work experience (graphical report) · •grupo aluminios de precisión gap urbanization and...
TRANSCRIPT
WORK EXPERIENCE (Graphical report)
David Manchón Frías Telephone: +34619935043
E-mail: [email protected]
1. WORK PROFILE HANDLED: “Site Manager”
PROJECTS WORKING ON
1. BUILDING PROJECTS:
– Urbanization and building of an industrial workshop for an aluminium processing company GAP (Grupo Aluminios de Precisión)
– Refurbish Works in two office buildings to update them according to the new company organization for ADISSEO International.
2. GENERAL CIVIL PROJECT:
– Works of Urbanization and updating in Quintanadueñas (Burgos)
– Works of Urbanization in Castrillo de Matajudios.
– Works of building of a new Water Regulation Tank in Escobados de Arriba.
– Works of Urbanization of “Bulevar Ferroviario de Burgos” Sectors 2-3 and 5 designed by Architect team Herzog & de Meuron.
– Urbanization Project of José Luís Talamillo Sports Center.
– Urbanization Project of Bulevar Ferroviario de Burgos in sector “2_accesos sector 27 ciudad del AVE” by Herzog & de Meuron.
– Study of Project and budget for the Urbanizations Works in streets LEÓN Y GLORIA FUERTES, city of Burgos. Planning of works, requirement of budgets, traffic access and regulation study, redaction of final report of Works
– Execution Project of " Marina San Vicente de la Barquera”
• Grupo Aluminios de Precisión GAP
Urbanization and building of an industrial workshop for an aluminium processing company, Budget 12.100.000€.
Aims:
Economic: Total benefit 23 % (of the invoiced)
Site Quality: 99%
Security: No accident at work
Execution Time: – Planned: 12 months (civil works)
– Used royal time: 8 months (civil works)
Number Subcontracted companies: 42 companies
Relation with Administrations: Private Site
• Grupo Aluminios de Precisión GAP
Air sight of foundations plant
Pits machinery and Bombs counter fires
Finished work
• Bulevar Ferroviario de Burgos” Sectors 2-3 and 5
Sectors 2-3: 60.849 m2
• Works of Urbanization (Study of initial budget and Project,
Planning of Civil Works)
• Designed by Architect team Herzog & de Meuron
• Budget sectors 2-3 and 5: 21.400.000 €
• Bulevar Ferroviario de Burgos” Sectors 2-3 and 5
Aims:
• Economic:
Adjudication Fall: 8 %
Estimated benefit: 6 % (after the adjudication Fall)
• Site in execution
• Relation with Administrations: Local administration
Sector 5: 182.348 m2
• Bulevar Ferroviario de Burgos ” ACCESOS sector 27 CIUDAD del AVE”
– Works of Urbanization
– Designed by Architect team: Herzog & de Meuron
– Budget: 5.900.000 €. €
Aims:
Economic: Total benefit 6 % (of the invoiced)
Site Quality: 90%
Security: No accident at work
Execution Time:
– Planned: 10 months
– Used royal time: 12 months
Number Subcontracted companies: 25 companies
Relation with Administrations: Local Administrations and Private Companies
• Bulevar Ferroviario de Burgos ” ACCESOS sector 27 CIUDAD del AVE”
• Urbanization Project: “CALLE LEÓN Y GLORIA FUERTES”
– Study of Project and budget for the Urbanizations Works (Planning of works, study and requirement of budgets, traffic access and regulation study, redaction of final report of Works, etc).
– Designed by PROINTEC (Consulting Company)
– Budget: 4.100.000 €
Aims:
Economic: Total benefit 5,5 % (Adjudication Fall: 9% and Estimated benefit: 4 % after the adjudication Fall)
Site Quality: 93%
Security: No accident at work
Execution Time:
– Planned: 9 months
– Used royal time: 10 months
Number Subcontracted companies: 5 companies
Relation with Administrations: Local Administrations
• Urbanization Project: “CALLE LEÓN Y GLORIA FUERTES”
• Different Sites:
– ADISSEO International: Refurbish Works in two office
buildings to update them according to the new
company organization (Budget: 134.500 €).
Administration Building Technical building
• Different Sites:
– Works of Urbanization and updating in Quintanadueñas (Burgos) (Budget: 280.000 €)
–Works of Urbanization
Castrillo de Matajudios.
(Budget: 260.000€)
• Different Sites:
– Works of building of a new Water
Regulation Tank in Escobados de
Arriba (Budget: 50.000€).
– Urbanization Project of José Luís
Talamillo Sports Center (Budget:
365.000€).
2. WORK PROFILE HANDLED: “Project Manager”
PROJECTS WORKING ON
1. BUILDING PROJECTS:
– Since 11/2009 till 03/2010 Cooperation, supervision and assessment on the
design of work reform on a flat located in downtown of Bilbao, another one in Av. America (Madrid), another one in Sector S3 in Burgos.
– Execution Project of " Regional Center of musical Creation and Production" Former Hangars RENFE's station of Burgos. City hall of Burgos.
2. GENERAL CIVIL PROJECT:
– Urbanization Project on the” U.A.29.01.1 y la U.A.29.01.2 del Plan Especial de la
Estación de Burgos”
– Urbanization Project on the “ SECTOR SAUI-1 de Villagonzalo de Pedernales (Burgos)
• U.A.29.01.1 y U.A.29.01.2 del Plan Especial de la Estación Brugos
Study, Design and Project direction in phase of project execution.
Project Manager in phase of site execution.
Budget: 9.500.000 €
Aims:
Economic: 0% Difference between initial budget of bidding and final certification delivered by the construction
company
Site Quality: 100%
Security: No accident at work
Execution Time: 2 years
Number Subcontracted companies: 2 companies
Relation with Administrations: Local administrations and the Private Companies
• U.A.29.01.1 y U.A.29.01.2 del Plan Especial de la Estación Brugos
Urbanization Project on the “ SECTOR SAUI-1 de Villagonzalo de Pedernales (Burgos)
Aims:
• Economic: 5 % Difference between initial budget of
biddingand final certification delivered by
the construction company
•Site Quality: 100%
• Security: No accident at work
• Execution Time: 1,5 years
• Relation with Administrations: Local
administrations and the Private Companies
• Study, Design and Project direction in phase of project execution.
• Execution Project of " Regional Center of musical Creation and
Production"
Execution Project of " Regional Center of musical
Creation and Production"
Former Hangars RENFE's station of Burgos. City hall
of Burgos.
Study, Design and Project direction in phase of
project execution.
Project Manager in phase of site execution.
Budget: 2.500.000 €
Counter fires Installation
Gatherings and sections
Foundations Flat
• Execution Project of " Regional Center of musical Creation and
Production"
Aims:
• Economic: Precise study of the project and budget, in order the best relation offers quality, design
and economic cost
• Security: No accident at work
• Execution Time: 1 years
• Number Subcontracted companies in project execution: 3 companies
• Relation with Administrations: Local and regional administrations
• Execution Project of “ Marina San Vicente de la Barquera”
Execution Project of " Marina San Vicente de la Barquera“
Study, Design and Project direction in phase of project execution.
Budget: 4.600.000 €
Project alternatives: Project: