with an exciting portfolio of high-quality nickel & gold projects...with an exciting portfolio of...
TRANSCRIPT
-
www.azureminerals.com.au
@AzureMinerals
ASX: AZS
Tony RoviraManaging DirectorAzure Minerals Ltd
Investor PresentationNovember 2020
AZURE IS BACK IN WAWith an exciting portfolio of
high-quality nickel & gold projects
1
-
Quality nickel & gold projects in WA
ENTERED INTO JV’s ON 4 PROJECTS WITH MARK CREASY
Andover Nickel-Copper Project60% Azure / 40% Creasy
Turner River, Meentheena & Coongan Gold Projects70% Azure / 30% Creasy
+
Barton Gold Project in Kookynie Gold District100% Azure
22
-
Corporate snapshot
CORPORATE STRUCTURE
Share Price (@ 12 November 2020) A$0.70Shares 242.2 millionOptions 5.85 millionMarket Cap A$170 millionCash (@ 30 September 2020) A$3.0 million
Debt(Convertible Note: conversion @ A$0.145)
A$2.0 million
MAJOR SHAREHOLDERS
Creasy Group 19.1%Deutsche Balaton 18.0%Teck Resources Ltd 11.4%Directors & Management 2.7%Top 20 60.0%
33
-
4
$0.00
$0.10
$0.20
$0.30
$0.40
$0.50
$0.60
$0.70
$0.80
Nov-19 Dec-19 Jan-20 Feb-20 Mar-20 Apr-20 May-20 Jun-20 Jul-20 Aug-20 Sep-20 Oct-20 Nov-20
Last Price
12-Month Share Price
Acquisition of WA Gold & Nickel Projects from
Creasy Group
Drilling starts at Andover
Hole 1 intersects Massive Sulphides
Hole 2 intersects Massive Sulphides
Hole 3 intersects Massive Sulphides
Holes 1 & 2 assays
Hole 4 intersects Massive Sulphides
-
The Pilbara – a Tier 1 exploration & mining region
Hemi gold discovery
Andover: 70km2New nickel-copper discovery in layered mafic-ultramafic intrusive complex
Turner River: 450km2Adjacent to De Grey’s Mallina Gold Project & Hemi gold discovery
Coongan: 223km2Adjacent to Novo’s Beatons Creek Gold Project
Meentheena: 141km2Gold exploration by Creasy since 1994
5
Andover: new nickel discovery
Turner River: Hemi lookalikes?
5
-
6
Andover Nickel-Copper Project
Andover Project70km2
First class infrastructure
• Commercial flights
• Highways, roads & rail
2.5 hours from Perth airport
• Power & scheme water
• Cell phone coverage
• Accommodation & services
• Good access throughout project area
-
ADRC002:7m @ 2.62% Ni & 0.65% Cu from 43m;in 26m @ 1.03% Ni & 0.46% CuSemi-massive and disseminated sulphides
ADRC001:4m @ 1.10% Ni & 0.80% Cu from 6mGossan
ADRC001:2m @ 1.77% Ni & 0.53% Cu from 62mSulphide stringers
ADRC006:2m @ 2.10% Ni & 0.44% Cu from 15mSemi-massive and disseminated sulphides
* Refer ASX announcement 17 July 2020
Target 1
Target 2
2018 - Nickel sulphides discovered by Mark Creasy*
-
Azure’s exploration
Surveyed 12 EM targets in September
Multiple bedrock conductors identified
#1 priority: VC7
Diamond drilling started in October
VC7
-
4 holes completed
Massive Ni-Cu sulphides intersected in every drillhole
Hit EM conductor = hit massive nickel sulphides
Diamond drilling at VC7
-
11
ANDD0001:3.9m @ 2.8% Nickel and 0.5% Copper from 94.5m in massive sulphides in:
22.4m @ 1.0% Nickel and 0.6% Copper from 81.6m
AND
5.0m @ 2.1% Nickel and 1.1% Copper from 116.0m in massive to matrix sulphides in:
11.3m @ 1.2% Nickel and 0.7% Copper from 110.0m
ANDD0002:
4.6m @ 2.4% Nickel and 0.5% Copper from 113.0m in semi-massive sulphides in:
13.6m @ 1.2% Nickel and 0.4% Copper from 104.0m
Massive sulphides & high-grade nickel*
* Refer ASX announcement 9 November 2020
-
12
ANDD0003Three sulphide zones
Assays pending
-
13
ANDD0001 ANDD0002 ANDD0003
Massive Sulphides Matrix Sulphides Semi-Massive Sulphides
3.57% Ni0.42% Cu 2.31% Ni
0.82% Cu Assays pending
-
VC7 conductor down-dip extent: >150m - 200m
VC7
ANDD0004
-
15
