  • 8/19/2019 Work at Height - Scaffolding

    1/46

    Contents

    • Objectives• Scaffolding

    • Types of Scaffolding

    • Planning considerations

    • System scaffolding

    construction

    • Bracing

    • Tubular frame scaffolding

    • Mobile scaffolding

    • Dismantle of Scaffolding• Scaffolding tag system

    1

    • Working platform• Scaffold Board

    • DO! System

    • "adder Safety

    • #all protection$Safety %ets

    • Competent Person• #ield &nspection

    • 'emember

    • Major (a)ards

    •Personal #all !rresting system• Summary

    • *mergency Control 'oom$!jmer

  • 8/19/2019 Work at Height - Scaffolding

    2/46

  • 8/19/2019 Work at Height - Scaffolding

    3/46

  • 8/19/2019 Work at Height - Scaffolding

    4/46

    Types of Scaffolding

    •  Tube & Fittins

    •  !wickstae

    •  "uplock 

  • 8/19/2019 Work at Height - Scaffolding

    5/46

    Planning Considerations

    •#. $hat is the e%act location for the scaold'

    •(. $here will the scaold be used for and whowill be usin it'

    •). *ow much weiht must the scaold be

    capable of supportin'

    •+. $hat type of scaold will be required'

    •. $hat is the heiht and lenth of therequired scaold'

  • 8/19/2019 Work at Height - Scaffolding

    6/46

    Planning Considerations

    • -. Are the round conditions suitable'

    • . Are there any overhead obstructions'

     

    /i.e. pipe racks and power lines0

    • 1. $ill the scaold interfere with a main road orpedestrian tra2c'

    • 3. *ow will workers access the scaold'

  • 8/19/2019 Work at Height - Scaffolding

    7/46

    System Scaffolding Construction

    • Follow manufacturer4s desin

    specs5requirements

    • 6ase is on solid round5footin

    • 7tructure is both square and plumb

    • 8latforms must be9• fully planked or decked with noaps

    • at least )1 mm wide5thickness/boards0

    • able to support its own weiht

    • able to support + :4s itsma%imum load

  • 8/19/2019 Work at Height - Scaffolding

    8/46

    System Scaffolding Construction

    • 7pacin between the bays must never

    e%ceed (. meters

    • All boards or planks used must always be secured

    •  ;imensions•   ma%imum distance between the base plate and

    •   the

  • 8/19/2019 Work at Height - Scaffolding

    9/46

  • 8/19/2019 Work at Height - Scaffolding

    10/46

    System Scaffolding Construction

  • 8/19/2019 Work at Height - Scaffolding

    11/46

    System Scaffolding Construction

  • 8/19/2019 Work at Height - Scaffolding

    12/46

    System Scaffolding Construction

    SI## 'S)#E *)&RD(

    *&SE P#&+E

    R,--ER '#EDER(

    S+&-D&RD

    +)E*)&RD

    %SE ,PRI!+

    DR)P *&R

    MID R&I#

    +)P R&I#

    S&%%)#D P#&-KS

    *E&RER '+R&-S)M(

    #)-I+,DI- *R&I-

    S/I0E# ),P#ER

    %I1ED ),P#ER '234(

    +R&-S0ERSE *R&I-

    *&SE #I%+ 'KIKER #I%+(

    #&DDER #&MP

    3.25m 6 7.75 m

    '89:;

  • 8/19/2019 Work at Height - Scaffolding

    13/46

  • 8/19/2019 Work at Height - Scaffolding

    14/46

    ystem caffolds All system scaffolds shall be erected per manufacturer!s published

    instructions and the re"uirements

  • 8/19/2019 Work at Height - Scaffolding

    15/46

    Tubular #rame Scaffold

    • Designed to support 4 times the maximumrated load.

    • Braced by cross bracing or diagonal bracesor both.

    • Set on adjustable bases or plain bases.

    • If load bearing capacity of soil less base tobe set on sole plate.

    • Each such joint to have a coupler tostac!ing pins

    • Secured to the structure at Intervals not to

    exceed "m #$% feet& hori'ontally and (m#)* feet& vertically.

    • Sca+olds above $(m #1), feet& heightshall be designed by a -rofessionalEngineer

  • 8/19/2019 Work at Height - Scaffolding

    16/46

    Mobile Scaffold

  • 8/19/2019 Work at Height - Scaffolding

    17/46

    Mobile Scaffold

    • hen free/standing height not exceed fourtimes the minimum base dimension.

    •  0o support four times the maximumintended load.

    • ll heels shall be provided ith a positiveloc!ing device

    •  0o be braced by cross bracing or diagonalbraces or both

    • -latforms shall be tightly dec!ed securedagainst displacement.

    • -latforms shall be provided ith guard rail

  • 8/19/2019 Work at Height - Scaffolding

    18/46

    Mobile Scaffold

    •  0he force to move the sca+old to be appliedas close to the base as practicable

    •  0o be moved only on level 2oors free fromobstructions and openings.

    •  0he heels to be provided ith rubber orsimilar resilient tires

    • or!men not to be alloed to ride on mobilesca+old.

    • ll materials to be removed before mobilesca+old is moved.

    • heels to be loc!ed hile sca+old in use.

  • 8/19/2019 Work at Height - Scaffolding

    19/46

    Scaffolding

    @rection

  • 8/19/2019 Work at Height - Scaffolding

    20/46

    Scaffolding

    @rection• 6y skilled workmen with the

    supervision of a competent7upervisor.

    • "ordonin the area.

    • iftin of frame and other partsby the use of ;errick & 8ulley

    arranement• adder shall be used for climbin

    up and down.

    • >ed Ta shall be provided to

    caution that the scaold is under

  • 8/19/2019 Work at Height - Scaffolding

    21/46

    Scaffolding

    @rection

    t the end of the day3 if a sca+old is going to be left half/erected3 it is essential to loer all the loose sca+oldmaterials don and ensure that the sca+old is bracedadeuately to the building5structure.

    Double 6anyard Safety 7arness shall be used by allor!men engaged in sca+old erection or!s.

  • 8/19/2019 Work at Height - Scaffolding

    22/46

    Dismantling of Scaffolding

    • Dismantling only by S!illed or!men• 8ordoning of the area

    • 9ed 0ag to be displayed

    • 6oering of the materials by the useof Derric! and -ulley arrangement

    • Each tier shall be completelydismantled and the material loered

    to the ground before beginning todismantle the next tier

    • :aterials not to be dropped

  • 8/19/2019 Work at Height - Scaffolding

    23/46

    Dismantling of Scaffolding

    Double lanyard safety harness to beanchored to a strong structure or lifelinebefore attempting to loosen stuc! or jammedparts

    t the end of the day3 if a sca+old is going tobe left half/dismantled3 it is essential toloer all the loose sca+old materials donand ensure that the sca+old is braced

    adeuately to the building5structure

    ll the dismantled materials shall be stac!edin the appropriate manner at the designatedplace

  • 8/19/2019 Work at Height - Scaffolding

    24/46

    Scaffold Tag System

    UNSAFE FOR USE

    ;ate of Bnspection9

    7inature of "ompetent8erson

    SAFE FOR USE

    ;ate of Bnspection 9

    7inature of "ompetent8erson

  • 8/19/2019 Work at Height - Scaffolding

    25/46

    Scaffold Tag System

    >ed Ta

     0his tag indicates that the sca+old isunder erection or dismantling or has notbeen inspected or is not safe for use #byanyone other than sca+old gang&.

    =reen 7caold Ta 0his tag indicates that the sca+old iscomplete ; it has been inspected by

    competent person and is safe for use.

  • 8/19/2019 Work at Height - Scaffolding

    26/46

    >9?I=< -60@>9:

  • 8/19/2019 Work at Height - Scaffolding

    27/46

    $O>!C8ATFO>D

    "O7@E 6OA>;

    A;@GAT@E 7@"G>@;HOT @77 T*AH (?? DD $B;@ AH; & ? DD

    T*! 

    7G88O>T@; AT@A7T OI@> ) 7G88O>T7

    @:T@H; -?? DD 6@EOH; T*@ $O>!BH= 78A"@-?? mm $*@H G7@; FO> 8@>7OH

    1?? mm $*@H G7@; FO> 8@>7OH & DAT@>BA

    OI@>*AH=

    minimum ? mm

    ma%imum + times the thk of the board.

    Allowable ma%. span between supports

     #.J thick plank #. m (J thick plank (.- m

  • 8/19/2019 Work at Height - Scaffolding

    28/46

    7caold 6oard

  • 8/19/2019 Work at Height - Scaffolding

    29/46

    Flexible system 

    - Lesser overall stock • Rapid assembly

    - Reduced cycle time, labour savings.

