work areas app i
DESCRIPTION
Work Areas App ITRANSCRIPT
WORK AREAS • Sewerage Treatment Plants
• Desalination Plants
Appendix-I Dammam City Sewerage Treatment Plant, Eastern
Province, Kingdom of Saudi Arabia.
Appendix-II Al-Khobar City Sewerage Treatment Plant, Eastern
Province, Kingdom of Saudi Arabia.
Appendix-III Al-Azizia Desalination Plant, Al-Khobar, Eastern
Province, Kingdom of Saudi Arabia.
Appendix-IV Al-Jubail Desalination Plant, Al-Jubail, Eastern
Province, Kingdom of Saudi Arabia.
Appendix-V PTA Combined Effluent Treatment Plant, Korangi
Tanneries, Korangi Industrial Area, Karachi
Pakistan.
Appendix-I
Appendix-I-1
DAMMAM CITY SEWERAGE TREATMENT PLANT Eastern Province, Saudi Arabia
Broader view 260 10’ 39.06’’ N 500 12’ 35.54’’ E Inlet Structure =1 Aeration Tanks (Carousels) = 8 Clarifiers=8 Sludge Thichners =2 Screw Pump Stations = 4
Sea out-fall discharges = 250,000 m3/day Discharge BOD Loadings: 20-25mg/l O2
• Wastewater Treatment by Aeration Lagoons aborted since 1982-83 . The
plant was designed and constructed by Ballast BV of Netherlands.
• Advance Wastewater Treatment by Activated Sludge System was
commissioned in late 1982 which was designed and constructed by Metcalf
and Eddy Incorp, Waikfield, Mass, USA.
Appendix-I-2
DAMMAM SEWERAGE TREATMENT PLANT Eastern Province, Saudi Arabia
260 10’ 39.06’’ N 500 12’ 35.54’’ E
Bird Eye view STP Dammam
• Wastewater Treatment by Aeration Lagoons aborted since 1982-83 . The
plant was designed and constructed by Ballast BV of Netherlands.
• Advance Wastewater Treatment by Activated Sludge System was
commissioned in late 1982 which was designed and constructed by Metcalf
and Eddy Incorp, waikfield, Mass, USA.
Appendix-I-3
DAMMAM SEWERAGE TREATMENT PLANT Eastern Province, Saudi Arabia
260 10’ 39.06’’ N 500 12’ 35.54’’ E
Tertiary Wastewater Treatment Largest continuous flow Sand Filtration Facility in the world
Recently Equipped with 216 DynaSand® filters, will make Dammam the world's
largest continuous operated sand filter plant for tertiary treatment.
Appendix-I-4
DAMMAM SEWERAGE TREATMENT PLANT Eastern Province, Saudi Arabia
260 10’ 39.06’’ N 500 12’ 35.54’’ E
Lagooning System of Wastewater Treatment
Aborted 1982-83
Sea Out-fall discharges = 200,000m3/day (before 1983)
Average BOD loading = 20 -25mg/litre O2
Aborted Lagoons
Appendix-I-5
DAMMAM SEWERAGE TREATMENT PLANT Eastern Province, Saudi Arabia
260 10’ 39.06’’ N 500 12’ 35.54’’ E
Front view of Plant
Right corner Jubail-Ras Tanura Highway Sea Out-fall Discharges = 250,000m3/day
Average BOD discharge loading = 20 -25mg/litre O2
• Wastewater Treatment by Aeration Lagoons aborted since 1982-83 . The
plant was designed and constructed by Ballast BV of Netherlands.
• Advance Wastewater Treatment by Activated Sludge System was
commissioned in late 1982 which was designed and constructed by Metcalf
and Eddy Incorp, waikfield, Mass, USA.
Appendix-I-6
DAMMAM CITY SEWERAGE TREATMENT PLANT Eastern Province, Saudi Arabia
260 10’ 39.06’’ N 500 12’ 35.54’’ E
Sludge Drying Beds Left corner
Sludge Drying Beds Aeration Tanks
Appendix-II
Appendix-II-1
AL-KHOBAR CITY SEWERAGE TREATMENT PLANT
Eastern Province, Saudi Arabia
260 14’ 48.27’’ N 500 12’ 33.20’’ E
BROADER VIEW
Inlet Structure =1 Aeration Tanks (Carousels) = 6 Clarifiers=6 Sludge Thichners =2 Screw Pump Stations = 3 Sea Out-fall Discharges = 150,000m3/day
Average BOD discharge loading = 20 -25mg/litre O2
AL-KHOBAR SEWERAGE TREATMENT PLANT
Eastern Province, Saudi Arabia Appendix-II-2
260 14’ 48.27’’ N 500 12’ 33.20’’ E
Lagooning System of Wastewater Treatment
Aborted 1982-83 Sea Out-fall Discharges = 120,000m3/day (before 1983)
Average BOD discharge loading = 20 -25mg/litre O2
AL-KHOBAR SEWERAGE TREATMENT PLANT Eastern Province, Saudi Arabia
Appendix-II-3
260 14’ 48.27’’ N 500 12’ 33.20’’ E
Zoom-in View Sea Out-fall Discharges = 150,000m3/day
Average BOD discharge loading = 20 -25mg/litre O2
Aborted Lagoons Sludge Thickner Screw Pump Station Aeration Tanks Final Clarifier
AL-KHOBAR SEWERAGE TREATMENT PLANT Eastern Province, Saudi Arabia
Appendix-II-4
260 14’ 48.27’’ N 500 12’ 33.20’’ E
Sludge Drying Beds Sea Out-fall Discharges = 150,000m3/day
Average BOD loading = 20 -25mg/litre O2
Sludge Drying Beds
AL-KHOBAR SEWERAGE TREATMENT PLANT Eastern Province, Saudi Arabia
Appendix-II-5
260 14’ 48.27’’ N 500 12’ 33.20’’ E
FRONT VIEW Inlet Structure =1 Aeration Tanks (Carousels) = 6 Clarifiers=6 Sludge Thichners =2 Screw Pump Stations = 3 Clarifiers Aeration Tanks (Carousels) Sea Out-fall Discharges = 150,000m3/day
Average BOD discharge loading = 20 -25mg/litre O2