work areas app i

12
WORK AREAS Sewerage Treatment Plants Desalination Plants Appendix-I Dammam City Sewerage Treatment Plant, Eastern Province, Kingdom of Saudi Arabia. Appendix-II Al-Khobar City Sewerage Treatment Plant, Eastern Province, Kingdom of Saudi Arabia. Appendix-III Al-Azizia Desalination Plant, Al-Khobar, Eastern Province, Kingdom of Saudi Arabia. Appendix-IV Al-Jubail Desalination Plant, Al-Jubail, Eastern Province, Kingdom of Saudi Arabia. Appendix-V PTA Combined Effluent Treatment Plant, Korangi Tanneries, Korangi Industrial Area, Karachi Pakistan.

Upload: talha20

Post on 07-Dec-2014

1.177 views

Category:

Career


0 download

DESCRIPTION

Work Areas App I

TRANSCRIPT

Page 1: Work Areas App I

WORK AREAS • Sewerage Treatment Plants

• Desalination Plants

Appendix-I Dammam City Sewerage Treatment Plant, Eastern

Province, Kingdom of Saudi Arabia.

Appendix-II Al-Khobar City Sewerage Treatment Plant, Eastern

Province, Kingdom of Saudi Arabia.

Appendix-III Al-Azizia Desalination Plant, Al-Khobar, Eastern

Province, Kingdom of Saudi Arabia.

Appendix-IV Al-Jubail Desalination Plant, Al-Jubail, Eastern

Province, Kingdom of Saudi Arabia.

Appendix-V PTA Combined Effluent Treatment Plant, Korangi

Tanneries, Korangi Industrial Area, Karachi

Pakistan.

Page 2: Work Areas App I

Appendix-I

Appendix-I-1

DAMMAM CITY SEWERAGE TREATMENT PLANT Eastern Province, Saudi Arabia

Broader view 260 10’ 39.06’’ N 500 12’ 35.54’’ E Inlet Structure =1 Aeration Tanks (Carousels) = 8 Clarifiers=8 Sludge Thichners =2 Screw Pump Stations = 4

Sea out-fall discharges = 250,000 m3/day Discharge BOD Loadings: 20-25mg/l O2

• Wastewater Treatment by Aeration Lagoons aborted since 1982-83 . The

plant was designed and constructed by Ballast BV of Netherlands.

• Advance Wastewater Treatment by Activated Sludge System was

commissioned in late 1982 which was designed and constructed by Metcalf

and Eddy Incorp, Waikfield, Mass, USA.

Page 3: Work Areas App I

Appendix-I-2

DAMMAM SEWERAGE TREATMENT PLANT Eastern Province, Saudi Arabia

260 10’ 39.06’’ N 500 12’ 35.54’’ E

Bird Eye view STP Dammam

• Wastewater Treatment by Aeration Lagoons aborted since 1982-83 . The

plant was designed and constructed by Ballast BV of Netherlands.

• Advance Wastewater Treatment by Activated Sludge System was

commissioned in late 1982 which was designed and constructed by Metcalf

and Eddy Incorp, waikfield, Mass, USA.

Page 4: Work Areas App I

Appendix-I-3

DAMMAM SEWERAGE TREATMENT PLANT Eastern Province, Saudi Arabia

260 10’ 39.06’’ N 500 12’ 35.54’’ E

Tertiary Wastewater Treatment Largest continuous flow Sand Filtration Facility in the world

Recently Equipped with 216 DynaSand® filters, will make Dammam the world's

largest continuous operated sand filter plant for tertiary treatment.

Page 5: Work Areas App I

Appendix-I-4

DAMMAM SEWERAGE TREATMENT PLANT Eastern Province, Saudi Arabia

260 10’ 39.06’’ N 500 12’ 35.54’’ E

Lagooning System of Wastewater Treatment

Aborted 1982-83

Sea Out-fall discharges = 200,000m3/day (before 1983)

Average BOD loading = 20 -25mg/litre O2

Aborted Lagoons

Page 6: Work Areas App I

Appendix-I-5

DAMMAM SEWERAGE TREATMENT PLANT Eastern Province, Saudi Arabia

260 10’ 39.06’’ N 500 12’ 35.54’’ E

Front view of Plant

Right corner Jubail-Ras Tanura Highway Sea Out-fall Discharges = 250,000m3/day

Average BOD discharge loading = 20 -25mg/litre O2

• Wastewater Treatment by Aeration Lagoons aborted since 1982-83 . The

plant was designed and constructed by Ballast BV of Netherlands.

• Advance Wastewater Treatment by Activated Sludge System was

commissioned in late 1982 which was designed and constructed by Metcalf

and Eddy Incorp, waikfield, Mass, USA.

Page 7: Work Areas App I

Appendix-I-6

DAMMAM CITY SEWERAGE TREATMENT PLANT Eastern Province, Saudi Arabia

260 10’ 39.06’’ N 500 12’ 35.54’’ E

Sludge Drying Beds Left corner

Sludge Drying Beds Aeration Tanks

Page 8: Work Areas App I

Appendix-II

Appendix-II-1

AL-KHOBAR CITY SEWERAGE TREATMENT PLANT

Eastern Province, Saudi Arabia

260 14’ 48.27’’ N 500 12’ 33.20’’ E

BROADER VIEW

Inlet Structure =1 Aeration Tanks (Carousels) = 6 Clarifiers=6 Sludge Thichners =2 Screw Pump Stations = 3 Sea Out-fall Discharges = 150,000m3/day

Average BOD discharge loading = 20 -25mg/litre O2

Page 9: Work Areas App I

AL-KHOBAR SEWERAGE TREATMENT PLANT

Eastern Province, Saudi Arabia Appendix-II-2

260 14’ 48.27’’ N 500 12’ 33.20’’ E

Lagooning System of Wastewater Treatment

Aborted 1982-83 Sea Out-fall Discharges = 120,000m3/day (before 1983)

Average BOD discharge loading = 20 -25mg/litre O2

Page 10: Work Areas App I

AL-KHOBAR SEWERAGE TREATMENT PLANT Eastern Province, Saudi Arabia

Appendix-II-3

260 14’ 48.27’’ N 500 12’ 33.20’’ E

Zoom-in View Sea Out-fall Discharges = 150,000m3/day

Average BOD discharge loading = 20 -25mg/litre O2

Aborted Lagoons Sludge Thickner Screw Pump Station Aeration Tanks Final Clarifier

Page 11: Work Areas App I

AL-KHOBAR SEWERAGE TREATMENT PLANT Eastern Province, Saudi Arabia

Appendix-II-4

260 14’ 48.27’’ N 500 12’ 33.20’’ E

Sludge Drying Beds Sea Out-fall Discharges = 150,000m3/day

Average BOD loading = 20 -25mg/litre O2

Sludge Drying Beds

Page 12: Work Areas App I

AL-KHOBAR SEWERAGE TREATMENT PLANT Eastern Province, Saudi Arabia

Appendix-II-5

260 14’ 48.27’’ N 500 12’ 33.20’’ E

FRONT VIEW Inlet Structure =1 Aeration Tanks (Carousels) = 6 Clarifiers=6 Sludge Thichners =2 Screw Pump Stations = 3 Clarifiers Aeration Tanks (Carousels) Sea Out-fall Discharges = 150,000m3/day

Average BOD discharge loading = 20 -25mg/litre O2