    • Virtually self aligning

     

    - Dimensional accuracy.• International safety Standard 

    - Built in safety features• Excellent aesthetics

     

    - Consistent high quality, lines,

     surface finish.• Overall Economy 

    - Versatile and recurring roductive usage netting large savings

    A;IAHTA=@7A;IAHTA=@7

    &T C ;O!A 7E7T@D

  • 8/19/2019 Work at Height - Scaffolding

    30/46

    &T C ;O!A 7E7T@D

    @lexibilty of 0imber

    Strength of Steel

    &

    @6EA

    B@S

    7D0

    66

    8>6:=

    86I:BI=<

    88ESS

    S0I9

  • 8/19/2019 Work at Height - Scaffolding

    31/46

    66

  • 8/19/2019 Work at Height - Scaffolding

    32/46

    @6EA

    B@S

  • 8/19/2019 Work at Height - Scaffolding

    33/46

    B@S

  • 8/19/2019 Work at Height - Scaffolding

    34/46

    7D0

    F D t

  • 8/19/2019 Work at Height - Scaffolding

    35/46

    Few Donts

    A;;@>

  • 8/19/2019 Work at Height - Scaffolding

    36/46

    OI@>C>@A"* OH

    A A;;@>

    A;;@>

    DON'T

    AO$ DO>@ T*AHOH@ 8@>7OH AT A

    G7@ DA!@C

    7*BFTA;;@>7

    FACE AWAY THELADDER WHENASCENDING

    OR

    DESCENDING

    OA; T*@>GH=7 OF T*@ SAY “Oh! GOD”

    L dd S f t

  • 8/19/2019 Work at Height - Scaffolding

    37/46

    Ladder Safety 

    Single section only36ength not more than 1% m3Distance beteen rungs.

    =ot less than ),% mm.

    =ot more than $,% mm.:ust support 4 times the max

    load.idth beteen side railsC)"% mm / up to $ m 6ength  * mm / for every %.$m

    6ength

    :a!e shift ladders shall not bepermitted

    Fall protection

  • 8/19/2019 Work at Height - Scaffolding

    38/46

    Fall protection –Safety Net 

    7afety net protects, -erson from falling -rotect person or!ing belo Safety net distance should notexceed ., m =et shall extend

    up to 1., m ).4% m 1., to $.% m$.%% m F $.% m 4.%% m

     0ie cord at every 1 m

    "ompetent 8erson

  • 8/19/2019 Work at Height - Scaffolding

    39/46

    "ompetent 8erson

    • >equired employee capable of identifyin andpromptly correctin scaoldin haKards L

    •   selects quali

  • 8/19/2019 Work at Height - Scaffolding

    40/46

    Field Bnspection

    • "ompetent person inspects

    for visible defects• before each shift & after anyalterations

    • ;ocument inspections everyweek

    /lon standin structures0

    • >emove defective parts fromuseM

    • Ta all scaoldin perprocedureM

    > b M

  • 8/19/2019 Work at Height - Scaffolding

    41/46

    >ememberM

    • 7caolds can only be erected, moved,

    • dismantled or altered under the supervision

    of a competent person.

      "ompetent person selects and

    directs workers & determines

    if necessary fall protection measures.

    >ememberM

  • 8/19/2019 Work at Height - Scaffolding

    42/46

    >ememberM

    •Train all scaoldincrews how to L

    • erect, disassemble,move, & work onscaolds

    • inspect, maintain, &repair scaolds

    • reconiKe haKards &use fall protection

    • follow relevantproject

    • procedures.

    D j * d

  • 8/19/2019 Work at Height - Scaffolding

    43/46

    Dajor *aKards

    •Falls from anyelevation

    •6ad plankin

    •7caold collapse

    •Fallin objects

    /tools, debris, etc.0

    •@lectrocution

    8ersonal Fall Arrest 7ystem /8FA70

  • 8/19/2019 Work at Height - Scaffolding

    44/46

    8ersonal Fall Arrest 7ystem /8FA70

    • Full 6ody *arness

    • >etractable reels 5 inertiarails 5 rope rabs

    • ifelines C independent 5horiKontal 5 vertical

    • 7ecure anchorae points

    • "ompetent person to check8FA7 & lifeline

    • Bnstallation

    7GDDA>E

  • 8/19/2019 Work at Height - Scaffolding

    45/46

    7GDDA>E 

    •"omply with 7ite scaoldinrequirements

    •8lan ahead for scaoldin

    construction•"onduct required trainin

    •"onduct risk assessments

    /N*A5N7A0•>einforce safe practicesthrouh inspection

  • 8/19/2019 Work at Height - Scaffolding

    46/46

    ny

    GuestionsHHH