*** 38.1m mineralised envelope from 336.1m ***
6.10m of blebby to matrix Ni-Cu sulphides from 347.50m
4.05m of massive Ni-Cu sulphides from 354.80m
4.10m of heavily disseminated to matrix to massive Ni-Cu sulphides from 359.20m
ANDD0004 – multiple zones of Ni-Cu sulphides
-
16
ANDD0004
Massive Sulphides Matrix Sulphides
-
VC7 conductor strike length: ~1,050m
VC7 conductor down-dip extent: >150m - 200m
38.1m mineralised zone with massive and matrix sulphides
Assays pending
-
VC7
-
Massive nickel & copper sulphides intersected in first 4 drill holes
EM conductor plate 1,050m long & >150-200m deep
Diamond drilling continuing – one hole every 7-10 days
Regular delivery of assay results going forward
Multiple electromagnetic conductors identified - more drill targets
Drilling planned through 2020 into 2021
Andover - a new nickel-copper sulphide discovery
-
www.azureminerals.com.au
@AzureMinerals
ASX: AZS
Thank youFor enquiries, please contact:Tony Rovira, Managing [email protected]
20
-
21
Competent Person Statements
OPOSURAInformation in this report that relates to Mineral Resources for the Oposura Project is extracted from the report “Azure Expands Oposura Mineral Resource” created and released to the ASX on 8 May 2019 and is available to view on www.asx.com.au. Azure Minerals Limited confirms that it is not aware of any new information or data that materially affects information included in the relevant market announcement, and that all material assumptions and technical parameters underpinning the estimates in the announcement continue to apply and have not materially changed.
Information in this report that relates to the Scoping Study for the Oposura Project is extracted from the report “Oposura Scoping Study Delivers Outstanding Economics” created and released to the ASX on 15 October 2018 and is available to view on www.asx.com.au. Azure Minerals Limited confirms that it is not aware of any new information or data that materially affects information included in the relevant market announcement, and that all material assumptions and technical parameters underpinning the estimates in the announcement continue to apply and have not materially changed.
ALACRÁNThe information in this report that relates to Mineral Resources for the Mesa de Plata and Loma Bonita deposits on the Alacrán Project are extracted from the respective reports “Mesa de Plata Mineral Resource Upgraded” and “Loma Bonita Mineral Resource” created and released to the ASX on 1 December 2016 and 21 December 2016 respectively and are available to view on www.asx.com.au. Azure Minerals Limited confirms that it is not aware of any new information or data that materially affects information included in the relevant market announcement, and that all material assumptions and technical parameters underpinning the estimates in the announcement continue to apply and have not materially changed.
EXPLORATION RESULTSInformation in this report that relates to previously reported Exploration Results has been crossed-referenced in this report to the date that it was reported to ASX. Azure Minerals Limited confirms that it is not aware of any new information or data that materially affects information included in the relevant market announcements.
http://www.asx.com.au/http://www.asx.com.au/http://www.asx.com.au/
Slide Number 1Slide Number 2Slide Number 3Slide Number 4Slide Number 5Slide Number 6Slide Number 7Slide Number 8Slide Number 9Slide Number 10Slide Number 11Slide Number 12Slide Number 13Slide Number 14Slide Number 15Slide Number 16Slide Number 17Slide Number 18Slide Number 19Slide Number 20Competent Person Statements