical report) · •Grupo Aluminios de Precisión GAP Urbanization and building of an industrial workshop for an aluminium processing company, Budget 12.100.000€

• Execution Project of " Regional Center of musical Creation and

Production"

Execution Project of " Regional Center of musical

Creation and Production"

Former Hangars RENFE's station of Burgos. City hall

of Burgos.

Study, Design and Project direction in phase of

project execution.

Project Manager in phase of site execution.

Budget: 2.500.000 €

Counter fires Installation

Gatherings and sections

Foundations Flat

Page 19: WORK EXPERIENCE (Graphical report) · •Grupo Aluminios de Precisión GAP Urbanization and building of an industrial workshop for an aluminium processing company, Budget 12.100.000€

• Execution Project of " Regional Center of musical Creation and

Production"

Aims:

• Economic: Precise study of the project and budget, in order the best relation offers quality, design

and economic cost

• Security: No accident at work

• Execution Time: 1 years

• Number Subcontracted companies in project execution: 3 companies

• Relation with Administrations: Local and regional administrations

Page 20: WORK EXPERIENCE (Graphical report) · •Grupo Aluminios de Precisión GAP Urbanization and building of an industrial workshop for an aluminium processing company, Budget 12.100.000€

• Execution Project of “ Marina San Vicente de la Barquera”

Execution Project of " Marina San Vicente de la Barquera“

Study, Design and Project direction in phase of project execution.

Budget: 4.600.000 €

Project alternatives: Project: